CN207140931U - A kind of CNG clusters long-tube trailer - Google Patents

A kind of CNG clusters long-tube trailer Download PDF

Info

Publication number
CN207140931U
CN207140931U CN201720398852.XU CN201720398852U CN207140931U CN 207140931 U CN207140931 U CN 207140931U CN 201720398852 U CN201720398852 U CN 201720398852U CN 207140931 U CN207140931 U CN 207140931U
Authority
CN
China
Prior art keywords
saddle
cng
walking mechanism
tube trailer
anchor ear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720398852.XU
Other languages
Chinese (zh)
Inventor
蔡英强
刘凯
邱雨柱
苏长顺
尤敏
杨长涛
刘爱仙
马建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LUXIN NEW ENERGY EQUIPMENT GROUP Co Ltd
Original Assignee
LUXIN NEW ENERGY EQUIPMENT GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LUXIN NEW ENERGY EQUIPMENT GROUP Co Ltd filed Critical LUXIN NEW ENERGY EQUIPMENT GROUP Co Ltd
Priority to CN201720398852.XU priority Critical patent/CN207140931U/en
Application granted granted Critical
Publication of CN207140931U publication Critical patent/CN207140931U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The utility model discloses a kind of CNG clusters long-tube trailer, including walking mechanism, the walking mechanism front end sets the first support meanss, and walking mechanism rear end sets the second support meanss;Multiple anchor ear saddle structures are set from front to back in the walking mechanism, and the anchor ear saddle structure includes the saddle component with gas cylinder snap fit, and the saddle component outward flange sets anchor ear to be fastened.CNG clusters long-tube trailer of the present utility model has kerb weight small, and overall volume is big, and it is more to fill quality of natural gas, and conevying efficiency is high.Anchor ear saddle structure is set, spacing fixed Seamless Gas Cylinder is can be very good, makes transport safer.Front end structure with oblique member is set, strengthens overall structure stability.

Description

A kind of CNG clusters long-tube trailer
Technical field
CNG transport equipment fields are the utility model is related to, more particularly to a kind of CNG clusters long-tube trailer.
Background technology
Compressed natural gas (Compressed Natural Gas, abbreviation CNG), by pressurizeing and being stored in a gaseous form In container.Compressed gas long-tube trailer is the instrument of special transport of compressed gas, is Gas Filling Stations in Cities, industrial gasses production and application Unit service.
At present, conventional frame formula long-tube trailer and before and after the cluster long-tube trailer of other forms uses in the industry in supporting plate Between plus hooping structure or rectangular tube frame structure form, such a structure type has the following disadvantages:
(1) complete vehicle curb weight weight, aeration quantity is few, utilization rate is relatively low;
(2) cost of transportation is higher, and economic benefit is poor;
(3) installation procedure is various, less efficient;
(4) it is complicated to operate chamber structure, operation maintenance is inconvenient.
As Figure 1-Figure 4, its structure composition is to set front chamber structure 19 in bottom Chinese herbaceous peony portion to the structure of existing long-tube trailer, Chamber structure 21 after being set at rear portion, sets hooping structure 20 to bundle CNG gas cylinders between front chamber structure 19 and rear chamber structure 21, preceding Chamber structure 19 includes preceding storehouse frame structure 22 and front end connecting plate 23, and front end connecting plate 23 and every CNG gas cylinders are connected by front end Acting flange 24 is fixedly connected;Chamber structure 21 includes rear storehouse frame structure 25 and rear end connecting plate 26 afterwards, rear end connecting plate 26 and every One CNG gas cylinders are fixedly connected by rear end adpting flange 27, and this structure type complexity is, it is necessary to all accurate by every CNG gas cylinders The position of the front end adpting flange 24 of alignment front end connecting plate 23, the rear end adpting flange 27 of rear end connecting plate 26, completes connection, Connected mode complexity is not easy to operate;Meanwhile hooping structure 20 is only wrapped outside gas cylinder and made a circle it can be seen from accompanying drawing 3, and Larger gap between gas cylinder be present, and do not support mutually, gas cylinder thus can be caused to fix unstable, easily cause security incident.
In summary, the binding transportation problem for CNG in the prior art, still lacks effective solution.
Utility model content
The purpose of this utility model is to overcome above-mentioned the deficiencies in the prior art, there is provided a kind of CNG clusters long-tube trailer, Multiple anchor ear saddle structures are set, can effectively fix the seamless CNG gas cylinders of big volume steel, transportation is safer, Transportation Efficiency Rate is higher.
To achieve the above object, the utility model uses following technical proposals:
A kind of CNG clusters long-tube trailer, including walking mechanism, the walking mechanism front end set the first support meanss, Walking mechanism rear end sets the second support meanss;Multiple anchor ear saddle structures are set from front to back in the walking mechanism, it is described Anchor ear saddle structure includes the saddle component with gas cylinder snap fit, and the saddle component outward flange sets anchor ear to be fastened.
Further, the first saddle of the saddle component including top and the 4th saddle of bottom, the first saddle and the At least one second saddle and at least one Three Saddle are set between four saddles.
The first saddle bottom sets multiple arc grooves coordinated with cylinder outer surface.
The upper and lower part of second saddle is respectively provided with multiple arc grooves coordinated with cylinder outer surface.
The upper and lower part of the Three Saddle is respectively provided with multiple arc grooves coordinated with cylinder outer surface.
The 4th saddle top sets multiple arc grooves coordinated with cylinder outer surface.
Protective layer is set in the arc groove.
It is fastenedly connected between the Three Saddle and the 4th saddle by connector.
Further, the both ends of the anchor ear are connected in walking mechanism by fixed structure.
Preferably, the both ends of the first saddle top surface are set in the arc-shaped.
Preferably, the second saddle two sides are arranged to clinoplain.
Further, the first support meanss sidepiece sets multiple snubber blocks to coordinate with gas cylinder end.
Preferably, first support meanss and walking mechanism are connected with preceding diagonal brace.
The walking mechanism rear end also sets up pipe-line system and is connected with gas cylinder.
The beneficial effects of the utility model are:
1st, CNG clusters long-tube trailer of the present utility model has kerb weight small, and overall volume is big, fills natural makings Amount is more, and conevying efficiency is high.
The 2nd, anchor ear saddle structure is set, can be very good spacing fixed Seamless Gas Cylinder, transport is more pacified Entirely.
The 3rd, front end structure with oblique member is set, strengthen overall structure stability.
4th, pipeline is succinct, and leakage point is few, easily operated maintenance.
5th, vehicle production process is reduced, and installation effectiveness is improved.
Brief description of the drawings
Fig. 1 is existing long-tube trailer structural representation;
Fig. 2 is existing long-tube trailer front chamber structure schematic diagram;
Fig. 3 is existing long-tube trailer hooping structure schematic diagram;
Fig. 4 is chamber structure schematic diagram after existing long-tube trailer;
Fig. 5 is the structural representation of CNG clusters long-tube trailer of the present utility model;
Fig. 6 is anchor ear saddle structure detailed maps of the present utility model;
Fig. 7 is the utility model long-tube trailer pipe-line system schematic diagram.
In figure, 1, walking mechanism, 2, snubber block, 3, front end support device, 4, preceding diagonal brace, 5, anchor ear saddle structure, 6, big Volume seamless steel gas cylinder group, 7, rear storehouse emptying tube support device, 8, pipe-line system, the 9, first saddle, the 10, second saddle, 11, Anchor ear fixing device, 12, flat base band, 13, Three Saddle, 14, anchor ear, 15, connecting stud, the 16, the 4th saddle, 17, connection spiral shell Bolt, 18, supporting leg fixed structure, 19, front chamber structure, 20, hooping structure, 21, rear chamber structure, 22, preceding storehouse frame structure, 23, preceding Hold connecting plate, 24, front end adpting flange, 25, rear storehouse frame structure, 26, rear end connecting plate, 27, rear end adpting flange, 28, valve Door, 29, safety relief device, 30, blowoff valve, 31, thermometer, 32, pressure gauge valve, 33, pressure gauge, 34, master control ball valve, 35, Atmospheric valve, 36, snap joint.
Embodiment
The utility model is further illustrated with reference to the accompanying drawings and examples.
As illustrated in figs. 5-7, a kind of CNG clusters long-tube trailer, including walking mechanism 1, snubber block 2, front end support device 3 (i.e. the first support meanss), preceding diagonal brace 4, Seamless Gas Cylinder 6, anchor ear saddle structure 5, rear storehouse emptying tube support device 7 (i.e. the second support meanss), pipe-line system 8 form.It is general by setting four sets of anchor ear saddle structure forms to substitute in the present embodiment Add the structure type of anchor ear before and after logical binding long-tube trailer uses among supporting plate, and in anterior design and installation bumper and absorbing shock knot Structure.By the structure type for setting anchor ear saddle to be connected with walking mechanism, under the premise of 40 tons of vehicle nominal-mass, further drop The low kerb weight of vehicle, so that loading mass increases.
Multiple saddle components are set on anchor ear saddle structure 5, and saddle component outward flange is equipped with anchor ear 14, solid to support Determine Seamless Gas Cylinder group.The both ends of anchor ear 14 are connected in walking mechanism by supporting leg fixed structure 18, anchor ear and Supporting leg fixed structure 18 is connected by connecting bolt 17.
First saddle 9 of saddle component including top and the 4th saddle 16 of bottom, the first saddle 9 and the 4th saddle 16 it Between at least one second saddle 10 and at least one Three Saddle 13 are set.
The bottom of first saddle 9 sets multiple arc grooves coordinated with cylinder outer surface.
The upper and lower part of second saddle 10 is respectively provided with multiple arc grooves coordinated with cylinder outer surface.
The upper and lower part of Three Saddle 13 is respectively provided with multiple arc grooves coordinated with cylinder outer surface.
The top of 4th saddle 16 sets multiple arc grooves coordinated with cylinder outer surface.
Protective layer is respectively provided with arc groove, protective layer uses flat base band 12 in the present embodiment.
It is fastenedly connected between the saddle 16 of Three Saddle 13 and the 4th by connector (i.e. connecting stud 15).
The both ends setting of the top surface of first saddle 9 is in the arc-shaped, and the two sides of the second saddle 10 are arranged to clinoplain.Anchor ear card Close outside multiple saddles, the top of anchor ear 14 coordinates with the first saddle top surface, the sidepiece of anchor ear 14 and the second saddle, Three Saddle, 4th saddle side coordinates.The sidepiece of second saddle 10 sets anchor ear fixing device 11 to fix anchor ear 14.Anchor ear 14 can use Stainless steel is made.
Front end support device 3 sets damping rubber block 2, and shock absorbing effect is played in vehicle travel process.Front end branch Support arrangement 3 is rectangular tube frame welding formula structure.Snubber block is the buffer unit between end plug and anterior part support device, Ke Yiwei The damper of silica gel material.Front end support device 3 and walking mechanism 1 are connected with preceding diagonal brace 4.
Set bearing diagonal device to be connected with walking mechanism at front end support device 3, improve vehicle impact resistance.
Seamless Gas Cylinder group 6 need not be separately provided installation connecting flange structure, and bottleneck is without threading.
Pipe-line system installs pressure gauge and thermometer integral type, is easy to observe safety operation during handling.
Moveable walking mechanism is 40 feet of walking mechanisms, by designing leg-shaped on the basis of 40 feet of walking mechanisms The attachment structure of formula.
In the present embodiment, Seamless Gas Cylinder group 6 is seven Seamless Gas Cylinders, by changing anchor ear The saddle quantity of saddle structure 5, can transport greater number of Seamless Gas Cylinder.
Afterwards storehouse emptying tube support device 7 be by top saddle be vented pipe holding structure be connected, play fixation, Avoid the vibrations of emptying piping caused by the impact of traveling process middle pipe road;Pipe-line system, which is set, operates preceding storehouse and storehouse after operation, interior If necessary pipeline, instrument, valve are filled for medium and equipment safety operation.
When vehicle is installed, the 4th saddle 16 and the supporting leg fixed structure 18 on walking structure are welded and fixed first, And ensure that both installation center lines are kept point-blank.Seamless Gas Cylinder is then once loaded in the 4th saddle Seat 16 3 circular arcs among, then by Three Saddle 13 be arranged on bottle above, using connecting stud 15 by Three Saddle 13 with 4th saddle 16 is attached, it is ensured that Three Saddle 13 and the 16 parallel fixation of the 4th saddle.Seamless Gas Cylinder 6 and Between Three Saddle protection support is carried out with flat base band 12.Second saddle, the first saddle are installed successively, after the completion of by stainless steel hoop It is close to anchor ear lateral edges bottom by setting special construction bolt and supporting leg fixed structure 18 to be attached fixation.
Compared to existing binding long-tube trailer design structure, by front end support device 3 is set and snubber block 2 substitute it is existing before Chamber structure, remove preceding storehouse frame structure 22 and anterior adpting flange 23, while also save flange bolt.By setting simultaneously Four groups of saddle structures are put, open-celled structure is designed on saddle structure, on the premise of support strength is ensured, effectively reduce saddle weight Amount.By setting anchor ear fixing device to limit the displacement between stainless steel hoop 14 and saddle, make the friction of anchor ear and saddle It is firmly bigger, ensure the safety and stability in actual moving process, instead of directly with hooping structure 20 bundle big volume steel without The structure and rear storehouse frame structure 25, rear end connecting plate 26, rear end adpting flange 27 of gas cylinders group 6 are stitched, is at utmost alleviated whole Body weight, complete vehicle curb weight reduction, the good result that aeration quantity is significantly increased are reached.
The rear end of walking mechanism 1 also sets up pipe-line system 8 and is connected with big volume seamless steel gas cylinder group 6;Safety relief fills The security that 29 are put when can ensure discharge gas.
The utility model long-tube trailer process for using is:1. answering whether check valve 28 is closed before filling, protect Gas piping master control ball valve 34 is held to be closed;2. opening each bottleneck valve 28 successively, master control ball valve is then slowly opened 34, the nitrogen encapsulated in steel cylinder is vented, master control ball valve 34 is closed immediately after pressure is unloaded to the greatest extent;3. will be filled on station flexible pipe with it is fast Quick coupling 36 is attached, it is ensured that connection is in place;4. replacing flexible pipe air, the charge valve of fueling station is opened, enters natural gas Flexible pipe, closed after pressure balance, be then turned on atmospheric valve 35 by natural gas vent in flexible pipe, atmospheric valve is closed after confirmation 35;5. opening master control ball valve 34, the charge valve for then slowly opening fueling station is inflated operation;6. fill temperature pair when reaching During the charge pressure answered, the charge valve of fueling station is closed, closes each bottleneck valve 28 and master control ball valve 34, opens atmospheric valve 35, Gas in flexible pipe is discharged, confirms to disconnect the connection of ready-packaged joint in flexible pipe after no pressure.Pressure is kept a close eye in gas replenishment process Power table 33 (pressure gauge valve 32 is opened, then pressure gauge can show pressure data), the situation of change of thermometer 31, and carry out each connection The leakage check at position, stop charging operation immediately when having leakage situation.
Each valve state is checked before unloading gas operation, all valves (in addition to pressure gauge valve is opens) in operation storehouse is confirmed and unloads Gas column valve is in closed mode.1. the upper discharge hose that will stand is attached with operating the snap joint 36 in storehouse, it is ensured that even It is connected to position;2. opening each bottleneck valve 28 and slowly opening master control ball valve 34 in operation storehouse, close, be then turned on after pressure balance Atmospheric valve 35, gas in flexible pipe is vented, atmospheric valve is closed after confirmation;3. master control ball valve 34 in operation storehouse is slowly opened, Discharge column main valve is slowly opened again to carry out unloading gas;4. when unloading gas and finishing, discharge column main valve, the master control of shutoff operation storehouse are closed Ball valve 34, open atmospheric valve 35 and discharge the gas in flexible pipe, confirm the connection of disconnection ready-packaged joint after flexible pipe no pressure, close Atmospheric valve 35, unload gas operation completion.Pressure gauge 33, the situation of change of thermometer 31 should be kept a close eye on during gas by unloading, and control is unloaded Gas velocity degree.When needing blowdown, control of sewage disposal valve 30, which is opened, carries out blowdown.
It is not new to this practicality although above-mentioned specific embodiment of the present utility model is described with reference to accompanying drawing The limitation of type protection domain, one of ordinary skill in the art should be understood that on the basis of the technical solution of the utility model, ability Field technique personnel need not pay the various modifications that creative work can make or deformation still in protection model of the present utility model Within enclosing.

Claims (10)

1. a kind of CNG clusters long-tube trailer, it is characterized in that, including walking mechanism, the walking mechanism front end setting first Support arrangement, walking mechanism rear end set the second support meanss;Multiple anchor ear saddle knots are set from front to back in the walking mechanism Structure, the anchor ear saddle structure include the saddle component with gas cylinder snap fit, and the saddle component outward flange sets anchor ear will It is fastened.
2. CNG clusters long-tube trailer as claimed in claim 1, it is characterized in that, the saddle component includes the first of top Saddle and the 4th saddle of bottom, set at least one second saddle and at least one 3rd between the first saddle and the 4th saddle Saddle.
3. CNG clusters long-tube trailer as claimed in claim 2, it is characterized in that, the first saddle bottom set it is multiple with The arc groove that cylinder outer surface coordinates;The upper and lower part of second saddle is respectively provided with multiple circles coordinated with cylinder outer surface Arc groove.
4. CNG clusters long-tube trailer as claimed in claim 2, it is characterized in that, the upper and lower part of the Three Saddle is equal Multiple arc grooves coordinated with cylinder outer surface are set;The 4th saddle top sets multiple circles coordinated with cylinder outer surface Arc groove.
5. the CNG cluster long-tube trailers as described in claim 3 or 4, it is characterized in that, protective layer is set in the arc groove.
6. CNG clusters long-tube trailer as claimed in claim 2, it is characterized in that, between the Three Saddle and the 4th saddle It is fastenedly connected by connector.
7. CNG clusters long-tube trailer as claimed in claim 1, it is characterized in that, the both ends of the anchor ear pass through fixed structure It is connected in walking mechanism.
8. CNG clusters long-tube trailer as claimed in claim 2, it is characterized in that, the both ends of the first saddle top surface are set It is in the arc-shaped;The second saddle two sides are arranged to clinoplain.
9. CNG clusters long-tube trailer as claimed in claim 1, it is characterized in that, the first support meanss sidepiece sets more Individual snubber block coordinates with gas cylinder end.
10. CNG clusters long-tube trailer as claimed in claim 1, it is characterized in that, first support meanss and walking mechanism It is connected with preceding diagonal brace;
The walking mechanism rear end also sets up pipe-line system and is connected with gas cylinder.
CN201720398852.XU 2017-04-17 2017-04-17 A kind of CNG clusters long-tube trailer Active CN207140931U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720398852.XU CN207140931U (en) 2017-04-17 2017-04-17 A kind of CNG clusters long-tube trailer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720398852.XU CN207140931U (en) 2017-04-17 2017-04-17 A kind of CNG clusters long-tube trailer

Publications (1)

Publication Number Publication Date
CN207140931U true CN207140931U (en) 2018-03-27

Family

ID=61658974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720398852.XU Active CN207140931U (en) 2017-04-17 2017-04-17 A kind of CNG clusters long-tube trailer

Country Status (1)

Country Link
CN (1) CN207140931U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112829671A (en) * 2021-02-04 2021-05-25 江苏中泰建发集团有限公司 A raw and other materials conveying equipment for building bridge
CN114484274A (en) * 2021-12-02 2022-05-13 洛阳双瑞特种装备有限公司 Sea-land dual-purpose large-capacity hydrogen storage container

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112829671A (en) * 2021-02-04 2021-05-25 江苏中泰建发集团有限公司 A raw and other materials conveying equipment for building bridge
CN112829671B (en) * 2021-02-04 2022-06-10 江苏中泰建发集团有限公司 A raw and other materials conveying equipment for building bridge
CN114484274A (en) * 2021-12-02 2022-05-13 洛阳双瑞特种装备有限公司 Sea-land dual-purpose large-capacity hydrogen storage container

Similar Documents

Publication Publication Date Title
US10696154B2 (en) Cooperating tank and rack superstructure
CN207140931U (en) A kind of CNG clusters long-tube trailer
CN106494423B (en) A kind of tank car
CN203544774U (en) High-pressure gas tube bundle type container
CN105691140A (en) Pressure shock mitigation system of wheeled armored missile transporter vehicle
CN212029160U (en) Gas recovery device
CN101734236B (en) High-pressure gas long pipe hydraulic pressure air-entrapping semitrailer
CN201561264U (en) High-pressure gas bottle-type container tube bundle
CN205618982U (en) Big volume storage tank of ANG
CN209813719U (en) Hydrogen cylinder group fixing and damping device
CN204740872U (en) Spherical nucleus fuel element storage container
CN210064027U (en) Chemical industry is with storage jar that security performance is good
CN2454324Y (en) Air-inflating leakage-blocking-up sealing bag
CN201796515U (en) Brake demonstration teaching aid for railway vehicle
CN202674812U (en) 12 tube helium containing tube bundle
CN113188033A (en) LNG low-temperature transportation tank car
RU48903U1 (en) MOBILE GAS FILLER
CN207298368U (en) A kind of simple skid liquefied natural gas filling device for automobile
CN205618983U (en) ANG tank car is with filling blowdown piping
CN203511806U (en) Frame type eight-pipe high-pressure gas long pipe transportation semitrailer
CN202879326U (en) Hydrogen long pipe semi-trailer
CN220947553U (en) Side-hanging type vehicle-mounted hydrogen bottle device
CN214232488U (en) Water tank for fire engine
CN111237633A (en) Movable simple gas filling substation
CN217584039U (en) Ultrahigh pressure hydrogen storage equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant