CN202674812U - 12 tube helium containing tube bundle - Google Patents
12 tube helium containing tube bundle Download PDFInfo
- Publication number
- CN202674812U CN202674812U CN 201220123723 CN201220123723U CN202674812U CN 202674812 U CN202674812 U CN 202674812U CN 201220123723 CN201220123723 CN 201220123723 CN 201220123723 U CN201220123723 U CN 201220123723U CN 202674812 U CN202674812 U CN 202674812U
- Authority
- CN
- China
- Prior art keywords
- gas cylinder
- pipe
- safety installations
- rear end
- tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
The utility model discloses a 12 tube helium containing tube bundle, and belongs to the technical field of helium containing tube bundles. The helium containing tube bundle comprises a front bin safety device, a gas bottle, a frame, a binding belt, a connecting flange, a back bin safety and operation device, and an anti-vibration cushion, wherein the front bin safety device is connected with one end of the gas bottle, the back bin safety and operation device is connected with the other end of the gas bottle, the frame is provided with a inclined brace, outer threads at the two ends of the gas bottle are connected with the connecting flange and then the gas bottle is installed on a front end standing plate and a back end standing plate, the front end standing plate and back end standing plate are connected with the frame, and the anti-vibration cushion is arranged between the gas bottle and a bottom beam of the frame. The 12 tube helium containing tube bundle has the advantages of being large in storage and transportation capacity, small in the number of back bin tube pipeline joints, convenient to install, and small in the number of leaking points. Besides, due to the fact that a right and left dual gas inlet and gas outlet structure is adopted, the 12 tube helium containing tube bundle is convenient to operate, and air inflation and discharge velocity is greatly increased.
Description
Technical field
The utility model belongs to helium tube skid technical field, particularly relates to a kind of 12 pipe helium tube skids.
Background technique
Along with the development of industrial gas and popularizing of rock gas, carry between the strange land of pressurized gas and grow with each passing day.Serial long-tube trailer and the bundled tube shipping containers such as existing 8 pipes of my company, 9 pipes, 10 pipes, have industrial gas long-tube trailer and bundled tube shipping container or blank only, in order actively to capture industrial gas warehousing and transportation facilities market, increase corporate economy's benefit, my company has developed 12 pipe helium tube skids.
Summary of the invention
The purpose of this utility model is to provide a kind of 12 pipe helium tube skids.Solve storage, the transportation problem of the industrial gas such as helium, hydrogen.
The utility model comprises that front storehouse safety installations 1, gas cylinder 2, framework 3, bundling belt 4, adpting flange 5, rear storehouse reach safely operation equipment 6, vibration pad 7.Front storehouse safety installations 1 is connected with gas cylinder 2 one ends, and rear storehouse reaches safely operation equipment 6 and is connected with gas cylinder 2 the other ends; On the framework 3 brace is installed, the outside thread at gas cylinder 2 two ends with install on front end riser and the rear end riser after adpting flange 5 is connected, the front and back ends riser is connected on the framework 3; Vibration pad 7 is between the bottom girder of gas cylinder 2 and framework 3 and be fixed on the bottom girder of framework 3.
Front storehouse safety installations 1 comprises front end plug 9, front end safety installations 10, front end blow-down pipe 11.Gas cylinder 2 one ends are connected with front end plug 9, and front end plug 9 is connected with front end safety installations 10, and front end safety installations 10 is connected with front end blow-down pipe 11.
Rear storehouse reaches safely operation equipment 6 and comprises rear end plug 12, rear end safety installations 13, rear end blow-down pipe 14, bottle-jack valve 15, male connection 16, inserts soldered splice 17, coiled pipe 18, gathering tube 19, four-way 20, the first steel pipe 21, the second steel pipe 22, threeway 23, elbow 24, cone SEALING FITTING 25, main valve 26, joint 27, stop valve for pressure gauge 28, GAUGE CONNECTOR 29, pressure gauge 30.Gas cylinder 2 the other ends are connected with rear end plug 12, rear end plug 12 the other ends are connected with 13 imports of rear end safety installations, rear end safety installations 13 has two outlets, one is connected with rear end blow-down pipe 14, another is connected with bottle-jack valve 15 imports, bottle-jack valve 15 outlets are connected with male connection 16, male connection 16 is connected with slotting soldered splice 17, inserting soldered splice 17 is connected with coiled pipe 18, coiled pipe 18 is connected by four-way 20 with gathering tube 19, the lower end of four-way 20 is connected with the first steel pipe 21, and the first steel pipe 21 is connected with threeway 23 1 ends, and threeway 23 the other ends are connected with the second steel pipe 22, threeway 23 the other ends are connected with stop valve for pressure gauge 28, stop valve for pressure gauge 28 is connected with GAUGE CONNECTOR 29, and GAUGE CONNECTOR 29 the other ends are connected with pressure gauge 30, takes over 22 the other ends and is connected with elbow 24, elbow 24 the other ends are connected with cone SEALING FITTING 25, cone SEALING FITTING 25 the other ends are connected with main valve 26, and main valve 26 is connected with joint 27, to realize the turnover operation of gas.
Front end riser, rear end riser, framework 3, brace form frame structure.
Bundling belt 4 comprises connecting bolt 31, steel band 32, rubberized canvas flat rubber belting 33.Rubberized canvas flat rubber belting 33 is fixed on the steel band 32 by pulling rivet, to increase the frictional force of gas cylinder in movement process, prevents from rotating.
The utility model has the advantage of: the storage transport volume is large, and 12 gas cylinders can be stored 5000 standard cube gases; Rear storekeeper pipeline connector is few, easy for installation, and leakage point is few; About two advance air outlet structure, easy to operate, fill and unload gas speed and significantly improve.
Description of drawings
Fig. 1 is the schematic diagram of high pressure gas long pipe semitrailer of the present utility model.Wherein, front storehouse safety installations 1, gas cylinder 2, framework 3, bundling belt 4, adpting flange 5, rear storehouse reach safely operation equipment 6, vibration pad 7.
Fig. 2 is the linkage structure schematic diagram of gas cylinder of the present utility model end and adpting flange.Wherein, adpting flange 5, stop pin 8.
Fig. 3 is the left view of Fig. 2.Wherein, gas cylinder 2.
Fig. 4 is front storehouse of the present utility model safety installations schematic diagram.Wherein, front end plug 9, front end safety installations 10, front end blow-down pipe 11.
Fig. 5 is that rear storehouse of the present utility model reaches safely the operation equipment schematic diagram.Wherein, rear end plug 12, rear end safety installations 13, rear end blow-down pipe 14, bottle-jack valve 15, male connection 16, slotting soldered splice 17, coiled pipe 18, gathering tube 19, four-way 20, the first steel pipe 21, the second steel pipe 22, threeway 23, elbow 24, cone SEALING FITTING 25, main valve 26, joint 27, stop valve for pressure gauge 28, GAUGE CONNECTOR 29, pressure gauge 30.
Fig. 6 is fixedly steel band linkage structure schematic diagram of three layers of gas cylinder of the present utility model.Wherein, connecting bolt 31, steel band 32, rubberized canvas flat rubber belting 33, channel-section steel 34.
Fig. 7 is the vibration pad structural representation between gas cylinder of the present utility model and the framework bottom girder.Wherein, vibration pad 7, bolt 35, pressing plate 36.
Fig. 8 is the plan view of Fig. 7.
Embodiment
Fig. 1-8 is a kind of embodiment of the present utility model.
The utility model comprises that front storehouse safety installations 1, gas cylinder 2, framework 3, bundling belt 4, adpting flange 5, rear storehouse reach safely operation equipment 6, vibration pad 7.Front storehouse safety installations 1 is connected with gas cylinder 2 one ends, and rear storehouse reaches safely operation equipment 6 and is connected with gas cylinder 2 the other ends; On the framework 3 brace is installed, the outside thread at gas cylinder 2 two ends with install on front end riser and the rear end riser after adpting flange 5 is connected, the front and back ends riser is connected on the framework 3; Vibration pad 7 is between the bottom girder of gas cylinder 2 and framework 3 and be fixed on the bottom girder of framework 3.
Front storehouse safety installations 1 comprises front end plug 9, front end safety installations 10, front end blow-down pipe 11.Gas cylinder 2 one ends are connected with front end plug 9, and front end plug 9 is connected with front end safety installations 10, and front end safety installations 10 is connected with front end blow-down pipe 11.
Rear storehouse reaches safely operation equipment 6 and comprises rear end plug 12, rear end safety installations 13, rear end blow-down pipe 14, bottle-jack valve 15, male connection 16, inserts soldered splice 17, coiled pipe 18, gathering tube 19, four-way 20, the first steel pipe 21, the second steel pipe 22, threeway 23, elbow 24, cone SEALING FITTING 25, main valve 26, joint 27, stop valve for pressure gauge 28, GAUGE CONNECTOR 29, pressure gauge 30.Gas cylinder 2 the other ends are connected with rear end plug 12, rear end plug 12 the other ends are connected with 13 imports of rear end safety installations, rear end safety installations 13 has two outlets, one is connected with rear end blow-down pipe 14, another is connected with bottle-jack valve 15 imports, bottle-jack valve 15 outlets are connected with male connection 16, male connection 16 is connected with slotting soldered splice 17, inserting soldered splice 17 is connected with coiled pipe 18, coiled pipe 18 is connected by four-way 20 with gathering tube 19, the lower end of four-way 20 is connected with steel pipe 21, and steel pipe 21 is connected with threeway 23 1 ends, and threeway 23 the other ends are connected with steel pipe 22, threeway 23 the other ends are connected with stop valve for pressure gauge 28, stop valve for pressure gauge 28 is connected with GAUGE CONNECTOR 29, and GAUGE CONNECTOR 29 the other ends are connected with pressure gauge 30, takes over 22 the other ends and is connected with elbow 24, elbow 24 the other ends are connected with cone SEALING FITTING 25, cone SEALING FITTING 25 the other ends are connected with main valve 26, and main valve 26 is connected with joint 27, to realize the turnover operation of gas.
Front end riser, rear end riser, framework 3, brace form frame structure.
Bundling belt 4 comprises connecting bolt 31, steel band 32, rubberized canvas flat rubber belting 33.Rubberized canvas flat rubber belting 33 is fixed on the steel band 32 by pulling rivet, to increase the frictional force of gas cylinder in movement process, prevents from rotating.
Claims (5)
1. manage the helium tube skid for one kind 12, it is characterized in that, the helium tube skid comprises that front storehouse safety installations (1), gas cylinder (2), framework (3), bundling belt (4), adpting flange (5), rear storehouse reach safely operation equipment (6), vibration pad (7); Front storehouse safety installations (1) is connected with gas cylinder (2) one ends, rear storehouse reaches safely operation equipment (6) and is connected with gas cylinder (2) the other end, the upper installation of framework (3) brace, the outside thread at gas cylinder (2) two ends with install on front end riser and the rear end riser after adpting flange (5) is connected, the front and back ends riser is connected on the framework, and vibration pad (7) is positioned between the bottom girder of gas cylinder (2) and framework (3).
2. 12 pipe helium tube skids according to claim 1 is characterized in that, described front storehouse safety installations (1) comprises front end plug (9), front end safety installations (10), front end blow-down pipe (11); Gas cylinder (2) one ends are connected with front end plug (9), and front end plug (9) is connected with front end safety installations (10), and front end safety installations (10) is connected with front end blow-down pipe (11).
3. according to claim 1 12 manage the helium tube skids, it is characterized in that, described rear storehouse reaches safely operation equipment (6) and comprises rear end plug (12), rear end safety installations (13), rear end blow-down pipe (14), bottle-jack valve (15), male connection (16), insert soldered splice (17), coiled pipe (18), gathering tube (19), four-way (20), the first steel pipe (21), the second steel pipe (22), threeway (23), elbow (24), cone SEALING FITTING (25), main valve (26), joint (27), stop valve for pressure gauge (28), GAUGE CONNECTOR (29), pressure gauge (30); Gas cylinder (2) the other end is connected with rear end plug (12), rear end plug (12) the other end is connected with rear end safety installations (13) import, rear end safety installations (13) has two outlets, one is connected with rear end blow-down pipe (14), another is connected with bottle-jack valve (15) import, bottle-jack valve (15) outlet is connected with male connection (16), male connection (16) is connected with slotting soldered splice (17), inserting soldered splice (17) is connected with coiled pipe (18), coiled pipe (18) is connected by four-way (20) with gathering tube (19), the lower end of four-way (20) is connected with steel pipe (21), steel pipe (21) is connected with threeway (23) one ends, threeway (23) the other end is connected with steel pipe (22), threeway (23) the other end is connected with stop valve for pressure gauge (28), stop valve for pressure gauge (28) is connected with GAUGE CONNECTOR (29), GAUGE CONNECTOR (29) the other end is connected with pressure gauge (30), taking over (22) the other end is connected with elbow (24), elbow (24) the other end is connected with cone SEALING FITTING (25), cone SEALING FITTING (25) the other end is connected with main valve (26), and main valve (26) is connected with joint (27).
4. 12 pipe helium tube skids according to claim 1 is characterized in that, bundling belt (4) comprises connecting bolt (31), steel band (32), rubberized canvas flat rubber belting (33).
5. 12 pipe helium tube skids according to claim 1 is characterized in that, gas cylinder (2) is 12, respectively at the upper, middle and lower layer, and 4 every layer; Gas cylinder (2) external thread of bottleneck, adpting flange (5) internal thread are the 5.5-8UN U.S. standard screw thread, and gas cylinder (2) bottleneck internal thread, end plug internal thread are the 3.5-8UN U.S. standard screw thread.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220123723 CN202674812U (en) | 2012-03-28 | 2012-03-28 | 12 tube helium containing tube bundle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220123723 CN202674812U (en) | 2012-03-28 | 2012-03-28 | 12 tube helium containing tube bundle |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202674812U true CN202674812U (en) | 2013-01-16 |
Family
ID=47495718
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220123723 Expired - Lifetime CN202674812U (en) | 2012-03-28 | 2012-03-28 | 12 tube helium containing tube bundle |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202674812U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103542256A (en) * | 2013-10-24 | 2014-01-29 | 江南工业集团有限公司 | Vertical gas bottle adjustable frame |
-
2012
- 2012-03-28 CN CN 201220123723 patent/CN202674812U/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103542256A (en) * | 2013-10-24 | 2014-01-29 | 江南工业集团有限公司 | Vertical gas bottle adjustable frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102635781B (en) | High-pressure gas containerized tube bundle | |
CN203544774U (en) | High-pressure gas tube bundle type container | |
CN202674812U (en) | 12 tube helium containing tube bundle | |
CN204688698U (en) | Open-top car pipeline transportation frame | |
CN203667209U (en) | Natural gas cylinder bundling device | |
CN202884469U (en) | Vehicle liquefied natural gas bottle control pipeline structure | |
CN102705702B (en) | Auxiliary unit used for hydraulic horizontal-pushing pressurizer and hydraulic horizontal-pushing pressurizer | |
CN202279169U (en) | Hydraulic long-pipe gas semitrailer | |
CN201561264U (en) | High-pressure gas bottle-type container tube bundle | |
CN103253309B (en) | 6 pipe hydraulic pressure aerating long tube superimposed trailers | |
CN204187270U (en) | A kind of lightweight hydraulic pressure filling vehicle | |
CN202879326U (en) | Hydrogen long pipe semi-trailer | |
CN206694735U (en) | Spliced pipeline maintenance dedicated connecting sleeve | |
CN201636520U (en) | Pipe-type high-pressure gas integrated pipe bundle | |
CN201941738U (en) | Six-pipe high-pressure gas long-pipe hydraulic gas filling semitrailer | |
CN101943322B (en) | Integrated pipeline system of cluster type compressed natural gas cylinder group | |
CN204187267U (en) | A kind of hydraulic pressure aerating type bundled tube shipping container | |
CN204184767U (en) | A kind of 6 pipe 34 feet of bundled tube freight containers | |
CN207049600U (en) | Storehouse pipe-line system before and after a kind of long-tube trailer | |
CN204127649U (en) | The box LNG dispenser pump sled of a kind of overall vacuum | |
CN203517317U (en) | Compressed natural gas complete purifying, quick installing and moving device | |
CN111207893A (en) | Rail vehicle braking air tightness test trolley | |
CN202046384U (en) | Long-pipe semitrailer for frame type five-pipe high pressure gas transportation | |
CN203486368U (en) | Tube bundle container | |
CN202834757U (en) | Semi-trainer front-end device for hydraulic filling of high-pressure gas with long tubes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20130116 |
|
CX01 | Expiry of patent term |