CN207130770U - One-shot forming L-type end box hat structure construction - Google Patents

One-shot forming L-type end box hat structure construction Download PDF

Info

Publication number
CN207130770U
CN207130770U CN201721106340.8U CN201721106340U CN207130770U CN 207130770 U CN207130770 U CN 207130770U CN 201721106340 U CN201721106340 U CN 201721106340U CN 207130770 U CN207130770 U CN 207130770U
Authority
CN
China
Prior art keywords
immersed tube
structure construction
type
construction
box hat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721106340.8U
Other languages
Chinese (zh)
Inventor
刘晓东
吕勇刚
黄清飞
林巍
李毅
张志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Highway Consultants Co Ltd
Original Assignee
CCCC Highway Consultants Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Highway Consultants Co Ltd filed Critical CCCC Highway Consultants Co Ltd
Priority to CN201721106340.8U priority Critical patent/CN207130770U/en
Application granted granted Critical
Publication of CN207130770U publication Critical patent/CN207130770U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

It the utility model is related to a kind of one-shot forming L-type end box hat structure construction, located at immersed tube end, structure construction is set along the immersed tube end face in closed circular body, and section of the structure construction along immersed tube axial direction is L-shaped, the structure that the one side that structure constructs wherein described in L-type is located at ring-type perpendicular to the immersed tube axis, another side constructs inner side, and the structure construction connects the immersed tube shell body.Constructed with one-shot forming L-type end box hat structure described in the utility model, the opening of L-type structure is easy to the pouring of structure construction inner concrete, vibration compacting, to ensure that the immersed tube end construction of concrete structure has enough rigidity to resist the deformation that pressure acts on, ensure the immersed tube smooth watertight docking under water, so as to subsequent construction, the structural texture is simple, and installation settings is convenient, and its inner concrete pours easily and Forming Quality is good.

Description

One-shot forming L-type end box hat structure construction
Technical field
Immersed tube tunnel field is the utility model is related to, particularly a kind of one-shot forming L-type end box hat structure construction.
Background technology
Immersed tunnelling method constructing tunnel, exactly partly latent refute or dry-docking in prefabricated tunnel immersed tube difference transportation by driving to making a reservation for Position sinking docking, to realize that two section immersed tube smoothly dock watertight under water, the end face of two section immersed tube docking is smooth, wherein a section Immersed tube end face is provided with closed circular waterstop, when waterstop is crimped on the end face of another section immersed tube, in waterstop isolation tube coupling Outer seawater, the watertight docking of two section immersed tube is realized, therefore flatness, rigidity of immersed tube ends etc. are saved to two and is had higher requirements; For the immersed tunnel structure of box hat-concrete structure, its shell is box hat, wherein casting concrete, to ensure waterstop pressure plaster Box hat has that enough rigidity is indeformable during together on box hat and under hydraulic pressure effect, ensures water-tight, it is necessary to inside box hat Concreting is closely knit, due to concrete flowability difference, it is necessary to which a kind of be easy to concreting, flowing and follow-up closely knit steel Shell structure constructs.
Utility model content
Goal of the invention of the present utility model is:For the immersed tunnel structure existing for prior art for concrete structure, Box hat has that enough rigidity is indeformable during to ensure waterstop pressure plaster together on concrete surface and under hydraulic pressure effect, ensures A kind of water-tight problem, there is provided one-shot forming L-type end box hat structure construction.
To achieve these goals, the technical solution adopted in the utility model is:
A kind of one-shot forming L-type end box hat structure construction, located at immersed tube end, structure construction is in along the immersed tube end face Closed circular body is set, and section of the structure construction along immersed tube axial direction is L-shaped, and structure constructs wherein described in L-type The structure for being simultaneously located at ring-type perpendicular to the immersed tube axis, another side constructs inner side, and the structure is constructed described in connection Immersed tube shell body.
Wherein, structure construction is set along the immersed tube end face in closed circular body is meant that the structure construction is in ring Shape body, the structure construction is located at the end face of the immersed tube.
Constructed using one-shot forming L-type end box hat structure described in the utility model, the opening of L-type structure is easy to the knot Structure construction the pouring of inner concrete, vibration compacting, to ensure that the immersed tube end construction of concrete structure has enough rigidity to resist The deformation of pressure effect is hit, ensures the immersed tube smooth watertight docking under water, so as to subsequent construction, the structural texture is simple, Installation settings is convenient, and its inner concrete pours easily and Forming Quality is good.
Preferably, the cooperation panel for two structure constructions being oppositely arranged on immersed tube described in two adjacent sections, wherein one The individual cooperation panel is provided with the waterstop of closed circular first, and first waterstop is pressurized in the immersed tube docking of two sections Power is brought into close contact the cooperation panel on another immersed tube, realizes the watertight docking of the two sections immersed tube, described first stops The seawater that water band completely cuts off inside and outside the immersed tube.
Preferably, first waterstop is Gina waterstops.
Preferably, the flange plate of the structure construction is perpendicular to the cooperation panel, the cooperation panel and the edge of a wing At least one stiffener, the rigidity of reinforcement structure are provided between plate.
Preferably, the flange plate is provided with the second waterstop embedded sleeve barrel, and the embedded sleeve barrel is used for two adjacent sections institute State and set between immersed tube second waterstop to carry out secondary waterproof, second waterstop is in closed circular.
Preferably, second waterstop is Omega waterstops.
Preferably, the structure construction is with setting built-in type Grouting Pipe in concrete surface, when concrete reaches design Make injecting treatment after the 90% of intensity.
Preferably, the built-in type slip casting pipe diameter is 10mm.
Preferably, the cooperation panel is provided with least one structural member, the structure towards the side inside the immersed tube After part is used for follow-up concreting shaping, increase the bond stress between the structure construction and concrete.
Preferably, the structural member is followed closely for weldering.
In summary, by adopting the above-described technical solution, the beneficial effects of the utility model are:
1st, constructed with one-shot forming L-type end box hat structure described in the utility model, the opening of L-type structure is easy to described Structure construction the pouring of inner concrete, vibration compacting, to ensure that the immersed tube end construction of concrete structure has enough rigidity The deformation of pressure effect is resisted, ensures the immersed tube smooth watertight docking under water, so as to subsequent construction, structural texture letter Single, installation settings is convenient, and its inner concrete pours easily and Forming Quality is good;
2nd, constructed with one-shot forming L-type end box hat structure described in the utility model, the cooperation panel is described in Side inside immersed tube is provided with least one structural member, after the structural member is used for follow-up concreting shaping, described in increase Structure constructs the bond stress between concrete.
Brief description of the drawings
Fig. 1 is set location schematic diagram of the present utility model;
Fig. 2 is structural representation of the present utility model;
Fig. 3 uses schematic diagram to be of the present utility model.
Marked in figure:1- immersed tube, 2- structures construction, 21- coordinate panel, 22- flange plates, 23- stiffeners, the pre-buried sets of 24- Cylinder, 25- structural members, 26- built-in type Grouting Pipes, 27- grouting pipes, the waterstops of 3- first, the waterstops of 4- second.
Embodiment
Below in conjunction with the accompanying drawings, the utility model is described in detail.
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only explaining this Utility model, it is not used to limit the utility model.
Embodiment
As Figure 1-3, a kind of one-shot forming L-type end box hat structure construction described in the utility model, located at the end of immersed tube 1 Portion.
Structure construction 2 is set along the end face of immersed tube 1 in closed circular body, and the structure constructs 2 along the immersed tube 1 The section of axial direction is L-shaped, and the one side of structure construction 2 is located at ring-type perpendicular to the axis of immersed tube 1, another side wherein described in L-type The inner side of structure construction 2, the connection shell bodies of immersed tube 1 of structure construction 2.
As Figure 2-3, the cooperation panel for two structure constructions 2 being oppositely arranged described in two adjacent sections on immersed tube 1 21, one of them described cooperation panel 21 is provided with the first waterstop of closed circular 3, and first waterstop 3 is described in two sections Be stressed the cooperation panel 21 being brought into close contact on another immersed tube 1 during the docking of immersed tube 1, realizes the two sections immersed tube 1 Watertight docks, and the seawater that first waterstop 3 completely cuts off inside and outside the immersed tube 1, first waterstop 3 is Gina waterstops. The flange plate 22 of the structure construction 2 is between the cooperation panel 21, the cooperation panel 21 and the flange plate 22 Provided with least one stiffener 23, the rigidity of reinforcement structure.The flange plate 22 is provided with the embedded sleeve barrel 24 of the second waterstop 4, The embedded sleeve barrel 24 is used to setting between immersed tube 1 described in two adjacent sections second waterstop 4 to carry out secondary waterproof, and described second Waterstop 4 is in closed circular.Second waterstop 4 is Omega waterstops.
As a preferred scheme of the present embodiment, the structure construction 2 is with setting pre-embedded type injection in concrete surface Pipe 26 is starched, makees injecting treatment after concrete strength reaches the 90% of C45.26 a diameter of 10mm of built-in type Grouting Pipe, institute State built-in type Grouting Pipe connection grouting pipe 27.The cooperation panel 21 is provided with least one towards the side inside the immersed tube 1 Individual structural member 25, after the structural member 25 is used for follow-up concreting shaping, increase between the structure construction 2 and concrete Bond stress, the structural member 25 for weldering follow closely.
Constructed with one-shot forming L-type end box hat structure described in the utility model, the opening of L-type structure is easy to the knot Structure constructs the pouring of 2 inner concretes, vibration compacting, to ensure that the immersed tube end construction of concrete structure has enough rigidity to resist The deformation of pressure effect is hit, ensures the immersed tube 1 smooth watertight docking under water, so as to subsequent construction, the structural texture is simple, Installation settings is convenient, and its inner concrete pours easily and Forming Quality is good.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (9)

1. a kind of one-shot forming L-type end box hat structure construction, it is characterised in that located at immersed tube (1) end, structure construction (2) Set along the immersed tube (1) end face in closed circular body, and section of the structure construction (2) along the immersed tube (1) axial direction is in L The one side of structure construction (2) is located at the structure of ring-type perpendicular to the immersed tube (1) axis, another side described in type, wherein L-type Construct on the inside of (2), the structure construction (2) connects immersed tube (1) shell body.
2. box hat structure construction in L-type end according to claim 1, it is characterised in that phase on immersed tube described in two adjacent sections (1) To the cooperation panel (21) of two structure constructions (2) of setting, one of them described cooperation panel (21) is provided with closing The waterstop of ring-type first (3), first waterstop (3) are stressed in immersed tube (1) docking of two sections and are brought into close contact in another Cooperation panel (21) on one immersed tube (1).
3. box hat structure construction in L-type end according to claim 2, it is characterised in that first waterstop (3) is Gina Waterstop.
4. box hat structure construction in L-type end according to claim 2, it is characterised in that the flange plate of the structure construction (2) (22) at least one add is provided between the cooperation panel (21), the cooperation panel (21) and the flange plate (22) Strength plate (23).
5. L-type end box hat structure according to claim 4 construction, it is characterised in that the flange plate (22) is provided with the Two waterstops (4) embedded sleeve barrel (24).
6. L-type end box hat structure according to claim 5 construction, it is characterised in that second waterstop (4) is Omega waterstops.
7. box hat structure construction in L-type end according to claim 1, it is characterised in that the structure construction (2) and concrete Built-in type Grouting Pipe (26) is set in contact surface.
8. the L-type end box hat structure construction according to claim any one of 2-6, it is characterised in that the cooperation panel (21) it is provided with least one structural member (25) towards the internal side of the immersed tube (1).
9. box hat structure construction in L-type end according to claim 8, it is characterised in that the structural member (25) is followed closely for weldering.
CN201721106340.8U 2017-08-30 2017-08-30 One-shot forming L-type end box hat structure construction Active CN207130770U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721106340.8U CN207130770U (en) 2017-08-30 2017-08-30 One-shot forming L-type end box hat structure construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721106340.8U CN207130770U (en) 2017-08-30 2017-08-30 One-shot forming L-type end box hat structure construction

Publications (1)

Publication Number Publication Date
CN207130770U true CN207130770U (en) 2018-03-23

Family

ID=61637145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721106340.8U Active CN207130770U (en) 2017-08-30 2017-08-30 One-shot forming L-type end box hat structure construction

Country Status (1)

Country Link
CN (1) CN207130770U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112031028A (en) * 2020-08-19 2020-12-04 广船国际有限公司 Method for improving installation precision of steel shell water stop sleeve
CN112222775A (en) * 2020-09-28 2021-01-15 中船黄埔文冲船舶有限公司 Manufacturing method of flange plate of end steel shell structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112031028A (en) * 2020-08-19 2020-12-04 广船国际有限公司 Method for improving installation precision of steel shell water stop sleeve
CN112031028B (en) * 2020-08-19 2022-02-15 广船国际有限公司 Method for improving installation precision of steel shell water stop sleeve
CN112222775A (en) * 2020-09-28 2021-01-15 中船黄埔文冲船舶有限公司 Manufacturing method of flange plate of end steel shell structure

Similar Documents

Publication Publication Date Title
CN207130770U (en) One-shot forming L-type end box hat structure construction
CN106812258A (en) A kind of full grout sleeves of GFRP
CN101012750B (en) Combined jointing method of lining gilled tube and inner lining for shield tunnel
CN204418231U (en) A kind of underground concrete exterior wall shrinkage joint water-tight device
CN209942849U (en) Subway station and shield tunnel interface waterproof construction
CN110644538A (en) Basement side wall extra front and back pouring belt periphery protection structure
CN105113535A (en) Prefabricated assembled tunnel joint structure and construction method thereof
CN108547316B (en) Double-layer corrugated steel structure for underground comprehensive pipe gallery
CN203533005U (en) Prestressed steel-concrete composite pressure jacking pipe
CN110552378A (en) Underground space roof subsides post-cast strip and seals structure in advance
CN103526777A (en) Semi-rigid pipe joint for immersed tunnel
CN209637770U (en) A kind of metro shield section of jurisdiction
CN203834477U (en) Waterproof structure of anti-floating anchor bars of basement
CN203145542U (en) Ordinary reinforced concrete crack-resistant no-seepage pool with large volume
CN210975900U (en) Basement side wall extra front and back pouring belt periphery protection structure
CN202302366U (en) Prestressed steel cylinder concrete jacking pipe
CN210288159U (en) Split type precast concrete culvert's concatenation structure
CN213776657U (en) Multiple sealed reinforced concrete pipe culvert with steel joint at socket end
CN211342004U (en) Hole reinforcing and leakage preventing construction structure for side wall of old water pool
CN206986930U (en) Remain silent section steel tubulation corridor and concrete cast-in-situ section connection structure
CN103924694B (en) A kind of mending-leakage processing method of water proofing property concrete extension joint
CN201057049Y (en) Connecting structure used between lining duct piece and inner lining in shield-tunneling-method tunnel
CN203175570U (en) Supporting and protecting structure in super-shallow buried weak surrounding rock tunnel construction
CN208068535U (en) A kind of mobile prostrate piping lane segment spray maintenance device
CN207092137U (en) A kind of prestressed pipe merism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant