CN207130694U - A kind of hydraulic engineering water dam - Google Patents
A kind of hydraulic engineering water dam Download PDFInfo
- Publication number
- CN207130694U CN207130694U CN201721158487.1U CN201721158487U CN207130694U CN 207130694 U CN207130694 U CN 207130694U CN 201721158487 U CN201721158487 U CN 201721158487U CN 207130694 U CN207130694 U CN 207130694U
- Authority
- CN
- China
- Prior art keywords
- flashboard
- stile
- chute
- crossbeam
- hydraulic engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Barrages (AREA)
Abstract
The utility model discloses a kind of hydraulic engineering water dam, including flashboard, stile, mounting platform, support column and underframe, the both ends of the underframe are provided with stile by board, it is provided with the outside of the stile and pours frame, described pour is evenly distributed with spud pile on the outside of frame, the stile is provided with flashboard by chute, liquid level sensor is installed on the stile of the flashboard side, the crossbeam is provided with siren on the upper support post of liquid level sensor one end, illuminating lamp is installed on the upper support post at the crossbeam both ends, two groups of hoist engines are installed on the mounting platform, retracting roller is installed on the outside of the hoist engine.The utility model has good sealing and steadiness, flashboard is installed by the chute in stile, side leak can be prevented, it can further strengthen lateral tight ness rating by being provided with sealing strip in the chute of flashboard both sides simultaneously, pour frame and spud pile by being provided with gate installation can be made more firm in flood control mouth.
Description
Technical field
Hydraulic engineering technical field is the utility model is related to, specially a kind of hydraulic engineering water dam.
Background technology
It is always one of the important livelihood issues in China that river, which is administered, runs into more rainfall seasons every time and may all occur
Eagre, it is necessary to flood gate is set at important flood control mouth, flooding not so can be caused, be brought to the common people huge
Property loss, water dam of the prior art simple utilization inserts and caulking groove etc. is embedded structure, it is easy to produces lateral tight
The problems such as density deficiency, water dam is contemporary society's flood control and common structure in addition, and the water dam use of correlation technique is outer
The global design that frame is fixed with water fender, i.e., be fixed on housing by water fender, then housing is fixed on into flood control mouth, prior art
Water dam does not possess open function, is only capable of integral installation, then needs to dismount water fender when water moves back, inconvenient.
Utility model content
The purpose of this utility model is to provide a kind of hydraulic engineering water dam, to solve to carry in above-mentioned background technology
The problem of going out.
To achieve the above object, the utility model provides following technical scheme:A kind of hydraulic engineering water dam, including
Flashboard, stile, mounting platform, support column and underframe, the both ends of the underframe are provided with stile by board, the stile
Outside, which is provided with, pours frame, and described pour is evenly distributed with spud pile on the outside of frame, and the inner side of the stile is provided with chute, described
Stile is provided with flashboard by chute, and the front and rear sides of the flashboard are provided with reinforcing strip, pacified on the stile of the flashboard side
Equipped with liquid level sensor, crossbeam is installed above the stile, connecting plate is installed above flashboard in the crossbeam, it is described
Support column is installed above crossbeam both ends, is provided with the chute being used cooperatively with flashboard in the support column, the crossbeam is close
Siren is installed on the upper support post of liquid level sensor one end, illumination is installed on the upper support post at the crossbeam both ends
Lamp, mounting platform is installed above the support column, two groups of hoist engines are installed on the mounting platform, the hoist engine
Outside is provided with retracting roller, and furls roller and be connected by steel wire rope with connecting plate.
Preferably, the top of the underframe is provided with the flange being used cooperatively with the groove of flashboard bottom.
Preferably, it is provided with sealing strip in the chute of the flashboard both sides.
Preferably, the flashboard is provided with corrosion-resistant coating.
Preferably, the top of the connecting plate is provided with a pair of fixation with steel wire rings.
Compared with prior art, the beneficial effects of the utility model are:The water dam have good sealing with it is steady
Solidity, side leak can be prevented by the framework and chute of stile, while can provided with sealing strip in the chute for passing through flashboard both sides
Further strengthen lateral tight ness rating, pour frame and spud pile by being provided with gate installation can be made more firm in flood control mouth, lead to
Cross and the measurable water level of liquid level sensor is installed, can be alarmed when water level amount of increase is abnormal by siren, by being provided with photograph
Bright lamp be easy to night observe water level, when flood is decorporated, by hoist engine can automatic starting gate flashboard, without dismantling baffle plate,
Manpower is saved, when needing flood discharge, draining can be carried out by hoist engine regulating gate openings of sizes, while pass through liquid level sensor
Water level is measured, flood discharge is completed by hoist engine closed shutter when draining to target water level, it is very convenient.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the internal structure schematic diagram of the utility model stile;
Fig. 3 is the structural representation of the utility model flashboard.
In figure:1- hoist engines;2- illuminating lamps;3- sirens;4- flashboards;5- stiles;6- liquid level sensors;7- furls roller;
8- mounting platforms;9- steel wire ropes;10- support columns;11- crossbeams;12- pours frame;13- spud piles;14- underframes;15- boards;
16- connecting plates;17- chutes.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Refer to Fig. 1-3, a kind of embodiment provided by the utility model:A kind of hydraulic engineering water dam, including lock
Plate 4, stile 5, mounting platform 8, support column 10 and underframe 14, the both ends of underframe 14 are provided with stile 5, stile by board 15
5 outside, which is provided with, pours frame 12, and the outside for pouring frame 12 is evenly distributed with spud pile 13, by pouring frame 12 and spud pile
13 surrounding joints cements are fixed on flood control mouth by what gate consolidated, and the inner side of stile 5 is provided with chute 17, and stile 5 passes through chute 17
Flashboard 4 is installed, side leak can be prevented by the framework of chute 17 and stile 5, sealing is provided with the chute 17 of the both sides of flashboard 4
Bar, can further strengthen lateral compactness, and the front and rear sides of flashboard 4 are provided with reinforcing strip, reinforce flashboard 4, make flashboard 4 more
Solid, flashboard 4 is provided with corrosion-resistant coating, can effectively protect flashboard 4 not to be corroded, and the top of underframe 14 is provided with and the bottom of flashboard 4
The flange that is used cooperatively of groove, flashboard 4 can be made to be combined closely with underframe 14, liquid level biography is installed on the stile 5 of the side of flashboard 4
Sensor 6, liquid level sensor 6 can use HD-136 type liquid level sensors, measurable water level, and the top of stile 5 is provided with crossbeam 11,
The top of flashboard 4 is provided with connecting plate 16 in crossbeam 11, and the top of connecting plate 16 is provided with a pair of fixation with steel wire rings, can be by steel wire rope
9 are fixed on connecting plate 16, support column 10 are provided with above the both ends of crossbeam 11, being provided with to coordinate with flashboard 4 in support column 10 makes
Chute 17, crossbeam 11 are provided with siren 3 on the upper support post 10 of the one end of liquid level sensor 6, work as level sensing
Device 6 measure water level amount of increase it is excessive when alarm sent by siren 3, photograph is installed on the upper support post 10 at the both ends of crossbeam 11
Bright lamp 2, illumination can be provided at night, be easy to the situation of observation flood control mouth, the top of support column 10 is provided with mounting platform 8, pacifies
Two groups of hoist engines 1 are installed on assembling platform 8, the outside of hoist engine 1 is provided with retracting roller 7, and furl roller 7 by steel wire rope 9 with
Connecting plate 16 connects, and the controllable retracting roller 7 of hoist engine 1 rotates, and steel wire rope 9 is wound or is loosened, is moved down so as to control on flashboard 4
It is dynamic, to reach the purpose of regulating gate openings of sizes.
Operation principle:In use, first pass through to pour around frame 12 and spud pile 13 joints cement firmly solid by gate
Be scheduled on flood control mouth, then check gate each part whether can normal use, when flood comes interim, first passing through liquid level sensor 6 can
It is too high to measure water level amount of increase, causes related personnel to pay attention to by the alarm of alarm 3, is then put down flashboard 4 by hoist engine 1
Groove and the flange on the top of underframe 14 to the bottom of flashboard 4 are combined closely, and to be controlled flood, when needing flood discharge, pass through elevator
The regulating gate openings of sizes of machine 1 carries out draining, when liquid level sensor 6 measures draining target water level, is closed by hoist engine 1
Gate 4.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and
And in the case of without departing substantially from spirit or essential attributes of the present utility model, it can realize that this practicality is new in other specific forms
Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new
The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained
All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation
Involved claim.
Claims (5)
1. a kind of hydraulic engineering water dam, including flashboard (4), stile (5), mounting platform (8), support column (10) and underframe
(14), it is characterised in that:The both ends of the underframe (14) are provided with stile (5) by board (15), the stile (5) it is outer
Side, which is provided with, pours frame (12), and described pour is evenly distributed with spud pile (13) on the outside of frame (12), the inner side of the stile (5)
Provided with chute (17), the stile (5) is provided with flashboard (4) by chute (17), and the front and rear sides of the flashboard (4) are provided with
Reinforcing strip, liquid level sensor (6) is installed on the stile (5) of flashboard (4) side, is provided with above the stile (5)
Crossbeam (11), connecting plate (16), the top peace at crossbeam (11) both ends are installed above the interior flashboard of the crossbeam (11) (4)
The chute (17) being used cooperatively with flashboard (4) is provided with equipped with support column (10), in the support column (10), the crossbeam (11) is leaned on
Siren (3), the top branch at crossbeam (11) both ends are installed on the upper support post (10) of nearly liquid level sensor (6) one end
Illuminating lamp (2) is installed on dagger (10), mounting platform (8), the mounting platform are installed above the support column (10)
(8) two groups of hoist engines (1) are installed on, retracting roller (7) is installed on the outside of the hoist engine (1), and furls roller (7) and passes through steel
Cord (9) is connected with connecting plate (16).
A kind of 2. hydraulic engineering water dam according to claim 1, it is characterised in that:The top of the underframe (14)
The flange being used cooperatively provided with the groove with flashboard (4) bottom.
A kind of 3. hydraulic engineering water dam according to claim 1, it is characterised in that:Flashboard (4) both sides
Sealing strip is provided with chute (17).
A kind of 4. hydraulic engineering water dam according to claim 1, it is characterised in that:The flashboard (4) is provided with
Corrosion-resistant coating.
A kind of 5. hydraulic engineering water dam according to claim 1, it is characterised in that:The connecting plate (16) it is upper
Side is provided with a pair of fixation with steel wire rings.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721158487.1U CN207130694U (en) | 2017-09-11 | 2017-09-11 | A kind of hydraulic engineering water dam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721158487.1U CN207130694U (en) | 2017-09-11 | 2017-09-11 | A kind of hydraulic engineering water dam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207130694U true CN207130694U (en) | 2018-03-23 |
Family
ID=61637899
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721158487.1U Expired - Fee Related CN207130694U (en) | 2017-09-11 | 2017-09-11 | A kind of hydraulic engineering water dam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207130694U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108442335A (en) * | 2018-05-21 | 2018-08-24 | 水利部水工金属结构质量检验测试中心 | A kind of compound gate of light-weighted environment-friendly type |
CN109881642A (en) * | 2019-03-27 | 2019-06-14 | 翟保亮 | A kind of full-automatic open-close sluice gate of water leakage alarm |
CN110029625A (en) * | 2019-05-23 | 2019-07-19 | 中建科技(福州)有限公司 | Detachable easily memory-type flood protection device |
-
2017
- 2017-09-11 CN CN201721158487.1U patent/CN207130694U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108442335A (en) * | 2018-05-21 | 2018-08-24 | 水利部水工金属结构质量检验测试中心 | A kind of compound gate of light-weighted environment-friendly type |
CN109881642A (en) * | 2019-03-27 | 2019-06-14 | 翟保亮 | A kind of full-automatic open-close sluice gate of water leakage alarm |
CN110029625A (en) * | 2019-05-23 | 2019-07-19 | 中建科技(福州)有限公司 | Detachable easily memory-type flood protection device |
CN110029625B (en) * | 2019-05-23 | 2024-05-10 | 中建科技(福州)有限公司 | Detachable and easy-to-store flood control device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207130694U (en) | A kind of hydraulic engineering water dam | |
CN103791882B (en) | The full deformation monitoring method of a kind of arch dam | |
CN106199054A (en) | A kind of River Hydrology monitoring device | |
CN213926189U (en) | Underwater garbage collection device | |
CN205296100U (en) | Husky equipment is arranged in reservoir segmentation | |
CN201407056Y (en) | Completely closed waterproof composite lining structure bearing medium water pressure | |
CN201844866U (en) | Flood preventing water level measuring tape device with fully-automatic warning function | |
CN208026887U (en) | A kind of hydrometeorological observation buoyancy station | |
CN103031851A (en) | Caisson device and construction method for caisson device applied to water foundation ditch | |
CN110006816A (en) | A kind of deep sea environment simulation device | |
CN216484509U (en) | Detection water permeability detection device of lightweight aggregate concrete | |
CN206669056U (en) | A kind of float-type water tank valve body | |
CN208309611U (en) | A kind of underwater broken line flow-guiding structure | |
CN108978696B (en) | Open caisson back cover prevention of seepage and displacement monitoring devices | |
CN208415202U (en) | A kind of safe floodgate of turnover plate type | |
CN211340999U (en) | Automatic water replenishing system suitable for high-order cistern | |
CN209179151U (en) | A kind of steel structure water shut-in well | |
CN208167639U (en) | A kind of hydraulic engineering ecological supporting structure | |
CN111982778A (en) | Seepage intelligent monitoring system for hydraulic engineering | |
CN207295611U (en) | A kind of rubber dam fills pumping equipment | |
CN206656780U (en) | A kind of water-level gauge of measure water position | |
CN205313855U (en) | Balanced ring vacuum filling device | |
CN208733585U (en) | A kind of hydraulic engineering flashboard | |
CN203603124U (en) | Landscape hydraulic flap gate | |
CN205483473U (en) | Inspection shaft safety net testing arrangement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180323 Termination date: 20180911 |
|
CF01 | Termination of patent right due to non-payment of annual fee |