CN207130617U - A kind of highway bridge bridge deck drainage facility - Google Patents

A kind of highway bridge bridge deck drainage facility Download PDF

Info

Publication number
CN207130617U
CN207130617U CN201720616724.8U CN201720616724U CN207130617U CN 207130617 U CN207130617 U CN 207130617U CN 201720616724 U CN201720616724 U CN 201720616724U CN 207130617 U CN207130617 U CN 207130617U
Authority
CN
China
Prior art keywords
bridge
drainage pipeline
support meanss
sides
drainage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720616724.8U
Other languages
Chinese (zh)
Inventor
张晓辉
朱桂香
朱崇林
李小强
师雪梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720616724.8U priority Critical patent/CN207130617U/en
Application granted granted Critical
Publication of CN207130617U publication Critical patent/CN207130617U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The application is a kind of highway bridge bridge deck drainage facility, including the drainage pipeline being laid under bridge floor, support meanss are provided with inside drainage pipeline, the cross section of the support meanss is Λ shapes, and the support meanss summit is located at the circular top surface of drainage pipeline, the bottom of the support meanss extends towards to both sides, due to being provided with support meanss, good booster action is served to drainage pipeline, improves the overall structural strength of bridge.

Description

A kind of highway bridge bridge deck drainage facility
Technical field
A kind of pumping equipment is the utility model is related to, particularly a kind of highway bridge bridge deck drainage facility.
Background technology
Bridge is for road, pipeline etc. each other mutually across or across natural objects (such as water body, mountain valley) Engineering structure, bridge are the piths in communications and transportation composition.With the development of science and technology, bridge construction also obtains Rapidly development.Bridges in Our Country construction in recent years develops rapidly, and the ratio that bridge investment accounts for social capital construction investment is also more next It is bigger.During bridge construction, the setting of bridge drainage system is highly important part during bridge construction One of, it is related to the normal use of whole bridge.But designer's often heavier applying depending on bridge construction jackshaft girder construction Work and design, and ignore the research to bridge drainage system.But bridge drainage system functional relationship bridge durability and traffic peace Congruent problem, it is impossible to regard as unimportant.
Being currently known may cause science of bridge building to be damaged because the drainage system of bridge floor has problem.It is mainly manifested in Following several respects:(1) long when the bridge floor rainwater holdup time, rainwater can first pass through pave-load layer and gradually permeate again under pave-load layer Waterproof layer, finally enter inside bridge structure, the reinforcing bar in bridge spanning, bridge pier and bridge abutment structure may because infiltration become rust Erosion, reinforcing bar toughness and intensity decreases, the stability of this service life and normal operation to bridge can all have adverse effect on. (2) if the water entered by deck crack or seam etc. impenetrable waterproof layer inside bridge structure can not be discharged in time, at one section Between after the bridge deck pavement internal void water capacity easily reach saturation.Vehicle can quickly make full in bridge deck pavement when bridge floor is walked Flow velocity and pressure are produced with pore water, and then bridge deck pavement is produced peeling, loose, pit-hole etc..(3) if bridge floor Water effectively, can not be excluded promptly, and moisture film even ponding will be formed in bridge floor;Bridge floor antiskid degradation will be made, work as vehicle It is able to may occur to slide because of moisture film or ponding when driving through bridge floor or can not normal braking.Again because traveling can splash ponding The sight of driver can be influenceed, makes the reduction of safety traffic coefficient, and one of inducement of multiple traffic accident on rainy day bridge.This The rainwater of external storm period bridge floor excludes that if effect is bad deep water will be assembled so that traffic jam occurs, this also gives Bridge, people, vehicle bring potential safety hazard.
People have started to pay attention to excluding bridge floor precipitation as quickly as possible at present, this depend on normal work all the time, effectively Drainage system.It is but main on highway bridge bridge floor at present that ponding is carried out using the structure for excavating rhone or drainage pipeline Exclude, the structure design of this rhone is relatively simple, exists weaken bridge intensity in actual use, cause stress collection In, the problems such as potential safety hazard be present.Therefore the highway bridge bridge deck drainage facility used at present is difficult the hair for adapting to current social Exhibition needs.And with the continuous development of road pavement technology, how to protect traffic safety of the rainy day on highway bridge bridge floor Also the extensive concern of society has increasingly been caused, this workmen also to highway bridge bridge floor proposes requirements at the higher level.
The content of the invention
The defects of technical problem to be solved in the utility model is to overcome prior art and a kind of structural strength is provided High, the convenient highway bridge bridge deck drainage facility of draining.
Technical problem of the present utility model is achieved through the following technical solutions:
A kind of highway bridge bridge deck drainage facility, including the drainage pipeline being laid under bridge floor, drainage pipeline inside are provided with Support meanss, the cross section of the support meanss is Λ shapes, and the support meanss summit is located at the circular top surface of drainage pipeline, The bottom of the support meanss extends towards to both sides.
Due to being provided with support meanss, good booster action is served to drainage pipeline, improves the overall knot of bridge Structure intensity.
Technical scheme can be further:The drainage pipeline is semicircle, and base portion also extends towards to both sides, and two While it is respectively provided with groove portion.
Technical scheme can be further:The base portion both sides of the bottom both sides extension insertion drainage pipeline of the support meanss Groove portion in.Both simply consolidate by the mating connection mode in embedded groove, are easy to process.
Technical scheme can be further:The base portion both sides of the drainage pipeline are provided with the part extended obliquely upward.
Technical scheme can be further:The part extended obliquely upward on both sides is centrosymmetric.It is so that overall Structure does not produce stress concentration effect.
Technical scheme can be further:The drainage pipeline is centrosymmetric.So that overall structure does not produce stress collection Middle effect.
Technical scheme can be further:The support meanss are centrosymmetric.So that overall structure does not produce stress collection Middle effect.
Technical scheme can be further:The height of the support meanss is equal to the radius of the drainage pipeline.
Compared with prior art, the utility model plays reinforcing and strengthened by setting support meanss in drainage pipeline The effect of drain pipeline structure intensity, the overall structural strength for lifting bridge, will not cause stress concentration, band at drainage pipeline Carry out potential safety hazard.Therefore, this highway bridge bridge deck drainage facility has the advantages that structural strength is high, draining is convenient.
Brief description of the drawings
Fig. 1 is the schematic diagram of the utility model transverse direction sectional structure embodiment 1;
Fig. 2 is the schematic diagram of the utility model transverse direction sectional structure embodiment 2.
Embodiment
The utility model embodiment will be elaborated again by above-mentioned accompanying drawing below.
As shown in Figure 1-2,1. drainage pipelines, 2. support meanss.
Embodiment 1
A kind of highway bridge bridge deck drainage facility, including the drainage pipeline 1 being laid under bridge floor, set inside drainage pipeline 1 There are support meanss 2, the cross section of support meanss 2 is Λ shapes, and the summit of support meanss 2 is located at the circular top surface of drainage pipeline 1, support The bottom of device 2 extends towards to both sides, and drainage pipeline 1 is semicircle, and base portion also extends towards to both sides, and both sides have There is groove portion.
In the groove portion on the base portion both sides of the bottom both sides extension insertion drainage pipeline 1 of support meanss 2.Drainage pipeline 1 and branch Support arrangement 2 is centrosymmetric, and the height of support meanss 2 is equal to the radius of drainage pipeline 1.The radius of drainage pipeline is 0.5m.
Embodiment 2
A kind of highway bridge bridge deck drainage facility, including the drainage pipeline 1 being laid under bridge floor, set inside drainage pipeline 1 There are support meanss 2, the cross section of support meanss 2 is Λ shapes, and the summit of support meanss 2 is located at the circular top surface of drainage pipeline 1, support The bottom of device 2 extends towards to both sides, and drainage pipeline 1 is semicircle, and base portion also extends towards to both sides, and both sides have There is groove portion.
In the groove portion on the base portion both sides of the bottom both sides extension insertion drainage pipeline 1 of support meanss 2.Drainage pipeline 1 and branch Support arrangement 2 is centrosymmetric, and the height of support meanss 2 is equal to the radius of drainage pipeline 1.The radius of drainage pipeline is 0.8m.
Embodiment 3
A kind of highway bridge bridge deck drainage facility, including the drainage pipeline 1 being laid under bridge floor, set inside drainage pipeline 1 There are support meanss 2, the cross section of support meanss 2 is Λ shapes, and the summit of support meanss 2 is located at the circular top surface of drainage pipeline 1, branch The bottom of support arrangement 2 extends towards to both sides, and drainage pipeline 1 is semicircle, and base portion also extends towards to both sides, and both sides are equal With groove portion.
In the groove portion on the base portion both sides of the bottom both sides extension insertion drainage pipeline 1 of support meanss 2.Drainage pipeline 1 and branch Support arrangement 2 is centrosymmetric, and the height of support meanss 2 is equal to the radius of drainage pipeline 1.The radius of drainage pipeline is 1m.
Embodiment 4
A kind of highway bridge bridge deck drainage facility, including the drainage pipeline 1 being laid under bridge floor, set inside drainage pipeline 1 There are support meanss 2, the cross section of support meanss 2 is Λ shapes, and the summit of support meanss 2 is located at the circular top surface of drainage pipeline 1, branch The bottom of support arrangement 2 extends towards to both sides, and drainage pipeline 1 is semicircle, and base portion also extends towards to both sides, and both sides are equal With groove portion.The base portion both sides of drainage pipeline are provided with the part extended obliquely upward, during the part that both sides extend obliquely upward is in The heart is symmetrical.
In the groove portion on the base portion both sides of the bottom both sides extension insertion drainage pipeline 1 of support meanss 2.Drainage pipeline 1 and branch Support arrangement 2 is centrosymmetric, and the height of support meanss 2 is equal to the radius of drainage pipeline 1.The radius of drainage pipeline is 1m.
Embodiment 5
A kind of highway bridge bridge deck drainage facility, including the drainage pipeline 1 being laid under bridge floor, set inside drainage pipeline 1 There are support meanss 2, the cross section of support meanss 2 is Λ shapes, and the summit of support meanss 2 is located at the circular top surface of drainage pipeline 1, branch The bottom of support arrangement 2 extends towards to both sides, and drainage pipeline 1 is semicircle, and base portion also extends towards to both sides, and both sides are equal With groove portion.The base portion both sides of drainage pipeline are provided with the part extended obliquely upward, during the part that both sides extend obliquely upward is in The heart is symmetrical.
In the groove portion on the base portion both sides of the bottom both sides extension insertion drainage pipeline 1 of support meanss 2.Drainage pipeline 1 and branch Support arrangement 2 is centrosymmetric, and the height of support meanss 2 is equal to the radius of drainage pipeline 1.The radius of drainage pipeline is 1.5m.
Embodiment 6
A kind of highway bridge bridge deck drainage facility, including the drainage pipeline 1 being laid under bridge floor, set inside drainage pipeline 1 There are support meanss 2, the cross section of support meanss 2 is Λ shapes, and the summit of support meanss 2 is located at the circular top surface of drainage pipeline 1, support The bottom of device 2 extends towards to both sides, and drainage pipeline 1 is semicircle, and base portion also extends towards to both sides, and both sides have There is groove portion.The base portion both sides of drainage pipeline are provided with the part extended obliquely upward, and the part that both sides extend obliquely upward is in center Symmetrically.
In the groove portion on the base portion both sides of the bottom both sides extension insertion drainage pipeline 1 of support meanss 2.Drainage pipeline 1 and branch Support arrangement 2 is centrosymmetric, and the height of support meanss 2 is equal to the radius of drainage pipeline 1.The radius of drainage pipeline is 2m.
By being provided with support meanss in drainage pipeline, the structural strength around drainage pipeline, draining greatly strengthen The internal diameter of pipeline can also increase, and the base portion both sides in embodiment 4-6 structure due to drainage pipeline are provided with obliquely upward The part of extension, therefore its overall construction intensity is bigger, the settable radius of drainage pipeline is bigger.
The utility model is not restricted to the described embodiments, and simply illustrates this reality described in above-described embodiment and specification With new principle, on the premise of the spirit and scope of the utility model is not departed from, the utility model also have various change and Improve, these changes and improvements are both fallen within claimed the scope of the utility model.The utility model requires protection scope by Appended claims and its equivalent thereof.

Claims (8)

1. a kind of highway bridge bridge deck drainage facility, including the drainage pipeline being laid under bridge floor, it is characterised in that:Drainage pipeline Inside is provided with support meanss, and the cross section of the support meanss is Λ shapes, and the support meanss summit is located at drainage pipeline Circular top surface, the bottom of the support meanss extend towards to both sides.
2. highway bridge bridge deck drainage facility according to claim 1, it is characterised in that:The drainage pipeline is semicircle Shape, and base portion also extends towards to both sides, and both sides are respectively provided with groove portion.
3. highway bridge bridge deck drainage facility according to claim 2, it is characterised in that:The bottom two of the support meanss In the groove portion on the base portion both sides of side extension insertion drainage pipeline.
4. highway bridge bridge deck drainage facility according to claim 2, it is characterised in that:The base portion two of the drainage pipeline Side is provided with the part extended obliquely upward.
5. highway bridge bridge deck drainage facility according to claim 4, it is characterised in that:The described of both sides prolongs obliquely upward The part stretched is centrosymmetric.
6. highway bridge bridge deck drainage facility according to claim 1, it is characterised in that:The drainage pipeline is in center pair Claim.
7. highway bridge bridge deck drainage facility according to claim 1, it is characterised in that:The support meanss are in center pair Claim.
8. highway bridge bridge deck drainage facility according to claim 1, it is characterised in that:Height of the support meanss etc. In the radius of the drainage pipeline.
CN201720616724.8U 2017-05-31 2017-05-31 A kind of highway bridge bridge deck drainage facility Expired - Fee Related CN207130617U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720616724.8U CN207130617U (en) 2017-05-31 2017-05-31 A kind of highway bridge bridge deck drainage facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720616724.8U CN207130617U (en) 2017-05-31 2017-05-31 A kind of highway bridge bridge deck drainage facility

Publications (1)

Publication Number Publication Date
CN207130617U true CN207130617U (en) 2018-03-23

Family

ID=61631423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720616724.8U Expired - Fee Related CN207130617U (en) 2017-05-31 2017-05-31 A kind of highway bridge bridge deck drainage facility

Country Status (1)

Country Link
CN (1) CN207130617U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677703A (en) * 2018-06-04 2018-10-19 郑州德威机械设备有限公司 A kind of highway bridge bridge deck drainage facility

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677703A (en) * 2018-06-04 2018-10-19 郑州德威机械设备有限公司 A kind of highway bridge bridge deck drainage facility

Similar Documents

Publication Publication Date Title
CN103541310A (en) Long-united bridge widening splicing structure and construction method thereof
CN207130617U (en) A kind of highway bridge bridge deck drainage facility
CN104314003A (en) Long-life reinforcing mesh flexible fiber reinforced concrete bridge deck pavement structure
CN207017093U (en) New-old concrete bond widens seam-line removal structure
CN205999792U (en) Spliced bridging structure
CN103015307B (en) Prestressed concrete pontoon bridge
CN213709015U (en) Scattered gravel pavement structure capable of enhancing pavement strength
CN209099165U (en) A kind of expanded joint structure suitable for bridge
CN204401452U (en) Oblique prestressed concrete composite pavement connects with bridge transition structure
CN208884350U (en) A kind of bridge on highway discharge structure
CN203530865U (en) Long-connection bridge widening splicing structure
CN208455404U (en) A kind of long-life Steel Bridge Deck draining paving structure layer
CN209260544U (en) A kind of road and bridge seamless connection structure for large and medium-sized bridge
CN106337342A (en) Road cross section structure of mountainous road
CN207159816U (en) A kind of drainage bridge floor of overpass
CN208415099U (en) Rib steel reinforced floorings
CN205474797U (en) Hold formula beam element and half through bridge girder construction among prefabricated ultra high performance concrete
CN204919331U (en) Prevent ponding bridge floor
CN206308613U (en) Beam-ends percolating water ejector at a kind of expansion joint
CN206396582U (en) Exclude the road structure and its construction member of hard surface ponding
CN109695205A (en) System reinforcement method for steel plate combination continuous beam
CN221118138U (en) Asphalt concrete pavement repair structure
CN204530463U (en) A kind of pedestrian overcrossing dewatering installation
CN215289547U (en) Town road waterproof construction
CN209129004U (en) A kind of high gradient slope supporting construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180323