CN207130617U - A kind of highway bridge bridge deck drainage facility - Google Patents
A kind of highway bridge bridge deck drainage facility Download PDFInfo
- Publication number
- CN207130617U CN207130617U CN201720616724.8U CN201720616724U CN207130617U CN 207130617 U CN207130617 U CN 207130617U CN 201720616724 U CN201720616724 U CN 201720616724U CN 207130617 U CN207130617 U CN 207130617U
- Authority
- CN
- China
- Prior art keywords
- bridge
- drainage pipeline
- support meanss
- sides
- drainage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000003780 insertion Methods 0.000 claims description 8
- 230000037431 insertion Effects 0.000 claims description 8
- 230000009471 action Effects 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 8
- 230000000694 effects Effects 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 238000011161 development Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 206010039203 Road traffic accident Diseases 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000012466 permeate Substances 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000001556 precipitation Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 239000011800 void material Substances 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The application is a kind of highway bridge bridge deck drainage facility, including the drainage pipeline being laid under bridge floor, support meanss are provided with inside drainage pipeline, the cross section of the support meanss is Λ shapes, and the support meanss summit is located at the circular top surface of drainage pipeline, the bottom of the support meanss extends towards to both sides, due to being provided with support meanss, good booster action is served to drainage pipeline, improves the overall structural strength of bridge.
Description
Technical field
A kind of pumping equipment is the utility model is related to, particularly a kind of highway bridge bridge deck drainage facility.
Background technology
Bridge is for road, pipeline etc. each other mutually across or across natural objects (such as water body, mountain valley)
Engineering structure, bridge are the piths in communications and transportation composition.With the development of science and technology, bridge construction also obtains
Rapidly development.Bridges in Our Country construction in recent years develops rapidly, and the ratio that bridge investment accounts for social capital construction investment is also more next
It is bigger.During bridge construction, the setting of bridge drainage system is highly important part during bridge construction
One of, it is related to the normal use of whole bridge.But designer's often heavier applying depending on bridge construction jackshaft girder construction
Work and design, and ignore the research to bridge drainage system.But bridge drainage system functional relationship bridge durability and traffic peace
Congruent problem, it is impossible to regard as unimportant.
Being currently known may cause science of bridge building to be damaged because the drainage system of bridge floor has problem.It is mainly manifested in
Following several respects:(1) long when the bridge floor rainwater holdup time, rainwater can first pass through pave-load layer and gradually permeate again under pave-load layer
Waterproof layer, finally enter inside bridge structure, the reinforcing bar in bridge spanning, bridge pier and bridge abutment structure may because infiltration become rust
Erosion, reinforcing bar toughness and intensity decreases, the stability of this service life and normal operation to bridge can all have adverse effect on.
(2) if the water entered by deck crack or seam etc. impenetrable waterproof layer inside bridge structure can not be discharged in time, at one section
Between after the bridge deck pavement internal void water capacity easily reach saturation.Vehicle can quickly make full in bridge deck pavement when bridge floor is walked
Flow velocity and pressure are produced with pore water, and then bridge deck pavement is produced peeling, loose, pit-hole etc..(3) if bridge floor
Water effectively, can not be excluded promptly, and moisture film even ponding will be formed in bridge floor;Bridge floor antiskid degradation will be made, work as vehicle
It is able to may occur to slide because of moisture film or ponding when driving through bridge floor or can not normal braking.Again because traveling can splash ponding
The sight of driver can be influenceed, makes the reduction of safety traffic coefficient, and one of inducement of multiple traffic accident on rainy day bridge.This
The rainwater of external storm period bridge floor excludes that if effect is bad deep water will be assembled so that traffic jam occurs, this also gives
Bridge, people, vehicle bring potential safety hazard.
People have started to pay attention to excluding bridge floor precipitation as quickly as possible at present, this depend on normal work all the time, effectively
Drainage system.It is but main on highway bridge bridge floor at present that ponding is carried out using the structure for excavating rhone or drainage pipeline
Exclude, the structure design of this rhone is relatively simple, exists weaken bridge intensity in actual use, cause stress collection
In, the problems such as potential safety hazard be present.Therefore the highway bridge bridge deck drainage facility used at present is difficult the hair for adapting to current social
Exhibition needs.And with the continuous development of road pavement technology, how to protect traffic safety of the rainy day on highway bridge bridge floor
Also the extensive concern of society has increasingly been caused, this workmen also to highway bridge bridge floor proposes requirements at the higher level.
The content of the invention
The defects of technical problem to be solved in the utility model is to overcome prior art and a kind of structural strength is provided
High, the convenient highway bridge bridge deck drainage facility of draining.
Technical problem of the present utility model is achieved through the following technical solutions:
A kind of highway bridge bridge deck drainage facility, including the drainage pipeline being laid under bridge floor, drainage pipeline inside are provided with
Support meanss, the cross section of the support meanss is Λ shapes, and the support meanss summit is located at the circular top surface of drainage pipeline,
The bottom of the support meanss extends towards to both sides.
Due to being provided with support meanss, good booster action is served to drainage pipeline, improves the overall knot of bridge
Structure intensity.
Technical scheme can be further:The drainage pipeline is semicircle, and base portion also extends towards to both sides, and two
While it is respectively provided with groove portion.
Technical scheme can be further:The base portion both sides of the bottom both sides extension insertion drainage pipeline of the support meanss
Groove portion in.Both simply consolidate by the mating connection mode in embedded groove, are easy to process.
Technical scheme can be further:The base portion both sides of the drainage pipeline are provided with the part extended obliquely upward.
Technical scheme can be further:The part extended obliquely upward on both sides is centrosymmetric.It is so that overall
Structure does not produce stress concentration effect.
Technical scheme can be further:The drainage pipeline is centrosymmetric.So that overall structure does not produce stress collection
Middle effect.
Technical scheme can be further:The support meanss are centrosymmetric.So that overall structure does not produce stress collection
Middle effect.
Technical scheme can be further:The height of the support meanss is equal to the radius of the drainage pipeline.
Compared with prior art, the utility model plays reinforcing and strengthened by setting support meanss in drainage pipeline
The effect of drain pipeline structure intensity, the overall structural strength for lifting bridge, will not cause stress concentration, band at drainage pipeline
Carry out potential safety hazard.Therefore, this highway bridge bridge deck drainage facility has the advantages that structural strength is high, draining is convenient.
Brief description of the drawings
Fig. 1 is the schematic diagram of the utility model transverse direction sectional structure embodiment 1;
Fig. 2 is the schematic diagram of the utility model transverse direction sectional structure embodiment 2.
Embodiment
The utility model embodiment will be elaborated again by above-mentioned accompanying drawing below.
As shown in Figure 1-2,1. drainage pipelines, 2. support meanss.
Embodiment 1
A kind of highway bridge bridge deck drainage facility, including the drainage pipeline 1 being laid under bridge floor, set inside drainage pipeline 1
There are support meanss 2, the cross section of support meanss 2 is Λ shapes, and the summit of support meanss 2 is located at the circular top surface of drainage pipeline 1, support
The bottom of device 2 extends towards to both sides, and drainage pipeline 1 is semicircle, and base portion also extends towards to both sides, and both sides have
There is groove portion.
In the groove portion on the base portion both sides of the bottom both sides extension insertion drainage pipeline 1 of support meanss 2.Drainage pipeline 1 and branch
Support arrangement 2 is centrosymmetric, and the height of support meanss 2 is equal to the radius of drainage pipeline 1.The radius of drainage pipeline is 0.5m.
Embodiment 2
A kind of highway bridge bridge deck drainage facility, including the drainage pipeline 1 being laid under bridge floor, set inside drainage pipeline 1
There are support meanss 2, the cross section of support meanss 2 is Λ shapes, and the summit of support meanss 2 is located at the circular top surface of drainage pipeline 1, support
The bottom of device 2 extends towards to both sides, and drainage pipeline 1 is semicircle, and base portion also extends towards to both sides, and both sides have
There is groove portion.
In the groove portion on the base portion both sides of the bottom both sides extension insertion drainage pipeline 1 of support meanss 2.Drainage pipeline 1 and branch
Support arrangement 2 is centrosymmetric, and the height of support meanss 2 is equal to the radius of drainage pipeline 1.The radius of drainage pipeline is 0.8m.
Embodiment 3
A kind of highway bridge bridge deck drainage facility, including the drainage pipeline 1 being laid under bridge floor, set inside drainage pipeline 1
There are support meanss 2, the cross section of support meanss 2 is Λ shapes, and the summit of support meanss 2 is located at the circular top surface of drainage pipeline 1, branch
The bottom of support arrangement 2 extends towards to both sides, and drainage pipeline 1 is semicircle, and base portion also extends towards to both sides, and both sides are equal
With groove portion.
In the groove portion on the base portion both sides of the bottom both sides extension insertion drainage pipeline 1 of support meanss 2.Drainage pipeline 1 and branch
Support arrangement 2 is centrosymmetric, and the height of support meanss 2 is equal to the radius of drainage pipeline 1.The radius of drainage pipeline is 1m.
Embodiment 4
A kind of highway bridge bridge deck drainage facility, including the drainage pipeline 1 being laid under bridge floor, set inside drainage pipeline 1
There are support meanss 2, the cross section of support meanss 2 is Λ shapes, and the summit of support meanss 2 is located at the circular top surface of drainage pipeline 1, branch
The bottom of support arrangement 2 extends towards to both sides, and drainage pipeline 1 is semicircle, and base portion also extends towards to both sides, and both sides are equal
With groove portion.The base portion both sides of drainage pipeline are provided with the part extended obliquely upward, during the part that both sides extend obliquely upward is in
The heart is symmetrical.
In the groove portion on the base portion both sides of the bottom both sides extension insertion drainage pipeline 1 of support meanss 2.Drainage pipeline 1 and branch
Support arrangement 2 is centrosymmetric, and the height of support meanss 2 is equal to the radius of drainage pipeline 1.The radius of drainage pipeline is 1m.
Embodiment 5
A kind of highway bridge bridge deck drainage facility, including the drainage pipeline 1 being laid under bridge floor, set inside drainage pipeline 1
There are support meanss 2, the cross section of support meanss 2 is Λ shapes, and the summit of support meanss 2 is located at the circular top surface of drainage pipeline 1, branch
The bottom of support arrangement 2 extends towards to both sides, and drainage pipeline 1 is semicircle, and base portion also extends towards to both sides, and both sides are equal
With groove portion.The base portion both sides of drainage pipeline are provided with the part extended obliquely upward, during the part that both sides extend obliquely upward is in
The heart is symmetrical.
In the groove portion on the base portion both sides of the bottom both sides extension insertion drainage pipeline 1 of support meanss 2.Drainage pipeline 1 and branch
Support arrangement 2 is centrosymmetric, and the height of support meanss 2 is equal to the radius of drainage pipeline 1.The radius of drainage pipeline is 1.5m.
Embodiment 6
A kind of highway bridge bridge deck drainage facility, including the drainage pipeline 1 being laid under bridge floor, set inside drainage pipeline 1
There are support meanss 2, the cross section of support meanss 2 is Λ shapes, and the summit of support meanss 2 is located at the circular top surface of drainage pipeline 1, support
The bottom of device 2 extends towards to both sides, and drainage pipeline 1 is semicircle, and base portion also extends towards to both sides, and both sides have
There is groove portion.The base portion both sides of drainage pipeline are provided with the part extended obliquely upward, and the part that both sides extend obliquely upward is in center
Symmetrically.
In the groove portion on the base portion both sides of the bottom both sides extension insertion drainage pipeline 1 of support meanss 2.Drainage pipeline 1 and branch
Support arrangement 2 is centrosymmetric, and the height of support meanss 2 is equal to the radius of drainage pipeline 1.The radius of drainage pipeline is 2m.
By being provided with support meanss in drainage pipeline, the structural strength around drainage pipeline, draining greatly strengthen
The internal diameter of pipeline can also increase, and the base portion both sides in embodiment 4-6 structure due to drainage pipeline are provided with obliquely upward
The part of extension, therefore its overall construction intensity is bigger, the settable radius of drainage pipeline is bigger.
The utility model is not restricted to the described embodiments, and simply illustrates this reality described in above-described embodiment and specification
With new principle, on the premise of the spirit and scope of the utility model is not departed from, the utility model also have various change and
Improve, these changes and improvements are both fallen within claimed the scope of the utility model.The utility model requires protection scope by
Appended claims and its equivalent thereof.
Claims (8)
1. a kind of highway bridge bridge deck drainage facility, including the drainage pipeline being laid under bridge floor, it is characterised in that:Drainage pipeline
Inside is provided with support meanss, and the cross section of the support meanss is Λ shapes, and the support meanss summit is located at drainage pipeline
Circular top surface, the bottom of the support meanss extend towards to both sides.
2. highway bridge bridge deck drainage facility according to claim 1, it is characterised in that:The drainage pipeline is semicircle
Shape, and base portion also extends towards to both sides, and both sides are respectively provided with groove portion.
3. highway bridge bridge deck drainage facility according to claim 2, it is characterised in that:The bottom two of the support meanss
In the groove portion on the base portion both sides of side extension insertion drainage pipeline.
4. highway bridge bridge deck drainage facility according to claim 2, it is characterised in that:The base portion two of the drainage pipeline
Side is provided with the part extended obliquely upward.
5. highway bridge bridge deck drainage facility according to claim 4, it is characterised in that:The described of both sides prolongs obliquely upward
The part stretched is centrosymmetric.
6. highway bridge bridge deck drainage facility according to claim 1, it is characterised in that:The drainage pipeline is in center pair
Claim.
7. highway bridge bridge deck drainage facility according to claim 1, it is characterised in that:The support meanss are in center pair
Claim.
8. highway bridge bridge deck drainage facility according to claim 1, it is characterised in that:Height of the support meanss etc.
In the radius of the drainage pipeline.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720616724.8U CN207130617U (en) | 2017-05-31 | 2017-05-31 | A kind of highway bridge bridge deck drainage facility |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720616724.8U CN207130617U (en) | 2017-05-31 | 2017-05-31 | A kind of highway bridge bridge deck drainage facility |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207130617U true CN207130617U (en) | 2018-03-23 |
Family
ID=61631423
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720616724.8U Expired - Fee Related CN207130617U (en) | 2017-05-31 | 2017-05-31 | A kind of highway bridge bridge deck drainage facility |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207130617U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108677703A (en) * | 2018-06-04 | 2018-10-19 | 郑州德威机械设备有限公司 | A kind of highway bridge bridge deck drainage facility |
-
2017
- 2017-05-31 CN CN201720616724.8U patent/CN207130617U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108677703A (en) * | 2018-06-04 | 2018-10-19 | 郑州德威机械设备有限公司 | A kind of highway bridge bridge deck drainage facility |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103541310A (en) | Long-united bridge widening splicing structure and construction method thereof | |
CN207130617U (en) | A kind of highway bridge bridge deck drainage facility | |
CN104314003A (en) | Long-life reinforcing mesh flexible fiber reinforced concrete bridge deck pavement structure | |
CN207017093U (en) | New-old concrete bond widens seam-line removal structure | |
CN205999792U (en) | Spliced bridging structure | |
CN103015307B (en) | Prestressed concrete pontoon bridge | |
CN213709015U (en) | Scattered gravel pavement structure capable of enhancing pavement strength | |
CN209099165U (en) | A kind of expanded joint structure suitable for bridge | |
CN204401452U (en) | Oblique prestressed concrete composite pavement connects with bridge transition structure | |
CN208884350U (en) | A kind of bridge on highway discharge structure | |
CN203530865U (en) | Long-connection bridge widening splicing structure | |
CN208455404U (en) | A kind of long-life Steel Bridge Deck draining paving structure layer | |
CN209260544U (en) | A kind of road and bridge seamless connection structure for large and medium-sized bridge | |
CN106337342A (en) | Road cross section structure of mountainous road | |
CN207159816U (en) | A kind of drainage bridge floor of overpass | |
CN208415099U (en) | Rib steel reinforced floorings | |
CN205474797U (en) | Hold formula beam element and half through bridge girder construction among prefabricated ultra high performance concrete | |
CN204919331U (en) | Prevent ponding bridge floor | |
CN206308613U (en) | Beam-ends percolating water ejector at a kind of expansion joint | |
CN206396582U (en) | Exclude the road structure and its construction member of hard surface ponding | |
CN109695205A (en) | System reinforcement method for steel plate combination continuous beam | |
CN221118138U (en) | Asphalt concrete pavement repair structure | |
CN204530463U (en) | A kind of pedestrian overcrossing dewatering installation | |
CN215289547U (en) | Town road waterproof construction | |
CN209129004U (en) | A kind of high gradient slope supporting construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180323 |