CN207121878U - Gate assembly - Google Patents
Gate assembly Download PDFInfo
- Publication number
- CN207121878U CN207121878U CN201720633697.5U CN201720633697U CN207121878U CN 207121878 U CN207121878 U CN 207121878U CN 201720633697 U CN201720633697 U CN 201720633697U CN 207121878 U CN207121878 U CN 207121878U
- Authority
- CN
- China
- Prior art keywords
- gate
- board
- side plate
- river course
- main gate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Barrages (AREA)
Abstract
The application is related to gate assembly.Gate assembly includes gate sheet, ground and drive division, the ground includes the first matrix, second matrix and erecting bed, first matrix and second matrix are oppositely arranged and form river course therebetween, width of the gate sheet along the river course is across the whole river course, the erecting bed extends from first matrix and/or second matrix to be formed, its bearing of trend is the width along the river course backwards to the river course, the drive division is arranged on the erecting bed and is connected with the gate sheet, to drive the gate sheet to open and close the river course.Using the technical scheme, maintenance and maintenance difficulty can be reduced.
Description
Technical field
The application is related to hydraulic engineering technical field, more particularly to a kind of gate assembly.
Background technology
Flap gate is water conservancy projects indispensable in water storage dam, and flap gate is mainly used in reservoir, river, storage
Pond etc. intercepts or excretion current.
Flap gate includes being used for the opening device for controlling its gate sheet to open and close, in the related art, the unlatching
Device is typically mounted in river course.When needing to repair opening device and maintained, operating personnel need to enter in river course
Portion, operation difficulty are very high.
It is, therefore, desirable to provide a kind of improved plan solves drawbacks described above.
Utility model content
This application provides a kind of gate assembly, the operation difficulty of maintenance personal can be reduced.
This application provides a kind of gate assembly, including gate sheet, ground and drive division, the ground includes the first base
Body, the second matrix and erecting bed, first matrix and second matrix are oppositely arranged and form river therebetween
Road,
Width of the gate sheet along the river course across the whole river course,
The erecting bed extends from first matrix and/or second matrix to be formed, its bearing of trend be along
The width in the river course backwards to the river course,
The drive division is arranged on the erecting bed and is connected with the gate sheet, to drive the gate sheet to open
With the closing river course.
Preferably, the gate sheet includes main gate-board and side plate, and width of the main gate-board along the river course is horizontal
Across the whole river course, the main gate-board is connected with the side plate, and the main gate-board passes through the side plate and the driving
Portion connects.
Preferably, the side plate includes the first side plate and the second side plate, first side plate and second side plate point
It is not connected to the both ends of the main gate-board along its length, and first side plate and second side plate are along the master
The symmetrical center line of flashboard width is symmetrical arranged.
Preferably, the drive division includes the first drive division and the second drive division, first drive division and described first
Side plate is connected, and second drive division is connected with second side plate.
The main gate-board includes main gate-board body and buffer part, and the buffer part is arranged on the main gate-board body,
And the pressure acted on for buffered water on the gate sheet.
Preferably, the buffer part is the arc convex being formed on the main gate-board body, the arc convex it is convex
Outgoing direction is relative with the flow direction of water.
Preferably, the gate sheet also includes the first reinforcement structure, first reinforcement structure connect the main gate-board and
The side plate.
Preferably, the main gate-board also includes the second reinforcement structure, so the second reinforcement structure and the main gate-board body
Connection.
Preferably, first drive division and second drive division include rotating shaft and driving group, the driving group
The axis of rotation is driven to realize the opening and closing of the gate sheet.
Preferably, the axis of the rotating shaft is concordant with symmetrical center line of the main gate-board along the river width direction.
Preferably, in addition to sealing structure, the sealing structure be arranged on the gate sheet and first matrix and
Between the gate sheet and second matrix.
Preferably, filtrating overflow hole, length of the filtrating overflow hole along the main gate-board are further opened with the main gate-board
Direction extension is spent, and is arranged on a sidepiece of the main gate-board along its width, when the gate sheet closes the river
During road, the sidepiece is located at the main gate-board adjacent to the side of the water surface in the river course.
The technical scheme that the application provides can reach following beneficial effect:
The gate assembly that the application provides, drive division being arranged on erecting bed, erecting bed is located at the both sides in river course, so that
Obtaining when operating personnel are repaired and maintained to drive division to enter back into river course, reduce the work difficulty of staff.
It should be appreciated that the general description and following detailed description of the above are only exemplary, this can not be limited
Application.
Brief description of the drawings
The stereogram I for the gate assembly that Fig. 1 is provided by the embodiment of the present application;
Schematic diagram after the drive division amplification that Fig. 2 is provided by the embodiment of the present application;
The stereogram II for the gate sheet assembly that Fig. 3 is provided by the embodiment of the present application;
The scheme of installation for the gate assembly that Fig. 4 is provided by the embodiment of the present application.
Reference:
100- gate assemblies;
10- gate sheets;
101- main gate-boards;
1011- main gate-board bodies;
1012- buffer parts;
1013- filtrating overflows hole;
The reinforcement structures of 1014- second;
102- side plates;
The side plates of 1021- first;
The side plates of 1022- second;
The reinforcement structures of 103- first;
20- grounds;
The matrixes of 201- first;
The matrixes of 202- second;
203- erecting beds;
30- drive divisions;
301- rotating shafts;
302- driving groups;
3021- brakes;
3022- rotating shaft support parts;
3023- gear-boxes;
200- river courses.
Accompanying drawing herein is merged in specification and forms the part of this specification, shows the implementation for meeting the application
Example, and be used to together with specification to explain the principle of the application.
Embodiment
The application is described in further detail below by specific embodiment and with reference to accompanying drawing.
As shown in Figure 1-2, this application provides a kind of gate assembly 100, including gate sheet 10, ground 20 and drive division
30.Ground 20 includes the first matrix 201, the second matrix 202 and erecting bed 203, the first matrix 201 and the phase of the second matrix 202
To setting, and river course 200 is formed between the first matrix 201 and the second matrix 202.
Width of the gate sheet 10 along river course 200 is across on whole river course 200, and gate sheet 10 passes through drive division
30 drivings can open and close river course 200.
Erecting bed 203 extends from the first matrix 201 and/or the second matrix 202 to be formed, the bearing of trend of erecting bed 203
It is the side of the width along river course 200 and the side extension backwards to river course 200.That is, erecting bed 203 is located at river
The both sides in road 200, erecting bed 203 are installed for drive division 30.After being arranged such, operating personnel need not enter back into right in river course 200
Drive division 30 is repaired and maintained, and need to only be operated in the both sides in river course 200.Therefore, the work difficulty of operating personnel is reduced.
Drive division 30 is used to drive gate sheet 10 to open and close river course 200, and the set-up mode of drive division 30 has a variety of.
For example, drive division 30 can include hydraulic cylinder and connection member, one end of connection member is connected with gate sheet 10, the other end with
Piston rod connection in hydraulic cylinder.When the piston rod in hydraulic cylinder extends and retracts, gate sheet 10 can move up and down to open
With closing river course 200.
In the present embodiment, drive division 30 includes rotating shaft 301 and driving group 302, and the drive shaft 301 of driving group 302 rotates, from
And gate sheet 10 is driven to open and close river course 200.Driving group 302 can include motor.In the present embodiment, driving group 302 is excellent
Elect oscillating oil cylinder as.
The structure of gate sheet 10 can also have multiple choices, as long as gate sheet 10, which can be realized, opens and closes river course 200
Function.In the present embodiment, as shown in figure 3, gate sheet 10 preferably includes main gate-board 101 and side plate 102.Main gate-board
101 along the width in river course 200 across on whole river course 200, main gate-board 101 is as opening and closing and river course 200
Main part.Side plate 102 is connected on main gate-board 101, and main gate-board 101 is connected via side plate 102 with rotating shaft 301.This side
In case, the rotating shaft 301 in drive division 30 is connected with side plate 102, the radius of gyration of gate sheet 10 can be increased, so as to increase lock
The moving displacement of door-plate 10.That is, turn over less angle at rotating shaft 301, can just be obtained at gate sheet 10 compared with
Big displacement.This scheme shortens actuation time when gate sheet 10 is turned on and off river course 200, improves efficiency.
As shown in figure 3, side plate 102 further preferably includes the first side plate 1021 and the second side plate 1022, the first side plate 1021 with
And second side plate 1022 be connected to the both ends of main gate-board 101 (X-direction in Fig. 3) along its length, and the first side
The side plate 1022 of plate 1021 and second is symmetricly set on symmetrical centre of the main gate-board 101 along its width (Y-direction in Fig. 3)
The both sides of line.After being set by this scheme, gate sheet 10 is symmetrical structure, during river course 200 is opened and closed, due to lock
The center of gravity of door-plate 10 is located at its symmetrical centre, and therefore, the kinetic stability of gate sheet 10 is higher, can avoid deflection during motion
Or bite.In the present embodiment, the angle of preferably the first side plate 1021 and the second side plate 1022 and main gate-board 101 is 90 °.
Further, the axis of rotating shaft 301 is also concordant with the symmetrical center line of the length direction of main gate-board 101.Due to turning
The overall structure that axle 301 is formed after being connected with gate sheet 10 is also symmetrical, therefore, in stability of the gate sheet 10 in motion process
Can further it improve.
As shown in figure 3, main gate-board 101 includes main gate-board body 1011 and buffer part 1012, buffer part 1012 is arranged on
On main gate-board body 1011.The pressure that the setting of buffer part 1012 can be acted on gate sheet 10 with buffered water, reduce gate sheet
10 deformation under hydraulic pressure effect, to extend the service life of gate sheet 10.
Buffer part 1012 can select soft material, and the appearance of main gate-board body 1011 is coated on using the soft material
Face, with impact of the buffered water to main gate-board 101.
In the present embodiment, buffer part 1012 is preferably arranged to the arc convex to be formed on main gate-board body 1011, the arc
Shape projection protrudes from the plate face of main gate-board body 1011, and relative with the flow direction of water.Impacted when water is formed to main gate-board 101
When, elastic deformation can occur for the arc convex, and the elastic deformation can be used for offsetting the effect that water is acted on main gate-board 101
Power, so as to realize buffering.
In addition, being further opened with filtrating overflow hole 1013 on main gate-board 101, filtrating overflow hole 1013 is used to control water surface height
Degree, and prevent large volume of floating object from passing through.Specifically, filtrating overflow hole 1013 is long and narrow strip structure, and it is set
Extend in a sidepiece of the main gate-board 101 along its width, and along the length direction of main gate-board 101.When gate sheet 10 closes
When closing river course 200, the sidepiece is located at the side that main gate-board 101 closes on the water surface of river course 200.It is in this scheme, the advantages of one side
Stable water surface landscape can be provided, be that can effectively intercept floating object the advantages of another aspect, improve the ecological environment.
In the gate assembly 100 that the application provides, the quantity of drive division 30 is preferably arranged to two, i.e. the first drive division
With the second drive division.First drive division is connected with the first side plate 1021, and the second drive division is connected with the second side plate 1022.Two drives
The dynamic combination settings of portion 30 can increase driving force when gate sheet 10 moves, and river course is opened and closed so as to add gate sheet 10
200 reliability.Meanwhile it can also extend the service life of drive division 30.
When gate sheet 10 closes river course 200, revealed to reduce water from the both sides in river course 200, in the gate assembly 100
Also include sealing structure.Sealing structure is arranged between the matrix 201 of gate sheet 10 and first and the matrix of gate sheet 10 and second
Between 202.Sealing structure can use the sealing gasket of quality of rubber materials, can also use labyrinth sealing.
As shown in figure 4, gate sheet 10 has the first open position, the first open position refers to gate sheet 10 close to river course
The side of 200 bottoms is less than the water surface, and the side away from the bottom of river course 200 is higher than the water surface.When gate sheet 10 is in the first open position
When putting, the gate sheet 10 can effectively intercept floating object, and the silt to deposit in bottom of river channel is washed away, and ensure water generating work
That makees is smoothed out.
On the other hand, gate sheet 10 also has the second open position, as shown in figure 1, the second open position refers to gate sheet
Location after 10 positions closed from river course 200 turn over 90 °.Now, main gate-board 101 turns into the connection two sides of river course 200
Bridge, can be for use by.
Further, gate sheet 10 also includes the first reinforcement structure 103, and the first reinforcement structure 103 is used to connect main gate-board
101 and side plate 102, to improve the bonding strength between main gate-board 101 and side plate 102, safety when ensureing to pass through gate sheet 10
Property.In the present embodiment, 103 preferred ribs of the first reinforcement structure.One end of ribs is connected with main gate-board 101, the other end with
Side plate 102 connects, and ribs forms support therebetween, adds the bonding strength of main gate-board 101 and side plate 102 and subtracts
Small deformation and destruction.
Further, the second reinforcement structure 1014, the second reinforcement structure 1014 and main gate-board are also included on main gate-board 101
Body 1011 connects.Second reinforcement structure 1014 is used to strengthen main gate-board 101 intensity of itself.In the present embodiment, second strengthens
The preferred bar shaped reinforcement of structure 1014, and bar shaped reinforcement be arranged side by side it is a plurality of.Every reinforcement is each along main gate-board 101
Length direction extension.The setting of a plurality of reinforcement can make the self-strength of main gate-board 101 more uniform.
The gate assembly 100 that the application provides, driving group 302 also include brake 3021, and rotating shaft 301 passes through brake
3021 brakings.When river course 200 is opened, gate sheet 10 has towards the trend moved downward under gravity, and brake 3021 can
Larger brake force is provided, to keep the present position of gate sheet 10.In the present embodiment, the braking of 3021 preferred fluid pressure type of brake
Device, its brake force is big, and braking ability is excellent.
Further, brake 3021 is preferably also arranged at close to the side of gate sheet 10.Due to the weight of gate sheet 10
It is larger, select brake 3021 being arranged in rotating shaft 301 and close to the side of gate sheet 10, can further improve braking effect
Fruit.
Also, driving group 302 also includes rotating shaft support part 3022, rotating shaft 301 is supported on rotating shaft support part 3022.Rotating shaft
Support member 3022 is that rotating shaft 301 provides multiple fulcrums, reduces the deformation of rotating shaft 301.
In addition, driving group 302 also includes gear-box 3023, gear-box 3023 serves as the effect of decelerator, to be transferred to
The suitable rotating speed of gate sheet 10.In the present embodiment, gear-box 3023 and oscillating oil cylinder are integral type structure, and gear-box 3023
It is connected by shaft coupling with rotating shaft 301.
The preferred embodiment of the application is the foregoing is only, is not limited to the application, for the skill of this area
For art personnel, the application can have various modifications and variations.It is all within spirit herein and principle, made any repair
Change, equivalent substitution, improvement etc., should be included within the protection domain of the application.
Claims (12)
1. a kind of gate assembly, including gate sheet, ground and drive division, it is characterised in that the ground include the first matrix,
Second matrix and erecting bed, first matrix and second matrix are oppositely arranged and form river course therebetween,
Width of the gate sheet along the river course across the whole river course,
The erecting bed extends from first matrix and/or second matrix to be formed, and its bearing of trend is along described
The width in river course backwards to the river course,
The drive division is arranged on the erecting bed and is connected with the gate sheet, to drive the gate sheet to open and close
Close the river course.
2. gate assembly according to claim 1, it is characterised in that the gate sheet includes main gate-board and side plate, institute
Width of the main gate-board along the river course is stated across the whole river course, the main gate-board is connected with the side plate, and institute
Main gate-board is stated to be connected with the drive division by the side plate.
3. gate assembly according to claim 2, it is characterised in that the side plate includes the first side plate and the second side plate,
First side plate and second side plate are connected to the both ends of the main gate-board along its length, and described
The symmetrical center line of side plate and second side plate along the main gate-board width is symmetrical arranged.
4. gate assembly according to claim 3, it is characterised in that the drive division includes the first drive division and second and driven
Dynamic portion, first drive division are connected with first side plate, and second drive division is connected with second side plate.
5. gate assembly according to claim 4, it is characterised in that the main gate-board includes main gate-board body and buffering
Portion, the buffer part are arranged on the main gate-board body, and the pressure acted on for buffered water on the gate sheet.
6. gate assembly according to claim 5, it is characterised in that the buffer part is to be formed at the main gate-board body
On arc convex, the protrusion direction of the arc convex is relative with the flow direction of water.
7. according to the gate assembly described in claim any one of 2-6, it is characterised in that the gate sheet also includes first and strengthened
Structure, first reinforcement structure connect the main gate-board and the side plate.
8. according to the gate assembly described in claim any one of 5-6, it is characterised in that the main gate-board also includes second and strengthened
Structure, so the second reinforcement structure is connected with the main gate-board body.
9. according to the gate assembly described in claim any one of 4-6, it is characterised in that first drive division and described second
Drive division includes rotating shaft and driving group, the driving group drive the axis of rotation with realize the unlatching of the gate sheet and
Close.
10. gate assembly according to claim 9, it is characterised in that the axis of the rotating shaft and the main gate-board width
The symmetrical center line in direction is concordant.
11. according to the gate assembly described in claim any one of 1-6, it is characterised in that also including sealing structure, the sealing
Structure setting is between the gate sheet and first matrix and the gate sheet and second matrix.
12. according to the gate assembly described in claim any one of 2-6, it is characterised in that be further opened with the main gate-board
Spout hole, length direction extension of the filtrating overflow hole along the main gate-board are filtered, and it is wide along it to be arranged on the main gate-board
A sidepiece in direction is spent, when the gate sheet closes the river course, the sidepiece is located at the main gate-board adjacent to the river
The side of the water surface in road.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720633697.5U CN207121878U (en) | 2017-06-02 | 2017-06-02 | Gate assembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720633697.5U CN207121878U (en) | 2017-06-02 | 2017-06-02 | Gate assembly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207121878U true CN207121878U (en) | 2018-03-20 |
Family
ID=61615564
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720633697.5U Withdrawn - After Issue CN207121878U (en) | 2017-06-02 | 2017-06-02 | Gate assembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207121878U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107142904A (en) * | 2017-06-02 | 2017-09-08 | 中国水利水电科学研究院 | Gate assembly |
CN111820024A (en) * | 2020-07-29 | 2020-10-27 | 夏文进 | Method for promoting tree seedling cultivation cutting rooting |
-
2017
- 2017-06-02 CN CN201720633697.5U patent/CN207121878U/en not_active Withdrawn - After Issue
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107142904A (en) * | 2017-06-02 | 2017-09-08 | 中国水利水电科学研究院 | Gate assembly |
CN107142904B (en) * | 2017-06-02 | 2023-09-12 | 中国水利水电科学研究院 | Gate assembly |
CN111820024A (en) * | 2020-07-29 | 2020-10-27 | 夏文进 | Method for promoting tree seedling cultivation cutting rooting |
CN111820024B (en) * | 2020-07-29 | 2021-11-02 | 广西南岜仔科技有限公司 | Method for promoting tree seedling cultivation cutting rooting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207121878U (en) | Gate assembly | |
CN101509463B (en) | Door case type water (wind) turbine | |
CN207619941U (en) | A kind of sluice gate down-the-hole plane emergency gate structure | |
CN201485831U (en) | Door leaf type hydraulic gate | |
CN202597795U (en) | Multi-pedaled buoyant box type check valve | |
CN201694193U (en) | Bottom door and switching mechanism for railway hopper car | |
CN108797527A (en) | Bulkhgead gate on checkdam | |
CN208472654U (en) | A kind of flood control component | |
CN202347502U (en) | Trunnion lodging type gate | |
CN203096698U (en) | Water blocking device | |
CN107142904A (en) | Gate assembly | |
WO2016165513A1 (en) | Hydraulic lifting weir | |
CN206452696U (en) | A kind of land leveller ridge buster hoisting mechanism | |
CN220414161U (en) | Water conservancy water and electricity flood discharge gate | |
CN207987887U (en) | A kind of high voltage bearing arc-shaped cast-iron sluice gate | |
CN216238411U (en) | Hydraulic pressure flap gate buttress structure | |
CN101158151A (en) | Steel dam anchor gate | |
CN208867933U (en) | The swing arm of slag-soil truck translates roof system | |
CN207646696U (en) | A kind of pressure dam rotary gate | |
CN205501946U (en) | Steel dam gate with micromatic setting | |
CN109235378B (en) | Rear-mounted flap valve water filling valve driven by gears | |
CN109235375B (en) | Four-way running arc gate water filling valve | |
CN2751071Y (en) | Multi-support-hinge type arc gate with deep hole | |
CN206570776U (en) | A kind of new ellipsoid gate door hinge | |
CN203530938U (en) | Landscape steel dam with bottom cross shafts rotating |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20180320 Effective date of abandoning: 20230912 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20180320 Effective date of abandoning: 20230912 |
|
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |