CN207110671U - The two poles of the earth upset railing of improved belt locking - Google Patents
The two poles of the earth upset railing of improved belt locking Download PDFInfo
- Publication number
- CN207110671U CN207110671U CN201720986320.8U CN201720986320U CN207110671U CN 207110671 U CN207110671 U CN 207110671U CN 201720986320 U CN201720986320 U CN 201720986320U CN 207110671 U CN207110671 U CN 207110671U
- Authority
- CN
- China
- Prior art keywords
- pillar
- railing
- mounting rod
- rotating shaft
- poles
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910001256 stainless steel alloy Inorganic materials 0.000 claims description 6
- 239000000956 alloy Substances 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 4
- 239000004566 building material Substances 0.000 abstract description 3
- 238000005034 decoration Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses the two poles of the earth of improved belt locking to overturn railing, including the first pillar and the second pillar, first rotating shaft and the second rotating shaft are separately installed among the mutually close side wall of first pillar and the second pillar, the one end of the first rotating shaft away from the second pillar is fixed with the first mounting rod, the described one end of second rotating shaft away from the first pillar is fixed with the second mounting rod, the first rotating shaft is connected with the output shaft of motor close to one end of the second pillar, the mutually close side of first mounting rod and the second mounting rod is equidistant to be uniformly provided with railing, first mounting rod and the second mounting rod are equipped with the first fixing groove at the top and bottom of mutually remote side.In the utility model, railing is overturn with two-stage, and vertical relation is kept with the first pillar and the second pillar, allow the operation employee in building site that easily building site building materials are carried in building site, do not interfere with job schedule, the present apparatus is simple in construction, modern design, it is worthy to be popularized.
Description
Technical field
It the utility model is related to two-stage upset railing technical field, more particularly to the two poles of the earth upset column of improved belt locking
Bar.
Background technology
The ancient title across of railing China, also referred to as hook door screen are bridges and architectural safety devices.Railing rises in use to be divided
Every, be oriented to effect, make be divided zone boundary it is clearly clear, designed railing, have very much decoration significance.On Zhou Dynasty sacrificial vessel seat
There is the component of similar railing.Han dynasty is most using sleeping lattice formula railing.Six Dynasties's hook tabs prevailing hooks door screen.Railing corner founds baluster column or seeks cane
The twisted mouth person of making, it is found in Yungang Grottoes, Dunhuang frescoes.The wooden railing of first Ming and Qing is than relatively fine, and stone balustrade progressively disengages wood
The shape of railing processed, tend to thick and heavy.After the late Qing Dynasty, the railing form of western classical ratio, yardstick and decoration enters China.It is modern
The material of railing and moulding are more various.
Railing is very common in life, in road or site construction, can all be placed with railing, to cut zone
Through protecting pedestrian, danger is produced, but the presence of railing is also in certain journey provided with railing in order to prevent passerby to be strayed into on-site
The entrance of operation employee is prevented on degree, is inconvenient when carrying thing because of the presence of railing, influences job schedule.
The content of the invention
The purpose of this utility model is and the improved belt locking that proposes in order to solve shortcoming present in prior art
The two poles of the earth overturn railing.
To achieve these goals, the utility model employs following technical scheme:
The two poles of the earth upset railing of improved belt locking, including the first pillar and the second pillar, first pillar and second
Be separately installed with first rotating shaft and the second rotating shaft among the mutually close side wall of pillar, the first rotating shaft away from the second pillar one
End is fixed with the first mounting rod, and the described one end of second rotating shaft away from the first pillar is fixed with the second mounting rod, described first turn
Axle is connected with the output shaft of motor close to one end of the second pillar, and first mounting rod and the second mounting rod are mutually close
Side is equidistant to be uniformly provided with railing, and first mounting rod and the second mounting rod are equipped with the top and bottom of mutually remote side
First fixing groove, the mutually remote side centre position of first mounting rod and the second mounting rod is provided with the second fixing groove, described
Through hole is equipped with the top of first pillar and the second pillar, and T-shaped steady pin is movably installed with through hole, the T-shaped steady pin
On be connected with extension spring, one end of extension spring described in two groups connects the first pillar and the second pillar, first pillar and second respectively
The mutually remote side wall of pillar is provided with bearing, and the inner ring of the bearing is connected with one end of spring stack, the spring stack it is another
End is connected with fixed mount, and fixed mount matches with the second fixing groove size.
Preferably, the top of first pillar and the second pillar is respectively and fixedly provided with base, and base is bolted on
On ground.
Preferably, the T-shaped steady pin matches with the first fixing groove size.
Preferably, the quantity of the railing is 3-4 roots, and railing is made up of stainless steel alloy material.
Preferably, the fixed mount is U-shape structure, and is made up of stainless steel alloy.
Compared with prior art, the beneficial effects of the utility model are:In the utility model, railing is set to be overturn with two-stage
And vertical relation can be kept with the first pillar and the second pillar, allow the operation employee in building site easily by building site building materials
It is carried in building site, does not interfere with job schedule, the present apparatus is simple in construction, novel in design, is worthy to be popularized.
Brief description of the drawings
Fig. 1 be the utility model proposes improved belt locking the two poles of the earth overturn railing structural representation;
Fig. 2 be the utility model proposes the two poles of the earth of improved belt locking overturn the railing structure vertical with pillar of railing
Schematic diagram.
In figure:1 first pillar, 2 second pillars, 3 first rotating shafts, 4 second rotating shafts, 5 motors, 6 second mounting rods, 7
First mounting rod, 8 railings, 9 first fixing grooves, 10 second fixing grooves, 11T types steady pin, 12 extension springs, 13 bearings, 14 spring stacks,
15 fixed mounts.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.
Reference picture 1-2, the two poles of the earth upset railing of improved belt locking, including the first pillar 1 and the second pillar 2, first
The top of the pillar 2 of post 1 and second is respectively and fixedly provided with base, and base is bolted on ground, the first pillar 1 and second
Be separately installed with the rotating shaft 4 of first rotating shaft 3 and second among the mutually close side wall of post 2, first rotating shaft 3 away from the second pillar 3 one
End is fixed with the first mounting rod 7, and the one end of the second rotating shaft 4 away from the first pillar 1 is fixed with the second mounting rod 6, and first rotating shaft 3 is leaned on
One end of nearly second pillar 3 is connected with the output shaft of motor 5, the first mounting rod 7 side mutually close with the second mounting rod 6
Equidistant to be uniformly provided with railing 8, the quantity of railing 8 is 3-4 roots, and railing is made up of stainless steel alloy material, the first mounting rod 7
The first fixing groove 9, the first mounting rod 7 and the second mounting rod 6 are equipped with the top and bottom of the side mutually remote with the second mounting rod 6
Mutually remote side centre position is provided with the second fixing groove 10, and the top of the first pillar 1 and the second pillar 2 is equipped with through hole, and
T-shaped steady pin 11 is movably installed with through hole, T-shaped steady pin 11 matches with the size of the first fixing groove 9, on T-shaped steady pin 11
Extension spring 12 is connected with, one end of two groups of extension springs 12 connects the first pillar 1 and the second pillar 2, the first pillar 1 and the second pillar respectively
2 mutually remote side walls are provided with bearing 13, and the inner ring of bearing 13 is connected with one end of spring stack 14, and the other end of spring stack 14 connects
Fixed mount 15 is connected to, and fixed mount 15 matches with the size of the second fixing groove 10, fixed mount 15 is U-shape structure, and by stainless steel
Alloy is made, and in the utility model, railing is overturn with two-stage and can be kept hanging down with the first pillar 1 and the second pillar 2
Straight relation, allow the operation employee in building site that easily building site building materials are carried in building site, do not interfere with job schedule, this dress
Put it is simple in construction, it is novel in design, be worthy to be popularized.
Operation principle:When needing railing 8 carrying out two-stage upset, T-shaped steady pin 11 is extracted, then starts motor
5, the rotating shaft 4 of first rotating shaft 3 and second is rotated, is rotated to 180 degree, can then be put down with realizing that the two-stage of railing 8 is overturn
T-shaped steady pin 11, is allowed to fixed;And railing 8 can turn over turn 90 degrees when, torsional spring post 14, fixed mount 15 is stuck in second
In fixing groove 10, make the keep level of railing 8, facilitate workers carry's goods.
It is described above, the only preferable embodiment of the utility model, but the scope of protection of the utility model is not
This is confined to, any one skilled in the art is in the technical scope that the utility model discloses, according to this practicality
New technical scheme and its utility model design are subject to equivalent substitution or change, should all cover in protection model of the present utility model
Within enclosing.
Claims (5)
1. the two poles of the earth upset railing of improved belt locking, including the first pillar(1)With the second pillar(2), it is characterised in that it is described
First pillar(1)With the second pillar(2)First rotating shaft is separately installed among mutually close side wall(3)With the second rotating shaft(4), institute
State first rotating shaft(3)Away from the second pillar(2)One end be fixed with the first mounting rod(7), second rotating shaft(4)Away from first
Pillar(1)One end be fixed with the second mounting rod(6), the first rotating shaft(3)Close to the second pillar(2)One end be connected with drive
Dynamic motor(5)Output shaft, first mounting rod(7)With the second mounting rod(6)Mutually close side is equidistant to be uniformly provided with
Railing(8), first mounting rod(7)With the second mounting rod(6)The first fixation is equipped with the top and bottom of mutually remote side
Groove(9), first mounting rod(7)With the second mounting rod(6)Mutually remote side centre position is provided with the second fixing groove(10),
First pillar(1)With the second pillar(2)Top be equipped with through hole, and T-shaped steady pin is movably installed with through hole(11),
The T-shaped steady pin(11)On be connected with extension spring(12), extension spring described in two groups(12)One end connect the first pillar respectively(1)With
Second pillar(2), first pillar(1)With the second pillar(2)Mutually remote side wall is provided with bearing(13), the bearing
(13)Inner ring be connected with spring stack(14)One end, the spring stack(14)The other end be connected with fixed mount(15), and it is solid
Determine frame(15)With the second fixing groove(10)Size matches.
2. the two poles of the earth upset railing of improved belt locking according to claim 1, it is characterised in that first pillar
(1)With the second pillar(2)Top be respectively and fixedly provided with base, and base is bolted on ground.
3. the two poles of the earth upset railing of improved belt locking according to claim 1, it is characterised in that the T-shaped steady pin
(11)With the first fixing groove(9)Size matches.
4. the two poles of the earth upset railing of improved belt locking according to claim 1, it is characterised in that the railing(8)'s
Quantity is 3-4 roots, and railing is made up of stainless steel alloy material.
5. the two poles of the earth upset railing of improved belt locking according to claim 1, it is characterised in that the fixed mount(15)
For U-shape structure, and it is made up of stainless steel alloy.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720986320.8U CN207110671U (en) | 2017-08-09 | 2017-08-09 | The two poles of the earth upset railing of improved belt locking |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720986320.8U CN207110671U (en) | 2017-08-09 | 2017-08-09 | The two poles of the earth upset railing of improved belt locking |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207110671U true CN207110671U (en) | 2018-03-16 |
Family
ID=61571168
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720986320.8U Expired - Fee Related CN207110671U (en) | 2017-08-09 | 2017-08-09 | The two poles of the earth upset railing of improved belt locking |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207110671U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593643A (en) * | 2019-09-24 | 2019-12-20 | 武汉博腾电力工程有限公司 | Detachable safety guardrail |
-
2017
- 2017-08-09 CN CN201720986320.8U patent/CN207110671U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593643A (en) * | 2019-09-24 | 2019-12-20 | 武汉博腾电力工程有限公司 | Detachable safety guardrail |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207110671U (en) | The two poles of the earth upset railing of improved belt locking | |
CN205041085U (en) | Safe anti -climb rail | |
CN108060646B (en) | A kind of wind-resistant vibration-attenuating rail | |
CN1740491A (en) | Automatically expanding garage with automobile side set for small covered area | |
CN206987427U (en) | A kind of prefabrication combined type adjustable support frame | |
CN207092420U (en) | A kind of Combined balcony railing of fall arrest | |
CN202718373U (en) | Movable operating workbench | |
CN208777171U (en) | A kind of bridge construction platform | |
CN204355913U (en) | A kind of construction elevator cage constructional device | |
CN208633587U (en) | A kind of housing construction temporary traffic jump frame | |
CN206205475U (en) | A kind of vertical opening protective device of shear wall structure | |
CN205392325U (en) | Blendor hoisting frame | |
CN206737805U (en) | Construction folding ladder | |
CN108952196A (en) | A kind of elevator protection canopy | |
CN218061333U (en) | Fastener type scaffold with moving function | |
CN208280571U (en) | A kind of external wall coat of paint maintenance hanging basket | |
CN206805907U (en) | The experience apparatus of steel construction potential safety hazard | |
CN107829676A (en) | A kind of architecture indoor finishing comfortable step ladder for being easy to place material | |
CN211985252U (en) | High altitude hanging flower basket for construction | |
CN206530040U (en) | Portable steel structure stairway | |
CN211873745U (en) | Bearing frame for building construction | |
CN208184106U (en) | A kind of building safety protective fence | |
CN218117152U (en) | Movable external wall construction platform | |
CN221664358U (en) | Landscape garden corridor frame structure | |
CN207003866U (en) | A kind of multi-composite type safety barrier for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180316 |
|
CF01 | Termination of patent right due to non-payment of annual fee |