CN207102989U CN201720983059.6U CN201720983059U CN207102989U CN 207102989 U CN207102989 U CN 207102989U CN 201720983059 U CN201720983059 U CN 201720983059U CN 207102989 U CN207102989 U CN 207102989U
Authority
CN
China
Prior art keywords
clean room
shell
pond
air
spray booth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720983059.6U
Other languages
Chinese (zh)
Inventor
张忠帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720983059.6U priority Critical patent/CN207102989U/en
Application granted granted Critical
Publication of CN207102989U publication Critical patent/CN207102989U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)

Abstract

The utility model discloses a kind of paint spray booth, including shell, it is arranged at the pond of the shell inside bottom, the sink top is provided with mesh dividing plate, the pond side is provided with blow-off pipe, the shell side is provided with controller, the cover top portion is provided with exhaust blower, and the enclosure is provided with clean room, and the clean room is located at the pond side and highly consistent with the pond.Beneficial effect is:During the utility model can be by carrying out air draft in the exhaust blower, mixed by the water smoke for generating the ultrasonic ultrasonic delay line memory with air, and filtered after the clean room is mixed by the air cleaner, improve the cleanliness factor of discharge air;By by air and water carry out it is dual mix, then filtered, reduce the pollutant concentration of the air cleaner inner air, reduce the replacement frequency of filter core, reduce spray painting purification of air cost.

Description

A kind of paint spray booth
Technical field
It the utility model is related to paint spraying apparatus, furniture manufacture field, and in particular to a kind of paint spray booth.
Background technology
Paint spray booth is the place for work of painting.Paint spray booth can provide the satisfaction spray painting not having under natural environment and apply Environment temperature, humidity, illuminance and the pure air of work are filled, can preferably carry out spray painting work, improves spray painting work Efficiency and quality.Traditional paint spray booth directly discharges waste gas after spray painting work is carried out, due to there is substantial amounts of oil in waste gas Paint and noxious material, directly discharge have had a strong impact on atmosphere quality.
Applicants have discovered that following technical problem in the prior art at least be present:Existing spray painting cleaning equipment generally use Dry filter sets pond to carry out air absorption and filtering in inside of paint booths, but because coating cloud can directly be inhaled after filtering It is attached to inside the filter core of filter plant, causes filter element replacing speed to be accelerated, improve spray painting cost, and be difficult to being mixed in air Coating cloud and noxious material carry out effective filtration, purification.
Utility model content
The purpose of this utility model is that to solve the above problems and provides a kind of paint spray booth, to solve prior art Middle spray painting indoor air filtration is not thorough, the technical problems such as air filtering core replacing speed causes very much purification of air cost higher soon. Preferable technical scheme has in many technical schemes provided by the utility model:Can be by being carried out to inside of paint booths air Most of paint and harmful substance in the Adsorption air of pond, while water smoke can be mixed during exhausting and air is entered The secondary mixing of row, and coordinate pond absorption and purification of air to improve the removal efficiency of harmful substance in air, and reduce sky The replacing speed of filter element, reduce the technique effects such as spray painting purification cost, elaboration as detailed below.
To achieve the above object, the utility model provides following technical scheme:
A kind of paint spray booth provided by the utility model, including shell, the pond for being arranged at the shell inside bottom, it is described Sink top is provided with mesh dividing plate, and the pond side is provided with blow-off pipe, and the shell side is provided with controller, described Cover top portion is provided with exhaust blower, and the enclosure is provided with clean room, the clean room be located at the pond side and with The pond is highly consistent, and air cleaner is provided with the top of the clean room;
Spray painting head is installed on the outer casing inner wall, infrared heater is installed on the outer casing inner wall, the shell is another Side is provided with the water inlet pipe for connecting the clean room;
Ultrasonic ultrasonic delay line memory is installed, the exhaust blower side is provided with delivery pipe, the conveying inside the exhaust blower Pipe is connected with the clean room, and the delivery pipe lower end is provided with rising head, and the rising head is located inside the clean room;
Net gas efferent duct is provided with the top of the air cleaner;
The junction in the clean room and the pond is provided with dividing plate, and the dividing plate is fixed at the top of the clean room.
Using a kind of above-mentioned paint spray booth, after workpiece to be painted is placed on the mesh dividing plate, the infrared heater exists Heated under the control of the controller, then the controller control spray painting head paints to workpiece, paints Coating cloud is fallen into the pond through the mesh dividing plate in journey, and remaining coating cloud is after exhaust blower extraction in air, in institute State and mixed inside exhaust blower with the water smoke of the ultrasonic ultrasonic delay line memory atomized inside, mixed gas is through described in delivery pipe feeding In clean room, mixed inside the clean room with water, then gas carries out purification filtering inside the air cleaner, most By the net gas efferent duct output.
Preferably, the clean room is connected with the pond, and height of the dividing plate away from clean room bottom is more than Height of water level inside the clean room.
Preferably, magnetic valve of the blow-off pipe with being mounted on electrically connecting the controller on the water inlet pipe.
Preferably, the riser height is less than dividing plate base height.
Preferably, the air cleaner is connected with the clean room, and the net gas efferent duct is through described outer Shell.
Preferably, the controller electrically connects with the spray painting head, the spray painting head is internally provided with electric powered steering knot Structure.
Preferably, the enclosure is provided with temperature monitoring, the temperature monitoring is electrically connected with the controller Connect.
Beneficial effect is:1st, the utility model can by the exhaust blower carry out air draft during, pass through by The water smoke of the ultrasonic ultrasonic delay line memory generation is mixed with air, and by the air after the clean room is mixed Filter is filtered, and improves the cleanliness factor of discharge air;
2nd, by by air and water carry out it is dual mix, then filtered, reduced empty inside the air cleaner The pollutant concentration of gas, the replacement frequency of filter core is reduced, reduce spray painting purification of air cost.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only It is some embodiments of the utility model, for those of ordinary skill in the art, is not paying the premise of creative work Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is control system block diagram of the present utility model.
Description of reference numerals is as follows:
1st, shell;101st, paint head;102nd, infrared heater;103rd, water inlet pipe;104th, blow-off pipe;2nd, controller;3rd, arrange Blower fan;301st, ultrasonic ultrasonic delay line memory;302nd, delivery pipe;303rd, rising head;4th, air cleaner;401st, net gas efferent duct;5th, purify Room;501st, dividing plate;6th, pond;601st, mesh dividing plate.
Embodiment
, below will be to technology of the present utility model to make the purpose of this utility model, technical scheme and advantage clearer Scheme is described in detail.Obviously, described embodiment is only the utility model part of the embodiment, rather than all Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not before creative work is made Resulting all other embodiment is put, belongs to the scope that the utility model is protected.
Referring to shown in Fig. 1-Fig. 2, the utility model provides a kind of paint spray booth, including shell 1, is arranged at the inner side of shell 1 The pond 6 of bottom, the top of pond 6 are provided with mesh dividing plate 601, and the side of pond 6 is provided with blow-off pipe 104, the installation of the side of shell 1 There is controller 2, the top of shell 1 is provided with exhaust blower 3, and shell 1 is internally provided with clean room 5, and clean room 5 is located at the side of pond 6 And it is highly consistent with pond 6, the top of clean room 5 is provided with air cleaner 4;
Spray painting first 101 is installed on the inwall of shell 1, infrared heater 102, the opposite side of shell 1 are installed on the inwall of shell 1 The water inlet pipe 103 of connection clean room 5 is installed;
Ultrasonic ultrasonic delay line memory 301 is installed, the side of exhaust blower 3 is provided with delivery pipe 302, delivery pipe 302 inside exhaust blower 3 It is connected with clean room 5, the lower end of delivery pipe 302 is provided with rising head 303, and rising head 303 is located inside clean room 5;
The top of air cleaner 4 is provided with net gas efferent duct 401;
The junction in clean room 5 and pond 6 is provided with dividing plate 501, and dividing plate 501 is fixed on the top of clean room 5;
During carrying out air draft in exhaust blower 3, by the way that the water smoke that ultrasonic ultrasonic delay line memory 301 generates and air are entered Row mixing, and purified room 5 mixed after filtered by air cleaner 4, improve discharge air cleanliness factor;
By by air and water carry out it is dual mix, then filtered, reduce the dirt of the inner air of air cleaner 4 Thing concentration is contaminated, reduces the replacement frequency of filter core, reduces spray painting purification of air cost.
As optional embodiment, clean room 5 is connected with pond 6, and height of the dividing plate 501 away from the bottom of clean room 5 More than the height of water level inside clean room 5, it is arranged such, can prevents cavity of the air through the lower section of dividing plate 501 inside shell 1 from entering Enter in clean room 5;
Blow-off pipe 104 and the magnetic valve for being mounted on electrically connecting controller 2 on water inlet pipe 103, are arranged such, achievable pair Automatically changed at the inside water source of pond 6;
The height of rising head 303 is arranged such, the coating cloud mixing water smoke sprayed through rising head 303 exists less than the base of dividing plate 501 height Below the water surface, it is ensured that fully contacted with the water source inside clean room 5;
Air cleaner 4 is connected with clean room 5, and net gas efferent duct 401 runs through shell 1;
Controller 2 electrically connects with spray painting first 101, and spray painting first 101 is internally provided with electric powered steering structure, is arranged such, can Realize that controller 2 automatically controls to first 101 motion of painting, realize auto spray painting;
Temperature monitoring is installed, temperature monitoring is electrically connected with controller 2, is arranged such, controller 2 inside shell 1 The heating-up temperature of infrared heater 102 can be automatically controlled according to the monitoring information of temperature monitoring.
Using said structure, after workpiece to be painted is placed on mesh dividing plate 601, infrared heater 102 is in controller 2 Heated under control, paint first 101 pairs of workpiece of the then control of controller 2 paint, in painting process coating cloud through mesh every Plate 601 is fallen into pond 6, and remaining coating cloud is after the extraction of exhaust blower 3 in air, in the inside of exhaust blower 3 and ultrasonic ultrasonic delay line memory The water smoke mixing of 301 atomized insides, mixed gas are sent into clean room 5 through delivery pipe 302, are mixed in the inside of clean room 5 with water, Then gas carries out purification filtering inside air cleaner 4, is most exported afterwards through net gas efferent duct 401.
It is described above, only specific embodiment of the present utility model, but the scope of protection of the utility model is not limited to In this, any one skilled in the art can readily occur in change in the technical scope that the utility model discloses Or replace, it should all cover within the scope of protection of the utility model.Therefore, the scope of protection of the utility model should be with the power The protection domain that profit requires is defined.

Claims (7)

1. a kind of paint spray booth, including shell (1), the pond (6) for being arranged at the shell (1) inside bottom, pond (6) top Portion is provided with mesh dividing plate (601), and pond (6) side is provided with blow-off pipe (104), it is characterised in that:The shell (1) Side is provided with controller (2), is provided with exhaust blower (3) at the top of the shell (1), the shell (1) is internally provided with purification Room (5), the clean room (5) are located at the pond (6) side and, clean room (5) top highly consistent with the pond (6) Portion is provided with air cleaner (4);
Spray painting head (101) is installed on shell (1) inwall, infrared heater is installed on shell (1) inwall (102), shell (1) opposite side is provided with the water inlet pipe (103) for connecting the clean room (5);
Ultrasonic ultrasonic delay line memory (301) is installed inside the exhaust blower (3), exhaust blower (3) side is provided with delivery pipe (302), the delivery pipe (302) is connected with the clean room (5), and delivery pipe (302) lower end is provided with rising head (303), it is internal to be located at the clean room (5) for the rising head (303);
Net gas efferent duct (401) is provided with the top of the air cleaner (4);
The junction in the clean room (5) and the pond (6) is provided with dividing plate (501), and the dividing plate (501) is fixed on described At the top of clean room (5).
A kind of 2. paint spray booth according to claim 1, it is characterised in that:The clean room (5) is connected with the pond (6) It is logical, and height of the dividing plate (501) away from clean room (5) bottom is more than the clean room (5) internal height of water level.
A kind of 3. paint spray booth according to claim 2, it is characterised in that:The blow-off pipe (104) and the water inlet pipe (103) On be mounted on electrically connecting the magnetic valves of the controller (2).
A kind of 4. paint spray booth according to claim 3, it is characterised in that:The rising head (303) is highly less than the dividing plate (501) base height.
A kind of 5. paint spray booth according to claim 4, it is characterised in that:The air cleaner (4) and the clean room (5) It is connected, and the net gas efferent duct (401) runs through the shell (1).
A kind of 6. paint spray booth according to claim 5, it is characterised in that:The controller (2) and spray painting head (101) electricity Connection, the spray painting head (101) are internally provided with electric powered steering structure.
A kind of 7. paint spray booth according to any one of claim 1 to 6, it is characterised in that:It is provided with inside the shell (1) Temperature monitoring, the temperature monitoring electrically connect with the controller (2).
CN201720983059.6U 2017-08-08 2017-08-08 A kind of paint spray booth Expired - Fee Related CN207102989U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720983059.6U CN207102989U (en) 2017-08-08 2017-08-08 A kind of paint spray booth

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720983059.6U CN207102989U (en) 2017-08-08 2017-08-08 A kind of paint spray booth

Publications (1)

Publication Number Publication Date
CN207102989U true CN207102989U (en) 2018-03-16

Family

ID=61570924

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720983059.6U Expired - Fee Related CN207102989U (en) 2017-08-08 2017-08-08 A kind of paint spray booth

Country Status (1)

Country Link
CN (1) CN207102989U (en)

Similar Documents

Publication Publication Date Title
CN104190543B (en) A kind of wet electrical dust precipitator and comprise the electric precipitation desulfurizer of this wet electrical dust precipitator
CN201823666U (en) Dry spray booth
CN210786823U (en) Based on desulphurization unit for flue gas purification of thermal power plant
CN203124177U (en) Fixed type environmental-friendly integral air exchange paint-spraying room
CN106839026A (en) A kind of noise elimination oil fume purifier
CN110624344A (en) Treatment system for waste gas of paint spraying chamber
CN206621914U (en) Coating cloud filtration system and dry type spraying room
CN201470555U (en) Pump-free water-rotating paint spraying room
CN207102989U (en) A kind of paint spray booth
CN201659058U (en) Automated water-whirling paint-spraying system
CN105879539B (en) A kind of high-pressure electrostatic plasma smoke treated equipment
CN203764069U (en) Exhaust purification four-in-one machine
CN206965396U (en) A kind of water mist dust-removing system
CN202546943U (en) Air adjusting machine with humidifying and purifying functions
CN210699382U (en) Environment-friendly flue gas desulfurization device
CN212855108U (en) Tail gas treatment device for heating stove
CN210522146U (en) Environment-friendly dust remover
CN208320449U (en) The boiler flue gas purification system of effect is mentioned based on dehumidification drying device
CN112691488A (en) Waste gas purification equipment for biomass particle combustion
CN203043778U (en) Dust and exhaust gas treatment system in workshop
CN205913937U (en) Spray booth environmental protection cabinet
CN206762628U (en) A kind of boiler flue gas purification exhaust system
CN109381960A (en) A kind of printing Tower for purifying waste gas
CN217856718U (en) Environment-friendly electrostatic precipitator is used in mill's dust removal
CN216965104U (en) Environment-friendly paint spray booth with filtering function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180316

Termination date: 20180808

CF01 Termination of patent right due to non-payment of annual fee