CN207097418U - Procurement plan completeness suggestion device - Google Patents
Procurement plan completeness suggestion device Download PDFInfo
- Publication number
- CN207097418U CN207097418U CN201721151943.XU CN201721151943U CN207097418U CN 207097418 U CN207097418 U CN 207097418U CN 201721151943 U CN201721151943 U CN 201721151943U CN 207097418 U CN207097418 U CN 207097418U
- Authority
- CN
- China
- Prior art keywords
- flow
- graphic panel
- reel
- plate
- procurement plan
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Looms (AREA)
Abstract
The utility model discloses a kind of procurement plan completeness suggestion device, it is related to procurement plan engineering device technique field.It includes base;Reel is provided between two supporting plates;The outer end of main shaft has been fixedly connected with gear;Reel periphery middle part is provided with the locating slot of annular;The iron hoop of annular is connected with locating slot;Reel periphery is evenly distributed with flow Graphic Panel;Magnet is fixedly connected with the middle part of the rear end of flow Graphic Panel;The front end face of flow Graphic Panel is divided into clipboard, the neck on the right side of clipboard;Neck interpolation is connected to process identification plate in succession;Notice board is slidably connected in cavity;The upper end of notice board is provided with holding tank;The front end face of notice board is uniformly divided into multiple progress prompt areas;The clipboard of one of flow Graphic Panel is divided into the sorting plate of at least three bar shapeds.The beneficial effects of the utility model are:Simple in construction, flow classification is clear and definite, is convenient to plan record and completeness is checked, avoid repetition or the loss of procurement plan.
Description
Technical field
It the utility model is related to procurement plan engineering device technique field.
Background technology
When doing procurement plan work, general flow includes customer demand plan submission, procurement plan examination & approval, adopted in order
The determination of purchaser's formula, according to procurement method select supplier, sign commercial contract for future delivery, check and accepting storing, sale with supplier
Deng seven links, each link includes corresponding specific works arrangement again, and staff needs a device easily real
Now plan record effect, completeness is checked, suggesting effect, and lacks such device now.
Utility model content
Technical problem to be solved in the utility model, it is to be directed to above-mentioned technical deficiency, there is provided one kind buying meter
Draw completeness suggestion device.Simple in construction, flow classification is clear and definite, is convenient to plan record and completeness is checked, avoid buying from counting
The repetition drawn or loss.
The technical solution adopted in the utility model is:A kind of procurement plan completeness suggestion device, including base are provided;Bottom
Seat front end slidably connects drawer;Supporting plate has been fixedly connected with left and right sides of base upper end;Vertical lead is provided with supporting plate
To chute;Rack is installed with front side of guide chute;Reel is provided between two supporting plates;The left and right ends axle of reel
Main shaft has been fixedly connected with the heart;Main shaft is slidably connected with corresponding guide chute;The outer end of main shaft has been fixedly connected with gear;
Wheel and rack engagement coordinates;The uniform socket connection limited location plate on the rear side of guide chute, supporting plate;Reel periphery middle part
It is provided with the locating slot of annular;The iron hoop of annular is connected with locating slot;Reel periphery is evenly distributed with flow Graphic Panel;Each two
It is rotatablely connected between neighbouring flow Graphic Panel by pinboard;The upper and lower ends of the pinboard stream with upper and lower both sides respectively
Journey Graphic Panel is rotatablely connected;Magnet is fixedly connected with the middle part of the rear end of flow Graphic Panel;Magnet is connected with iron hoop magnetic absorption;Stream
The front end face of journey Graphic Panel is divided into clipboard, the neck on the right side of clipboard;Neck interpolation is connected to process identification plate in succession;Flow exhibition
The inside for showing plate is cavity structure, and cavity connects with flow Graphic Panel left end;Notice board is slidably connected in cavity;Notice board
Upper end is provided with holding tank;The front end face of notice board is uniformly divided into multiple progress prompt areas;The writing of one of flow Graphic Panel
Plate is divided into the sorting plate of at least three bar shapeds;Sorting plate left and right ends are rotatablely connected with flow displaying front edge of board respectively.
Further optimize the technical program, iron hoop and the locating slot of procurement plan completeness suggestion device are rotatablely connected;Volume
The left side of cylinder is provided with screwed hole;Screwed hole connects with locating slot side;Screwed hole internal thread is connected with puller bolt.
Further optimize the technical program, signal is installed on the process identification plate of procurement plan completeness suggestion device
Lamp;Right-hand member is provided with the controlling switch of signal lamp in cavity.
The utility model beneficial effect is:
1st, by the cooperation of wheel and rack, reel can realize that rotation is slided, while being slided up and down in guide chute,
Own rotation, connected by magnetic absorption between iron hoop and flow Graphic Panel, can be by flow Graphic Panel while spool turns
Periphery is wrapped in successively, and each flow Graphic Panel is corresponding with the process of a procurement plan respectively, and is sequentially arranged above and below, then
The procurement plan process not yet completed can be shown in front, coordinates the height change of reel, can play prompt completeness how many
Effect, reel is lower, and the completeness of whole procurement plan is higher, as a kind of completeness cue, while is convenient to check
Completed schedule flow, the setting of limiting plate can hinder the movement of gear, and reel is realized and positioned;
Different procurement plan flows is marked on process identification plate, class indication, flow displaying are carried out to flow Graphic Panel
The clipboard of front edge of board can correspond to writing standard process, plan etc., and the concrete operations to each flow are planned, prompted.It is empty
The notice board that intracavitary is slidably connected, the tool of the flow by the needs of each flow plan, can be sequentially write in progress prompt area
Body operating process, summary prompting is operated to the plan in each flow and completeness is prompted, and the holding tank in notice board can
For storing corresponding bill, plan record etc.;
Supplier is selected according to procurement method according among procurement plan workflow, three are roughly divided into the flow
Kind of selection, therefore one of clipboard is divided at least three sorting plates and carries out corresponding mark with supplier selection mode, selection
One determination mode, other sorting plates are overturn, the procurement method that only display determines, play suggesting effect, avoid confusion;
2nd, iron hoop and locating slot are rotatably assorted, and realize locking control using puller bolt, when iron hoop turns in locating slot
When dynamic, then it can realize that all flow Graphic Panels are connected with iron hoop magnetic, and realize rotation in the case of highly constant,
Most front side shows ongoing procurement plan flow;
3rd, the notice board slided in cavity can be turned on and off controlling switch, so as to control signal lamp, ongoing stream
Journey is bright state, and the flow completed and do not carried out is dark state, strengthens suggesting effect, signal prompt is used as using light.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the utility model practicality status architecture schematic diagram;
Fig. 3 is viewing angle constructions schematic diagram on rear side of Fig. 2;
Fig. 4 is the utility model flow Graphic Panel planar structure schematic diagram;
Fig. 5 is tally circuit figure of the present utility model;
Fig. 6 is a kind of expansion structure schematic diagram of the utility model;
In figure, 1, base;2nd, drawer;3rd, supporting plate;4th, guide chute;5th, rack;6th, reel;7th, main shaft;8th, gear;9、
Limiting plate;10th, locating slot;11st, iron hoop;12nd, flow Graphic Panel;13rd, pinboard;14th, magnet;15th, clipboard;16th, flow mark
Know plate;17th, cavity;18th, notice board;19th, holding tank;20th, progress prompt area;21st, sorting plate;22nd, puller bolt;23rd, signal
Lamp;24th, controlling switch.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
As shown in figures 1 to 6, procurement plan completeness suggestion device, including base 1;The front end of base 1 slidably connects drawer
2;Supporting plate 3 has been fixedly connected with left and right sides of the upper end of base 1;Vertical guide chute 4 is provided with supporting plate 3;Guide chute 4
Front side be installed with rack 5;Reel 6 is provided between two supporting plates 3;It is fixed at the left and right ends axle center of reel 6
It is connected with main shaft 7;Main shaft 7 is slidably connected with corresponding guide chute 4;The outer end of main shaft 7 has been fixedly connected with gear 8;Gear 8
Cooperation is engaged with rack 5;The uniform socket connection limited location plate 9 on the rear side of guide chute 4, supporting plate 3;In the periphery of reel 6
Portion is provided with the locating slot 10 of annular;The iron hoop 11 of annular is connected with locating slot 10;The periphery of reel 6 is evenly distributed with flow displaying
Plate 12;It is rotatablely connected between the neighbouring flow Graphic Panel 12 of each two by pinboard 13;The upper and lower ends of pinboard 13
The flow Graphic Panel 12 with upper and lower both sides is rotatablely connected respectively;Magnet 14 is fixedly connected with the middle part of the rear end of flow Graphic Panel 12;
Magnet 14 is connected with the magnetic absorption of iron hoop 11;The front end face of flow Graphic Panel 12 is divided into clipboard 15, the card on the right side of clipboard 15
Groove;Neck interpolation is connected to process identification plate 16 in succession;The inside of flow Graphic Panel 12 is the structure of cavity 17, cavity 17 and flow exhibition
Show that the left end of plate 12 connects;Notice board 18 is slidably connected in cavity 17;The upper end of notice board 18 is provided with holding tank 19;Notice board 18
Front end face be uniformly divided into multiple progress prompt areas 20;The clipboard 15 of one of flow Graphic Panel 12 divides at least three
The sorting plate 21 of shape;The left and right ends of sorting plate 21 are rotatablely connected with the front end of flow Graphic Panel 12 respectively;Iron hoop 11 and locating slot 10
Rotation connection;The left side of reel 6 is provided with screwed hole;Screwed hole connects with the side of locating slot 10;Screwed hole internal thread is connected with top
Tight bolt 22;Signal lamp 23 is installed on process identification plate 16;Right-hand member is provided with the controlling switch 24 of signal lamp 23 in cavity 17.
When in use, it is first-class to can be placed in desk, in the present embodiment, according to procurement plan completeness for the utility model
Be actually needed, not including sales process, to customer demand plan, procurement plan examination & approval, the determination of procurement method, according to buying side
Formula is to select supplier, commercial contract for future delivery is signed with supplier, check and accepting storing this six procurement plan flows are respectively in flow
Record identification is carried out on marking plate 16, and is plugged on the right side of different flow Graphic Panels 12 successively from top to bottom in sequence,
Six flow Graphic Panels 12 are made sequentially to be corresponded with six procurement plan workflows, to standard process, work on clipboard 15
Make the information such as summary, director and carry out writing mark;The specific works meter of progress prompt area 20 on notice board 18 to the flow
Draw and be arranged into running hand write record, and be written on successively from right to left in different progress prompt areas 20 in chronological order.Reel 6 rises
Beginning, position was located at guide chute 4 topmost, utilized the limiting plate 9 of the top to carry out clamping positioning, the flow Graphic Panel of the top
12 is corresponding with customer demand plan, is connected with the magnetic of iron hoop 11 of reel 6, and towards front, is convenient to check, remaining flow
The vertical direction of Graphic Panel 12 arranges.
After the completion of the action corresponding to customer demand plan on flow Graphic Panel 12, the limiting plate of the top is removed
9 limitation, under gravity, reel 6 move down, and rotate counterclockwise, and second limiting plate 9 positions to reel 6, limit
Reel 6 processed continues to move down, and reel 6 moves down rotation, drives first flow Graphic Panel 12 to follow rotation, second flow
Graphic Panel 12 is connected with the magnetic of iron hoop 11 and just at the top of vertical direction, and relative with front, that is, represents
One procurement plan flow carries out the work of second flow procurement plan examination & approval to complete.The aobvious of flow is carried out successively
Show and prompt.Reel 6 moves down true dynamic this corresponding relation of the position of a flow Graphic Panel 12 that takes a turn for the better, can by actually test into
Row is corresponding, and those skilled in the art can realize the corresponding relation.
Procurement plan flow content corresponding to each flow Graphic Panel 12, can be divided into according to real work progress demand again
More part specific works contents, the plan of specific action, then can be written on notice board 18, and in sequence from the right side to
It is left to be written on respectively in progress prompt area 20, for example when this planning procedures is examined in progress procurement plan, the flow is specifically interior
Appearance is roughly divided into planner and reports procurement plan examination and approval document and unit leader to examine the two steps, then can the person's of being intended to report buying meter
The specific works content for drawing examination and approval document is written in the progress prompt area 20 of the rightmost side, and unit leader's examination & approval write on right number second
In progress prompt area 20, it will be prompted to plate 18 and be drawn out to the progress prompt area 20 that can show the rightmost side, show two plan works
As completion, after Section 1 program content is completed, then the mobile notice board 18 into cavity 17, blocks Section 1 action
, unfinished work item is shown in outside, completeness that can be under the quick prompt flow according to remaining project, until notice board
18 reset.
According to planning procedures, Section 4 selects supplier according to procurement method, is roughly divided into selection:Bid and purchase
The notice of award list issued is done according to group's bid, expert makes a joint checkup being commented by expert's joint examination buying review form, the inquiry rate of exchange for buying
Examine buying and determine supplier etc. by the result of more than three inquiry rate of exchange review forms, then can be by the book of the 4th flow Graphic Panel 12
Write plate 15 and divide sorting plate 21 for several bar shapeds, and carry out with above-mentioned several classification that written records are corresponding, select the mode of determination
It is shown, the mode given up is overturn over, is avoided confusion.Plate 18 is will be prompted to during upset to extract out, is then inserting notice board 18,
The rotation of sorting plate 21 can be avoided.
Controlling switch 24 is button switch, and during extruding, circuit disconnects, during release, circuit turn-on.When notice board 18 is in cavity
During 17 inside, controlling switch 24 is extruded, circuit disconnects, and signal lamp 23 does not work;Specific works content is entered when notice board 18 pulls out
During row prompting, release control switch 24, circuit turn-on, signal lamp 23 is bright, and planning procedures plate content is carried out corresponding to display,
The signal distinguished as prompting, after the completion of, notice board 18 is completely into cavity 17 and extrudes controlling switch 24, and signal lamp 23 goes out.
The utility model can position reel 6 to a certain height, and the just corresponding flow in replacing front is realized by rotating
Graphic Panel 12, and without upper and lower movement.Reel 6 is realized using limiting plate 9 and positioned, limitation moves down, and rotates puller bolt
22, the positioning limitation to iron hoop 11 is unclamped, iron hoop 11 is rotatable in locating slot 10, and flow Graphic Panel 12 is all adsorbed in iron hoop 11
On, stir flow Graphic Panel 12.
Another embodiment of the present utility model, as shown in fig. 6, all structures of the top of base 1 are main suggestion device, bottom
The main suggestion device of the top of seat 1 can be arranged by Rankine-Hugoniot relations as shown in Figure 6, be each independently operated, and be symmetrical set,
Notice board 18 can use to two side-pullings, be independent of each other;It is front and rear to be symmetrical arranged, do not influence to watch flow Graphic Panel 12, rotation is changed
Position, or be convenient to use the people of seat respectively.Set multiple, disclosure satisfy that when worker's real work, simultaneously
The demand of multiple project works is carried out, carries out record prompting respectively.
Claims (3)
- A kind of 1. procurement plan completeness suggestion device, it is characterised in that:Including base(1);Base(1)Front end slidably connects Drawer(2);Base(1)Supporting plate has been fixedly connected with left and right sides of upper end(3);Supporting plate(3)On be provided with vertical guiding and slide Groove(4);Guide chute(4)Front side be installed with rack(5);Two supporting plates(3)Between be provided with reel(6);Reel (6)Left and right ends axle center at be fixedly connected with main shaft(7);Main shaft(7)With corresponding guide chute(4)It is slidably connected;It is main Axle(7)Outer end be fixedly connected with gear(8);Gear(8)With rack(5)Engagement coordinates;In guide chute(4)Rear side, Supporting plate(3)Upper uniform socket connection limited location plate(9);Reel(6)Peripheral middle part is provided with the locating slot of annular(10);Locating slot (10)Inside it is connected with the iron hoop of annular(11);Reel(6)Periphery is evenly distributed with flow Graphic Panel(12);Each two is neighbouring Flow Graphic Panel(12)Between pass through pinboard(13)Rotation connection;Pinboard(13)Upper and lower ends respectively with upper and lower both sides Flow Graphic Panel(12)Rotation connection;Flow Graphic Panel(12)Rear end in the middle part of be fixedly connected with magnet(14);Magnet(14) With iron hoop(11)Magnetic absorption connects;Flow Graphic Panel(12)Front end face be divided into clipboard(15), clipboard(15)Right side Neck;Neck interpolation is connected to process identification plate in succession(16);Flow Graphic Panel(12)Inside be cavity(17)Structure, cavity (17)With flow Graphic Panel(12)Left end connects;Cavity(17)Inside slidably connect notice board(18);Notice board(18)Upper end It is provided with holding tank(19);Notice board(18)Front end face be uniformly divided into multiple progress prompt areas(20);One of flow displaying Plate(12)Clipboard(15)It is divided into the sorting plate of at least three bar shapeds(21);Sorting plate(21)Left and right ends respectively with flow exhibition Show plate(12)Front end is rotatablely connected.
- 2. procurement plan completeness suggestion device according to claim 1, it is characterised in that:Iron hoop(11)With locating slot (10)Rotation connection;Reel(6)Left side be provided with screwed hole;Screwed hole and locating slot(10)Side connects;Screwed hole internal thread It is connected with puller bolt(22).
- 3. procurement plan completeness suggestion device according to claim 1, it is characterised in that:Process identification plate(16)Upper peace Equipped with signal lamp(23);Cavity(17)Interior right-hand member is provided with signal lamp(23)Controlling switch(24).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721151943.XU CN207097418U (en) | 2017-09-10 | 2017-09-10 | Procurement plan completeness suggestion device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721151943.XU CN207097418U (en) | 2017-09-10 | 2017-09-10 | Procurement plan completeness suggestion device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207097418U true CN207097418U (en) | 2018-03-13 |
Family
ID=61539513
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721151943.XU Expired - Fee Related CN207097418U (en) | 2017-09-10 | 2017-09-10 | Procurement plan completeness suggestion device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207097418U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111243462A (en) * | 2020-03-31 | 2020-06-05 | 中国人民解放军陆军军医大学第一附属医院 | Portable work prompting device |
CN112381521A (en) * | 2020-11-23 | 2021-02-19 | 北京华彬立成科技有限公司 | Early warning method and device for registration and evaluation information of medical products |
-
2017
- 2017-09-10 CN CN201721151943.XU patent/CN207097418U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111243462A (en) * | 2020-03-31 | 2020-06-05 | 中国人民解放军陆军军医大学第一附属医院 | Portable work prompting device |
CN111243462B (en) * | 2020-03-31 | 2022-01-04 | 中国人民解放军陆军军医大学第一附属医院 | Portable work prompting device |
CN112381521A (en) * | 2020-11-23 | 2021-02-19 | 北京华彬立成科技有限公司 | Early warning method and device for registration and evaluation information of medical products |
CN112381521B (en) * | 2020-11-23 | 2021-07-30 | 北京华彬立成科技有限公司 | Early warning method and device for registration and evaluation information of medical products |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2009321C (en) | Business education model | |
Aft | Work measurement and methods improvement | |
CN207097418U (en) | Procurement plan completeness suggestion device | |
Visco | 5S made easy: a step-by-step guide to implementing and sustaining your 5S program | |
Niven | Driving focus and alignment with the balanced scorecard | |
CN105868873A (en) | Cloud computing-based human resources management simulated combat sand table system and application | |
JP2009000385A (en) | Prize controlling device, price controlling system and method for prize controlling | |
Ortiz | Kaizen and Kaizen Event Implementation: Kaizen Kaizen Event Impleme | |
JP5133717B2 (en) | Premium management device and premium management method | |
KR200385367Y1 (en) | Portable type device for education of accounting and method thereof | |
TWM557426U (en) | Vending machine having modular product channels | |
Ortiz | The Cell Manufacturing Playbook: A Step-by-step Guideline for the Lean Practitioner | |
JP5647658B2 (en) | Premium management device and premium management method | |
TWI644292B (en) | Vending machine having modular product channels | |
CN202816210U (en) | Beer game simulation teaching sand table | |
JP7284892B1 (en) | game equipment | |
CN207250017U (en) | A kind of project cost specialty movable show stand | |
JP2654485B2 (en) | Automatic car wash machine management device with magnetic car wash card | |
JP2017120353A (en) | Accounting learning material and method of using accounting learning material | |
JPH02176894A (en) | Goods dispenser | |
CN210983992U (en) | ERP (Enterprise resource planning) display sand table for business administration teaching | |
JP5395206B2 (en) | Gift management system | |
Murphy | Kaizen at The HON Company: A Decade of Lean. | |
JPS6223868B2 (en) | ||
JP2021115273A (en) | Game tool for learning management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180313 Termination date: 20180910 |
|
CF01 | Termination of patent right due to non-payment of annual fee |