CN207093094U - Relief hole buffer structure at a kind of high speed subway tunnel portal - Google Patents

Relief hole buffer structure at a kind of high speed subway tunnel portal Download PDF

Info

Publication number
CN207093094U
CN207093094U CN201721033701.0U CN201721033701U CN207093094U CN 207093094 U CN207093094 U CN 207093094U CN 201721033701 U CN201721033701 U CN 201721033701U CN 207093094 U CN207093094 U CN 207093094U
Authority
CN
China
Prior art keywords
relief hole
right line
high speed
partition wall
breeze way
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721033701.0U
Other languages
Chinese (zh)
Inventor
车轮飞
付维纲
林昶隆
蔡崇庆
李小坤
刘俊
赵建伟
夏继豪
胡清华
朱毅
孙勋考
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201721033701.0U priority Critical patent/CN207093094U/en
Application granted granted Critical
Publication of CN207093094U publication Critical patent/CN207093094U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses relief hole buffer structure at a kind of high speed subway tunnel portal, it is included in the range of the 40~60m of tunnel portal open excavation section of underground section and is divided to two sections top relief hole breeze way and left and right line partition wall relief hole breeze way are set respectively, open excavation section U-type groove lamina tecti (2) is provided with the top relief hole breeze way, the top of the open excavation section U-type groove lamina tecti (2) is provided with civil engineering structure cover plate, is uniformly provided with the civil engineering structure cover plate multiple with the extraneous lamina tecti relief hole (3) communicated;The left and right line partition wall relief hole breeze way is provided with left and right line mid-board (5), and multiple left and right line partition wall relief holes (6) are uniformly offered on the left and right line mid-board (5).Relief hole buffer structure at high speed subway tunnel portal of the present utility model, in-car external pressure fluctuation when train drives into underground section tunnel portal at a high speed can be reduced, meets occupant's pressure comfort requirement, substantially increases train operation efficiency.

Description

Relief hole buffer structure at a kind of high speed subway tunnel portal
Technical field
The utility model belongs to Tunnel Engineering and Aerodynamics of High-speed Trains technical field, more particularly, to one kind Relief hole buffer structure at high speed subway tunnel portal.
Background technology
With the development of economic society and technology, the speed of service of many city underground trains is also gradually stepping up:As extensively No. 3 lines of state subway, No. 11 lines of Shenzhen Metro, Dongguan R2 lines etc., design highest running speed have all reached 120km/h.Subway arranges Car is run in the underground space, when the speed of service is more than 100km/h, many problems negligible in low speed, in high speed Just become gradually obvious.
When high speed subway train drives into tunnel at a high speed at the tunnel portal caused by interior pressure rate of change and pressure oscillation Amplitude problems of too, the comfortableness taken to the security, economy and passenger of train operation and tunnel surrounding environment, station ring There is harmful effect in border.Guangzhou Metro Line 3 initial operating stage, just often receives passenger's complaint, and reaction has ear-drum malaise symptoms, train Driver's malaise symptoms are even more serious, or even the occupational diseases such as intermittent deafness occur, therefore when formally putting into effect, train is entering When going out tunnel more employ " reduction of speed " operation, the segment distance of tunnel one to be entered afterwards ramp up again, after travel at the uniform speed, influence to arrange The traffic efficiency of car, length of tunnel are then even more serious compared with temporary influence.
Utility model content
For the disadvantages described above or Improvement requirement of prior art, the utility model is provided at a kind of high speed subway tunnel portal Relief hole buffer structure, pressure release pore structure breeze way is set in the range of 40~60m of tunnel portal, alleviates train and drives into tunnel at a high speed Occupant's pressure comfort requirement is met to in-car external pressure influence of fluctuations at tunnel portal during road, improves train passage The purpose of efficiency.
To achieve these goals, the utility model provides relief hole buffer structure at a kind of high speed subway tunnel portal, It is included in the range of the 40~60m of tunnel portal open excavation section of underground section and is divided to two sections top relief hole breeze way and left and right are set respectively Line partition wall relief hole breeze way;
Wherein, the top relief hole breeze way is 20~30m one-tunnel two-tracks section, is provided with the one-tunnel two-tracks section bright Section U-type groove lamina tecti is dug, the top of the open excavation section U-type groove lamina tecti is provided with civil engineering structure cover plate, the civil engineering structure cover plate On be uniformly provided with it is multiple with the extraneous lamina tecti relief hole communicated;
The left and right line partition wall relief hole breeze way be 20~30m one-tunnel one-track section, the centre of the one-tunnel one-track section Provided with left and right line mid-board, multiple left and right line partition wall relief holes are uniformly offered on the left and right line mid-board;
The lamina tecti relief hole and the left and right line partition wall relief hole drive into the subterranean region at a high speed for reducing train Between tunnel portal when in-car external pressure fluctuation.
Further, upper surface of the lamina tecti relief hole along the top relief hole breeze way is in multiple rows of more column arrays Arrangement, and the perforate gross area of the lamina tecti relief hole is more than or equal to the top relief hole breeze way tunnel cross-section area 40%.
Further, it is in multiple rows of more column array cloth that the left and right line partition wall relief hole is on duty along the left and right line mid-board Put, and the perforate gross area of described left and right line partition wall relief hole is more than or equal to the left and right line partition wall relief hole breeze way tunnel The 40% of cross-sectional area.
Further, the length of the top relief hole breeze way or left and right line partition wall relief hole breeze way is more than or equal to three Times tunnel hydraulic diameter.
Further, the length of the top relief hole breeze way or left and right line partition wall relief hole breeze way is 20~30m.
Further, the lamina tecti relief hole and the left and right line partition wall relief hole are circular or square relief hole.
Further, the area of the lamina tecti relief hole and the left and right line partition wall relief hole is 0.4~0.5m2
Further, first is provided between the top relief hole breeze way and the left and right line partition wall relief hole breeze way Boundary.
Further, the second boundary is provided between the relief hole buffer structure and tunnel main body.
In general, by the contemplated above technical scheme of the utility model compared with prior art, can obtain down Row beneficial effect:
(1) relief hole buffer structure at high speed subway tunnel portal of the present utility model, in underground section, tunnel portal is bright Dig in the range of 40~60m of section and use relief hole structure type, car when train drives into underground section tunnel portal at a high speed can be reduced External and internal pressure fluctuates, and meets occupant's pressure comfort requirement.
(2) relief hole buffer structure at high speed subway tunnel portal of the present utility model, simple in construction, easy to implement, solution The problem of speed can not be too high when conventional train of having determined drives into underground running tunnel, substantially increases train operation efficiency, has Significant economic benefit and social benefit.
Brief description of the drawings
Fig. 1 is the tunnel that relief hole buffer structure structure is related at a kind of high speed subway tunnel portal of the utility model embodiment Floor map at hole;
Fig. 2 is that the vertical section of relief hole buffer structure structure at a kind of high speed subway tunnel portal of the utility model embodiment shows It is intended to.
In all of the figs, same reference represents identical technical characteristic, is specially:1- undergrounds running tunnel enters Mouthful (outlet), 2- open excavation section U-type grooves lamina tecti, 3- lamina tectis relief hole, 4- first are demarcated, 5- or so line mid-board, 6- or so Line partition wall relief hole, 7- second demarcate.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only explaining this Utility model, it is not used to limit the utility model.It is in addition, involved in each embodiment of the utility model disclosed below As long as and to technical characteristic each other do not form conflict can be mutually combined.
Relief hole buffer structure at a kind of high speed subway tunnel portal of the utility model embodiment, in underground section Tunnel Relief hole structure type is used in the range of 40~60m of mouth open excavation section, reaches alleviation train and drives into caused pressure at a high speed to car The purpose of external and internal pressure influence of fluctuations, meet occupant's pressure comfort requirement.
It is divided to two sections of setting pressure release pore structure breeze ways in the range of the 40~60m of tunnel portal open excavation section of underground section.Buffering Section first section be 20~30m one-tunnel two-tracks sections, the U-type groove structural top setting civil engineering structure cover plate in underground, and is uniformly opened up and room The relief hole being interlinked to the outside;20~30m of secondary segment is one-tunnel one-track section, and relief hole, two-stage structure are uniformly opened up on the line partition wall of left and right The percent opening of relief hole is not less than the 40% of tunnel cross-section area.
Fig. 1 is the tunnel that relief hole buffer structure structure is related at a kind of high speed subway tunnel portal of the utility model embodiment Floor map at hole.Fig. 2 is relief hole buffer structure structure at a kind of high speed subway tunnel portal of the utility model embodiment Schematic longitudinal section.As depicted in figs. 1 and 2, relief hole buffer structure bag at high speed subway tunnel portal of the present utility model Include in underground section tunnel portal (outlet) 1, open excavation section U-type groove lamina tecti 2, the boundary of lamina tecti relief hole 3, first 4, left and right line Partition wall 5, the boundary of left and right line partition wall relief hole 6 and second 7.
L1, L2 length as shown in Figure 1 is not less than 3 times of tunnel hydraulic diameters, and typically desirable 20~30m, 3 and 6 can be used Circular or square relief hole, single hole area about 0.4~0.5m2, lamina tecti relief hole 3 is upper along the top relief hole breeze way End face is arranged in multiple rows of more column arrays, for example as shown in figure 1, being arranged using the array of 4 rows 12 row, and the lamina tecti relief hole The 3 perforate gross area is more than or equal to the 40% of the top relief hole breeze way tunnel cross-section area.
Left and right line partition wall relief hole 6 is arranged along the left and right line mid-board 5 is on duty in multiple rows of more column arrays, for example such as Fig. 2 It is shown, arranged using the array of 3 rows 12 row, and the perforate gross area of described left and right line partition wall relief hole 6 is more than or equal to described The 40% of left and right line partition wall relief hole breeze way tunnel cross-section area.
In preferred embodiment of the present utility model, when speed is 120km/h, main body tunnel clearance cross-sectional area is 26m2, hydraulic diameter is about that 6m, L1 and L2 take 30m, and relief hole uses the length of side, and for 0.7m square holes, percent opening takes 40%, then L1 sections Structure lamina tecti perforate total quantity (perforate summation above the line of left and right) should be not less than 44, and the number of openings is not small on L2 section mid-boards In 22, perforate is evenly arranged.
Without reduction of speed when the train run at high speed outside hole drives into underground running tunnel, the relief hole breeze way of tunnel portal can Reduce the pressure change rate and pressure oscillation amplitude when train drives at a high speed, meet the purpose of personnel's comfortableness requirement.
Relief hole buffer structure at high speed subway tunnel portal of the present utility model, train can be reduced and drive into underground at a high speed In-car external pressure fluctuation during running tunnel hole, meet occupant's pressure comfort requirement, solve conventional train and drive into ground The problem of speed can not be too high during lower running tunnel, operational efficiency is improved, there is significant economic benefit and social benefit.
As it will be easily appreciated by one skilled in the art that preferred embodiment of the present utility model is the foregoing is only, not For limiting the utility model, any modification of all made within spirit of the present utility model and principle, equivalent substitution and change Enter, should be included within the scope of protection of the utility model.

Claims (9)

1. relief hole buffer structure at a kind of high speed subway tunnel portal, it is characterised in that be included in underground section tunnel portal It is divided to two sections top relief hole breeze way and left and right line partition wall relief hole breeze way are set respectively in the range of 40~60m of open excavation section;
Wherein, the top relief hole breeze way is 20~30m one-tunnel two-tracks section, and open excavation section is provided with the one-tunnel two-tracks section U-type groove lamina tecti (2), the top of the open excavation section U-type groove lamina tecti (2) are provided with civil engineering structure cover plate, the civil engineering structure lid It is uniformly provided with plate multiple with the extraneous lamina tecti relief hole (3) communicated;
The left and right line partition wall relief hole breeze way is 20~30m one-tunnel one-track section, and the centre of the one-tunnel one-track section is provided with Left and right line mid-board (5), multiple left and right line partition wall relief holes (6) are uniformly offered on the left and right line mid-board (5);
The lamina tecti relief hole (3) and the left and right line partition wall relief hole (6) drive into the underground at a high speed for reducing train In-car external pressure fluctuation during running tunnel hole.
2. relief hole buffer structure at a kind of high speed subway tunnel portal according to claim 1, it is characterised in that described Upper surface of the lamina tecti relief hole (3) along the top relief hole breeze way is arranged in multiple rows of more column arrays, and the lamina tecti The perforate gross area of relief hole (3) is more than or equal to the 40% of the top relief hole breeze way tunnel cross-section area.
3. relief hole buffer structure at a kind of high speed subway tunnel portal according to claim 1, it is characterised in that described Left and right line partition wall relief hole (6) is arranged along the left and right line mid-board (5) is on duty in multiple rows of more column arrays, and described left and right line The perforate gross area of partition wall relief hole (6) is more than or equal to the left and right line partition wall relief hole breeze way tunnel cross-section area 40%.
4. relief hole buffer structure at a kind of high speed subway tunnel portal according to Claims 2 or 3, it is characterised in that The length of the top relief hole breeze way or left and right line partition wall relief hole breeze way is more than or equal to three times tunnel hydraulic diameter.
5. relief hole buffer structure at a kind of high speed subway tunnel portal according to claim 4, it is characterised in that described The length of top relief hole breeze way or left and right line partition wall relief hole breeze way is 20~30m.
6. relief hole buffer structure at a kind of high speed subway tunnel portal according to Claims 2 or 3, it is characterised in that The lamina tecti relief hole (3) and the left and right line partition wall relief hole (6) are circular or square relief hole.
7. relief hole buffer structure at a kind of high speed subway tunnel portal according to claim 6, it is characterised in that described Lamina tecti relief hole (3) and the area of the left and right line partition wall relief hole (6) are 0.4~0.5m2
8. relief hole buffer structure at a kind of high speed subway tunnel portal according to claim 1, it is characterised in that described The first boundary (4) is provided between top relief hole breeze way and the left and right line partition wall relief hole breeze way.
9. relief hole buffer structure at a kind of high speed subway tunnel portal according to claim 1, it is characterised in that described The second boundary (7) is provided between relief hole buffer structure and tunnel main body.
CN201721033701.0U 2017-08-17 2017-08-17 Relief hole buffer structure at a kind of high speed subway tunnel portal Active CN207093094U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721033701.0U CN207093094U (en) 2017-08-17 2017-08-17 Relief hole buffer structure at a kind of high speed subway tunnel portal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721033701.0U CN207093094U (en) 2017-08-17 2017-08-17 Relief hole buffer structure at a kind of high speed subway tunnel portal

Publications (1)

Publication Number Publication Date
CN207093094U true CN207093094U (en) 2018-03-13

Family

ID=61541621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721033701.0U Active CN207093094U (en) 2017-08-17 2017-08-17 Relief hole buffer structure at a kind of high speed subway tunnel portal

Country Status (1)

Country Link
CN (1) CN207093094U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387111A (en) * 2017-08-17 2017-11-24 中铁第四勘察设计院集团有限公司 Relief hole buffer structure at a kind of high speed subway tunnel portal
CN111828441A (en) * 2020-07-28 2020-10-27 温州泰乐维工程设计有限公司 Air oscillation controller for railway tunnel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387111A (en) * 2017-08-17 2017-11-24 中铁第四勘察设计院集团有限公司 Relief hole buffer structure at a kind of high speed subway tunnel portal
CN111828441A (en) * 2020-07-28 2020-10-27 温州泰乐维工程设计有限公司 Air oscillation controller for railway tunnel

Similar Documents

Publication Publication Date Title
CN207093094U (en) Relief hole buffer structure at a kind of high speed subway tunnel portal
CN207144952U (en) A kind of high speed subway tunnel portal aerodynamic effect buffer structure
CN106223969A (en) One closely upper and lower overlap or shield tunnel construction method of closely intersecting
CN105019715A (en) Structure jointly constructed by subway station and buildings
CN107387111A (en) Relief hole buffer structure at a kind of high speed subway tunnel portal
CN204627618U (en) Upper and lower asymmetrical double layer tunnel
CN101311413A (en) Process for using underground passage combined with roads on ground as passage of trolley bus
CN207633189U (en) Non-major P.E.subject flat bed main beam section constructs
CN207278271U (en) A kind of double-layer double-direction multi-pass tunnels structure for vacuum-pipeline transfer system
CN202690074U (en) Falling-rock preventing reinforced concrete open cut tunnel structure
CN204296710U (en) A kind of standardization bridge type elevated station
CN202081896U (en) Internal space arranging structure for magnetic levitation tunnel
CN204476420U (en) A kind of tunnel being applicable to bias voltage landform
CN103470269B (en) Seam high efficiency buffer structure between Railway Tunnel hole
CN203347801U (en) Large-section tunnel cross section structure
CN202659240U (en) Novel subway cross-river medium shield tunnel
CN108590741A (en) A kind of super high seam mash gas pumping drilling method for arranging
CN209724410U (en) For being equipped with the escape structure of the horizontal tunnel of deep shaft
CN208816176U (en) A kind of super long tunnel group hole service gallery type emergency relief station structure
CN203022762U (en) Tunnel structure capable of simultaneously meeting aerial drainage and passage requirements in tunnel diversion period
CN206110179U (en) Large -scale oval formula city utility tunnel
CN111911185A (en) PBA underground excavation station transfer passage structure and construction method thereof
CN206110168U (en) Three -layer quasi -rectangular city underground complex
CN209244576U (en) A kind of double-deck mountain tunnel convenient for pedestrian, non-motor vehicle and autos only
CN206873323U (en) A kind of variable deceleration strip of height

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant