CN207092422U - A kind of waterproof coating - Google Patents

A kind of waterproof coating Download PDF

Info

Publication number
CN207092422U
CN207092422U CN201720935875.XU CN201720935875U CN207092422U CN 207092422 U CN207092422 U CN 207092422U CN 201720935875 U CN201720935875 U CN 201720935875U CN 207092422 U CN207092422 U CN 207092422U
Authority
CN
China
Prior art keywords
waterproof coating
connection box
prime coat
basic unit
reservoir
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720935875.XU
Other languages
Chinese (zh)
Inventor
朱海剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jingqiu New Material Technology Co.,Ltd.
Original Assignee
Shanghai Building Waterproof Material (group) Waterproof Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Building Waterproof Material (group) Waterproof Engineering Co Ltd filed Critical Shanghai Building Waterproof Material (group) Waterproof Engineering Co Ltd
Priority to CN201720935875.XU priority Critical patent/CN207092422U/en
Application granted granted Critical
Publication of CN207092422U publication Critical patent/CN207092422U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of waterproof coating; including the basic unit being uniformly applied on exterior wall; it is coated with prime coat and protective layer in basic unit successively from inside to outside; the connection box of multiple equally distributed hard is fixedly installed in prime coat; soft reservoir is fixedly connected with connection box, quick-drying gelatin is filled with reservoir;Basic unit is laid on metope, the spray-applied primer layer in basic unit, connection box is uniformly put into prime coat simultaneously, connect and the reservoir filled with quick-drying gelatin is provided with box, prime coat will connect box covering, last spraying protective layer, connection box can increase the bonding strength of prime coat in prime coat, after waterproof coating is scraped off, connection box and its reservoir of inside are also scraped off, quick-drying gelatin is spilt to be repaired with the mouth of scraping to waterproof coating, avoid external force from continuing erosion waterproof coating and scrape mouth, expanded so as to prevent from scraping mouth, beneficial to the aging speed for slowing down waterproof coating, extend the service life of waterproof coating.

Description

A kind of waterproof coating
Technical field
Building waterproofing technique field is the utility model is related to, more specifically, it relates to a kind of waterproof coating.
Background technology
In recent years, as the engineering such as the fast development of market economy and house property cause, the newly-built of factory building, enlarging, transformation is got over Come more;Also more and more higher is required to the waterproof technique of architectural engineering simultaneously.Common building Chang Yinwei cracks or corner corner ooze Leak and cause it is of low quality, influence build total quality, different degrees of shadow will also result in other articles, the product in building Ring.Existing waterproof construction is there is two large problems, first, waterproof timeliness is short, second, waterproof construction is complicated, and it is more using material, Mounting process is cumbersome etc..
The external wall waterproof coating structure as disclosed in the Chinese patent that patent announcement number is CN203947707U, it is by uniformly applying The basic unit being distributed on exterior wall and its upside are disposed with prime coat, anticorrosive coat, mould proof layer, waterproof layer, protection from top to bottom Layer, basic unit is attapulgite paste water-proof putty layer, and prime coat is nanometer silica sol modified exterior wall emulsion paint layer, and anticorrosive coat is epoxy Lithium metasilicate zinc-rich layer, mould proof layer are single component mildew-proof coating, and waterproof layer is mono-component polyurethane waterproof coating, and protective layer is exterior wall Fluorine carbon metal paint layer, the non-aging durability of coating is strong, weatherability is strong, corrosion resistance is strong, water resistance is strong, it is mouldy to be not easy.
But above-mentioned external wall waterproof coating structure is after use, its coating is softer, after metope is by firm object scratch It can leave breach, and breach is then under the erosion in the external world gradually to external expansion, so as to accelerate the speed of waterproof coating structure aging, Reduce the life-span of waterproof coating structure.
Utility model content
For existing external wall waterproof coating structure after use, its coating is softer, when metope is by firm object scratch After can leave breach, and breach is then under the erosion in the external world gradually to external expansion, so as to accelerate the speed of waterproof coating structure aging Degree, the technical problem in the life-span of waterproof coating structure is reduced, the utility model provides a kind of waterproof coating, and it has ageing resistance The advantages of energy is strong, and service life is long.
To achieve the above object, the utility model provides following technical scheme:
A kind of waterproof coating, including the basic unit being uniformly applied on exterior wall, it is coated with successively from inside to outside in the basic unit Prime coat and protective layer, the connection box of multiple equally distributed hard, the connection box are fixedly installed in the prime coat Soft reservoir is inside fixedly connected with, quick-drying gelatin is filled with the reservoir.
Pass through above-mentioned technical proposal, basic unit is laid on metope, then the spray-applied primer layer in basic unit, in spray-applied primer Connection box is uniformly put into while layer in prime coat, is provided with the reservoir filled with quick-drying gelatin in connection box, and make priming paint Layer covers connection box, and last spraying protective layer, connection box can increase the bonding strength in prime coat part in prime coat, when After waterproof coating is scraped off, the reservoir for connecting box and its inside is also scraped off, and quick-drying gelatin is spilt to scrape mouth to waterproof coating Repaired, the adjacent connection box inwall of rapid-curing cutback gemel connection, so as to be closed and be reinforced to scraping oral area position, avoid external force from continuing Corrode waterproof coating and scrape mouth, expanded so as to prevent from scraping mouth, beneficial to the aging speed for slowing down waterproof coating, extend waterproof coating Service life.
Further, it is fixedly connected with the tip for abutting the reservoir on the inwall of the connection box.
Pass through above-mentioned technical proposal, it is broken when finding inside waterproof coating and connecting box, is produced in waterproof coating Gap, and when reservoir is not broken, reservoir can be made to be crimped on tip to allow speed by firmly pressing waterproof coating Dry glue is spilt with blind, reaches the purpose of repairing waterproof coating.
Further, sealing is plugged with seal, the seal in side wall relative between the adjacent connection box It is fixedly connected with the outer wall of the reservoir.
Pass through above-mentioned technical proposal, pulling force is received inside waterproof coating, and pulling force makes to crack inside it while anti- When the surface of water coating is either with or without gap, pulling force can increase adjacent connection the distance between box, so that prime coat is by grafting Seal pulls out connection box, while reservoir is pulled open and is spilt quick-drying gelatin, and quick-drying gelatin is repaired to gap, repairs waterproof Coating.
Further, the connection box is fixedly connected with multiple adsorption pieces towards the one side of the basic unit.
Pass through above-mentioned technical proposal, adsorption piece can produce absorption affinity on connection box, so as to the company of placement on prime coat When connecing box, connection box is rolled, there is connection box the one side of adsorption piece can be fixed when encountering prime coat, without connecting each Connect box to be aligned on prime coat one by one, facility is provided to connect the laying of box, it is convenient and swift.
Further, the adsorption piece is the sucker of enlarging shape, and the enlarging of the sucker is towards the basic unit.
Pass through above-mentioned technical proposal, it can be adsorbed using sucker as adsorption piece on prime coat, and sucker can be made That makees is very thin, will not allow and connect the too big thickness of box increase, prime coat is covered connection box easily.
Further, the adsorption piece is multiple raised lines being evenly distributed on the connection box, and the raised line is away from institute State the fastener that protrusion is fixedly connected with one end of connection box.
Pass through above-mentioned technical proposal, using raised line as adsorption piece, raised line can make to be inserted into priming paint in laying connection box Layer, can be to the fixation that be stablized of connection box even among basic unit.
Further, the drawing net of the drawing power for increasing the protective layer is fixedly connected with the protective layer.
Pass through above-mentioned technical proposal, the drawing net set in protective layer can be after waterproof coating be just provided with to anti- Connection box in water coating plays fixation, and the initial stage for making its position be shaped in waterproof coating keeps constant, and when anti- Also the tensile property of waterproof coating can be lifted at after the sizing of water coating, beneficial to the service life of lifting waterproof coating.
Further, the basic unit is attapulgite paste water-proof putty layer.
Pass through above-mentioned technical proposal, the basic unit that bumps are set effectively can be adhered to prime coat, reduce prime coat The probability to come off, and there is preferable water resistance, effectively resist the steam invasion coating in wall.
Further, the prime coat is Nano silica sol modified latex enamelled coating.
Pass through above-mentioned technical proposal, emulsioni paint layer can realize that also can carry out flexibility to connection box while waterproof covers Lid, reduce the hard extruding from prime coat that is subject to of connection box and caused displacement.
Further, the protective layer is fluorine carbon metal paint layer.
Pass through above-mentioned technical proposal, fluorine carbon metal paint layer weather resistance is excellent, has good solvent release, dry fast Speed, waterproof coating fast shaping can be made.
Compared with prior art, the beneficial effects of the utility model are:
(1) box is connected by being provided with the hard with soft reservoir in prime coat, quick-drying gelatin is filled with reservoir, when After waterproof coating is scraped off, the reservoir for connecting box and its inside is also scraped off, and quick-drying gelatin is spilt to scrape mouth to waterproof coating Repaired, the adjacent connection box inwall of rapid-curing cutback gemel connection, so as to be closed and be reinforced to scraping oral area position, avoid external force from continuing Corrode waterproof coating and scrape mouth, expanded so as to prevent from scraping mouth, beneficial to the aging speed for slowing down waterproof coating, extend waterproof coating Service life;
(2) seal is plugged with by being sealed between adjacent connection box, seal is fixedly connected with reservoir, when anti- Water coat inside receives pulling force, and when pulling force makes to crack inside it while the surface of waterproof coating is either with or without gap, pulling force The distance between adjacent connection box can be increased, so that the seal of grafting is pulled out connection box by prime coat, while make reservoir Pulled open and spill quick-drying gelatin, quick-drying gelatin is repaired to gap, repairs waterproof coating;
(3) by being fixedly connected with multiple adsorption pieces towards the one side of basic unit in connection box, adsorption piece can be in connection box Upper generation absorption affinity, so as to when placing connection box on prime coat, roll connection box, the one side that connection box has adsorption piece is encountered It can be fixed during prime coat, without each connection box is aligned on prime coat one by one, be provided just to connect the laying of box Profit, it is convenient and swift.
Brief description of the drawings
Fig. 1 is vertical section schematic diagram of the utility model embodiment with sucker;
Fig. 2 is Fig. 1 A portions enlarged diagram;
Fig. 3 is vertical section schematic diagram of the utility model embodiment with raised line.
Reference:1st, basic unit;2nd, prime coat;3rd, box is connected;4th, reservoir;5th, it is sophisticated;6th, seal;7th, adsorption piece; 71st, sucker;72nd, raised line;73rd, fastener;8th, protective layer;9th, drawing net.
Embodiment
With reference to the accompanying drawings and examples, the utility model is described in detail.
A kind of waterproof coating, as shown in figure 1, including the basic unit 1 being uniformly applied on exterior wall, basic unit 1 is attapulgite paste Water proof putty layer, the basic unit 1 that bumps are set can be adhered to effectively prime coat 2, reduce the probability that prime coat 2 comes off, And there is preferable water resistance, effectively resist the steam invasion coating in wall.Outside side is coated with bottom in basic unit 1 Enamelled coating 2, prime coat 2 are Nano silica sol modified latex enamelled coating, as shown in Fig. 2 prime coat 2 is placed with laying inside it The connection box 3 of multiple hard.Emulsioni paint layer can realize the covering that can also carry out flexibility while waterproof to connection box 3, reduce The hard extruding from prime coat 2 that is subject to of connection box 3 and caused displacement.Connection box 3 is uniformly distributed and its insertion is fixed on bottom In enamelled coating 2, connecting locking in box 3 or be adhesive with soft reservoir 4, reservoir 4 has retractility in the case where setting pulling force, if Its pulling force being subject to, which is more than setting pulling force, can then rupture.Be filled with quick-drying gelatin in reservoir 4, quick-drying gelatin not ingress of air when keep Liquid condition, and can rapid oxidation solidification if ingress of air.After waterproof coating is scraped off by extraneous hard material, connection Box 3 and its reservoir 4 of inside are also scraped off, and quick-drying gelatin is spilt to be repaired with the mouth of scraping to waterproof coating, rapid-curing cutback gemel connection The adjacent inwall of connection box 3, so as to be closed and be reinforced to scraping oral area position, avoid external force from continuing erosion waterproof coating and scrape mouth, Expanded so as to prevent from scraping mouth, beneficial to the aging speed for slowing down waterproof coating, extend the service life of waterproof coating
Connect the tip 5 for being wholely set on the inwall of box 3 and abutting reservoir 4.Relative side between adjacent connection box 3 Sealing is plugged with the seal 6 of strip on wall, and seal 6 extends into the one end for connecting box 3 and the outer wall of reservoir 4 is gluing solid It is fixed.Connection box 3 has been wholely set multiple adsorption pieces 7 towards the one side of basic unit 1.Adsorption piece 7 can be the sucker 71 of enlarging shape, sucker 71 enlarging can be adsorbed on prime coat 2, and sucker 71 can make towards basic unit 1 using sucker 71 as adsorption piece 7 It is very thin, will not allow connection box 3 increase too big thickness, enable prime coat 2 cover easily connection box 3.With reference to Fig. 3, absorption Part 7 or multiple raised lines 72 being evenly distributed on connection box 3, raised line 72 have been wholely set on one end away from connection box 3 The fastener 73 of protrusion, using raised line 72 as adsorption piece 7, raised line 72 can make to be inserted into prime coat 2 very in laying connection box 3 To being the fixation that can be stablized to connection box 3 among basic unit 1.Occur to break when finding inside waterproof coating and connecting box 3 Split, gap is produced in waterproof coating, and when reservoir 4 is not broken, reservoir 4 can be made by firmly pressing waterproof coating It is crimped on tip 5 and allows quick-drying gelatin to spill with blind, reaches the purpose for repairing waterproof coating.Received inside waterproof coating To pulling force, and when pulling force makes to crack inside it while the surface of waterproof coating is either with or without gap, pulling force can increase adjacent company Connect the distance between box 3 so that prime coat 2 by the seal 6 of grafting pull out connection box 3, while pulled open reservoir 4 and Quick-drying gelatin is spilt, quick-drying gelatin is repaired to gap, repairs waterproof coating.Adsorption piece 7 can produce absorption on connection box 3 Power, so as to when placing connection box 3 on prime coat 2, roll connection box 3, the one side that connection box 3 has adsorption piece 7 encounters priming paint It can be fixed during layer 2, without each connection box 3 is aligned on prime coat 2 one by one, be provided just to connect the laying of box 3 Profit, it is convenient and swift.
One side laying matcoveredn 8 of the prime coat 2 away from basic unit 1, protective layer 8 is fluorine carbon metal paint layer, fluorine carbon metal paint Layer weather resistance is excellent, has good solvent release, dries rapidly, can make waterproof coating fast shaping.Protective layer 8 is being spread If when it is internally embedded and is placed with drawing net 9 made of filamentary webs, drawing net 9 is used for the drawing power for increasing protective layer 8.Protecting The drawing net 9 set in layer 8 can play fixed work after waterproof coating is just provided with to the connection box 3 in waterproof coating With the initial stage for making its position be shaped in waterproof coating keeps constant, and can also be lifted at waterproof after waterproof coating is shaped The tensile property of coating, beneficial to the service life of lifting waterproof coating.
When laying waterproof coating, basic unit 1 is laid on metope, then the spray-applied primer layer 2 in basic unit 1, at spraying bottom Connection box 3 is uniformly put into while enamelled coating 2 in prime coat 2, the reservoir 4 filled with quick-drying gelatin is provided with connection box 3, makes The seal 6 to be applied glue with end is inserted in adjacent connection box 3, and the outer wall of reservoir 4 in gluing connection box 3, then Prime coat 2 is set to be covered box 3 is connected, last spraying protective layer 8, the embedded laying drawing net 9 during spraying protective layer 8.
Described above is only preferred embodiment of the present utility model, and the scope of protection of the utility model is not limited merely to Above-described embodiment, all technical schemes belonged under the utility model thinking belong to the scope of protection of the utility model.It should refer to Go out, for those skilled in the art, some improvement under the premise of the utility model principle is not departed from and Retouching, these improvements and modifications also should be regarded as the scope of protection of the utility model.

Claims (10)

1. a kind of waterproof coating, including the basic unit being uniformly applied on exterior wall(1), the basic unit(1)On apply successively from inside to outside It is wiped with prime coat(2)And protective layer(8), it is characterised in that the prime coat(2)Inside it is fixedly installed multiple connection boxes(3), The connection box(3)Inside it is fixedly connected with soft reservoir(4), the reservoir(4)It is interior to be filled with quick-drying gelatin.
2. waterproof coating according to claim 1, it is characterised in that the connection box(3)Inwall be provided with for will The reservoir(4)The tip punctured(5).
3. waterproof coating according to claim 2, it is characterised in that the adjacent connection box(3)Between be provided with it is close Sealing(6), and the seal(6)Extend to the connection box(3)The interior and reservoir(4)It is fixedly connected.
4. waterproof coating according to claim 3, it is characterised in that the connection box(3)Towards the basic unit(1)One Face is fixedly connected with multiple adsorption pieces(7).
5. waterproof coating according to claim 4, it is characterised in that the adsorption piece(7)For the sucker of enlarging shape(71), The sucker(71)Enlarging towards the basic unit(1).
6. waterproof coating according to claim 4, it is characterised in that the adsorption piece(7)For raised line(72), the raised line (72)Away from the connection box(3)One end on be fixedly connected with the fastener of protrusion(73).
7. the waterproof coating according to claim 5 or 6, it is characterised in that the protective layer(8)Inside it is provided with drawing net (9).
8. waterproof coating according to claim 7, it is characterised in that the basic unit(1)For attapulgite paste water-proof putty Layer.
9. waterproof coating according to claim 8, it is characterised in that the prime coat(2)For Nano silica sol modified milk Shellac varnish layer.
10. waterproof coating according to claim 9, it is characterised in that the protective layer(8)For fluorine carbon metal paint layer.
CN201720935875.XU 2017-07-29 2017-07-29 A kind of waterproof coating Active CN207092422U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720935875.XU CN207092422U (en) 2017-07-29 2017-07-29 A kind of waterproof coating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720935875.XU CN207092422U (en) 2017-07-29 2017-07-29 A kind of waterproof coating

Publications (1)

Publication Number Publication Date
CN207092422U true CN207092422U (en) 2018-03-13

Family

ID=61542966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720935875.XU Active CN207092422U (en) 2017-07-29 2017-07-29 A kind of waterproof coating

Country Status (1)

Country Link
CN (1) CN207092422U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116971511A (en) * 2023-09-25 2023-10-31 良固建筑工程(上海)有限公司 Assembled prevention of seepage steel mesh mould wall body

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116971511A (en) * 2023-09-25 2023-10-31 良固建筑工程(上海)有限公司 Assembled prevention of seepage steel mesh mould wall body

Similar Documents

Publication Publication Date Title
CN101956432B (en) Fireproofing structure of polyphenyl plate outer-wall outer heat-insulating building system and construction method thereof
CN102797297A (en) Solar power generation composite waterproof self-adhesive coiled material and construction method thereof
CN107338967A (en) A kind of new technology and new material of aging blocks outdoor tile facing renewal and reform
CN207092422U (en) A kind of waterproof coating
CN210828119U (en) Built-in reinforced polymer cement waterproof coating structure
CN205100447U (en) Prevent rain water leakage's roofing blast pipe
CN215374347U (en) Detection device for detecting waterproof performance of assembled outer wall seam sealant
CN206174316U (en) Modified asphalt waterproofing membrane
CN111677330A (en) Building outer wall cracking maintenance method
CN105239745B (en) Integrated wallboard and its plate stitch processing method
CN205063202U (en) Be located eave decorative board on outer wall
CN206616879U (en) A kind of cracking of wall surface repairs structure
CN216616362U (en) Aerogel felt outer wall external insulation system
CN107268812A (en) A kind of anti-dropout exterior wall with anticreep rod
CN104533041A (en) Novel GRC plate joint and processing method thereof
CN204475755U (en) A kind of new GRC plate seam
CN211548123U (en) Outer heat preservation outer wall subsiding crack node processing structure
CN204531020U (en) Building plastering linear of dripping
CN206707526U (en) A kind of waterproof connecting structure of aluminum alloy doors and windows
CN206245495U (en) A kind of waterproof construction of wall joints
CN112065115A (en) Sealing method for prefabricated clear water stand plate
CN215291613U (en) Structural leakage drainage treatment device
CN206512970U (en) A kind of anti-skidding abrasion resistant terrace paint product
CN220059003U (en) Outer wall hole plugging structure
CN205329876U (en) Thermal -insulated choke granary wall body

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200608

Address after: 201100 room 1121-1125, building 1, No. 39, Youdong Road, Minhang District, Shanghai

Patentee after: Shanghai Jingqiu New Material Technology Co.,Ltd.

Address before: Xuhui District 200030 dragon Wu Shanghai City Road No. 2046, room 223

Patentee before: SHANGHAI BUILDING WATERPROOF MATERIAL (GROUP) WATERPROOF ENGINEERING Co.,Ltd.

TR01 Transfer of patent right