CN207092054U - A kind of Dense Broken Stone Peg pile-forming equipment - Google Patents

A kind of Dense Broken Stone Peg pile-forming equipment Download PDF

Info

Publication number
CN207092054U
CN207092054U CN201720992657.XU CN201720992657U CN207092054U CN 207092054 U CN207092054 U CN 207092054U CN 201720992657 U CN201720992657 U CN 201720992657U CN 207092054 U CN207092054 U CN 207092054U
Authority
CN
China
Prior art keywords
drilling rod
door
pile
broken stone
stirring vane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720992657.XU
Other languages
Chinese (zh)
Inventor
庄金
王向阳
刘好正
张宗堂
敖文
庄春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAANXI ZHUANGXIN CONSTRUCTION ENGINEERING CO LTD
China Railway First Survey and Design Institute Group Ltd
Original Assignee
SHAANXI ZHUANGXIN CONSTRUCTION ENGINEERING CO LTD
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAANXI ZHUANGXIN CONSTRUCTION ENGINEERING CO LTD, China Railway First Survey and Design Institute Group Ltd filed Critical SHAANXI ZHUANGXIN CONSTRUCTION ENGINEERING CO LTD
Priority to CN201720992657.XU priority Critical patent/CN207092054U/en
Application granted granted Critical
Publication of CN207092054U publication Critical patent/CN207092054U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a kind of Dense Broken Stone Peg pile-forming equipment, including drilling rod and the drive device for driving drilling rod continuously to rotate and make drilling rod to be drilled down into and be lifted up, it is the hollow drill for the metaling blanking inside drilling rod, the lower end of drilling rod is provided with the brill door for metaling discharging, brill door is folding component, the mounting rod of folding component including horizontal layout and can be along the folding body that mounting rod is spun upside down, the both ends of mounting rod are fixedly connected with drilling rod, mounting rod is located at the middle part of drilling rod, and the quantity of folding body is two.The utility model is designed reasonably; drilling rod is continuously rotated by drive device; and it is drilled down into and is lifted up during rotation; larger vibrations will not be produced to pile peripheral earth while being drilled down into; be advantageous to the protection to pile peripheral earth prototype structure, avoid the decline of pile peripheral earth bearing capacity;Door is bored by being set in the lower end of drilling rod simultaneously, is easy to the discharging of metaling, it is simple in construction and easy to use.

Description

A kind of Dense Broken Stone Peg pile-forming equipment
Technical field
The utility model belongs to piling Technology field, more particularly, to a kind of Dense Broken Stone Peg pile-forming equipment.
Background technology
Dense Broken Stone Peg is common treatment process of composite foundation, and its principle is:Construct to form stake holes by squash type, And rubble is placed into stake holes, the ground after processing is that former weak soil is replaced into rubble, and soil around pile earth obtains compacted while broken Stone compaction pile can also play a part of controlling water draining as sand drain.Because these remarkable advantages of Dense Broken Stone Peg, It is widely used in basement process.
The traditional construction technology of Dense Broken Stone Peg is vibratory impulse broken stone pile, i.e., pile pipe is sunk into soil using vibrator It is interior, then crushed stone material is injected in pile pipe, while vibrate pile pipe and pull up pile pipe, make rubble compacted, form continuous tool There is the pile body of certain bearing capacity.The construction technology of vibratory impulse broken stone pile has the following disadvantages:Because traditional rubble is compacted Stake needs the vibration for being subject to high frequency to drilling rod in pile, and dither can produce liquefaction phenomenon to stake Soil Surrounding, destroy former The prototype structure that shape soil has consolidated, declines bearing capacity of soil.
The content of the invention
Technical problem to be solved in the utility model is to be directed to above-mentioned deficiency of the prior art, there is provided a kind of rubble Compaction pile pile-forming equipment, its is reasonable in design, and drilling rod is continuously rotated by drive device, and is carried out during rotation It is drilled down into and is lifted up, larger vibrations will not be produced to pile peripheral earth while being drilled down into, is advantageous to stake week The protection of soil body prototype structure, avoid the decline of pile peripheral earth bearing capacity;Door is bored by being set in the lower end of drilling rod simultaneously, just It is simple in construction and easy to use in the discharging of metaling.
In order to solve the above technical problems, the technical solution adopted in the utility model is:A kind of Dense Broken Stone Peg is set with pile It is standby, it is characterised in that:Including continuously being rotated in the drilling rod and the driving drilling rod vertically laid and being drilled down into the drilling rod With the drive device being lifted up, the drilling rod inside is the hollow drill for the metaling blanking, and the lower end of the drilling rod is set The brill door for metaling discharging is equipped with, the brill door is circular configuration, and the diameter for boring door is not less than the drilling rod Internal diameter, the brill door are folding component, and the folding component includes the mounting rod of horizontal layout and can carried out along the mounting rod The folding body spun upside down, the both ends of the mounting rod are fixedly connected with the drilling rod, and the mounting rod is located at the brill The middle part of bar, the quantity of the folding body is two, and two folding bodies are semicircle flat board.
A kind of above-mentioned Dense Broken Stone Peg pile-forming equipment, it is characterized in that:From top to bottom it is provided with the outer wall of the drilling rod Stirring vane, circumference of the stirring vane along the drilling-rod external wall helically lay by line.
A kind of above-mentioned Dense Broken Stone Peg pile-forming equipment, it is characterized in that:The width of the stirring vane is homogeneous from top to bottom Together, the pitch of stirring vane all same from top to bottom.
A kind of above-mentioned Dense Broken Stone Peg pile-forming equipment, it is characterized in that:Cutting is provided with the outside of the stirring vane Tooth or blade.
A kind of above-mentioned Dense Broken Stone Peg pile-forming equipment, it is characterized in that:The lower end of the stirring vane is arranged on the brill The lower section of door, the lower end of the stirring vane are 8mm~12mm with described the distance between the door that bores.
A kind of above-mentioned Dense Broken Stone Peg pile-forming equipment, it is characterized in that:The length of the mounting rod is not less than the drilling rod Internal diameter.
The utility model has advantages below compared with prior art:
1. the utility model is simple in construction and easy to operate, input cost is few.
2. the utility model include continuously rotating in the drilling rod vertically laid and driving drilling rod and make drilling rod be drilled down into and The drive device being lifted up, connection are simple.
3. drilling rod is continuously rotated by drive device, and during rotation be drilled down into and carried upwards Rise, larger vibrations will not be produced to pile peripheral earth while being drilled down into, be advantageous to the guarantor to pile peripheral earth prototype structure Shield, avoids the decline of pile peripheral earth bearing capacity.
4. the lower end of drilling rod is provided with the brill door for metaling discharging, bore door open when being drilled down into for drilling rod and drilling rod to The folding component closed during upper lifting, folding component is in horizontal layout, when drilling rod is drilled down into pore-forming, bores door and is in closed form State, when drilling rod is lifted up, because the deadweight of metaling makes brill door be in open mode, it is easy to the discharging of metaling, structure It is simple and easy to use.
In summary, the utility model is designed reasonably, drilling rod are continuously rotated by drive device, and in the mistake of rotation It is drilled down into and is lifted up in journey, larger vibrations will not be produced to pile peripheral earth while being drilled down into, favorably In the protection to pile peripheral earth prototype structure, the decline of pile peripheral earth bearing capacity is avoided;Set simultaneously by the lower end in drilling rod Brill door is put, is easy to the discharging of metaling, it is simple in construction and easy to use.
Below by drawings and examples, the technical solution of the utility model is described in further detail.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation that the utility model bores door.
Fig. 3 is the construction method FB(flow block) that Dense Broken Stone Peg shaping is carried out using pile-forming equipment.
Fig. 4 is preparation of construction schematic diagram when Dense Broken Stone Peg molding construction is carried out using pile-forming equipment.
Fig. 5 is using drilled as holes schematic diagram under drilling rod during pile-forming equipment progress Dense Broken Stone Peg molding construction.
Fig. 6 is that drilling rod when Dense Broken Stone Peg molding construction is carried out using pile-forming equipment lifts schematic diagram.
Fig. 7 is the construction molding schematic diagram of the utility model Dense Broken Stone Peg.
Description of reference numerals:
1-drilling rod;2-bore door;2-1-folding body;
2-2-mounting rod;3-stirring vane;4-unit head;
5-Dense Broken Stone Peg of constructing.
Embodiment
A kind of Dense Broken Stone Peg pile-forming equipment as shown in Figure 1 and Figure 2, including in the drilling rod 1 and driving institute vertically laid The continuous drive device for rotating and making the drilling rod 1 to be drilled down into and be lifted up of drilling rod 1 is stated, the inside of drilling rod 1 is for being somebody's turn to do The hollow drill of metaling blanking, the lower end of the drilling rod 1 are provided with the brill door 2 for metaling discharging, and the brill door 2 is Circular configuration, the diameter for boring door 2 are not less than the internal diameter of the drilling rod 1, and the brill door 2 is folding component, the folding structure The folding body 2-1 that part includes the mounting rod 2-2 of horizontal layout and can spun upside down along the mounting rod 2-2, the peace Dress bar 2-2 both ends are fixedly connected with the drilling rod 1, and the mounting rod 2-2 is located at the middle part of the drilling rod 1, the folding Body 2-1 quantity is two, and two folding body 2-1 are semicircle flat board.
During actual use, the drive device is continuous during driving the drilling rod 1 to be even drilled down into and deduct a percentage upwards Rotation, is drilled down into the drilling rod 1 without carrying out vibration to the drilling rod 1, therefore when the drilling rod 1 is drilled down into stake Zhou Tuti disturbance is small, is advantageous to protect the prototype structure of pile peripheral earth, avoids because vibration causes pile peripheral earth Depression of bearing force.
During actual use, when the drilling rod 1 is drilled down into pore-forming, the brill door 2 is in closure state, when the drilling rod 1 when being lifted up, and because the deadweight of metaling makes the brill door 2 be in open mode, is easy to the discharging of metaling, simple in construction It is and easy to use.
During actual use, the drive device is by hydraulic motor or motor-driven unit head 4.The unit head 4 Patent No. ZL201210026528.7 application for a patent for invention can be used《Long spire be squeezed into rock filling pile shaped device and Forming method》Disclosed in unit head.
In actual use, the pile-forming equipment is arranged on the molding construction that Dense Broken Stone Peg is carried out on pile frame, described Pile frame can be the pile frame of rotary rig, excavator etc..
During actual use, the lower end of the drilling rod 1, which is provided with, bores door 2, but the brill door 2 is horizontal layout, is unfavorable for The drilling rod 1 is drilled down into, therefore the lower end of the stirring vane 3 is arranged on to the lower section of the brill door 2, in the drilling rod 1 When being drilled down into, the stirring vane 3 initially enters the soil body, and the stirring vane 3 is helical blades, in the brill door 2 Screwfeed is converted rotational motion into by the helical blades before into the soil body, is easy to the drilling rod 1 to be drilled down into.
During actual use, the lower end of the preferable stirring vane 3 is 8mm~12mm with described the distance between the door 2 that bores, The stirring vane 3 is the larger structure of slenderness ratio, if the distance between door 2 is bored in the lower end of the stirring vane 3 with described It is long, the lower end of the stirring vane 3 in the drilling process of drilling rod 1 can be caused due to being destroyed by larger moment of torsion.
During actual use, the brill door 2 is used cooperatively with the drilling rod 1, therefore is designed as circle, but the brill The diameter of door 2 is not less than the internal diameter of the drilling rod 1, if the diameter for boring door 2 is less than the internal diameter of the drilling rod 1, works as institute When stating drilling rod 1 and being drilled down into, the soil body of the bottom of drilling rod 1 can produce thrust to the brill door 2, cause the brill door 2 to institute State and closed inside drilling rod 1, the brill door 2 is by metaling clamping when the drilling rod 1 is lifted up, it is impossible to open downwards, Metaling is produced blocking at the brill door 2, cause blanking to fail.
During actual use, the mounting rod 2-2 is preferably arranged on the cross section chord length maximum of drilling rod 1, is easy to The blanking of metaling.
During actual use, the folding body 2-1 is semicircle, and the semicircular right-angle side is provided with for the installation The sleeve that bar 2-2 is passed through, the sleeve set realize the folding body 2-1 and the mounting rod after the mounting rod 2-2 2-2's is be hinged.
In the present embodiment, stirring vane 3 is from top to bottom provided with the outer wall of the drilling rod 1, the stirring vane 3 is along institute State the circumference helically line laying of the outer wall of drilling rod 1.
In the present embodiment, the width of the stirring vane 3 from top to bottom all same, the pitch of the stirring vane 3 is by upper Downward all same.
In the present embodiment, the outside of the stirring vane 3 is provided with cutting tooth or blade.
During actual use, the type of the stirring vane 3 has a variety of, preferred helical blades during actual use, due to stirring Mix blade 3 to horizontally rotate, turned rotary motion by the helical blades during the drilling rod 1 is drilled down into Screwfeed is changed to, is advantageous to lower brill.
During actual use, the stirring vane 3 act as during the drilling rod 1 is drilled down into, entering the soil body Row cutting, cutting tooth or blade are set beneficial to the lower brill of the drilling rod 1, therefore in the outside of the stirring vane 3.
In the present embodiment, the lower end of the stirring vane 3 is arranged on the lower section of the brill door 2, under the stirring vane 3 End is 8mm~12mm with described the distance between the door 2 that bores.
During actual use, the lower end of the drilling rod 1, which is provided with, bores door 2, but the brill door 2 is horizontal layout, is unfavorable for The drilling rod 1 is drilled down into, therefore the lower end of the stirring vane 3 is arranged on to the lower section of the brill door 2, in the drilling rod 1 When being drilled down into, the stirring vane 3 initially enters the soil body, and the stirring vane 3 is helical blades, in the brill door 2 Screwfeed is converted rotational motion into by the helical blades before into the soil body, is easy to the drilling rod 1 to be drilled down into.
During actual use, the lower end of the preferable stirring vane 3 is 8mm~12mm with described the distance between the door 2 that bores, The stirring vane 3 is the larger structure of slenderness ratio, if the distance between door 2 is bored in the lower end of the stirring vane 3 with described It is long, the lower end of the stirring vane 3 in the drilling process of drilling rod 1 can be caused due to being destroyed by larger moment of torsion.
In the present embodiment, the length of the mounting rod 2-2 is not less than the internal diameter of the drilling rod 1.
A kind of construction method that Dense Broken Stone Peg shaping is carried out using the present embodiment as shown in Figure 3, this method include with Lower step:
Step 1: preparation of construction:Behind smooth construction site, city's roads are carried out to the stake position of constructed Dense Broken Stone Peg 5, Rotary rig is moved at the stake position present position of Dense Broken Stone Peg 5 again, makes brill door 2 positioned at 5 positions of Dense Broken Stone Peg of constructing Surface, while the drilling rod 1 is laid in vertical, refers to Fig. 4;
Step 2: drilled as holes under drilling rod:Start the drive device, the drive device drives the drilling rod 1 counterclockwise Rotation, and by controlling the drive device drilling rod 1 is at the uniform velocity crept into straight down, now the brill door 2 is closed form State, until at brill door 2 drilling to the stake bottom absolute altitude for Dense Broken Stone Peg of constructing, the drive device is closed, makes the brill Bar 1 stops the rotation and crept into, and forms the stake holes for Dense Broken Stone Peg 5 of constructing, refers to Fig. 5;
Step 3: tentatively pour into metaling:Metaling is poured into the porch of the drilling rod 1, fills up the metaling During the inside of the hollow drill, stop pouring into for metaling;
Step 4: lift drilling rod and pour into metaling again:Start the drive device, described in the drive device drives Drilling rod 1 turns clockwise, and by controlling the drive device drilling rod 1 is at the uniform velocity lifted straight up, in the drilling rod 1 During lifting, the brill door 2 is opened, and makes the metaling continuously into the stake holes formed in step 2;
During the metaling enters the stake holes, when the height of metaling in the hollow drill is less than described Hollow drill height 1/2~2/3 when, pour into metaling in the porch of the drilling rod 1, the metaling is filled up the sky The inside of heart drilling rod, refers to Fig. 6;
Step 5: pile body is molded:Repeat step three, until Dense Broken Stone Peg 5 of constructing is molded, refers to Fig. 7 to step 4.
During practice of construction, the drilling rod 1 when being drilled down into and being lifted up the drilling rod 1 be vertical direction, downward It is the process of pore-forming during drilling, it is ensured that the Dense Broken Stone Peg of shaping is vertical, first has to ensure that formed hole is vertical.
Traditional Dense Broken Stone Peg needs the vibration for being subject to high frequency to drilling rod 1 in pile, and dither can be to stake periphery Soil produces liquefaction phenomenon, destroys the prototype structure that original-state soil has consolidated, declines bearing capacity of soil, and the present embodiment In, the drive device drives the drilling rod 1 to be even drilled down into and continuously rotated during being lifted up, without to the brill Bar 1, which carries out vibration, is drilled down into the drilling rod 1, therefore the disturbance when the drilling rod 1 is drilled down into pile peripheral earth is small, has Protect, avoided because vibration causes the depression of bearing force of pile peripheral earth beneficial to the prototype structure to pile peripheral earth.
Meanwhile traditional Dense Broken Stone Peg is in formation of pile, because the vibration of high frequency, impact can produce sizable make an uproar Sound pollutes, and is unfavorable for the protection of ecological environment.
During practice of construction, formation of pile is constructed for soil compaction type, and after pile body shaping, soil around pile compactness is high, and in step 2 Described 1 time drilled as holes of drilling rod is a construction molding, is saved the duration, and without being unearthed in pore forming process, saving construction cost, The work progress is Jing Yin construction simultaneously, noiseless pollution.
During practice of construction, the external diameter of the drilling rod 1 is determined according to the pile body diameter of construction requirement, in the present embodiment, The a diameter of φ 300mm~φ 1200mm of pile body after the constructed shaping of Dense Broken Stone Peg 5, the external diameter of the drilling rod 1 is φ 100mm ~φ 800mm.
In the present embodiment, the speed that drilling rod 1 described in step 2 is at the uniform velocity crept into straight down is 0.2m/min~0.5m/ min;
Drilling rod 1 described in step 2 controls the drive device to make the drilling rod 1 per 2m~3m is at the uniform velocity crept into straight down Stop lower brill, while persistently rotation is not less than 15s to the drilling rod 1;
When being bored described in step 2 at the drilling of door 2 to the stake bottom absolute altitude for Dense Broken Stone Peg 5 of constructing, the driving dress is controlled Putting makes the drilling rod 1 stop lower brill, while the drilling rod 1 persistently rotates 30s~40s.
In the present embodiment, before the metaling of step 3 pours into, the metaling is processed, the metaling Particle diameter is not more than the internal diameter of the drilling rod 1.
In the present embodiment, before the metaling of step 3 pours into, the metaling is processed, the metaling Particle diameter is not more than the internal diameter of the drilling rod 1.
During practice of construction, when the drilling rod 1 is drilled down into, because the soil body of the lower end of drilling rod 1 produces to the brill door 2 Thrust, the brill door 2 closes, and when the drilling rod 1 is lifted up, the brill door 2 is described to open in the presence of metaling gravity Body 2-1 is closed to open downwards along the mounting rod 2-2, so that metaling can smoothly be fed intake, and without manually entering Row operation, while when the drilling rod 1 works, the brill door 2 belongs to hidden operation, and people's industry can not operate, therefore use institute State brill door 2 and effectively solve the problems, such as blanking difficulty.
The speed for controlling the drive device to make the drilling rod 1 at the uniform velocity be lifted straight up in the present embodiment, in step 4 For 0.6m/min~1.2m/min;
After controlling the drive device to make the drilling rod 1 per at the uniform velocity 1m~1.5m is lifted straight up in step 4, control The drive device makes the at the uniform velocity straight down anti-plug 0.5m~0.8m of drilling rod 1, and after each anti-plug terminates described in control Drive device makes the drilling rod 1 stop lower brill, while the drilling rod 1 persistently rotates 10s~20s.
During practice of construction, the size for being drilled down into speed, being lifted up speed can be entered respectively according to specific needs The corresponding adjustment of row.
The drive device is controlled to make the drilling rod 1 is every at the uniform velocity to be lifted straight up during practice of construction, in step 4 After 1m~1.5m, the drive device is controlled to make the at the uniform velocity straight down anti-plug 0.5m~0.8m of drilling rod 1, it is therefore an objective in anti-plug During, metaling is squeezed again, metaling will be squeezed into inter-pile soil, further improved soil, and by repeatedly being lifted With squeezing again, metaling is stayed in the hole of shaping, forms the Dense Broken Stone Peg continuously with certain bearing capacity.
It is described above, only it is preferred embodiment of the present utility model, not the utility model is imposed any restrictions, every Any simple modification, change and the equivalent structure change made according to the utility model technical spirit to above example, still Belong in the protection domain of technical solutions of the utility model.

Claims (7)

  1. A kind of 1. Dense Broken Stone Peg pile-forming equipment, it is characterised in that:Including in the drilling rod (1) and the driving brill vertically laid Bar (1) continuously rotates and made the drive device that the drilling rod (1) is drilled down into and is lifted up, and is to supply inside the drilling rod (1) The hollow drill of the metaling blanking, the lower end of the drilling rod (1) is provided with the brill door (2) for metaling discharging, described It is circular configuration to bore door (2), and the diameter for boring door (2) is not less than the internal diameter of the drilling rod (1), and the brill door (2) is folding Component, the mounting rod (2-2) of the folding component including horizontal layout and can be spun upside down along the mounting rod (2-2) Folding body (2-1), the both ends of the mounting rod (2-2) are fixedly connected with the drilling rod (1), mounting rod (2-2) position In the middle part of the drilling rod (1), the quantity of the folding body (2-1) is two, and two folding bodies (2-1) are half Circular flat board.
  2. 2. according to a kind of Dense Broken Stone Peg pile-forming equipment described in claim 1, it is characterised in that:Outside the drilling rod (1) From top to bottom it is provided with stirring vane (3) on wall, circumference of the stirring vane (3) along the drilling rod (1) outer wall helically line Lay.
  3. 3. according to a kind of Dense Broken Stone Peg pile-forming equipment described in claim 2, it is characterised in that:The stirring vane (3) Width from top to bottom all same, the pitch of the stirring vane (3) all same from top to bottom.
  4. 4. according to a kind of Dense Broken Stone Peg pile-forming equipment described in Claims 2 or 3, it is characterised in that:The stirring vane (3) cutting tooth or blade are provided with the outside of.
  5. 5. according to a kind of Dense Broken Stone Peg pile-forming equipment described in claim 1, it is characterised in that:Outside the drilling rod (1) Footpath is φ 100mm~φ 800mm.
  6. 6. according to a kind of Dense Broken Stone Peg pile-forming equipment described in claim 2, it is characterised in that:The stirring vane (3) Lower end be arranged on the lower section of the brill door (2), the lower end of the stirring vane (3) is with the described door the distance between (2) that bores 8mm~12mm.
  7. 7. according to a kind of Dense Broken Stone Peg pile-forming equipment described in claim 1, it is characterised in that:The mounting rod (2-2) Length be not less than the drilling rod (1) internal diameter.
CN201720992657.XU 2017-08-09 2017-08-09 A kind of Dense Broken Stone Peg pile-forming equipment Active CN207092054U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720992657.XU CN207092054U (en) 2017-08-09 2017-08-09 A kind of Dense Broken Stone Peg pile-forming equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720992657.XU CN207092054U (en) 2017-08-09 2017-08-09 A kind of Dense Broken Stone Peg pile-forming equipment

Publications (1)

Publication Number Publication Date
CN207092054U true CN207092054U (en) 2018-03-13

Family

ID=61542717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720992657.XU Active CN207092054U (en) 2017-08-09 2017-08-09 A kind of Dense Broken Stone Peg pile-forming equipment

Country Status (1)

Country Link
CN (1) CN207092054U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107245997A (en) * 2017-08-09 2017-10-13 陕西桩鑫建设工程有限公司 A kind of Dense Broken Stone Peg pile-forming equipment and bore forming method
CN113323584A (en) * 2021-06-18 2021-08-31 四川振杰岩土工程有限责任公司 Drilling method of large vibrating long spiral drilling machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107245997A (en) * 2017-08-09 2017-10-13 陕西桩鑫建设工程有限公司 A kind of Dense Broken Stone Peg pile-forming equipment and bore forming method
CN113323584A (en) * 2021-06-18 2021-08-31 四川振杰岩土工程有限责任公司 Drilling method of large vibrating long spiral drilling machine
CN113323584B (en) * 2021-06-18 2023-11-07 四川振杰岩土工程有限责任公司 Drilling method of large-scale vibration long spiral drilling machine

Similar Documents

Publication Publication Date Title
CN101532290B (en) Granule grouting pile of ripple plastic sleeve with hole for strengthening soft soil foundation and strengthening method
CN106120785B (en) A kind of pile cover former and Stake head handling and pile cover construction method
CN205907679U (en) Cast -in -place strength core stirring stake
CN105604001A (en) Stiffening core cement-soil tubular pile, construction method and cylindrical rotary stirring drilling tool
CN107245997A (en) A kind of Dense Broken Stone Peg pile-forming equipment and bore forming method
CN207092054U (en) A kind of Dense Broken Stone Peg pile-forming equipment
CN104846820B (en) Hold type screw-type Squeezing Soil Pile pile-forming equipment and bore forming method in a kind of end
CN1059008C (en) Screw pile forming technology by pouring
CN104594339B (en) The construction method of concrete-pile
WO2022126807A1 (en) Concrete building pile foundation preparation system and preparation method
CN107916663A (en) A kind of construction method for soft soil foundation
CN205999887U (en) Boring steel reinforcement cage hoop slip casting broken stone pile
CN101245597A (en) Breast wall type cast-in-situ bored pile construction method and pile machine
CN216950237U (en) Drilling device for piling on soft foundation ground
CN206246052U (en) Soil compaction rotary-jetting bottom-expanding pile shaped device
CN109441357A (en) A kind of drilling tool and construction method for the compacted pore-creating filling pile of long spire
CN206035381U (en) Porous connection type bored concrete pile of porous connection type rig of long spiral and preparation
CN105887810B (en) A kind of more wing shaped pile roll forming devices and construction method
CN209162815U (en) A kind of Screw Pile and its construction tool
CN104480940B (en) Double-deck stirring type concrete castinplace pile builds device
CN106351592A (en) Variable-diameter spiral drill rod and concrete pile construction method
CN217520854U (en) Gravel pile or sand pile forming device based on vibration table test
CN106351213A (en) Forming device and construction process for reverse screw pile
CN107975034B (en) The floating stake ground processing method of hollow preformed pile
CN106401466A (en) Soil-squeezing jet grouting pedestal pile forming device and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant