CN207090878U - A kind of electric block of galvanizing plating piece lifting - Google Patents

A kind of electric block of galvanizing plating piece lifting Download PDF

Info

Publication number
CN207090878U
CN207090878U CN201720981532.7U CN201720981532U CN207090878U CN 207090878 U CN207090878 U CN 207090878U CN 201720981532 U CN201720981532 U CN 201720981532U CN 207090878 U CN207090878 U CN 207090878U
Authority
CN
China
Prior art keywords
rope
notcher
mounting plate
galvanizing
horizontal mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720981532.7U
Other languages
Chinese (zh)
Inventor
洪余力
刘方
张吉均
颜林兵
金赛锋
赵益峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Twin Bird Lifting Equipment Co Ltd
Zhejiang Twin-Bird Lifting Equipment Co Ltd
Original Assignee
Zhejiang Twin Bird Lifting Equipment Co Ltd
Zhejiang Twin-Bird Lifting Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Twin Bird Lifting Equipment Co Ltd, Zhejiang Twin-Bird Lifting Equipment Co Ltd filed Critical Zhejiang Twin Bird Lifting Equipment Co Ltd
Priority to CN201720981532.7U priority Critical patent/CN207090878U/en
Application granted granted Critical
Publication of CN207090878U publication Critical patent/CN207090878U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Coating With Molten Metal (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The utility model discloses a kind of electric block of galvanizing plating piece lifting, including carriage device, the hook gear with left and right pulley, reducing motor and the reel portion being connected with reducing motor, reel portion symmetrically sets rope guide, left and right wallboard sets up left and right rope fixing part separately, spool portion is not wound with left and right rope, and left and right wallboard bottom is provided with a horizontal mounting plate and the notcher located at the plate bottom surface;Left and right rope is sagging through horizontal mounting plate, notcher successively after the extraction of left and right rope guide, and sequentially passes through notcher, horizontal mounting plate upwards around the left and right cord end of left and right pulley to be fixed in left and right rope anchor;Left and right rope copline;Notcher has in its underpart to be used to strut two pieces of hands of taking off from box-like elastic packing plate, and elastic packing plate is loaded on workshop top surface.The utility model has been unsatisfactory for galvanizing plating piece and smoothly passed in and out in workshop, and erosion caused by galvanizing can be avoided to corrode electric block.

Description

A kind of electric block of galvanizing plating piece lifting
【Technical field】
A kind of electric block of galvanizing plating piece lifting is the utility model is related to, belongs to electric block technical field.
【Background technology】
Electric block is the common tool of handling article, and in handling galvanizing plating piece, due to zinc hot-dip production line Particularity, production process supervenes substantial amounts of high-temp waste gas, useless cigarette and corrosivity acid mist, so as to inevitably to electronic calabash Lu Zaocheng corrodes, and not only faults frequent influences handling, reduces the service life of electric block, and harmful exhaust influences cucurbit The health of operating personnel.
【Utility model content】
The purpose of this utility model is to provide a kind of electric block of galvanizing plating piece lifting, and it can not only meet to lift by crane The rope of galvanizing plating piece is smoothly passed in and out in the galvanizing workshop of opposing seal, and can be avoided rotten caused by galvanizing operation Lose thing to corrode electric block, prevent electric block premature corrosion from damaging.
Therefore, the technical solution of the utility model is as follows:
A kind of electric block of galvanizing plating piece lifting, including roll the carriage device being matched with track, cucurbit sheet Body, hook gear, left wallboard and right wallboard, cucurbit body have included the reducing motor reused and the elevator dress with reel portion Put, reducing motor is connected with reel portion, is symmetrically installed with left rope guide, right rope guide in reel portion, hook gear includes Left chain wheel, right pulley, left rope anchor, right rope anchor, reel portion are arranged with the respective lower position of left and right wallboard Upper to be wound with left rope, right rope respectively, its improvement is that one piece of horizontal mounting plate is installed with the bottom of left and right wallboard, The bottom surface of the horizontal mounting plate is installed with a notcher;Sagging pass through is horizontally mounted left rope successively after the extraction of left rope guide Plate, notcher, and cause the left cord end around left chain wheel to sequentially pass through notcher, horizontal mounting plate upwards to be fixed on a left side In rope anchor;Right rope is sagging through horizontal mounting plate, notcher successively after the extraction of right rope guide, and causes around the right side The right cord end of pulley sequentially passes through notcher, horizontal mounting plate to be fixed in right rope anchor upwards;Duplicate rows rope shape The left rope of formula is arranged as copline together with the right rope of duplicate rows rope form;It is symmetrical on the floor top surface in galvanizing workshop It is provided with from two blocks of box-like elastic packing plates, notcher is used to strut two blocks of elastic packing plates.
Above-mentioned notcher is elongated, and above-mentioned two blocks of elastic packing plates are in herringbone.
To cause steel wire rope, the rings center of hook gear and the center of track discharged at rope guide to be hung down in same On line, the perpendicular bisector arrangement of above-mentioned reel portion offset track.
The advantages of the utility model and good effect are as follows:
Set up notcher and the floor top surface in galvanizing workshop is set from after box-like elastic packing plate, lift by crane galvanizing The rope of plating piece struts elastic packing plate by notcher and smoothly can entered in galvanizing workshop, and only partial-length section The hook gear of rope and clasp joint galvanizing plating piece is located within galvanizing workshop, and cucurbit body is still located at galvanizing workshop Outside, therefore waste gas caused by galvanizing operation, the useless erosion of cigarette and corrosivity acid mist to cucurbit body can be effectively avoided, with And influence of the galvanizing high-temperature operation to cucurbit body.
Because the left rope of duplicate rows rope form is arranged as copline together with the right rope of duplicate rows rope form, this measure is not only The hook gear in lifting process can be avoided to produce skew, and the thickness of notcher can be greatly reduced, more adapt to two pieces of bullets Property sealing plate struts gap.
【Brief description of the drawings】
Fig. 1 is structural representation of the present utility model;
Fig. 2 is side view of the present utility model.
【Embodiment】
Refer to Fig. 1, shown in 2, a kind of electric block of galvanizing plating piece lifting, including roll and be matched with track G Carriage device 1, cucurbit body, hook gear 5, left wallboard B1 and right wallboard B2, cucurbit body included reuse deceleration electricity Machine M and the winding plant with reel portion 2, reducing motor M are connected with reel portion 2, and being symmetrically installed with a left side in reel portion 2 leads Rope device 31, right rope guide 32, hook gear 5 include left chain wheel 51, right pulley 52, in left and right wallboard respective lower position point Provided with left rope anchor 61, right rope anchor 62, left rope 41, right rope 42 are wound with reel portion 2 respectively, it is improved Point is that one piece of horizontal mounting plate 7 is installed with the bottom of left and right wallboard, and being installed with one in the bottom surface of the horizontal mounting plate 7 opens Groove device 8;Left rope 41 is sagging through horizontal mounting plate 7, notcher 8 successively after the extraction of left rope guide 31, and causes around a left side The left cord end of pulley 51 sequentially passes through notcher 8, horizontal mounting plate 7 upwards, and left cord end is finally secured to left rope On fixture 61;Right rope 42 from right rope guide 32 extraction after successively it is sagging through horizontal mounting plate 7, notcher 8, and cause around The right cord end for crossing right pulley 52 sequentially passes through notcher 8, horizontal mounting plate 7 upwards, and right cord end is finally secured to the right side In rope anchor 62;The left rope 41 of duplicate rows rope form is arranged as copline together with the right rope 42 of duplicate rows rope form; Two blocks of elastic packing plates 9 are symmetrically installed with galvanizing workshop R floor top surface, this two blocks of elastic packing plates 9 are once supportted It can be closed automatically after opening, notcher 8 is then to be used to strut this two blocks of elastic packing plates 9.
Notcher is elongated, and two blocks of elastic packing plates are in herringbone.
The perpendicular bisector arrangement of reel portion offset track.
The maximum span of rope is less than the length of elastic packing plate 9 in notcher;Elastic packing plate 9 uses elastic rubber Glue.
During zinc-plated preparation, electric block hanging galvanizing plating piece convergence galvanizing workshop R, the side's facade institutes of R mono- in the workshop Automatically-controlled door be in open mode, and automatically-controlled door face electric block, when notcher 8 will be located at galvanizing workshop in its one end After the corresponding end of two blocks of elastic packing plates 9 of R top surfaces squeezes, with movement of the electric block above the R of galvanizing workshop, fluting Two blocks of elastic packing plates 9 are strutted as the road of device 8 one is like splitting a bamboo, is taken advantage of a situation along with left and right rope and cuts two blocks of elastic packing plates 9 The space being softened, and hook gear are taken advantage of a situation together with galvanizing plating piece and entered to by unlimited automatically-controlled door in the R of galvanizing workshop, When galvanizing plating piece is located in the surface in galvanizing pond, automatically-controlled door is closed automatically, electric block stopping transverse shifting, left, Right rope transfixion, now two blocks of elastic packing plates 9 close up automatically, galvanizing workshop R is then in relative and is sealed state, finally Operating personnel outside the R of workshop declines galvanizing plating piece by manipulating electric block and is immersed in galvanizing pond, is plated Zinc operation,
Carriage device 1 belongs to conventional structure, it is small by carriage walking reducing motor and four-wheel loaded on small car wall panel Car forms, and the integrative-structure that the reducing motor is made up of motor, decelerator and brake, lorry provides power by motor And with decelerator driving coupling, wherein, the wheel of lorry and track G coordinate in rolling.
It is conventional structure to rise and reuse reducing motor M, and the one that it is made up of lifting with motor, decelerator and brake is tied Structure, rise and reuse reducing motor loaded on right wallboard B2, its output shaft of decelerator is coupled with the right-hand member in reel portion 2 by spline;Volume The reel portion 2 for raising device is rotatably supported on left wallboard B1, right wallboard B2, and winding plant is conventional structure.

Claims (3)

1. a kind of electric block of galvanizing plating piece lifting, including roll the carriage device being matched with track, cucurbit body, Hook gear, left wallboard and right wallboard, cucurbit body have included the reducing motor reused and the winding plant with reel portion, subtracted Speed motor is connected with reel portion, is symmetrically installed with left rope guide, right rope guide in reel portion, hook gear includes left cunning Wheel, right pulley, left rope anchor, right rope anchor are arranged with the respective lower position of left and right wallboard, is divided in reel portion Left rope, right rope are not wound with, it is characterized in that one piece of horizontal mounting plate is installed with the bottom of left and right wallboard, in the level The bottom surface of installing plate is installed with a notcher;Left rope is sagging successively after the extraction of left rope guide to be passed through horizontal mounting plate, opens Groove device, and cause the left cord end around left chain wheel to sequentially pass through notcher, horizontal mounting plate upwards to be fixed on left rope On fixture;Right rope is sagging through horizontal mounting plate, notcher successively after the extraction of right rope guide, and to bypass right pulley Right cord end sequentially pass through notcher, horizontal mounting plate upwards to be fixed in right rope anchor;Duplicate rows rope form Left rope is arranged as copline together with the right rope of duplicate rows rope form;It is symmetrically installed on the floor top surface in galvanizing workshop Have from two blocks of box-like elastic packing plates, notcher is used to strut two blocks of elastic packing plates.
2. the electric block of galvanizing plating piece lifting according to claim 1, it is characterised in that:The notcher is in length Bar shaped, two blocks of elastic packing plates are in herringbone.
3. the electric block of galvanizing plating piece lifting according to claim 1, it is characterised in that:Deviate in the reel portion The perpendicular bisector arrangement of track.
CN201720981532.7U 2017-07-28 2017-07-28 A kind of electric block of galvanizing plating piece lifting Expired - Fee Related CN207090878U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720981532.7U CN207090878U (en) 2017-07-28 2017-07-28 A kind of electric block of galvanizing plating piece lifting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720981532.7U CN207090878U (en) 2017-07-28 2017-07-28 A kind of electric block of galvanizing plating piece lifting

Publications (1)

Publication Number Publication Date
CN207090878U true CN207090878U (en) 2018-03-13

Family

ID=61544062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720981532.7U Expired - Fee Related CN207090878U (en) 2017-07-28 2017-07-28 A kind of electric block of galvanizing plating piece lifting

Country Status (1)

Country Link
CN (1) CN207090878U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108996417A (en) * 2018-10-19 2018-12-14 诺威起重设备(苏州)有限公司 A kind of redundancy structure steel-wire rope type electric block

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108996417A (en) * 2018-10-19 2018-12-14 诺威起重设备(苏州)有限公司 A kind of redundancy structure steel-wire rope type electric block

Similar Documents

Publication Publication Date Title
CN201987468U (en) Counterweight type high-rise window cleaning machine
CN206581984U (en) A kind of lift protective seal separates protective door
CN106987891A (en) The electroplating assembly line of movable lifting platform is installed
CN207090878U (en) A kind of electric block of galvanizing plating piece lifting
CN205419620U (en) Electronic hoist device
CN102556854A (en) Mine hydraulic hoisting traveling crane
CN201493216U (en) Coating production line
CN107557712A (en) Galvanizing system and the method that side goes out are entered in a kind of end
CN206736398U (en) The electroplating assembly line of movable lifting platform is installed
CN212864919U (en) Hot-dip galvanizing totally-enclosed pretreatment system
CN204778422U (en) Hoist hoisting mechanism
CN206188203U (en) Coincide floor overhead hoist
CN207275550U (en) A kind of novel automatic hangs sky pipeline
CN205686746U (en) A kind of aluminium section bar storing frame
CN204872529U (en) Tow chain assembly line
CN207452226U (en) Hold the galvanizing system gone out into side
CN202985362U (en) Hoisting assembly of overhead rail shot blasting machine
CN207142685U (en) A kind of semimounted single-beam crane
CN203545482U (en) Water-surface slag grab bucket
CN207809912U (en) A kind of ductile iron pipe full automatic packaging device
CN207713359U (en) Lifting device between being closed for galvanizing
CN202643087U (en) Novel lifting appliance for bucket
CN207293904U (en) A kind of portable architectural engineering boom hoisting
CN202048798U (en) Improved melting and casting furnace lifting door
CN206735628U (en) Gantry electroplating assembly line Special running of standby suspender is installed

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180313

Termination date: 20200728