- CN207088519U CN207088519U CN201720935371.8U CN201720935371U CN207088519U CN 207088519 U CN207088519 U CN 207088519U CN 201720935371 U CN201720935371 U CN 201720935371U CN 207088519 U CN207088519 U CN 207088519U
- Authority
- CN
- China
- Prior art keywords
- cushion rubber
- reinforced plastic
- plastic pipe
- glass reinforced
- ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a kind of production mould of the glass reinforced plastic pipe of prefabricated cushion rubber, include the die ontology of tubulose, the both ends of die ontology are detachably and fixedly provided with a small ring respectively, small ring is respectively fitted on die ontology, big ring and cushion rubber are arranged with small ring respectively, is removably fixed between big ring and small ring, cushion rubber is tightly placed on small ring, there is certain interval, two cushion rubbers are between two big ring between cushion rubber and big ring.The die device of glass reinforced plastic pipe of the production with the prefabricated collar of the present utility model, the process that the fluting of later stage glass reinforced plastic pipe installs steel collar additional can be reduced, reduce fluting number, the collar is integrally formed with glass reinforced plastic pipe, the bond strength of the collar and glass reinforced plastic pipe is effectively improved, improves the construction quality of glass reinforced plastic pipe docking.
Description
Technical field
It the utility model is related to glass reinforced plastic pipe production equipment technology, and in particular to a kind of glass reinforced plastic pipe of prefabricated cushion rubber
Production mould.
Background technology
The production process of glass reinforced plastic pipe is included in system lining on the mould of wrapping machine, winding glass fibre, winds insulation film, be solid
Change, repair the steps such as groove, the demoulding, glass reinforced plastic pipe as requested at repairing groove by whole glass reinforced plastic pipe repair groove and being stripped cut into it is some
Segment, further according to needing head end groove of the selection in every segment glass reinforced plastic pipe to install steel collar and cushion rubber additional, tail end groove installs cushion rubber additional, this
The glass reinforced plastic pipe of two segments of sample is from beginning to end, in tail end insertion steel collar, so as to complete pipeline connection.But due to steel collar
Or cushion rubber is to install the process, it is necessary to certain in the later stage, and the collar could be caused to be firmly fixed to every segment fiberglass
The head end of pipe, the installation process of such collar is complicated, time and effort consuming, and the bonding strength of steel collar or cushion rubber and glass reinforced plastic pipe
It cannot be ensured with seal degree.
The content of the invention
For problems of the prior art, the utility model passes through the pre-prepared colloid on the mould of production glass reinforced plastic pipe
Circle so that the both ends of glass reinforced plastic pipe form the prefabricated cushion rubber combined closely with glass reinforced plastic pipe in forming process, after reducing
The process that phase installs cushion rubber additional in the end of glass reinforced plastic pipe fluting, the bond strength of cushion rubber and glass reinforced plastic pipe is improved, improves fiberglass
The quality of pipe construction docking.
To achieve the above object, the technical solution adopted in the utility model is:A kind of life of the glass reinforced plastic pipe of prefabricated cushion rubber
Mould is produced, includes the die ontology of tubulose, the both ends of die ontology are detachably and fixedly provided with a small ring, small ring difference respectively
It is enclosed on die ontology, is arranged with big ring and cushion rubber on small ring respectively, is removably fixed between big ring and small ring, cushion rubber tight set
On small ring, there is certain interval, two cushion rubbers are between two big ring between cushion rubber and big ring.
The lateral surface of big ring is provided with some projections, and around the big annulate shaft heart, circumferentially permutation arranges projection, and projection is provided with first
Mounting hole, the outer surface of small ring are provided with tapped second mounting hole, and the second mounting hole is corresponding with the first mounting hole, the
One bolt is screwed into the second mounting hole after passing through the first mounting hole.
Small ring is provided with some jacking blocks, and around the big annulate shaft heart, circumferentially permutation is arranged jacking block, and band internal thread is equipped with jacking block
Through hole, the second bolt withstands die ontology after being screwed into through hole.
The outer wall of cushion rubber is provided with some annular recess, and annular recess is coaxial with cushion rubber.
Small ring is provided with two annular grooves, and the inwall of cushion rubber has the convex tendon corresponding with annular groove, and convex tendon is caught in annular
Groove.
The angle that annular groove is formed with small ring outer surface is obtuse angle or fillet.
Small ring is provided with some hangers.
Operation principle of the present utility model is:Cushion rubber has certain elasticity, cushion rubber is tightly placed on small ring outer wall, big ring leads to
The first bolt fixed cover is crossed in the end of small ring.Cyclotella sleeve on die ontology after the second bolt is screwed into the through hole on jacking block
And die ontology is held out against, so as to which small ring to be fixed on to the both ends of die ontology.Small ring and die ontology between two big ring
On carry out the process production glass reinforced plastic pipe such as lining processed, winding glass fibre, winding insulation film, the glass reinforced plastic pipe both ends parcel after shaping
The firmly small ring and cushion rubber of the collar, first bolt of die ontology one end is then unclamped, big ring is separated with small ring, portal frame blocks
Big ring, keep fixing between the big ring and small ring and glass reinforced plastic pipe of the other end, die ontology is extracted from glass reinforced plastic pipe, glass
After steel pipe departs from from die ontology, the big ring of small ring and the other end, small ring are removed, completes the demoulding.Fiberglass after the demoulding
The groove of connection glass reinforced plastic pipe end can be formed on the inwall at pipe both ends, prefabricated cushion rubber in groove, so as to be formed and traditional glue
The similar thimble structure of snare ring structure.Both ends are had to the glass reinforced plastic pipe cutting section of cushion rubber, with regard to two one end tools can be obtained
There is the glass reinforced plastic pipe of prefabricated cushion rubber, there is the other end of the glass reinforced plastic pipe of prefabricated cushion rubber to slot again and cut thin external diameter at fluting etc.
In the external diameter of small ring, just it is inserted into the collar of the prefabricated cushion rubber of band of another glass reinforced plastic pipe.
The beneficial effects of the utility model are:The production mould of the glass reinforced plastic pipe of prefabricated cushion rubber of the present utility model, can
The process that the fluting of later stage glass reinforced plastic pipe installs cushion rubber additional is reduced, reduces fluting number, cushion rubber is integrally formed with glass reinforced plastic pipe, effectively
The bond strength of cushion rubber and glass reinforced plastic pipe is improved, improves the construction quality of glass reinforced plastic pipe docking.
Brief description of the drawings
Fig. 1 is schematic perspective view of the present utility model;
Fig. 2 is left view of the present utility model;
Fig. 3 is sectional view of the present utility model;
Fig. 4 is A portions enlarged diagram in Fig. 3.
Embodiment
In conjunction with accompanying drawing, the utility model is described in further detail.
As Figure 1-4, a kind of production mould of the glass reinforced plastic pipe of prefabricated cushion rubber, the die ontology 1 of tubulose, mould are included
The both ends of tool body 1 are detachably and fixedly provided with one small ring 2 respectively, and small ring 2 is respectively fitted on die ontology 1, on small ring 2 respectively
Be arranged with big ring 3 and cushion rubber 4, removably fixed between big ring 3 and small ring 2, cushion rubber 4 is tightly placed on small ring 2, cushion rubber 4 with it is big
There is certain interval, two cushion rubbers 4 are between two big ring 3 between ring 3.
The lateral surface of big ring 3 is provided with some projections 5, and around the big annulate shaft heart, circumferentially permutation is arranged projection 5, and projection 5 is provided with
First mounting hole, the outer surface of small ring 2 are provided with tapped second mounting hole, and the second mounting hole is relative with the first mounting hole
Should, the first bolt 6 is screwed into the second mounting hole after passing through the first mounting hole.
Small ring 2 is provided with some jacking blocks 7, and around the big annulate shaft heart, circumferentially permutation arranges jacking block 7, is equipped with jacking block 7 in band
The through hole of screw thread, the second bolt 8 withstand die ontology 1 after being screwed into through hole.
The outer wall of cushion rubber 4 is provided with some equally distributed annular recess 9, and annular recess 9 and cushion rubber are coaxial, annular recess 9
The contact area of cushion rubber 4 and glass reinforced plastic pipe can be effectively increased, improves the bond strength of cushion rubber 4 and glass reinforced plastic pipe so that cushion rubber 4
It is difficult for drop-off.
Small ring 2 is provided with two annular grooves 10, and the inwall of cushion rubber 4 has the convex tendon 11 corresponding with annular groove 10, convex tendon
11 are caught in annular groove 10, so as to which cushion rubber 4 is not easy to alter on small ring 2 in the processes such as system lining, winding glass fibre, winding insulation film
It is dynamic.The angle that annular groove 10 is formed with the small outer surface of ring 2 is obtuse angle or fillet, facilitates small ring 2 to depart from from glass reinforced plastic pipe.
Small ring 2 is provided with some hangers, facilitates crane hanged.
1 carries out lining processed, winding glass fibre, winding insulation film etc. on small ring 2 and die ontology between two big ring 3
Process produces glass reinforced plastic pipe, and the glass reinforced plastic pipe both ends after shaping wrap small ring 2 and cushion rubber 4, then unclamps the one end of die ontology 1
The first bolt 6, big ring 3 is separated with small ring 2, portal frame blocks big ring 3, the big ring 3 and small ring 2 and fiberglass of the other end
Keep fixing between pipe, then body 1 is extracted from glass reinforced plastic pipe, after glass reinforced plastic pipe departs from from die ontology 1, removed small
The big ring 3 of ring 2 and the other end, small ring 2, complete the demoulding.Connection glass can be formed on the inwall at the glass reinforced plastic pipe both ends after the demoulding
The groove of glass steel tube end part, prefabricated cushion rubber 4 in groove, so as to form the thimble structure similar to traditional cushion rubber thimble structure.
Both ends are had to the glass reinforced plastic pipe cutting section of cushion rubber 4, there is the glass reinforced plastic pipe of prefabricated cushion rubber 4 with regard to two one end can be obtained, are had
The other end for having the glass reinforced plastic pipe of prefabricated cushion rubber 4 is slotted again to be cut thin, and external diameter at fluting is equal to the external diameter of small ring 2, just can insert
In the collar of the prefabricated cushion rubber 4 of band for entering another glass reinforced plastic pipe.
Preferred embodiment of the present utility model described in detail above, it will be appreciated that the ordinary skill people of this area
Member makes many modifications and variations without creative work can according to design of the present utility model, therefore, all this technology necks
Technical staff passes through logic analysis, reasoning or limited reality on the basis of existing technology according to design of the present utility model in domain
Available technical scheme is tested, all should be in the protection domain being defined in the patent claims.
Claims (7)
1. a kind of production mould of the glass reinforced plastic pipe of prefabricated cushion rubber, it is characterised in that include the die ontology of tubulose, mould sheet
The both ends of body are detachably and fixedly provided with a small ring respectively, and small ring is respectively fitted on die ontology, are arranged with respectively on small ring big
Ring and cushion rubber, removably fixed between big ring and small ring, cushion rubber is tightly placed on small ring, between having necessarily between cushion rubber and big ring
Gap, two cushion rubbers are between two big ring.
2. the production mould of the glass reinforced plastic pipe of prefabricated cushion rubber as claimed in claim 1, it is characterised in that the outside of the big ring
Face is provided with some projections, and around the big annulate shaft heart, circumferentially permutation arranges projection, and projection is provided with the first mounting hole, the outer surface of small ring
Tapped second mounting hole is provided with, the second mounting hole is corresponding with the first mounting hole, and the first bolt is installed through first
The second mounting hole is screwed into behind hole.
3. the production mould of the glass reinforced plastic pipe of prefabricated cushion rubber as claimed in claim 1, it is characterised in that the small ring is provided with
Some jacking blocks, around the big annulate shaft heart, circumferentially permutation arranges jacking block, is equipped with tapped through hole on jacking block, the second bolt is screwed into
Die ontology is withstood after through hole.
4. the production mould of the glass reinforced plastic pipe of prefabricated cushion rubber as claimed in claim 1, it is characterised in that the outer wall of the cushion rubber
It is coaxial with cushion rubber provided with some annular recess, annular recess.
5. the production mould of the glass reinforced plastic pipe of prefabricated cushion rubber as claimed in claim 1, it is characterised in that the small ring is provided with
Two annular grooves, the inwall of cushion rubber have the convex tendon corresponding with annular groove, and convex tendon is caught in annular groove.
6. the production mould of the glass reinforced plastic pipe of prefabricated cushion rubber as claimed in claim 5, it is characterised in that the annular groove with it is small
The angle that ring outer surface is formed is obtuse angle.
7. the production mould of the glass reinforced plastic pipe of prefabricated cushion rubber as claimed in claim 1, it is characterised in that the small ring is provided with
Some hangers.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720935371.8U CN207088519U (en) | 2017-07-29 | 2017-07-29 | A kind of production mould of the glass reinforced plastic pipe of prefabricated cushion rubber |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720935371.8U CN207088519U (en) | 2017-07-29 | 2017-07-29 | A kind of production mould of the glass reinforced plastic pipe of prefabricated cushion rubber |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207088519U true CN207088519U (en) | 2018-03-13 |
Family
ID=61542547
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720935371.8U Expired - Fee Related CN207088519U (en) | 2017-07-29 | 2017-07-29 | A kind of production mould of the glass reinforced plastic pipe of prefabricated cushion rubber |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207088519U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109774187A (en) * | 2018-12-19 | 2019-05-21 | 中国科学院山西煤炭化学研究所 | A kind of method of carbon fiber winding oil pipeline |
CN112078146A (en) * | 2020-08-18 | 2020-12-15 | 湖北三江航天江北机械工程有限公司 | Method for winding front and rear skirts of engine shell by fibers |
-
2017
- 2017-07-29 CN CN201720935371.8U patent/CN207088519U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109774187A (en) * | 2018-12-19 | 2019-05-21 | 中国科学院山西煤炭化学研究所 | A kind of method of carbon fiber winding oil pipeline |
CN112078146A (en) * | 2020-08-18 | 2020-12-15 | 湖北三江航天江北机械工程有限公司 | Method for winding front and rear skirts of engine shell by fibers |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207088519U (en) | A kind of production mould of the glass reinforced plastic pipe of prefabricated cushion rubber | |
CN104772909B (en) | A kind of double Wound Dies manufacturing intervalve and the manufacture method of intervalve | |
PL2156909T3 (en) | Method for producing fixing or connection components with radial outer contours, in particular screws or threaded bolts | |
CN105081386A (en) | Outward expansion type clamp for bearing ring | |
CN203728326U (en) | Device for rewinding waste diamond cutting wire | |
CN203373438U (en) | Local nickel plating device for corrugated pipe | |
CN103016863B (en) | Pipeline connecting structure and hydraulic pipeline | |
CN203363524U (en) | Water-stopping device, water-stopping system and mold | |
CN208644905U (en) | One kind being used for thin-wall sleeve pipe part bar grinding attachment | |
CN207088465U (en) | A kind of die device for producing the glass reinforced plastic pipe with the prefabricated collar | |
CN204083574U (en) | A kind of tube bank joint for connecting bamboo composite pipe | |
CN203765865U (en) | Movable seal head pipe mold device | |
CN205709228U (en) | A kind of air-expanding shaft | |
CN106182716A (en) | A kind of multistation Wound Dies manufacturing intervalve and the manufacture method of intervalve | |
CN204471814U (en) | A kind of core conductor mould for the production of the three-layer co-extruded insulated cable of middle pressure | |
CN203863915U (en) | Plastic coating machine head for hose | |
CN203674930U (en) | Drill jig for motor support end cap | |
CN207535276U (en) | A kind of mouth mold core model auxiliary adjustment gap mold | |
CN206393499U (en) | New tubular gas inspection fixture | |
CN204585871U (en) | A kind of double Wound Dies manufacturing intervalve | |
CN201764159U (en) | Fast-assembled pipe fitting | |
CN203718170U (en) | Electric cable fixing head | |
CN204226898U (en) | Engine oil tube assembly | |
CN204986142U (en) | It is adjustable to quick connector that formula T type is inserted promptly to gas braking system pipeline | |
CN204912957U (en) | Be used for outer ring gear processing anchor clamps of grinding machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180313 |