CN207088125U - A kind of environmentally friendly bricks die for building - Google Patents

A kind of environmentally friendly bricks die for building Download PDF

Info

Publication number
CN207088125U
CN207088125U CN201721043831.2U CN201721043831U CN207088125U CN 207088125 U CN207088125 U CN 207088125U CN 201721043831 U CN201721043831 U CN 201721043831U CN 207088125 U CN207088125 U CN 207088125U
Authority
CN
China
Prior art keywords
fighting
stop people
baffle plate
group
lagging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721043831.2U
Other languages
Chinese (zh)
Inventor
林岸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuwen Hengtai New Type Building Material Co Ltd
Original Assignee
Xuwen Hengtai New Type Building Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuwen Hengtai New Type Building Material Co Ltd filed Critical Xuwen Hengtai New Type Building Material Co Ltd
Priority to CN201721043831.2U priority Critical patent/CN207088125U/en
Application granted granted Critical
Publication of CN207088125U publication Critical patent/CN207088125U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a kind of environmentally friendly bricks die for building, including device bottom plate, one group of lagging and one group of perpendicular baffle plate and a cover plate, the perpendicular baffle plate is plugged on described device bottom plate, the lagging is plugged on the perpendicular baffle plate, the cover plate lid is located at the top of the lagging and the perpendicular baffle plate, one group of gag lever post is also welded with described device bottom plate, there is one group of filling nozzle on the cover plate, the space that the filling nozzle is opened with the lagging and the perpendicular barrier partitions is corresponding relation, the cover plate and the Zola's frame coordinated in pairs, the right side try to stop people from fighting each other and coordinate in pairs on try to stop people from fighting each other, lower tie frame coordinates, Zola's frame, try to stop people from fighting each other and tried to stop people from fighting each other on described in the right side, the lower tie frame is coordinated by one group of fastening screw.The environmental protection brick mold attaching/detaching for building is simple, and fastening is convenient, and cost of manufacture is relatively low, has the environmental protection brick of positioning sleeve available for batch production, meets the production requirement of the new environmental protection brick for being favorably improved efficiency of construction.

Description

A kind of environmentally friendly bricks die for building
Technical field
Environmental protection brick mould applications are the utility model is related to, are specially a kind of environmentally friendly bricks die for building.
Background technology
Fragment of brick is widely applied in building and bridge engineering, and traditional fragment of brick is made, it is necessary to expend using burning process Substantial amounts of clay, as brickmaking is horizontal and the raising of technique, in order to replace traditional adobe, using flyash, cinder, gangue, Mine tailings, residue of chemical industry, industrial waste, burn away the refuse and burn clinker etc. be environmental protection brick made of raw material utilization rate increasingly Height, environmentally friendly drilling tool have the outward appearance of primitive simplicity and nature, and durability and intensity also meet the requirement of construction, and the production of environmental protection brick needs Mould is used to help fragment of brick to be molded, environmental protection brick profile and function are single at present, are commonly cuboid fragment of brick, now need a kind of Property environmentally friendly bricks die, come produce have improve efficiency of construction effect environment friendly brick.
Utility model content
The purpose of this utility model is to provide a kind of environmentally friendly bricks die for building, to solve to propose in above-mentioned background technology The problem of.
To achieve the above object, the utility model provides following technical scheme:A kind of environmentally friendly bricks die for building, including dress The perpendicular baffle plate of bottom set plate, one group of lagging and one group and a cover plate, the perpendicular baffle plate is plugged on described device bottom plate, described Lagging is plugged on the perpendicular baffle plate, and the cover plate lid is located at the top of the lagging and the perpendicular baffle plate, described device One group of gag lever post is also welded with bottom plate, there is one group of filling nozzle, the filling nozzle and the lagging and institute on the cover plate It is corresponding relation to state the space that perpendicular barrier partitions are opened, and the cover plate is tried to stop people from fighting each other with Zola's frame for coordinating in pairs, the right side and coordinated in pairs On try to stop people from fighting each other, lower tie frame coordinate, Zola's frame, the right side are tried to stop people from fighting each other and tried to stop people from fighting each other on described, the lower tie frame is by one group Fastening screw coordinates.
Preferably, a prescription groove is offered on described device bottom plate, the perpendicular baffle bottom has a prescription post, the side Post is adapted to the square groove, and the perpendicular baffle plate is plugged on described device bottom plate by the square column.
Preferably, the top of the perpendicular baffle plate offers one group of top bar groove, and the bottom of the lagging offers one group Bottom bar groove, the perpendicular baffle plate and the lagging complete grafting by the cooperation of the top bar groove and the bottom bar groove.
Preferably, Zola's frame and the right side try to stop people from fighting each other it is upper offer resigning square hole, the resigning square hole and the filling Nozzle is adapted to.
Preferably, Zola's frame, the right side try to stop people from fighting each other, it is described on try to stop people from fighting each other, one group of connection be welded with the lower tie frame Seat, the connecting seat are adapted to the fastening screw, and screw is offered on the connecting seat on Zola's frame and the lower tie frame, The right side try to stop people from fighting each other with it is described on try to stop people from fighting each other on connecting seat offer through hole.
Compared with prior art, the beneficial effects of the utility model are:The environmentally friendly bricks die for building is in use, device bottom After plate is laid flat, perpendicular baffle plate is plugged on device bottom plate by square column, then by lagging and perpendicular baffle plate grafting, now lagging Several square spaces can be separated out with perpendicular baffle plate, after erecting baffle plate and lagging grafting, are flushed at the top of perpendicular baffle plate and lagging, The positioning sleeve that is embedded in inside environmental protection brick will be prepared to be set on gag lever post, now by cover plate lid, then try to stop people from fighting each other by and under Try to stop people from fighting each other to take and be placed on cover plate top, then tried to stop people from fighting each other by by fastening screw and tensed with lower tie frame, then Zola's frame and the right side are tried to stop people from fighting each other Take and be placed on cover plate top, then Zola's frame and the right side are tried to stop people from fighting each other tension by fastening screw, then now in Zola's frame, the right side try to stop people from fighting each other, on Try to stop people from fighting each other, in the presence of lower tie frame coordinates, device bottom plate, lagging, perpendicular baffle plate are consolidated, then by device for casting by fluid The environmental protection brick compound of state is injected into square space by filling nozzle, and fluid foods are full of square space, by positioning sleeve bag Firmly, after fluid foods solidify to a certain degree, then cover plate can be pulled down, then successively pulls down lagging and perpendicular baffle plate, it is square Material in space can be removed environmental protection brick into environmental protection brick after fully solidifying from device bottom plate, now in the middle part of environmental protection brick Two positioning sleeves can be inlaid with, in building wall, the metal that nut can be bolted with by installing both ends into positioning sleeve positions Bar completes the positioning of the multilayer environment protecting brick after stacking so that need not smear pug during building wall between layer brick, save Engineering time;Present apparatus dismounting is simple, and fastening is convenient, and cost of manufacture is relatively low, available for environmental protection of the batch production with positioning sleeve Brick, meet the production requirement of the new environmental protection brick for being favorably improved efficiency of construction.
Brief description of the drawings
Fig. 1 is the utility model structure diagram.
Fig. 2 is Fig. 1 upward view.
Fig. 3 is the utility model device bottom plate, lagging, the structural representation of perpendicular baffle fit.
Fig. 4 is the structural representation of the utility model device bottom plate.
Fig. 5 is the structural representation of the utility model lagging.
Fig. 6 is the structural representation that the utility model erects baffle plate.
Fig. 7 is the structural representation for the environmental protection brick that the utility model is produced.
In figure:1st, device bottom plate, 2, lagging, 3, perpendicular baffle plate, 4, gag lever post, 5, cover plate, 6, filling nozzle, 7, Zola's frame, 8th, the right side is tried to stop people from fighting each other, 9, on try to stop people from fighting each other, 10, lower tie frame, 11, fastening screw, 12, square groove, 13, square column, 14, top bar groove, 15, lower bar Groove, 16, resigning square hole, 17, connecting seat, 18, screw, 19, through hole.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-7 are referred to, the utility model provides a kind of technical scheme:A kind of environmentally friendly bricks die for building, including device 1, one group of lagging 2 of bottom plate and one group of perpendicular baffle plate 3 and a cover plate 5, the perpendicular baffle plate 3 are plugged on described device bottom plate 1, The lagging 2 is plugged on the perpendicular baffle plate 3, and the cover plate 5 covers the top for being located at the lagging 2 and the perpendicular baffle plate 3, One group of gag lever post 4 is also welded with described device bottom plate 1, there is one group of filling nozzle 6, the filling nozzle 6 and institute on the cover plate 5 It is corresponding relation, the cover plate 5 and the Zola's frame 7 coordinated in pairs, the right side to state the space that lagging 2 and the perpendicular baffle plate 3 separate Try to stop people from fighting each other 8 and coordinate in pairs on 9, lower tie frame 10 of trying to stop people from fighting each other coordinate, Zola's frame 7, the right side try to stop people from fighting each other 8 and it is described on try to stop people from fighting each other 9th, the lower tie frame 10 is coordinated by one group of fastening screw 11, and a prescription groove 12 is offered on described device bottom plate 1, described perpendicular The bottom of baffle plate 3 has a prescription post 13, and the square column 13 is adapted to the square groove 12, and the perpendicular baffle plate 3 passes through the square column 13 It is plugged on described device bottom plate 1, the top of the perpendicular baffle plate 3 offers one group of top bar groove 14, the bottom of the lagging 2 One group of bottom bar groove 15 is offered, the perpendicular baffle plate 3 and the lagging 2 pass through the top bar groove 14 and the bottom bar groove Grafting is completed in 15 cooperation, and Zola's frame 7 and the right side are tried to stop people from fighting each other and offer resigning square hole 16, the resigning square hole 16 on 8 Be adapted to the filling nozzle 6, Zola's frame 7, the right side try to stop people from fighting each other 8, it is described on try to stop people from fighting each other and be welded with the 9, lower tie frame 10 One group of connecting seat 17, the connecting seat 17 are adapted to the fastening screw 11, the company on Zola's frame 7 and the lower tie frame 10 Offer screw 18 on joint chair 17, the right side try to stop people from fighting each other 8 and it is described on the connecting seat 17 tried to stop people from fighting each other on 9 offer through hole 19.
Operation principle:When using the environmentally friendly bricks die for building, after device bottom plate 1 is laid flat, perpendicular baffle plate 3 is passed through into square column 13 are plugged on device bottom plate 1, then by lagging 2 and the perpendicular grafting of baffle plate 3, if now lagging 2 and perpendicular baffle plate 3 can be separated out Dry square space, after erecting baffle plate 3 and the grafting of lagging 2, the top of perpendicular baffle plate 3 and lagging 2 flushes, and will prepare to be embedded in ring Protect brick inside positioning sleeve be set on gag lever post 4, now cover plate 5 is covered, then tried to stop people from fighting each other by 9 and lower tie frame 10 take and be placed on The top of cover plate 5, then by fastening screw 11 tried to stop people from fighting each other by 9 and lower tie frame 10 tense, then Zola's frame 7 and the right side are tried to stop people from fighting each other and 8 taken The top of cover plate 5 is placed on, then Zola's frame 7 and the right side are tried to stop people from fighting each other 8 tensions by fastening screw 11, then now tried to stop people from fighting each other on Zola's frame 7, the right side 8th, in the presence of 9, lower tie frame 10 of being tried to stop people from fighting each other on coordinates, device bottom plate 1, lagging 2, perpendicular baffle plate 3 are consolidated, and then pass through perfusion The environmental protection brick compound of fluid state is injected into square space by device by filling nozzle 6, and fluid foods are full of square space, Positioning sleeve is encased, after fluid foods solidify to a certain degree, then cover plate 5 can be pulled down, then successively by lagging 2 and perpendicular gear Plate 3 is pulled down, and the material in square space can be removed environmental protection brick into environmental protection brick after fully solidifying from device bottom plate 1, this When environmental protection brick in the middle part of can be inlaid with two positioning sleeves, in building wall, spiral shell can be bolted with by installing both ends into positioning sleeve Female metal locating rod completes the positioning of the multilayer environment protecting brick after stacking so that need not be applied during building wall between layer brick Claying material, save the engineering time.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of environmentally friendly bricks die for building, including device bottom plate(1), one group of lagging(2)With one group of perpendicular baffle plate(3)And one Individual cover plate(5), it is characterised in that:The perpendicular baffle plate(3)It is plugged on described device bottom plate(1)On, the lagging(2)It is plugged on The perpendicular baffle plate(3)On, the cover plate(5)Lid is located at the lagging(2)With the perpendicular baffle plate(3)Top, described device Bottom plate(1)On be also welded with one group of gag lever post(4), the cover plate(5)It is upper that there is one group of filling nozzle(6), the filling nozzle(6)With The lagging(2)With the perpendicular baffle plate(3)The space separated is corresponding relation, the cover plate(5)With the left side coordinated in pairs Try to stop people from fighting each other(7), the right side tries to stop people from fighting each other(8)And coordinate in pairs on try to stop people from fighting each other(9), lower tie frame(10)Coordinate, Zola's frame(7), the right side Try to stop people from fighting each other(8)And it is described on try to stop people from fighting each other(9), the lower tie frame(10)Pass through one group of fastening screw(11)Coordinate.
2. one kind environmentally friendly bricks die for building according to claim 1, it is characterised in that:Described device bottom plate(1)On open Provided with a prescription groove(12), the perpendicular baffle plate(3)Bottom has a prescription post(13), the square column(13)With the square groove(12) Adaptation, the perpendicular baffle plate(3)Pass through the square column(13)It is plugged on described device bottom plate(1)On.
3. one kind environmentally friendly bricks die for building according to claim 1, it is characterised in that:The perpendicular baffle plate(3)Top Offer one group of top bar groove(14), the lagging(2)Bottom offer one group of bottom bar groove(15), the perpendicular baffle plate (3)With the lagging(2)Pass through the top bar groove(14)With the bottom bar groove(15)Cooperation complete grafting.
4. one kind environmentally friendly bricks die for building according to claim 1, it is characterised in that:Zola's frame(7)With it is described Try to stop people from fighting each other on the right side(8)On offer resigning square hole(16), the resigning square hole(16)With the filling nozzle(6)Adaptation.
5. one kind environmentally friendly bricks die for building according to claim 1, it is characterised in that:Zola's frame(7), the right side Try to stop people from fighting each other(8), it is described on try to stop people from fighting each other(9), the lower tie frame(10)On be welded with one group of connecting seat(17), the connecting seat(17)With The fastening screw(11)Adaptation, Zola's frame(7)With the lower tie frame(10)On connecting seat(17)On offer screw (18), the right side is tried to stop people from fighting each other(8)With it is described on try to stop people from fighting each other(9)On connecting seat(17)Offer through hole(19).
CN201721043831.2U 2017-08-21 2017-08-21 A kind of environmentally friendly bricks die for building Expired - Fee Related CN207088125U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721043831.2U CN207088125U (en) 2017-08-21 2017-08-21 A kind of environmentally friendly bricks die for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721043831.2U CN207088125U (en) 2017-08-21 2017-08-21 A kind of environmentally friendly bricks die for building

Publications (1)

Publication Number Publication Date
CN207088125U true CN207088125U (en) 2018-03-13

Family

ID=61542362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721043831.2U Expired - Fee Related CN207088125U (en) 2017-08-21 2017-08-21 A kind of environmentally friendly bricks die for building

Country Status (1)

Country Link
CN (1) CN207088125U (en)

Similar Documents

Publication Publication Date Title
CN103171036B (en) Self-insulation concrete composite building block mold and using method thereof
CN105839667A (en) Construction and manufacturing process of total-prefabricated superimposed assembly type underground pipe gallery
CN1657251A (en) Automatic shaping method and equipment for load-bearing hollow brick
CN101905483A (en) Forming die of thin-wall hollow member
CN207643374U (en) Building mould is matched in adjustable industrial makeup
CN104227825A (en) Building wallboard producing machine
CN207088125U (en) A kind of environmentally friendly bricks die for building
CN102926526A (en) Red mud smoke exhaustion air flue, production method thereof and special mould
CN2778522Y (en) Automatic forming machine for hollow bearing brick
CN103882992A (en) Connection piece with annular steel bar
CN107053449A (en) The upset manufactured for combined wall board and bed die distribution machine
CN204001212U (en) Band ring-type rebar connector
CN206883884U (en) Upset and bed die distribution machine for combined wall board manufacture
CN2858824Y (en) Wall component
CN206902892U (en) A kind of inlet for stom water mould
CN108044771A (en) One kind makes brick equipment
CN206128619U (en) Veneer clear water concrete form system
CN206264131U (en) A kind of high tenacity cement industry goods of furniture for display rather than for use production equipment
CN210616867U (en) Cement brick production is with mould of conveniently getting brick
CN203418621U (en) Building wallboard production machine
CN204525753U (en) A kind of cement pipe molding mould
CN207564675U (en) A kind of moveable concrete curing equipment
CN102900195A (en) Inner wallboard and its manufacturing method
CN104608232A (en) Environmentally friendly brick hot-press manufacturing device
CN206123902U (en) A light -duty side form system for precast concrete wall panel production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180313

Termination date: 20210821