CN207086534U - A kind of water draw-off of rubbish landfill gas collection system - Google Patents

A kind of water draw-off of rubbish landfill gas collection system Download PDF

Info

Publication number
CN207086534U
CN207086534U CN201720983886.5U CN201720983886U CN207086534U CN 207086534 U CN207086534 U CN 207086534U CN 201720983886 U CN201720983886 U CN 201720983886U CN 207086534 U CN207086534 U CN 207086534U
Authority
CN
China
Prior art keywords
water draw
collection system
main pipe
gas collection
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720983886.5U
Other languages
Chinese (zh)
Inventor
吴兵兵
李平
周向阳
江大水
张竹君
曹丽
周江波
舒静
陈荣贵
刘青松
葛芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Orchid environmental protection Polytron Technologies Inc
Original Assignee
Zhong Lan Environmental Protection Science And Technology Co Ltd Of Shenzhen
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhong Lan Environmental Protection Science And Technology Co Ltd Of Shenzhen filed Critical Zhong Lan Environmental Protection Science And Technology Co Ltd Of Shenzhen
Priority to CN201720983886.5U priority Critical patent/CN207086534U/en
Application granted granted Critical
Publication of CN207086534U publication Critical patent/CN207086534U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model provides a kind of water draw-off of rubbish landfill gas collection system, and it includes gas collecting main pipe, reducing tee and drainage pipeline, and the bottommost of the gas collecting main pipe and middle part are provided with multiple reducing tees, and the reducing tee is connected with drainage pipeline;Side slope laying of the gas collecting main pipe along garbage loading embeading heap body, the garbage loading embeading heap body include landfill yard job platform, and the landfill yard job platform is provided with gas gathering station, and the outlet of the gas gathering station on the landfill yard job platform is connected with gas collecting main pipe.Using the technical solution of the utility model, this water draw-off need not set cold trap in addition, the drainage requirement of landfill gas collecting system can be realized under conditions of cold trap can not be set, relative to setting cold trap, this water draw-off can be according to the position flexible arrangement of collecting pipe, settable to sentence raising drainage effect and easy for installation, investment is small more.

Description

A kind of water draw-off of rubbish landfill gas collection system
Technical field
The utility model belongs to fixed-end forces technical field, more particularly to a kind of sluicing dress of rubbish landfill gas collection system Put.
Background technology
Landfill yard for being not provided with landfill gas guide system, usually after junk-heap body rises to certain altitude, Biogas well construction landfill gas collecting system is beaten on junk-heap body.Newly-built landfill gas collecting system needs to combine landfill yard actual conditions It is designed.In particular cases edge reserved space in landfill yard reservoir area is very limited some, leads to not set cold trap To collect the condensed water in landfill gas.If will be destroyed in anchored platform design cold trap to leakage preventing structure, exist larger Risk.It is this can not cold trap be set in the case of, it is necessary to using unconventional design, to realize landfill gas collecting system Draining.
Utility model content
For above technical problem, the utility model discloses a kind of water draw-off of rubbish landfill gas collection system, this Water draw-off need not set cold trap to realize draining in addition, and easy for installation.
On the other hand, the technical solution adopted in the utility model is:
A kind of water draw-off of rubbish landfill gas collection system, it includes gas collecting main pipe, reducing tee and drainage pipeline, institute The bottommost and middle part for stating gas collecting main pipe are provided with multiple reducing tees, and the reducing tee is connected with drainage pipeline;The gas collection Side slope of the supervisor along garbage loading embeading heap body is laid, and the garbage loading embeading heap body includes landfill yard job platform, and the landfill yard is made Industry platform is provided with gas gathering station, and the outlet of the gas gathering station on the landfill yard job platform is connected with gas collecting main pipe.
Using this technical scheme, this water draw-off need not set cold trap in addition, can not set the bar of cold trap The drainage requirement of landfill gas collecting system is realized under part, relative to cold trap is set, this water draw-off can be according to collecting pipe Position flexible arrangement, settable to sentence raising drainage effect and easy for installation, investment is small more.
As further improvement of the utility model, the reducing tee is connected by elbow with drainage pipeline.
As further improvement of the utility model, the elbow is 90 ° of elbows.
As further improvement of the utility model, the drainage pipeline is provided with stop valve.
As further improvement of the utility model, two stop valves are interval with the drainage pipeline.
As further improvement of the utility model, the spacing between described two stop valves is 2 ~ 3m.
As further improvement of the utility model, vertically a reducing three is provided with every 4 ~ 6m on the gas collecting main pipe It is logical.
As further improvement of the utility model, vertically a reducing tee is provided with every 5m on the gas collecting main pipe.
As further improvement of the utility model, the HDPE that the gas collecting main pipe is DN200 is managed, and the reducing tee is DN200/DN90 HDPE reducing tees.
Compared with prior art, the beneficial effects of the utility model are:
Using the technical solution of the utility model, when landfill yard does not have condition setting condensate liquid to collect well, can pass through The condensate liquid draining that this water draw-off realizes landfill-gas collecting pipeline is installed.Meanwhile the present apparatus can be according to the laying of collecting pipe Flexible arrangement, when specifically used, collecting well relative to fixed condensate liquid has higher flexibility.Meanwhile this sluicing fills Put it is easy for installation, it is easy to maintenance and investment it is small, can be set according to actual conditions many places, raising landfill-gas collecting pipeline condensate liquid Drainage effect.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the water draw-off of rubbish landfill gas collection system of the embodiment of the present invention.
Fig. 2 is that the rubbish landfill gas collection conduit of the embodiment of the present invention arranges schematic diagram.
Embodiment
Preferably embodiment of the present utility model is described in further detail below.
As shown in figure 1, a kind of water draw-off of rubbish landfill gas collection system, the water draw-off include:Collecting pipe 1, 2,90 ° of elbows 3 of reducing tee, stop valve 5 and drainage pipeline 4.The bottommost of the collecting pipe 1 and middle part are provided with multiple reducings Threeway 2, the reducing tee 2 are connected by 90 ° of elbows 3 with drainage pipeline 4;The collecting pipe 1 is along garbage loading embeading heap body Side slope is laid, and reservoir area edge is led to by job platform.The garbage loading embeading heap body includes landfill yard job platform, the landfill yard Job platform is provided with gas gathering station, and the outlet conduit of each gas gathering station on the landfill yard job platform is collected on collecting pipe 1. The HDPE that wherein collecting pipe 1 is DN200 is managed.Vertically every 5m height and the minimum point of collecting pipe 1 on collecting pipe 1 Place's one reducing tee 2 of welding, by discharge outlet of the low side of threeway as condensate liquid.
The collecting pipe 1 is DN200 HDPE collecting pipes 1.The HDPE that the reducing tee 2 is DN200/DN90 becomes Footpath threeway 2.90 ° of elbows 3 are HDPE elbows, and drainage pipeline 4 is the DN90 in line water pipes of HDPE.Welded after reducing tee 2 One 90 ° of HDPE elbows, elbow draw condensate liquid, and setting angle is adjusted according to the position of actual drainage point.With row Waterpipe 4 exports condensate liquid to drainage point.
As shown in Fig. 2 be provided with two stop valves 5 on the drainage pipeline 4, respectively the first stop valve 51 and second section Only valve 52, stop valve 5 select PVC material, retain certain spacing between two stop valves 5, are determined with specific reference to drainage position, Typically in 2 ~ 3m.During working condition, the first stop valve 51 is normally opened, and the second stop valve 52 completely closes, by the first cut-off during draining Valve 51 is closed, and the second stop valve 52 opens draining.Working condition is returned to after the completion of draining.
As shown in Fig. 2 collecting pipe 1 is laid to reservoir area edge by landfill operation platform along junk-heap body side slope, the gradient with Side slope is unanimously 1:2, discrepancy in elevation 15m.Vertical height sets a set of water draw-off every 5m, is provided with 3 sets of water draw-offs altogether. Often set water draw-off is drawn by reducing tee 2, is filled after threeway by 90 ° of elbows 3 and draining, condensed water is exported to each layer rubbish Rubbish gutter.Two stop valves 5 are set on every drainage pipeline 4, to control drain operation.The water row of the drainage pipeline 4 Into gutter 6.
Above content is to combine specific preferred embodiment further detailed description of the utility model, it is impossible to Assert that specific implementation of the present utility model is confined to these explanations.For the ordinary skill of the utility model art For personnel, without departing from the concept of the premise utility, some simple deduction or replace can also be made, should all be regarded To belong to the scope of protection of the utility model.

Claims (8)

  1. A kind of 1. water draw-off of rubbish landfill gas collection system, it is characterised in that:It includes gas collecting main pipe, reducing tee and row Waterpipe, the bottommost of the gas collecting main pipe and middle part are provided with multiple reducing tees, and the reducing tee is connected with drainage pipeline; Side slope laying of the gas collecting main pipe along garbage loading embeading heap body, the garbage loading embeading heap body includes landfill yard job platform, described Landfill yard job platform is provided with gas gathering station, and the outlet of the gas gathering station on the landfill yard job platform is connected with gas collecting main pipe.
  2. 2. the water draw-off of rubbish landfill gas collection system according to claim 1, it is characterised in that:The reducing tee It is connected by elbow with drainage pipeline.
  3. 3. the water draw-off of rubbish landfill gas collection system according to claim 2, it is characterised in that:The elbow is 90 ° of elbows.
  4. 4. the water draw-off of rubbish landfill gas collection system according to claim 1, it is characterised in that:The drainage pipeline It is provided with stop valve.
  5. 5. the water draw-off of rubbish landfill gas collection system according to claim 3, it is characterised in that:The drainage pipeline On be interval with two stop valves.
  6. 6. the water draw-off of rubbish landfill gas collection system according to claim 5, it is characterised in that:Described two cut-offs Spacing between valve is 2 ~ 3m.
  7. 7. the water draw-off of the rubbish landfill gas collection system according to claim 1 ~ 6 any one, it is characterised in that:Institute State and be vertically provided with a reducing tee every 5m on gas collecting main pipe.
  8. 8. the water draw-off of rubbish landfill gas collection system according to claim 7, it is characterised in that:The gas collection master The HDPE pipes for DN200 are managed, the reducing tee is DN200/DN90 HDPE reducing tees.
CN201720983886.5U 2017-08-08 2017-08-08 A kind of water draw-off of rubbish landfill gas collection system Active CN207086534U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720983886.5U CN207086534U (en) 2017-08-08 2017-08-08 A kind of water draw-off of rubbish landfill gas collection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720983886.5U CN207086534U (en) 2017-08-08 2017-08-08 A kind of water draw-off of rubbish landfill gas collection system

Publications (1)

Publication Number Publication Date
CN207086534U true CN207086534U (en) 2018-03-13

Family

ID=61544535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720983886.5U Active CN207086534U (en) 2017-08-08 2017-08-08 A kind of water draw-off of rubbish landfill gas collection system

Country Status (1)

Country Link
CN (1) CN207086534U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107350258A (en) * 2017-08-08 2017-11-17 深圳市中兰环保科技股份有限公司 A kind of water draw-off of rubbish landfill gas collection system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107350258A (en) * 2017-08-08 2017-11-17 深圳市中兰环保科技股份有限公司 A kind of water draw-off of rubbish landfill gas collection system

Similar Documents

Publication Publication Date Title
CN102242550B (en) Vacuum sewage interception system and method which are suitable for erecting pipes coastwise
CN105507415B (en) A kind of rainwater discharging well for the rubber flap check valve that dams with lift
CN105464202B (en) A kind of rainwater discharging well with the adjustable flap valve that dams
CN105821909A (en) Tree-like refuse leachate generated in landfill construction and closure as well as landfill gas guide and exhaust system and method
CN207086534U (en) A kind of water draw-off of rubbish landfill gas collection system
CN207775976U (en) A kind of rain early-stage split-flow device
CN206304385U (en) A kind of condensation vapor well construction for landfill gas collection system
CN107350258A (en) A kind of water draw-off of rubbish landfill gas collection system
CN208152200U (en) A kind of guiding device of the rainwater set on sanitary garbage landfill yard dam body
CN209213187U (en) A kind of pipe laying system of the efficient rain sewage diversion of landfill yard
CN206256508U (en) A kind of comprehensive rain collector
CN106869236B (en) Horizontal storage tank for sponge urban rainwater collection system and construction method of horizontal storage tank
CN106838623A (en) Gas drainage system with spring sealed ball
CN108421803A (en) A kind of surface gas collection device
CN208466817U (en) A kind of surface gas collection device
CN207453049U (en) For the rain sewage diversion system of hazardous waste security landfill
CN209293143U (en) A kind of distribution pretreatment system for sewage
CN209129108U (en) A kind of transformation of operation refuse landfill rain sewage diversion system
CN203878734U (en) Rainwater collecting and preprocessing device
CN206398374U (en) Gas drainage system with spring sealed ball
CN106917473A (en) A kind of photovoltaic afforests the rainwater recycle method of composite roof
CN207295964U (en) A kind of horizontal prefabricated pumping plant of integration
CN204728293U (en) A kind of combined type blocks oily dam device
CN208794058U (en) A kind of condensed water drainage device of rubbish landfill gas collection system
CN206361903U (en) A kind of air conditioner drainage arrangement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 518000 three, The Union Buildings, 1069 Nanhai Road, Shekou, Nanshan District, Shenzhen, Guangdong.

Patentee after: China Orchid environmental protection Polytron Technologies Inc

Address before: 518000 three, The Union Buildings, 1069 Nanhai Road, Shekou, Nanshan District, Shenzhen, Guangdong.

Patentee before: Zhong Lan environmental protection Science and Technology Co., Ltd. of Shenzhen