CN207081350U - A kind of instant heat exchanger - Google Patents
A kind of instant heat exchanger Download PDFInfo
- Publication number
- CN207081350U CN207081350U CN201721051669.9U CN201721051669U CN207081350U CN 207081350 U CN207081350 U CN 207081350U CN 201721051669 U CN201721051669 U CN 201721051669U CN 207081350 U CN207081350 U CN 207081350U
- Authority
- CN
- China
- Prior art keywords
- tower body
- fixedly connected
- pipe
- tower
- heat exchanger
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of instant heat exchanger, including tower body, cold flow pipe is fixedly connected with above the left side of the tower body, hot-fluid pipe is fixedly connected with below the left side of the tower body, the hot-fluid storehouse is connected with cold flow storehouse by the heat exchanger tube inside tower body, hanger is fixedly connected with the top of the tower body, the top right side of the tower body is provided with blast pipe, the blast pipe connects with the inside of tower body, the lower right-hand side of the tower body is provided with steam input pipe, tower seat is fixedly connected with below the tower body, the lower surface left and right sides of the tower seat is provided with condensate pipe, the condensate pipe connects through tower seat with the inside of tower body, the front of the tower body is fixedly connected with pressure gauge, heat-insulation layer is installed between the inner and outer wall of the tower body, the interior bottom portion of the tower body is fixedly connected with folding gas plate.The utility model is easy to use, and security performance is high and heat transfer effect is notable, has good market popularization value.
Description
Technical field
Field of heat exchangers is the utility model is related to, specially a kind of instant heat exchanger.
Background technology
Data show Chinese heat exchanger industrial market scale in 2016 at 50,000,000,000 yuan or so, focus primarily upon oil, change
The fields such as work, metallurgy, electric power, ship, central heating, refrigeration air-conditioner, machinery, food, pharmacy.Wherein, petrochemical industry is still
It is so the maximum market of heat exchanger industry, its market scale is 15,000,000,000 yuan.In addition, aerospace craft, semiconductor devices, nuclear power
The fields such as conventional island nuclear island, wind power generating set, solar energy power generating, production of polysilicon are required for substantial amounts of specialty heat exchange
Device, these markets there are about 13,000,000,000 yuan of scale, and heat exchanger is a kind of to be realized between two or more fluid of different temperatures
The energy-saving equipment of heat transfer between material, it is heat is passed to the relatively low fluid of temperature by the higher fluid of temperature, makes stream
Temperature reaches the index of flow specification, to meet the needs of process conditions, while is also to improve the main of energy utilization rate to set
It is one of standby, and existing heat exchanger is that hot property is not high, energy utilization rate is relatively low.
Utility model content
The purpose of this utility model is to provide a kind of instant heat exchanger, asked with solve to propose in above-mentioned background technology
Topic.
To achieve the above object, the utility model provides following technical scheme:A kind of instant heat exchanger, including tower body,
Be fixedly connected with cold flow pipe above the left side of the tower body, one end of the cold flow pipe connects with exterior space, and the other end and
Cold flow storehouse connection inside tower body, is fixedly connected with hot-fluid pipe below the left side of the tower body, one end of the hot-fluid pipe with it is outer
Portion space connects, and the other end connects with the hot-fluid storehouse inside tower body, and the hot-fluid storehouse and cold flow storehouse pass through in tower body
The heat exchanger tube in portion is connected, and hanger is fixedly connected with the top of the tower body, and the top right side of the tower body is provided with blast pipe, institute
State blast pipe to connect with the inside of tower body, the lower right-hand side of the tower body is provided with steam input pipe, and the lower section of the tower body is consolidated
Surely tower seat is connected with, the lower surface left and right sides of the tower seat is provided with condensate pipe, and the condensate pipe passes through tower seat and tower body
Inside connection, be fixedly connected with supporting leg below the tower seat, the front of the tower body is fixedly connected with pressure gauge, described
Heat-insulation layer is installed, the interior bottom portion of the tower body is fixedly connected with folding gas plate, the heat exchange between the inner and outer wall of tower body
Pipe is passed through by the pore of folding gas plate.
Preferably, the top of the blast pipe is rotatably connected to closed cover by hinge.
Preferably, the hot-fluid pipe, cold flow pipe and the connected mode of steam input pipe and tower body are designed as bolt and spiral shell
Female connected mode.
Preferably, the cold flow storehouse is fixedly connected by fixed plate with the inwall of tower body, and the hot-fluid storehouse passes through set square
It is fixedly connected with the interior bottom portion of tower body.
Compared with prior art, the beneficial effects of the utility model are:The utility model is easy to use, security performance it is high and
Heat transfer effect is notable, has good market popularization value, and i.e. hot property is substantially increased by way of high-temperature steam heating,
It is even more moreover the utilization ratio for improving the energy, the condensate pipe installed by the lower surface left and right sides of tower seat, steaming can be made
Steam is produced after condensing hot air furnace caused by vapour again, improves the utilization rate of resource.
Brief description of the drawings
Fig. 1 is the utility model agent structure schematic diagram;
Fig. 2 is A-A cross section structure diagram.
In figure:1 supporting leg, 2 condensate pipes, 3 hot-fluid pipes, 4 tower bodies, 5 cold flow pipes, 6 hangers, 7 blast pipes, 8 pressure gauges, 9
Steam pipe, 10 tower seats, 11 hot-fluid storehouses, 12 heat-insulation layers, 13 cold flow storehouses, 14 folding gas plates, 15 heat exchanger tubes.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
, it is necessary to explanation in description of the present utility model, the instruction such as term " vertical ", " on ", " under ", " level "
Orientation or position relationship are based on orientation shown in the drawings or position relationship, are for only for ease of description the utility model and simplification
Description, rather than the device or element of instruction or hint meaning must have specific orientation, with specific azimuth configuration and behaviour
Make, therefore it is not intended that to limitation of the present utility model.
In description of the present utility model, it is also necessary to which explanation, unless otherwise clearly defined and limited, term " are set
Put ", " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected,
Or it is integrally connected;Can be mechanical connection or electrical connection;Can be joined directly together, intermediary can also be passed through
It is indirectly connected, can is the connection of two element internals.For the ordinary skill in the art, can be according to specific feelings
Condition understands concrete meaning of the above-mentioned term in the utility model.
Fig. 1-2 is referred to, the utility model provides a kind of technical scheme:A kind of instant heat exchanger, including tower body 4, tower
Cold flow pipe 5 is fixedly connected with above the left side of body 4, one end of cold flow pipe 5 connects with exterior space, and in the other end and tower body 4
The cold flow storehouse 13 in portion is connected, and hot-fluid pipe 3 is fixedly connected with below the left side of tower body 4, and one end and the exterior space of hot-fluid pipe 3 connect
It is logical, and the other end connects with the hot-fluid storehouse 11 inside tower body, hot-fluid pipe, cold flow pipe and the connection side of steam input pipe and tower body
The connected mode that formula is designed as bolts and nuts is used to increase the steadiness of part connection while facilitates the replacing of part, hot-fluid storehouse
11 are connected with cold flow storehouse 13 by the heat exchanger tube 15 inside tower body 4, and cold flow storehouse is consolidated by the inwall of fixed plate and tower body
Fixed connection, hot-fluid storehouse are fixedly connected by set square with the interior bottom portion of tower body, for the stability of ensuring equipment, ensure to use
Safety, the top of tower body 4 is fixedly connected with hanger 6, and the top right side of tower body 4 is provided with blast pipe 7, the top of blast pipe 7
Closed cover is rotatably connected to by hinge, for closed steam and discharge steam, blast pipe 7 connects with the inside of tower body 4, tower body
4 lower right-hand side is provided with steam input pipe 9, and the lower section of tower body 4 is fixedly connected with tower seat 10, the lower surface left and right sides of tower seat 10
Condensate pipe 2 is installed, condensate pipe 2 connects through tower seat 10 with the inside of tower body 4, and the lower section of tower seat 10 is fixedly connected with branch
Support leg 1, the front of tower body 4 are fixedly connected with pressure gauge 8, heat-insulation layer 12, tower body 4 are provided between the inner and outer wall of tower body 4
Interior bottom portion be fixedly connected with folding gas plate 14, heat exchanger tube 15 is passed through by the pore of folding gas plate 14.
Operation principle:Before use, it must be confirmed by the service condition of all parts of the comprehensive check device of professional errorless
Rear can be used, and be covered tightly in use, the top of blast pipe 7 is rotatably connected into closed cover by hinge, the lower surface of tower seat 10
The condensate pipe 2 of left and right sides installation can discharge caused condensed water in heating process, and the front by observing tower body 4 is fixed to be connected
The pressure gauge 8 connect may determine that the pressure value in tower body 4, prevent security incident, and steam is put into by steam input pipe 9,
Steam is in effect of the move inside due to rolling over gas plate 14 of tower body 4, and the bottom of folding gas plate 14 is provided with the circular hole of marshalling, it will hair
Life circulation telemechanical, and rolling over the exchange heat pipe 15 of gas plate 14 has supporting function, steam input to be added again by cold flow pipe 5 after continuing for some time
Enter cold fluid and enter cold flow storehouse 13, then cold fluid enters in heat exchanger tube 15, and cold fluid is flowed by tower body 4 in heat exchanger tube 15
Interior high-temperature steam heating is changed into hot fluid, and then hot fluid is flowed into hot-fluid storehouse 11 and finally flowed out by hot-fluid pipe 3, heat transfer process
Terminate.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (4)
1. a kind of instant heat exchanger, including tower body (4), it is characterised in that:It is fixedly connected with above the left side of the tower body (4)
Cold flow pipe (5), one end of the cold flow pipe (5) connect with exterior space, and the cold flow storehouse (13) that the other end is internal with tower body (4)
Connection, the left side lower section of the tower body (4) are fixedly connected with hot-fluid pipe (3), and one end and the exterior space of the hot-fluid pipe (3) connect
It is logical, and the other end connects with the hot-fluid storehouse (11) inside tower body (4), the hot-fluid storehouse (11) and cold flow storehouse (13) by installed in
The internal heat exchanger tube (15) of tower body (4) is connected, and hanger (6) is fixedly connected with the top of the tower body (4), the tower body (4)
Top right side is provided with blast pipe (7), and the blast pipe (7) connects with the inside of tower body (4), under the right side of the tower body (4)
Side is provided with steam input pipe (9), and tower seat (10), the following table of the tower seat (10) are fixedly connected with below the tower body (4)
Face left and right sides is provided with condensate pipe (2), and the condensate pipe (2) connects through tower seat (10) with the inside of tower body (4), described
Supporting leg (1) is fixedly connected with below tower seat (10), the front of the tower body (4) is fixedly connected with pressure gauge (8), the tower
Heat-insulation layer (12) is installed, the interior bottom portion of the tower body (4) is fixedly connected with folding gas plate between the inner and outer wall of body (4)
(14), the heat exchanger tube (15) is passed through by the pore of folding gas plate (14).
A kind of 2. instant heat exchanger according to claim 1, it is characterised in that:Pass through at the top of the blast pipe (7)
Hinge is rotatably connected to closed cover.
A kind of 3. instant heat exchanger according to claim 1, it is characterised in that:The hot-fluid pipe (3), cold flow pipe (5)
And the connected mode of steam input pipe (9) and tower body (4) is designed as the connected mode of bolts and nuts.
A kind of 4. instant heat exchanger according to claim 1, it is characterised in that:The cold flow storehouse (13) passes through fixed plate
It is fixedly connected with the inwall of tower body (4), the hot-fluid storehouse (11) is fixedly connected by set square with the interior bottom portion of tower body (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721051669.9U CN207081350U (en) | 2017-08-22 | 2017-08-22 | A kind of instant heat exchanger |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721051669.9U CN207081350U (en) | 2017-08-22 | 2017-08-22 | A kind of instant heat exchanger |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207081350U true CN207081350U (en) | 2018-03-09 |
Family
ID=61420585
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721051669.9U Expired - Fee Related CN207081350U (en) | 2017-08-22 | 2017-08-22 | A kind of instant heat exchanger |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207081350U (en) |
-
2017
- 2017-08-22 CN CN201721051669.9U patent/CN207081350U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201407783Y (en) | Hot water tank of phase change energy storage condenser | |
CN106591887B (en) | A kind of aluminium cell side wall device for generating power by waste heat based on organic flash distillation cycle | |
CN102564167A (en) | Single-flow low-temperature spiral winding tube type heat exchanger with vacuum heat-insulation effect | |
CN102913986B (en) | Separating heat tube wall hanging type flat plate solar heating device | |
CN201599788U (en) | Radial heat pipe economizer with jacket | |
CN104454232A (en) | Fuel gas generator set waste heat utilization device | |
CN207081350U (en) | A kind of instant heat exchanger | |
CN208279557U (en) | A kind of coke oven threeway bridge tube heat exchanger apparatus | |
CN107091587A (en) | A kind of heat-exchanger rig based on graphene heat exchanger tube wet curtain paper | |
CN202119310U (en) | Heat exchange tube and waste heat recovery device with the same | |
CN206695406U (en) | A kind of solar heat pump integrated control system with automatic sun-tracking function | |
CN203099981U (en) | Wall-mounted type flat-plate solar heating device of power-driven separating type heat pipe | |
CN205262256U (en) | Natural gas voltage regulating station is with high -efficient double tubesheet heat exchanger | |
CN210512743U (en) | Novel explosion-proof heat exchanger | |
CN203824007U (en) | Thermosiphonhot-water system for domestic air conditionerexhaust energyrecovery | |
CN207838954U (en) | A kind of reaction kettle cooling water circulation recovery system | |
CN203177674U (en) | Industrial furnace flue gas waste heat collection device | |
CN202744480U (en) | Heat exchanger of low-bromine epoxy resin reaction kettle | |
CN207407558U (en) | A kind of CO2 heat pump systems for inhibiting frosting | |
CN202250270U (en) | Steam turbine condensing system | |
CN201387022Y (en) | Cold blast intermediate bypass low-temperature-corrosion resistant air pre-heater | |
CN206468589U (en) | A kind of centrifugal air compressor heat reclamation device | |
CN205909578U (en) | Dual -temperature industrial water cooling machine set | |
CN209069044U (en) | A kind of cooling device of process gas | |
CN202813841U (en) | Water pipe type solar vacuum collector tube |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180309 Termination date: 20180822 |
|
CF01 | Termination of patent right due to non-payment of annual fee |