CN207080216U - Multilateral well productivity test device - Google Patents

Multilateral well productivity test device Download PDF

Info

Publication number
CN207080216U
CN207080216U CN201720837213.9U CN201720837213U CN207080216U CN 207080216 U CN207080216 U CN 207080216U CN 201720837213 U CN201720837213 U CN 201720837213U CN 207080216 U CN207080216 U CN 207080216U
Authority
CN
China
Prior art keywords
simulation
branch
main hole
cylinder barrel
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720837213.9U
Other languages
Chinese (zh)
Inventor
陈钢
胡随
刘静华
李佳益
陈�田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Shale Gas Co Ltd
Original Assignee
Shanxi Shale Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Shale Gas Co Ltd filed Critical Shanxi Shale Gas Co Ltd
Priority to CN201720837213.9U priority Critical patent/CN207080216U/en
Application granted granted Critical
Publication of CN207080216U publication Critical patent/CN207080216U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measuring Volume Flow (AREA)

Abstract

The utility model discloses a kind of multilateral well productivity test device, including closed cylinder barrel(1), the closed cylinder barrel(1)Interior filling coal dust, simulation coal seam is formed after compacting(2), the simulation coal seam(2)Inside it is embedded into simulation main hole(3), the simulation main hole(3)It is connected with multiple simulation branch well cylinders(5), each simulate branch well cylinder(5)With simulating main hole(3)Branch node junction installation Node Switch valve(51)And some branch switch valves are installed in its different branch length(52);The simulation main hole(3)Upper end passes closed cylinder barrel(1)And flowmeter is installed as exhaust outlet, its upper end exhaust ports(4);The closed cylinder barrel(1)Bottom is provided with inflation inlet(6), the inflation inlet(6)It is filled with natural gas.The utility model can study the influence of numbers of branches and branch length to the gas production of multilateral well, obtain preliminary test data, make basis for practical application.

Description

Multilateral well productivity test device
Technical field
The utility model belongs to coal-bed gas exploitation field, specially a kind of multilateral well productivity test device.
Background technology
At present, coal-bed gas exploitation explores horizontal well, and the well type of multilateral well, multilateral well is as a kind of new coal Layer gas exploitation well type, traditional straight well that compares have an important advantage, and anaerogenic coal seam is at more points in the case of many straight wells Production capacity significantly improves after the transformation of branch well, but influences the enough experiments of shortage to production capacity to the well section of multilateral well different length Research, this experimental rig attempt solve this problem.
The content of the invention
The purpose of this utility model is to provide a kind of multilateral well productivity test device, completes multilateral well in different points In the case of number and different branch lengths, the experimental study device of the influence to overall production capacity.
The utility model adopts the following technical scheme that realization:
A kind of multilateral well productivity test device, including closed cylinder barrel, the interior filling coal dust of the closed cylinder barrel, shape after compacting Into simulation coal seam, simulation main hole is embedded into the simulation coal seam, the simulation main hole is connected with multiple simulation Multilateral Wells Cylinder, each branch node junction installation Node Switch valve and its different branch simulated branch well cylinder and simulate main hole Some branch switch valves are installed in length;The simulation main hole upper end passes closed cylinder barrel and arranged as exhaust outlet, its upper end Flowmeter is installed at gas port;The closed cylinder barrel bottom is provided with inflation inlet, and the inflation inlet is filled with natural gas.
Coal dust is filled in closed cylinder of steel, as simulation coal seam after compacting, in cylinder of steel center, a piece steel pipe of embedment is as mould Intend main hole, using high-pressure pump, natural gas is injected in simulation coal seam, gas is produced from the simulation main hole in center, it is main Pit shaft has multiple branch well cylinders, and main hole installs Node Switch valve, each branch well cylinder with branch well cylinder at each branch node On some branch switch valves are installed in different branch lengths.Under constant natural gas injection pressure, different points is opened Zhi Jiedian switch valves, the gas production of main hole is monitored, study the influence of gas production under different numbers of branches.Then, in branch's number Measure it is identical or certain in the case of, open multiple branch switch valves of each branch well cylinder, research branch length is to gas production Influence.
The beneficial effects of the utility model are the gas production that can study numbers of branches and branch length to multilateral well Influence, obtain preliminary test data, make basis for practical application.
Brief description of the drawings
Fig. 1 represents structural representation of the present utility model.
In figure, the closed cylinder barrels of 1-, 2- simulations coal seam, 3- simulation main holes, 4- flowmeters, 5- branch well cylinders, 51- nodes open Close valve, 52- branch switch valves, 6- inflation inlets.
Embodiment
Specific embodiment of the utility model is described in detail below in conjunction with the accompanying drawings.
A kind of multilateral well productivity test device, as shown in figure 1, including closed cylinder barrel 1, the closed cylinder barrel 1 is interior to be filled Coal dust, simulation coal seam 2 is formed after compacting, simulation main hole 3 is embedded into the simulation coal seam 2, the simulation main hole 3 connects There are multiple simulation branch well cylinders 5, each branch node junction installation node for simulating branch well cylinder 5 and simulation main hole 3 is opened Close and some branch switch valves 52 are installed in valve 51 and its different branch length;Simulation main hole 3 upper end passes closed cylinder Cylinder 1 is simultaneously provided with flowmeter 4 as exhaust outlet, its upper end exhaust ports;The bottom of closed cylinder barrel 1 is provided with inflation inlet 6, institute State inflation inlet 6 and be filled with natural gas.The exhaust outlet of the simulation main hole 1 connects with exhaust collection processing unit.
In use, using high-pressure pump, natural gas is injected in simulation coal seam by inflation inlet(Natural gas is in saturation shape State), gas then is produced from the simulation main hole in center, because main hole is connected with multiple branch well cylinders, each Multilateral Wells Ventilation sieve aperture is equipped with cylinder.Main hole installs Node Switch valve, each branch well cylinder with branch well cylinder at each branch node On some branch switch valves are installed in different branch lengths.Under constant natural gas injection pressure, different points is opened Zhi Jiedian switch valves, the gas production of main hole is monitored, study the influence to gas production under different numbers of branches.Then, in branch In the case that quantity is identical or certain, multiple branch switch valves of each branch well cylinder are opened, research branch length is to gas production Influence.Finally, the methane gas of output enters exhaust collection processing unit in experiment, is focused on.The experimental rig The influence of numbers of branches and branch length to the gas production of multilateral well can be studied, there is directive significance.
It should be noted last that above example is only unrestricted to illustrate the technical solution of the utility model, to the greatest extent Pipe is described in detail with reference to the utility model embodiment, it will be understood by those within the art that, it is new to this practicality The technical scheme of type is modified or equivalent substitution, without departure from the spirit and scope of the technical solution of the utility model, its It all should cover in claims.

Claims (2)

  1. A kind of 1. multilateral well productivity test device, it is characterised in that:Including closed cylinder barrel(1), the closed cylinder barrel(1)Inside fill Coal dust is filled out, simulation coal seam is formed after compacting(2), the simulation coal seam(2)Inside it is embedded into simulation main hole(3), the simulation master Pit shaft(3)It is connected with multiple simulation branch well cylinders(5), each simulate branch well cylinder(5)With simulating main hole(3)Branch node Junction is installed by Node Switch valve(51)And some branch switch valves are installed in its different branch length(52);The simulation Main hole(3)Upper end passes closed cylinder barrel(1)And flowmeter is installed as exhaust outlet, its upper end exhaust ports(4);It is described close Close cylinder barrel(1)Bottom is provided with inflation inlet(6), the inflation inlet(6)It is filled with natural gas.
  2. 2. multilateral well productivity test device according to claim 1, it is characterised in that:The simulation main hole(3)'s Exhaust outlet connects with exhaust collection processing unit.
CN201720837213.9U 2017-07-12 2017-07-12 Multilateral well productivity test device Expired - Fee Related CN207080216U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720837213.9U CN207080216U (en) 2017-07-12 2017-07-12 Multilateral well productivity test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720837213.9U CN207080216U (en) 2017-07-12 2017-07-12 Multilateral well productivity test device

Publications (1)

Publication Number Publication Date
CN207080216U true CN207080216U (en) 2018-03-09

Family

ID=61427321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720837213.9U Expired - Fee Related CN207080216U (en) 2017-07-12 2017-07-12 Multilateral well productivity test device

Country Status (1)

Country Link
CN (1) CN207080216U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025985A (en) * 2018-09-19 2018-12-18 青岛海洋地质研究所 Experimental simulation device based on multiple-limb hole technology exploitation hydrate
CN110700794A (en) * 2019-09-06 2020-01-17 太原理工大学 Multi-branch horizontal well coal seam gas extraction physical simulation experiment system
CN115405263A (en) * 2021-05-28 2022-11-29 中国石油化工股份有限公司 Multi-branch natural gas hydrate reservoir depressurization exploitation experimental device and method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025985A (en) * 2018-09-19 2018-12-18 青岛海洋地质研究所 Experimental simulation device based on multiple-limb hole technology exploitation hydrate
CN109025985B (en) * 2018-09-19 2019-11-05 青岛海洋地质研究所 Experimental simulation device based on multiple-limb hole technology exploitation hydrate
CN110700794A (en) * 2019-09-06 2020-01-17 太原理工大学 Multi-branch horizontal well coal seam gas extraction physical simulation experiment system
CN110700794B (en) * 2019-09-06 2021-10-22 太原理工大学 Multi-branch horizontal well coal seam gas extraction physical simulation experiment system
CN115405263A (en) * 2021-05-28 2022-11-29 中国石油化工股份有限公司 Multi-branch natural gas hydrate reservoir depressurization exploitation experimental device and method

Similar Documents

Publication Publication Date Title
CN207080216U (en) Multilateral well productivity test device
CN102590456B (en) Device and method for simulating volume fracturing of horizontal well on shale reservoir stratum
CN104196527B (en) Multilateral well productivity simulation system and multilateral well productivity simulation experimental technique
CN201593407U (en) Rock salt gas storage solution mining simulating device
CN104453802B (en) A kind of multiple seam closes the coal bed gas pit shaft biphase gas and liquid flow analogue means adopted
CN107476796A (en) A kind of experimental provision and method for simulating fracturing fluid recovery (backflow) control proppant backflow
CN103615241A (en) Fully-three-dimensional simulated visualized displacement simulation experiment system of fractured-vuggy oil reservoir
CN105201467A (en) Experimental device for evaluating gas injection synergistic huff and puff of high-temperature high-pressure bottom water reservoir
CN104459034A (en) Cavity construction physical simulation device and method of single-well single-cavity salt-cavern gas storage
CN206071560U (en) Variable seam is wide to stitch net device
CN105937388A (en) Integration development method for tight sandstone oil reservoir
CN104727805A (en) Apparatus for evaluating cementing strength of cement sheath
CN106640042A (en) Device and method for evaluating single well productivity of gas well
CN104459033A (en) Salt-cavern gas storage dual-well cavity construction physical simulation device and salt-cavern gas storage dual-well cavity construction physical simulation method
CN106401577A (en) Visual testing device and method for simulating bottom water coning of bottom water gas reservoir gas well
CN106285590A (en) A kind of judge the apparatus and method whether chemical agent lost efficacy for high infiltration strip parameter
CN206504969U (en) The lower shale gas well yield stimulation tester of slippery water effect
CN110441221A (en) Full diameter shale core ring packing cabin clamping device and measurement technique
CN110044799A (en) Heterogeneous coal-bearing series note nitrogen dust trajectory and permeability test device and method
CN201943703U (en) Imitated coal bed mining device
CN207245690U (en) Inject substitution gas exploiting coal bed methane experimental rig
CN206725560U (en) A kind of Carbonate Oil gas exploration diagnostic cast intends device
CN207051283U (en) A kind of carbonate rock oil gas exploration excess oil and gap block analog study equipment
CN206942746U (en) A kind of experimental provision for simulating fracturing fluid recovery (backflow) control proppant backflow
CN208502832U (en) A kind of novel coal bed gas extraction experimental simulation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180309

Termination date: 20190712