CN207078893U - A kind of mining closure plate - Google Patents
A kind of mining closure plate Download PDFInfo
- Publication number
- CN207078893U CN207078893U CN201721116132.6U CN201721116132U CN207078893U CN 207078893 U CN207078893 U CN 207078893U CN 201721116132 U CN201721116132 U CN 201721116132U CN 207078893 U CN207078893 U CN 207078893U
- Authority
- CN
- China
- Prior art keywords
- steel
- reserved
- mining
- hole
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
It the utility model is related to a kind of mining closure plate, including being fixed on Hatch Opening and being the main body frame of groined type structure, the main body frame is fixedly arranged above cover plate, the cover plate is provided with the reserved sliding cement pipe hole for being used for installing sliding cement pipe, for installing the reserved air duct hole of air duct and for lifting by crane the reserved well-bucket hole of well-bucket and buffering, sliding door is provided with the reserved well-bucket hole, the sliding door includes the sliding rail of both sides and middle push-and-pull door-plate, sliding door is set at reserved well-bucket hole, it is easy to open and closes, also sliding door can be opened while preventing from falling when carrying out explosion, buffer shooting air-flow, closure plate is prevented because explosion is damaged.
Description
Technical field
The technical field of Hatch Opening closure plate is the utility model is related to, more particularly to a kind of mining closure plate.
Background technology
So far, home and abroad colliery shaft coal pocket, waste bin construction, the generation of Hatch Opening falling accident is not prevented from, it is use more
Full-closed structure, i.e., in addition to reserved lifting hole, air vent and geomantic omen pipeline hole, other spaces of closure plate are completely enclosed;And
When warehouse is constructed, because country rock hardness(F)Mostly 4~6, even greater than 6, and all enter section and be more than 20 ㎡, blast charging amount more
Larger, working face is nearer apart from closure plate(Most nearby about 5m), blasting impact air-flow moment is excessive;In order to avoid sealing adjustment debit
Bad, maintenance schedule delays, potential safety hazard is reduced, just need to increase impact air-flow liberation port in card;In the past simply by opening disk
Face trapdoor reduces surge, but has little effect, and closure plate damage happens occasionally.
Utility model content
In order to solve the above-mentioned technical problem, the utility model provides a kind of mining closure plate.
The technical solution of the utility model is:A kind of mining closure plate, including it is fixed on Hatch Opening and for groined type structure
Main body frame, the main body frame is fixedly arranged above cover plate, and the cover plate, which is provided with, to be used for installing the reserved of sliding cement pipe
Sliding cement pipe hole, for installing the reserved air duct hole of air duct and for lifting by crane the reserved well-bucket hole of well-bucket and buffering, described pre-
Stay and sliding door is provided with well-bucket hole, the sliding door includes the sliding rail of both sides and middle push-and-pull door-plate.
Preferably, the main body frame includes several vertical connections horizontal I-steel together and vertical I-steel,
The web of the vertical I-steel is welded with the angle cleat positioned at junction, and the wing plate of the vertical I-steel is set in junction
Jagged, the angle cleat is provided with least two screwed holes, and the web of the horizontal I-steel also is provided with positioned at junction
Screwed hole, the angle cleat are connected by bolt with the web of the horizontal I-steel, and the height of the horizontal I-steel is big
In the height of the vertical I-steel.
Preferably, the cover plate is the steel plate being welded on the main body frame.
Preferably, the sliding rail is the zigzag structure of two angle steel being centrosymmetric compositions.
Preferably, the push-and-pull door-plate is fixedly arranged above handle.
Preferably, the cover plate is fixedly arranged above cylinder, and the expansion link of the cylinder is connected with the sliding door.
The beneficial effects of the utility model are:
Mining closure plate of the present utility model, sliding door is set at reserved well-bucket hole, is easy to open and closes, it is anti-to stop dropping
Also sliding door can be opened while falling when carrying out explosion, buffer shooting air-flow, prevents closure plate because explosion is damaged;Sealing
Disk is easy to process and gathered materials on the spot using conventional steelworks such as I-steel, angle steel and steel plates;Push-and-pull door-plate can manually use handle
Promote, convenient operation, can also be promoted with cylinder, avoid someone from arbitrarily opening sliding door.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the schematic diagram for removing cover plate in Fig. 1;
Fig. 3 is the structural representation that horizontal I-steel connects with vertical I-steel;
Fig. 4 is the structural representation of sliding door;
In figure:Slipped 1. Hatch Opening, 2. horizontal I-steel, 3. vertical I-steel, 31. angle cleats, 4. cover plates, 41. are reserved
Grey pore, 42. reserved air duct holes, 43. reserved well-bucket holes, 5. sliding rails, 6. push-and-pull door-plates, 61. handles, 7. cylinders.
Embodiment
Specific embodiment of the present utility model is referring to Fig. 1-4:
The utility model mainly discloses a kind of mining closure plate, with the schema hereinafter compareed, main expression and this reality
With the relevant structural representation of novel feature, also need not completely it not drawn according to actual size, first explanation.
A kind of mining closure plate, such as Fig. 1-4, including it is fixed on Hatch Opening 1 and for the main body frame of groined type structure, it is described
Main body frame is fixedly arranged above cover plate 4, and the cover plate 4 is provided with the reserved sliding cement pipe hole 41 for being used for installing sliding cement pipe, used
To install the reserved air duct hole 42 of air duct and for lifting by crane the reserved well-bucket hole 43 of well-bucket and buffering, in the reserved well-bucket hole
Sliding door is provided with 43, the sliding door includes the sliding rail 5 of both sides and middle push-and-pull door-plate 6, the main body frame
Including the horizontal I-steel 2 and vertical I-steel 3 several vertical connections together, the web welding of the vertical I-steel 3
There is the angle cleat 31 positioned at junction, the wing plate of the vertical I-steel 3 is provided with breach, the angle cleat 31 in junction
Provided with least two screwed holes, the web of the horizontal I-steel 2 also is provided with the screwed hole positioned at junction, the angle cleat
31 are connected by bolt with the web of the horizontal I-steel 2, and the height of the horizontal I-steel 2 is more than the vertical I-steel
3 height, the cover plate 4 are the steel plate being welded on the main body frame, and the sliding rail 5 is two and is centrosymmetric
Angle steel composition zigzag structure.
In order to facilitate operation, handle 61 is fixed in the top of push-and-pull door-plate 6.
In order to avoid someone arbitrarily opens sliding door, cylinder 7 is fixed in the top of cover plate 4, the expansion link of cylinder 7 is with pushing away
Sliding door connection, push-and-pull door-plate 6 is driven with cylinder 7.
It integral installation after the closure plate can complete, can also make, be inserted in reserved sliding cement pipe hole 41
Sliding cement pipe, in reserved air duct hole 42, interpolation enters air duct, and reserved well-bucket hole 43 is covered with push-and-pull door-plate 6, when needing to lift by crane well-bucket,
Open push-and-pull door-plate 6, it is not necessary to remained turned-off when lifting by crane well-bucket, when carrying out blast working, open push-and-pull door-plate 6, buffering is quick-fried
Relieving stagnant Qi stream, reduce explosion moment impact pressure, avoid the closure plate that crumbles.
Claims (6)
- A kind of 1. mining closure plate, it is characterised in that including be fixed on Hatch Opening and for groined type structure main body frame, the master Body framework is fixedly arranged above cover plate, the cover plate be provided be used for installing sliding cement pipe reserved sliding cement pipe hole, for installing The reserved air duct hole of air duct and for lifting by crane the reserved well-bucket hole of well-bucket and buffering, is provided with the reserved well-bucket hole and pushes away Sliding door, the sliding door include the sliding rail of both sides and middle push-and-pull door-plate.
- 2. mining closure plate according to claim 1, it is characterised in that the main body frame includes several vertical connections Horizontal I-steel and vertical I-steel together, the web of the vertical I-steel are welded with the joint angle positioned at junction Steel, the wing plate of the vertical I-steel are provided with breach in junction, and the angle cleat is provided with least two screwed holes, the horizontal stroke The screwed hole positioned at junction also is provided with to the web of I-steel, the angle cleat passes through bolt and the horizontal I-steel Web connects, and the height of the horizontal I-steel is more than the height of the vertical I-steel.
- 3. mining closure plate according to claim 1 or 2, it is characterised in that the cover plate is to be welded on the main body Steel plate on framework.
- 4. mining closure plate according to claim 1, it is characterised in that the sliding rail is two and is centrosymmetric The zigzag structure of angle steel composition.
- 5. mining closure plate according to claim 1, it is characterised in that the push-and-pull door-plate is fixedly arranged above handle.
- 6. mining closure plate according to claim 1 or 5, it is characterised in that the cover plate is fixedly arranged above cylinder, The expansion link of the cylinder is connected with the sliding door.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721116132.6U CN207078893U (en) | 2017-09-01 | 2017-09-01 | A kind of mining closure plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721116132.6U CN207078893U (en) | 2017-09-01 | 2017-09-01 | A kind of mining closure plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207078893U true CN207078893U (en) | 2018-03-09 |
Family
ID=61421536
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721116132.6U Expired - Fee Related CN207078893U (en) | 2017-09-01 | 2017-09-01 | A kind of mining closure plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207078893U (en) |
-
2017
- 2017-09-01 CN CN201721116132.6U patent/CN207078893U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208830666U (en) | A kind of skyscraper vertical garbage transportation system | |
CN203321519U (en) | Full-automatic belt lane wind current isolation device | |
CN101798023A (en) | Roof feeding device and feeding method of electrolytic aluminum crane block | |
CN204040402U (en) | The green transport channel of building waste and recovery system | |
CN207078893U (en) | A kind of mining closure plate | |
CN101629490B (en) | Full air pressure air borrowing method for coal mine underground tunneling roadway | |
CN203806731U (en) | Bottom-dump tramcar unloading system | |
CN203728011U (en) | Horizontal-type garbage compressor | |
CN208918205U (en) | Modular skyscraper refuse collection channel | |
CN103104123A (en) | Steel truss wind-break wall and construction method thereof | |
CN206215311U (en) | Coal pulverizer charging hopper hydraulic braking upset maintenance door | |
CN203938209U (en) | Mobile discharge mouth sealing device | |
CN207004564U (en) | A kind of automatic sprayer | |
CN203316232U (en) | Pebble coal drain-off system of medium speed coal mill | |
CN106523722A (en) | Automatic flap valve | |
CN204691809U (en) | A kind of long distance tunnel construction phase quick ventilation and exhaust device | |
CN204642833U (en) | A kind of horizontal compression type garbage storehouse | |
CN204435381U (en) | A kind of bituminous mixture vertical transport equipment be incubated | |
CN204307806U (en) | A kind of lump material is separated diagrid | |
CN201670514U (en) | Chute | |
CN205932961U (en) | Fluid pressure type elevater bucket | |
CN206955936U (en) | A kind of coke oven smoke-guiding car | |
CN202943482U (en) | Stainless steel continuous casting cutting machine dust extraction hood | |
CN207177613U (en) | Storage hole maintenance side-by-side gate | |
CN203602064U (en) | Bin sealing gate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180309 Termination date: 20180901 |
|
CF01 | Termination of patent right due to non-payment of annual fee |