CN207073395U CN201721064446.6U CN201721064446U CN207073395U CN 207073395 U CN207073395 U CN 207073395U CN 201721064446 U CN201721064446 U CN 201721064446U CN 207073395 U CN207073395 U CN 207073395U
Authority
CN
China
Prior art keywords
gas well
oil pipe
main body
plate main
orifice
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721064446.6U
Other languages
Chinese (zh)
Inventor
王子芬
王艺豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Guang Mao Petroleum Technology Services Co Ltd
Original Assignee
Shandong Guang Mao Petroleum Technology Services Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Guang Mao Petroleum Technology Services Co Ltd filed Critical Shandong Guang Mao Petroleum Technology Services Co Ltd
Priority to CN201721064446.6U priority Critical patent/CN207073395U/en
Application granted granted Critical
Publication of CN207073395U publication Critical patent/CN207073395U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Nozzles (AREA)

Abstract

The utility model belongs to gas well oil pipe field, more particularly to a kind of new gas well discharge opeing vitta structure.Including gas well oil pipe, gas well oil pipe includes oil pipe body, oil pipe body one end is to be provided with externally threaded male, the other end is the female female of setting being engaged with male, the structure includes at least two gas well oil pipes being engaged, orifice-plate type hydrops bubble atomising device is provided between male and female, orifice-plate type hydrops bubble atomising device includes orifice plate main body, orifice plate main body is single-layer plate-like structure, at least one through hole is provided with orifice plate main body, through hole runs through the orifice plate main body along the board direction perpendicular to the orifice plate main body.New gas well vitta structure provided by the utility model has additional orifice-plate type hydrops bubble atomising device in oil pipe junction, has gas well fluid-carrying capability strong, the steady production time is grown.Cost is low, reduces adding consistency or not dosing, reduces environmental pollution with operations number a little, can be extensively using in natural gas and the recovery process of coal bed gas.

Description

A kind of new gas well discharge opeing vitta structure
Technical field
The utility model belongs to gas well oil pipe field, more particularly to a kind of new gas well discharge opeing vitta structure.
Background technology
At present the oil pipe used in gas well liquid loading in structure with the oil pipe used in oil well substantially without big difference, do not have The particularity of gas well liquid loading is embodied, stratum aquatic products is often accompanied by gas well recovery process and is gone out, assembles in shaft bottom, influences in stratum Gas enters shaft bottom and by pit shaft output, when gas well yield is big, because the high speed of air-flow is migrated, can be atomized hydrops and arrange Go out pit shaft, when gas well yield is relatively low, hydrops flows back in pit shaft, it is difficult to pit shaft is discharged, arranged under normal circumstances by gaslift, bubble, Throw the modes such as foam rods, replacing minor diameter tubing to exclude hydrops, improve gas well yield, this several ways also can be arranged preferably Except hydrops, but the uninterrupted input of artificial lift and chemical agent not only increases production cost and certain dirt is will also result in environment Dye, therefore by improving the structure of gas well oil pipe, the oil pipe for being adapted to gas well feature is developed, gas well discharge opeing effect is improved, is reduced Production cost, it is the important directions that gas well maintains normally to produce.
Utility model content
The utility model is directed to the problem of above-mentioned, proposes a kind of new gas well discharge opeing vitta structure.
In order to achieve the above object, the technical solution adopted in the utility model is that the utility model provides a kind of Novel air Well discharge opeing vitta structure, including gas well oil pipe, the gas well oil pipe include oil pipe body, and described oil pipe body one end is to be provided with Externally threaded male, the other end are the female female of setting being engaged with male, it is characterised in that:The new gas well Discharge opeing vitta structure includes at least two gas well oil pipes being engaged, and orifice-plate type hydrops bubble is provided between the male and female Atomising device, the orifice-plate type hydrops bubble atomising device include orifice plate main body, and the orifice plate main body is single-layer plate-like structure, described At least one through hole is provided with orifice plate main body, the through hole runs through the hole along the board direction perpendicular to the orifice plate main body Plate main body.
Preferably, the oil pipe body and orifice plate main body are metal material.
Preferably, the orifice plate main body is circular or polygonized structure.
Preferably, the through hole is circular or polygonized structure.
Preferably, the through hole number is 1 to 10000.
Compared with prior art, it is the advantages of the utility model with good effect,
1st, new gas well vitta structure provided by the utility model has additional the bubble atomization of orifice-plate type hydrops in oil pipe junction Device, have gas well fluid-carrying capability strong, the steady production time is grown.Cost is low, reduces adding consistency or not dosing, and it is dirty to reduce environment Dye and operations number a little, can be extensively using in natural gases and the recovery process of coal bed gas.
Brief description of the drawings
It is required in being described below to embodiment in order to illustrate more clearly of the technical scheme of the utility model embodiment The accompanying drawing used is briefly described, it should be apparent that, drawings in the following description are some embodiments of the utility model, For those of ordinary skill in the art, without having to pay creative labor, can also be obtained according to these accompanying drawings Obtain other accompanying drawings.
Fig. 1 is a kind of new gas well discharge opeing oil pipe overall structure diagram that embodiment 1 provides;
Fig. 2 is a kind of new gas well discharge opeing oil pipe overall structure internal structure schematic diagram that embodiment 1 provides;
Fig. 3 is that the orifice-plate type hydrops that embodiment 1 provides steeps atomising device structural representation;
Fig. 4 is new gas well discharge opeing oil pipe cut-away view when the gas well yield of the offer of embodiment 1 is larger;
Fig. 5 is new gas well discharge opeing oil pipe cut-away view when the gas well yield of the offer of embodiment 1 is medium;
Fig. 6 is new gas well discharge opeing oil pipe cut-away view when the gas well yield of the offer of embodiment 1 is smaller;
More than in each figure, 1, gas well oil pipe;2nd, oil pipe body;3rd, male;4th, female;5th, orifice-plate type hydrops bubble atomization dress Put;6th, orifice plate main body;7th, through hole;8th, centre bore;9th, throttle orifice;10th, main aperture;11st, it is lateral opening.
Embodiment
It is below in conjunction with the accompanying drawings and real in order to be more clearly understood that above-mentioned purpose of the present utility model, feature and advantage Example is applied to be described further the utility model.It should be noted that in the case where not conflicting, embodiments herein and reality Applying the feature in example can be mutually combined.
Many details are elaborated in the following description in order to fully understand the utility model, still, this practicality New to implement using different from other modes described here, therefore, the utility model is not limited to be described below The limitation of the specific embodiment of specification.
Embodiment 1, as shown in figure 1, the utility model provides a kind of new gas well discharge opeing vitta structure, including a section one The gas well oil pipe 1 of section, the overall structure that this is combined are placed in gas well, for extracting the gas in gas well, still, in gas well Stratum aquatic products is often accompanied by recovery process to go out and in shaft bottom assemble, and is influenceed gas in stratum and is entered shaft bottom and by gas well oil pipe 1 output, when gas well yield is big, due to air-flow high speed migrate, can by hydrops steep atomization then along gas well oil pipe 1 step by step Above push away until excluding, still, when gas well yield is relatively low, deficiency of air may result in hydrops so that all hydrops are steeped into atomization Backflow, it is difficult to exclude, or even influence gas well yield.At this moment often through the modes such as gaslift, bubble row or replacing minor diameter tubing Hydrops is excluded, although can play a role, the uninterrupted input of artificial lift and chemical agent, which not only increases, to be produced into Originally certain pollution and is will also result in environment, so applicant passes through the structure between improving gas well oil pipe 1, develops and is adapted to gas well The oil pipe of feature, gas well discharge opeing effect is improved, reduce production cost.
At this stage, the gas well oil pipe 1 that gas well exploitation in China's is selected is mostly that metal is made, and preferred use just is made, and And mostly screwed connection between each oil pipe, as shown in Figure 2, there is provided a kind of cut-away view of gas well oil pipe 1, gas well oil pipe 1 wrap Oil pipe body 2 is included, 2 one end of oil pipe body is that the other end is set with what male 3 was engaged with externally threaded male 3 Female female 4 is put, by such design, facilitates the batch production of gas well oil pipe 1, also the installation group of job site Close.Applicant devises a kind of new discharge opeing gas well vitta structure, as can be seen from Figure 2 for this problem of gas well plug-ging Place, the structure are at least made up of two gas well oil pipes 1, and a section passes through male 3 and female 4 with next section on gas well oil pipe 1 Button connection, male 3 and the firm compression abacus formula hydrops of female 4 bubble atomising device 5 in junction.As shown in figure 3, the device bag Orifice plate main body 6 is included, orifice plate main body 6 is single-layer plate-like structure, and thickness is between 0.1 to 100 millimeter, in order to preferably oily with gas well Pipe 1 coordinates, preferably 2-3mm, is made because orifice plate main body 6 is mostly metal material, too thin easily by the gas in gas well from bottom to top Body hits bending and is even broken, and too thick be clipped between two sections of males 3 of gas well oil pipe 1 and female 4 is unfavorable between gas well oil pipe 1 Sealing, naturally it is also possible to which with the good nonmetallic replacement of physical and chemical properties, for example as carbon fiber, equally disclosure satisfy that makes Use demand.Orifice plate main body 6 is mostly the circle being engaged with the shape of gas well oil pipe 1, but also not shall be limited only to the extent circle, or more Side shape structure, is provided with through hole 7 in orifice plate main body 6, and ordinary circumstance lower through-hole 7 is designed as perpendicular to the plate face side of orifice plate main body 6 To and through orifice plate main body 6 straight hole, but in order to preferably make hydrops bubble atomization when narrow-minded, through hole 7 can also root The taper hole of curved hole or 0-80 degree is designed to according to actual conditions.Size, shape and the quantity of through hole 7 will be according to different gas wells Throughput determine, in order to preferably coordinate the through hole 7 of different size, shape and quantity, so the structure of orifice plate main body 6 And set according to actual conditions.By setting orifice-plate type hydrops between the junction male 3 and female 4 of gas well oil pipe 1 Atomising device 5 is steeped, the hydrops that gas carries is assembled around the upper through-hole 7 of orifice plate main body 6, is not easy to flow back to shaft bottom, with The lifting gasification for subsequent gases rises to upper level, and hydrops is lifted into well head step by step, when preventing that gas well yield is low, hydrops edge Tube wall backflow, can effectively overcome hydrops reflux problem, and can reduces the dosage of chemical agent, cost-effective, improves measure Effective time.So mentality of designing of the present utility model is the particularity using gas well liquid loading, devises one kind and apply gas well The new gas well vitta structure in field, the device for being beneficial to hydrops bubble atomization of orifice-plate type is set up in oil pipe junction, is neither influenceed Connection between oil pipe, and can prevent hydrops from flowing backwards, moreover it is possible to promote to clap outside hydrops, below, applicant is with a diameter of 50mm's of inwall Illustrated exemplified by gas well oil pipe and apply concrete structure of the present utility model for the gas well of different output.
As shown in figure 4, when gas well tolerance is sufficient, daily yield is about at 2000 cubic metres, and now gas well yield is big, The air-flow rate of climb is big, can be atomized hydrops and exclude pit shaft, so now, only need to open up one at the center of orifice plate main body 6 Individual a diameter of 40mm or so centre bore 8, the plate body around centre bore 8, which is just fully able to reach, to be stopped and is atomized not under individual cases The low liquid of hydrops backflow is caused, treats that subsequent gases lifting gasification rises to upper level, well head, Ran Houpai are arrived in lifting step by step Go out.
When the daily yield of gas well is at 1000 cubic metres or so, air velocity is more uniform, it is impossible to which the moment is by hydrops mist Change, if also only with one as figure 4 centre bore 8 hydrops cannot be throttled, when hydrops is saved bit by bit to a certain extent, understand therefrom Shaft bottom is flowed back in heart hole 8, so now needing to reduce the diameter in hole, but can be increased to ensure that gas can pass freely through The quantity in hole, as shown in figure 5,3 equally distributed a diameter of 15mm section can be set around the center of orifice plate main body 6 Discharge orifice 9, it is such to be designed to share backflow hydrops, ensure that it will not flow backward to shaft bottom, while the presence in three holes again will not Water seal is formed it into, air-flow is blocked, because the gas flow rate of daily 1000 cubic metres of yield is still very high, it is sufficient to will be at three The liquid atomization of the surrounding of throttle orifice 9 accumulation, is then lifted step by step.
However, when running into daily gas production and there was only the gas well of 500 or so cubic meters, as shown in fig. 6, in orifice plate main body 6 The design of through hole 5 is then diameter 20mm main aperture 10 to be set in the center of orifice plate main body 6, around main aperture 10 Be uniformly arranged lateral opening the 11 of 10 6mm so that formed around main aperture 10 it is netted, can preferably prevent because be atomized not in time and The hydrops of backflow, the presence and can of main aperture 10 ensure air-flow by while being atomized hydrops, then being lifted step by step, until excluding Well head.
More than, it is the gas well that applicant is directed to different gas yield according to practical experience by taking 50mm gas well oil pipes as an example, designs Different gas well oil pipes structure, but not only limit these dimensional structures because the gas production of each gas well is different, application Gas well oil pipe is also different, and simply the utility model is applied to gas well exploitation field by simple declaration applicant for above citing, in gas AND DEWATERING FOR ORIFICE STRUCTURE is set up between well oil pipe so as to form a kind of new gas well vitta structure, meanwhile, the knot of orifice plate main body 6 and through hole 7 Structure can be circular or polygon, and it can also be polygonal through hole that circular orifice main body, which can match somebody with somebody circular through hole, polygon Orifice plate main body can to match somebody with somebody polygonal through hole can also be manhole, and the design of through hole can be with according to actual conditions quantity Between 1 to 10000, this is determined according to reality, still, should be able to meet that gas takes liquid requirement, without making Blocked up into gas as standard.The new gas well vitta structure of the utility model design, makes the hydrops that gas carries lead on the top of orifice plate Assemble around hole, be not easy to flow back to shaft bottom, can effectively overcome hydrops reflux problem, and can reduces the dosage of chemical agent, saves Cost, and the gas for making script be shut by hydrops is more mined, and deflecting adds gas well yield, and structure letter Single, term of validity length, cost is cheap, easy for installation.It can be widely used in the recovery process of natural gas and every layer of gas.
It is described above, only it is preferred embodiment of the present utility model, is not that other forms are made to the utility model Limitation, any person skilled in the art is changed or is modified as possibly also with the technology contents of the disclosure above equivalent The equivalent embodiment of change is applied to other fields, but every without departing from the content of the technical scheme of the utility model, according to this reality Any simple modification, equivalent variations and the remodeling made with new technical spirit to above example, it is new to still fall within this practicality The protection domain of type technical scheme.

Claims (5)

1. a kind of new gas well discharge opeing vitta structure, including gas well oil pipe, the gas well oil pipe includes oil pipe body, the oil pipe Body one end is is provided with externally threaded male, and the other end is the female female of setting being engaged with male, its feature It is:The new gas well discharge opeing vitta structure includes at least two gas well oil pipes being engaged, between the male and female Orifice-plate type hydrops bubble atomising device is provided with, the orifice-plate type hydrops bubble atomising device includes orifice plate main body, the orifice plate main body For single-layer plate-like structure, at least one through hole is provided with the orifice plate main body, the through hole is along perpendicular to the orifice plate main body Board direction run through the orifice plate main body.
A kind of 2. new gas well discharge opeing vitta structure according to claim 1, it is characterised in that:The oil pipe body and orifice plate Main body is metal material.
A kind of 3. new gas well discharge opeing vitta structure according to claim 1, it is characterised in that:The orifice plate main body is circle Or polygonized structure.
A kind of 4. new gas well discharge opeing vitta structure according to claim 1, it is characterised in that:The through hole is circular or more Side shape structure.
A kind of 5. new gas well discharge opeing vitta structure according to claim 1, it is characterised in that:The through hole number be 1 to 10000。
CN201721064446.6U 2017-08-24 2017-08-24 A kind of new gas well discharge opeing vitta structure Expired - Fee Related CN207073395U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721064446.6U CN207073395U (en) 2017-08-24 2017-08-24 A kind of new gas well discharge opeing vitta structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721064446.6U CN207073395U (en) 2017-08-24 2017-08-24 A kind of new gas well discharge opeing vitta structure

Publications (1)

Publication Number Publication Date
CN207073395U true CN207073395U (en) 2018-03-06

Family

ID=61521173

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721064446.6U Expired - Fee Related CN207073395U (en) 2017-08-24 2017-08-24 A kind of new gas well discharge opeing vitta structure

Country Status (1)

Country Link
CN (1) CN207073395U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387057A (en) * 2017-09-08 2017-11-24 山东广贸石油技术服务有限公司 Hydrops for oil/gas well stimulation steeps atomization method
CN111042775A (en) * 2019-12-26 2020-04-21 四川省科源工程技术测试中心 Device for increasing yield of ultrasonic waves and performing atomization extraction under coal-bed gas well

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387057A (en) * 2017-09-08 2017-11-24 山东广贸石油技术服务有限公司 Hydrops for oil/gas well stimulation steeps atomization method
CN111042775A (en) * 2019-12-26 2020-04-21 四川省科源工程技术测试中心 Device for increasing yield of ultrasonic waves and performing atomization extraction under coal-bed gas well

Similar Documents

Publication Publication Date Title
CN103233923B (en) A kind of lead-jetting device getting rid of pit shaft hydrops
CN207073395U (en) A kind of new gas well discharge opeing vitta structure
CN105642466B (en) A kind of spill type atmizer being atomized for hydrops in the natural gas well
CN105974098A (en) Online detection device for wellhead water content of high-water-containing oil well
CN201232572Y (en) Coal mine tunnel goaf fire wall
Shomayramov et al. Experimental researches of hydraulic vacuum breakdown devices of siphon outlets of pumping stations
CN104329057A (en) Natural gas well supersonic nozzle atomization drainage gas recovery device and method
CN201087377Y (en) Combined injection tube of rear mud jacking filling pile
CN108797533A (en) A kind of design method of debris flow dam circle discharge orifice
CN207073396U (en) A kind of orifice-plate type hydrops for gas well oil connection steeps atomising device
CN207568571U (en) A kind of three-dimensional orifice plate hydrops for oil/gas well stimulation steeps atomising device
CN206772755U (en) A kind of measuring system of desulfurization carbide slag slurry parameter
CN206057130U (en) A kind of serosity composite measurement tank
CN204082057U (en) Bored pile faces fills with front gaslift hole cleaning device
CN211622280U (en) Inclined hole type grouting sleeve for connecting steel bars
CN207795126U (en) A kind of oil-pumping well head equipment
CN208024993U (en) Flat section is flow automatically water-bound under a kind of pressure pipeline
CN207829859U (en) A kind of horizontal well swirl injection throttling sand-washing pen point
CN106205340B (en) The routed water experiment porch of mine earth's surface raceway groove flowing water
CN206987754U (en) Concentric tube double-jet aeration negative pressure sand pumping device
CN206512831U (en) A kind of vertical slot formula drop well provided with buffer structure beam
CN204457685U (en) A kind of drainage underground gas production sonic nozzle
CN201162531Y (en) Controllable acid injection pipe
CN107024410A (en) A kind of measuring system of desulfurization carbide slag slurry parameter
CN207634035U (en) A kind of oil pipe for gas well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180306