CN207063950U CN201721031419.9U CN201721031419U CN207063950U CN 207063950 U CN207063950 U CN 207063950U CN 201721031419 U CN201721031419 U CN 201721031419U CN 207063950 U CN207063950 U CN 207063950U
Authority
CN
China
Prior art keywords
screen casing
fixture
gravel particle
simulation wellbore
wellbore hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721031419.9U
Other languages
Chinese (zh)
Inventor
赵旭
刘欢乐
姚志良
伊伟锴
付道明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Research Institute of Petroleum Engineering
Original Assignee
China Petroleum and Chemical Corp
Sinopec Research Institute of Petroleum Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Research Institute of Petroleum Engineering filed Critical China Petroleum and Chemical Corp
Priority to CN201721031419.9U priority Critical patent/CN207063950U/en
Application granted granted Critical
Publication of CN207063950U publication Critical patent/CN207063950U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model provides a kind of gravel particle packing pit shaft henchnmrk test device, including:First simulation wellbore hole, both ends are provided with fixture;First screen casing, it is inserted into the first simulation wellbore hole, is connected with fixture;There is annular space, for filling gravel particle between simulation wellbore hole and screen casing;First liquid inlet, is located in one of on fixture;First liquid outlet, on another fixture.The utility model also provides a kind of gravel particle packing pit shaft henchnmrk test device, including:Simulation wellbore hole, its both ends are provided with fixture;Screen casing, it is inserted into simulation wellbore hole, and is connected with fixture;There is annular space, for filling gravel particle between simulation wellbore hole and screen casing;First liquid inlet, is located in one of on fixture;First liquid outlet, on another fixture;Second liquid entrance, positioned at the side wall of simulation wellbore hole.The utility model can preferably go out the gravel particle of suitable horizontal segment filling.

Description

A kind of gravel particle insulates pit shaft henchnmrk test device
Technical field
It the utility model is related to SIMULATION STUDY OF GRAVEL PACKING IN HORIZONTAL WELL and adjust stream control water completion technique field, more particularly to a kind of gravel particle Insulate pit shaft henchnmrk test device.
Background technology
It is to adjust stream water-control sieve tube typically to use packer pair as core that SIMULATION STUDY OF GRAVEL PACKING IN HORIZONTAL WELL, which adjusts stream control water completion technique, Net horizontal section carries out insulating the annular space between horizontal segment tune stream water-control sieve tube and the borehole wall.If packer is long, whole tubing string Risk be present in tripping in;If packer is too short, there is risk in the sealing of packer.At present, with the continuous improvement of scientific and technological level, The packing to annular space between screen casing and reservoir can be realized instead of packer using the gravel particle layer of filling.
SIMULATION STUDY OF GRAVEL PACKING IN HORIZONTAL WELL adjusts the integral construction tubular column structure of stream control water completion technique as shown in fig. 1, in the tubing string In, laid in horizontal segment and adjust stream water-control sieve tube 11, pressed in the upper end of screen casing equipped with filling converter 12, filling packer 13. In practice of construction, load fluid 14 carries pack gravel and injected by well head, enters completion pipeline section after top inputs tubing string, fills Converter 12 introduces load fluid the annular space of horizontal segment tune stream water-control sieve tube 11 and ground interlayer, and load fluid filters by screen casing After the gravel buildup of carrying to annular space, liquid enters screen casing inner cylinder, after again passing by the filling sleeve pipe annular space of converter 12 Flow out outside well, whole filling circulation is until horizontal segment annular space terminates after being full of gravel.
In actual stowing operation, too high pressure is likely to result in pressure and wears reservoir and destroy screen casing, it is therefore desirable to uses Small displacement stably takes sandfilling technology, and small displacement filling requires that the density of pack gravel is low first, high temperature, height under surge well Pressure and the condition insulated for a long time, pack grain need to select low-density and adapt to high temperature resistant, high pressure, highly mineralized formation brines environment simultaneously Possesses the stable granular materials of long-term retention property.By being applied to multiple industry particles such as steel, sand control, chemical industry to kind more than ten Material optimizing evaluation, with reference to resistance to static pressure, resistance to salinity, high temperature extrusion experiment, the excellent polymer low-density support gravel that have selected is made For pack grain.But, it is also necessary to simulate the packing performance of gravel particle.Currently without good evaluation gravel particle packing well The laboratory facilities of cylinder performance.Therefore, gravel particle packing pit shaft performance how is evaluated, power-assisted SIMULATION STUDY OF GRAVEL PACKING IN HORIZONTAL WELL adjusts stream control water The fast development of completion technique is urgent problem to be solved.
Utility model content
Feature and advantage of the present utility model partly state in the following description, or can be aobvious and easy from the description See, or can be learnt by putting into practice the utility model.
To overcome problem of the prior art, the utility model provides a kind of gravel particle packing pit shaft henchnmrk test dress Put, including diametral tests device and axial experimental provision;The diametral tests device includes:
First simulation wellbore hole, its both ends are equipped with fixture;
First screen casing, it is inserted into first simulation wellbore hole, and be connected with the fixture;First simulation wellbore hole There is annular space between first screen casing, for filling gravel particle;
First liquid inlet, it is located in one of on the fixture, and is connected with the annular space;
First liquid outlet, positioned at another described on fixture, and it is connected with the annular space.
In a possible design, in addition to two end type of tamper evidence, the both ends of first screen casing are separately positioned on.
In a possible design, in addition to the first feed tube, it is connected with first liquid inlet;First goes out liquid Pipe, is connected with first liquid outlet.
In a possible design, the axial experimental provision includes:
Second simulation wellbore hole, its both ends are equipped with fixture;
Second screen casing, it is inserted into second simulation wellbore hole, and be connected with the fixture;Second simulation wellbore hole There is annular space between second screen casing, for filling gravel particle;
Second liquid entrance, it is connected positioned at the side wall of second simulation wellbore hole, and with the annular space.
In a possible design, in addition to screen casing type of tamper evidence, one of end of second screen casing is arranged on.
In a possible design, in addition to the second feed tube, it is connected with the second liquid entrance.
The utility model also provides a kind of gravel particle packing pit shaft henchnmrk test device, including:
Simulation wellbore hole, its both ends are equipped with fixture;
Screen casing, it is inserted into the simulation wellbore hole, and is connected with the fixture;The simulation wellbore hole and the screen casing it Between there is annular space, for filling gravel particle;
First liquid inlet, it is located in one of on the fixture, and is connected with the annular space;
First liquid outlet, positioned at another described on fixture, and it is connected with the annular space;
Second liquid entrance, it is connected positioned at the side wall of the simulation wellbore hole, and with the annular space.
In a possible design, in addition to:
Two the first type of tamper evidence, it is respectively used to block two ends of the screen casing;
Second liquid switch member, for blocking the second liquid entrance.
In a possible design, in addition to:
Second type of tamper evidence, for blocking one of end of the screen casing;
Two the first liquid switch parts, it is respectively used to block first liquid inlet and the first liquid outlet.
In a possible design, in addition to:
First feed tube, it is connected with first liquid inlet;
First drain pipe, it is connected with first liquid outlet;
Second feed tube, it is connected with the second liquid entrance.
The utility model provides a kind of gravel particle packing pit shaft henchnmrk test device, can preferably go out suitable water The gravel particle of flat section filling.
By reading specification, the feature of these technical schemes and interior will be best understood in those of ordinary skill in the art Hold.
Brief description of the drawings
The utility model is specifically described below with reference to accompanying drawing and with reference to example, the advantages of the utility model and realization Mode will be more obvious, and content is only used for explanation of the present utility model wherein shown in accompanying drawing, without forming to this reality With it is new in all senses on limitation, in the accompanying drawings:
Fig. 1 is the integral construction tubular column structure schematic diagram that SIMULATION STUDY OF GRAVEL PACKING IN HORIZONTAL WELL adjusts stream control water completion technique.
Fig. 2 is that the gravel particle of the utility model embodiment insulates radial direction experimental provision in pit shaft henchnmrk test device Structural representation;
Fig. 3 is that the gravel particle of the utility model embodiment insulates axial experimental provision in pit shaft henchnmrk test device Structural representation;
Fig. 4 is that the gravel particle of another embodiment of the utility model insulates the structural representation of pit shaft henchnmrk test device Figure;
Embodiment
As shown in Figure 2 and Figure 3, the utility model provides a kind of gravel particle packing pit shaft henchnmrk test device, including Diametral tests device 20 and axial experimental provision 30;Diametral tests device 20 includes:
First simulation wellbore hole 21, its both ends are equipped with fixture 22;
First screen casing 23, it is inserted into the first simulation wellbore hole 21, and be connected with fixture 22;First simulation wellbore hole 21 with There is annular space 24, for filling gravel particle between second screen casing 23;Diameter between first screen casing and the first simulation wellbore hole can With difference 70 to 100mm;Such as can be by φ 114mm the first screen casing insertion φ the first simulation wellbore holes of 190.5mm;First sieve Length of tube can be 8m to 12m, e.g. 10m;
First liquid inlet 25, is located in one of on fixture, and is connected with annular space 24;
First liquid outlet 27, it is connected on another fixture, and with annular space 24.
Also include two end type of tamper evidence 29, be separately positioned on the both ends of the first screen casing 23;Prevent fluid from being sieved from first The end outflow of pipe 23.
In the present embodiment, in addition to the first feed tube 27, it is connected with the first liquid inlet 25;First drain pipe 28, with First liquid outlet 26 is connected.In the specific implementation, the first feed tube 27, with the first liquid inlet 25 can together be molded, First drain pipe 28 and the first liquid outlet 26 can together be molded.First feed tube 27 can be with L-shaped.
Experimental Flowing Object enters the annular space 24 of pack gravel particle from the first feed tube 27 via the first liquid inlet 25, then passes through Cross and enter the first screen casing 23, finally flowed out via the first liquid outlet 26 from the first drain pipe 28.In whole experiment process, the The left end and right-hand member of one screen casing are all blocked by end type of tamper evidence 29, and fluid can not be by can only be from pack gravel particle Annular space 24 flows into and outflow.Annular space can be injected laterally into from annular space one end with the light oil of certain viscosity, in certain pressure differential The numerical value of lower test reduced discharge, calculates the Radial Flow ability after gravel filling.
As shown in figure 3, the axial experimental provision 30 includes:
Second simulation wellbore hole 31, its both ends are equipped with fixture 32;
Second screen casing 33, it is inserted into the second simulation wellbore hole 31, and be connected with fixture 32;Second simulation wellbore hole and There is annular space, for filling gravel particle between two screen casings;Diameter between second screen casing and the second simulation wellbore hole can differ 70 to 100mm;Such as can be by φ 114mm the second screen casing insertion φ the second simulation wellbore holes of 190.5mm;Second screen casing length Can be 8m to 12m, e.g. 10m;
Second liquid entrance 35, it is connected positioned at the side wall of the second simulation wellbore hole 31, and with annular space 34.
Also include screen casing type of tamper evidence 37, be arranged on one of end of the second screen casing 33.
In the present embodiment, in addition to the second feed tube 36, it is connected with second liquid entrance 35.
Experimental Flowing Object enters the annular space 34 of pack gravel particle from the second feed tube 36 via second liquid entrance 35, then enters Enter the second screen casing 33, one end outflow of screen casing type of tamper evidence 37 is finally not provided with from the second screen casing 33.In whole experiment process, the One of end of two screen casings is blocked by screen casing type of tamper evidence 37, and fluid can not pass through.For example, viscosity can be used 60mPa.s light oil injects annular space from the second liquid entrances of φ 190.5mm simulation wellbore holes, flows through after the second screen casing from φ Flowed out in 114mm screen casings, the numerical value of reduced discharge is tested under certain pressure differential, calculate lateral flow energy after gravel filling Power.
Result of the test more than twice can calculate Radial Flow ability and lateral flow ability after gravel filling Ratio, if ratio is more than predetermined threshold value, illustrate that pack gravel particle can be under the premise of ensureing in fluid radial inflow pit shaft Fluid is effectively prevented in annular space lateral flow;If ratio is less than or equal to predetermined threshold value, need to continue to change gravel particle And tested more than repeating.In addition, the needs according to actual Oil/gas Well, thus it is possible to vary the size of screen casing and simulation wellbore hole, can also Change Experimental Flowing Object, and then gravel particle is evaluated.The size of the predetermined threshold value is needed according to screen casing and simulation wellbore hole The viscosity of size and Experimental Flowing Object determines.
As shown in figure 4, the utility model also provides a kind of gravel particle packing pit shaft henchnmrk test device, including:
Simulation wellbore hole 41, its both ends are equipped with fixture 42;
Screen casing 43, it is inserted into simulation wellbore hole 41, and is connected with fixture 42;Have between simulation wellbore hole 41 and screen casing 43 Annular space 44, for filling gravel particle;
First liquid inlet 45, is located in one of on fixture, and is connected with annular space 44;
First liquid outlet 46, it is connected on another fixture, and with annular space 44;
Second liquid entrance 51, it is connected positioned at the side wall of simulation wellbore hole 41, and with annular space 44.
In addition, it can include:
First feed tube 47, it is connected with the first liquid inlet 45;
First drain pipe 48, it is connected with the first liquid outlet 46;
Second feed tube 52, is connected with second liquid entrance 51.
In the present embodiment, in addition to:
Two the first type of tamper evidence (not shown), it is respectively used to block two ends of screen casing 43;
Second liquid switch member (not shown), for blocking second liquid entrance 51.
Now, Experimental Flowing Object enters the annular space of pack gravel particle from the first feed tube 47 via the first liquid inlet 45 44, then by entering screen casing 43, finally flowed out via the first liquid outlet 46 from the first drain pipe 48.In whole experiment process In, the left end and right-hand member of screen casing are all blocked by the first type of tamper evidence, and second liquid entrance 51 is blocked by second liquid switch, flows Body can not be by can only flow into and flow out from the annular space 44 of pack gravel particle.Can be with the light oil of certain viscosity from annular space One end is injected laterally into annular space, and the numerical value of reduced discharge is tested under certain pressure differential, calculates the radial flow after gravel filling Kinetic force.
In the present embodiment, in addition to:
Second type of tamper evidence (not shown), for blocking one of end of screen casing;
Two the first liquid switch part (not shown), are respectively used to block the first liquid inlet and the first liquid discharge Mouthful.
Now, Experimental Flowing Object enters the annular space of pack gravel particle from the second feed tube 52 via second liquid entrance 51 44, screen casing 44 is entered back into, one end outflow of the second type of tamper evidence is finally not provided with from screen casing 44.In whole experiment process, screen casing One of end blocked by the second type of tamper evidence, the first liquid inlet and the first liquid outlet distinguish two the first liquid Switch member blocks, and fluid can not pass through.For example, can with viscosity 60mPa.s light oil from φ 190.5mm simulation wellbore holes the Annular space is injected in two liquid inlets, is flowed out after flowing through screen casing out of φ 114mm screen casings, reduced discharge is tested under certain pressure differential Numerical value, calculate gravel filling after lateral flow ability.
Result of the test more than twice can calculate Radial Flow ability and lateral flow ability after gravel filling Ratio, if ratio is more than predetermined threshold value, illustrate that pack gravel particle can be under the premise of ensureing in fluid radial inflow pit shaft Fluid is effectively prevented in annular space lateral flow;If ratio is less than or equal to predetermined threshold value, need to continue to change gravel particle And tested more than repeating.In addition, the needs according to actual Oil/gas Well, thus it is possible to vary the size of screen casing and simulation wellbore hole, can also Change Experimental Flowing Object, and then gravel particle is evaluated.The size of the predetermined threshold value is needed according to screen casing and simulation wellbore hole The viscosity of size and Experimental Flowing Object determines.
Gravel particle provided by the utility model insulates pit shaft henchnmrk test device, Experimental Flowing Object is entered annular space Afterwards, flowed out from screen casing, obtain stable flow and producing pressure differential, calculate footpath lateral flow ability after gravel filling;Make reality Fluid is tested into after annular space, is flowed out from the other end of annular space, obtains stable flow and producing pressure differential, after calculating gravel filling Radial Flow ability.By contrasting the relation between two kinds of situation down-offs and producing pressure differential, gravel particle is preferably filled with, finally Reach the target of the performance of evaluation packing pit shaft.
Above by reference to preferred embodiment of the present utility model has been illustrated, it is new that those skilled in the art do not depart from this practicality The scope and spirit of type, there can be a variety of flexible programs to realize the utility model.For example, the part as one embodiment The feature for showing or describing can be used for another embodiment to obtain another embodiment.It these are only that the utility model is preferably feasible Embodiment, not thereby limit to interest field of the present utility model, it is all to use the utility model specification and accompanying drawing content The equivalence changes made, it is both contained within interest field of the present utility model.

Claims (10)

1. a kind of gravel particle insulates pit shaft henchnmrk test device, it is characterised in that including diametral tests device and axial direction Experimental provision;The diametral tests device includes:
First simulation wellbore hole, its both ends are equipped with fixture;
First screen casing, it is inserted into first simulation wellbore hole, and be connected with the fixture;First simulation wellbore hole and institute Stating between the first screen casing has annular space, for filling gravel particle;
First liquid inlet, it is located in one of on the fixture, and is connected with the annular space;
First liquid outlet, positioned at another described on fixture, and it is connected with the annular space.
2. gravel particle packing pit shaft henchnmrk test device according to claim 1, it is characterised in that also including two End type of tamper evidence, it is separately positioned on the both ends of first screen casing.
3. gravel particle packing pit shaft henchnmrk test device according to claim 1, it is characterised in that also including first Feed tube, it is connected with first liquid inlet;First drain pipe, it is connected with first liquid outlet.
4. gravel particle packing pit shaft henchnmrk test device according to claim 1, it is characterised in that described axially real Experiment device includes:
Second simulation wellbore hole, its both ends are equipped with fixture;
Second screen casing, it is inserted into second simulation wellbore hole, and be connected with the fixture;Second simulation wellbore hole and institute Stating between the second screen casing has annular space, for filling gravel particle;
Second liquid entrance, it is connected positioned at the side wall of second simulation wellbore hole, and with the annular space.
5. gravel particle packing pit shaft henchnmrk test device according to claim 4, it is characterised in that also including screen casing Type of tamper evidence, it is arranged on one of end of second screen casing.
6. gravel particle packing pit shaft henchnmrk test device according to claim 4, it is characterised in that also including second Feed tube, it is connected with the second liquid entrance.
7. a kind of gravel particle insulates pit shaft henchnmrk test device, it is characterised in that including:
Simulation wellbore hole, its both ends are equipped with fixture;
Screen casing, it is inserted into the simulation wellbore hole, and is connected with the fixture;Have between the simulation wellbore hole and the screen casing There is annular space, for filling gravel particle;
First liquid inlet, it is located in one of on the fixture, and is connected with the annular space;
First liquid outlet, positioned at another described on fixture, and it is connected with the annular space;
Second liquid entrance, it is connected positioned at the side wall of the simulation wellbore hole, and with the annular space.
8. gravel particle packing pit shaft henchnmrk test device according to claim 7, it is characterised in that also include:
Two the first type of tamper evidence, it is respectively used to block two ends of the screen casing;
Second liquid switch member, for blocking the second liquid entrance.
9. gravel particle packing pit shaft henchnmrk test device according to claim 7, it is characterised in that also include:
Second type of tamper evidence, for blocking one of end of the screen casing;
Two the first liquid switch parts, it is respectively used to block first liquid inlet and the first liquid outlet.
10. gravel particle packing pit shaft henchnmrk test device according to claim 7, it is characterised in that also include:
First feed tube, it is connected with first liquid inlet;
First drain pipe, it is connected with first liquid outlet;
Second feed tube, it is connected with the second liquid entrance.
CN201721031419.9U 2017-08-17 2017-08-17 A kind of gravel particle insulates pit shaft henchnmrk test device Active CN207063950U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721031419.9U CN207063950U (en) 2017-08-17 2017-08-17 A kind of gravel particle insulates pit shaft henchnmrk test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721031419.9U CN207063950U (en) 2017-08-17 2017-08-17 A kind of gravel particle insulates pit shaft henchnmrk test device

Publications (1)

Publication Number Publication Date
CN207063950U true CN207063950U (en) 2018-03-02

Family

ID=61515813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721031419.9U Active CN207063950U (en) 2017-08-17 2017-08-17 A kind of gravel particle insulates pit shaft henchnmrk test device

Country Status (1)

Country Link
CN (1) CN207063950U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110159342A (en) * 2019-06-12 2019-08-23 中国石油大学(北京) Gravel filling simulation experimental system
CN112922558A (en) * 2021-03-24 2021-06-08 中海油田服务股份有限公司 Visual experimental apparatus
CN113756759A (en) * 2021-10-14 2021-12-07 中国石油大学(北京) Test equipment and experimental system for sand prevention simulation of well completion engineering
CN114109315A (en) * 2021-12-02 2022-03-01 中国地质大学(武汉) Oil exploitation method for improving injection and exploitation capacity of reservoir

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110159342A (en) * 2019-06-12 2019-08-23 中国石油大学(北京) Gravel filling simulation experimental system
CN112922558A (en) * 2021-03-24 2021-06-08 中海油田服务股份有限公司 Visual experimental apparatus
CN113756759A (en) * 2021-10-14 2021-12-07 中国石油大学(北京) Test equipment and experimental system for sand prevention simulation of well completion engineering
CN113756759B (en) * 2021-10-14 2022-04-22 中国石油大学(北京) Test equipment and experimental system for sand prevention simulation of well completion engineering
CN114109315A (en) * 2021-12-02 2022-03-01 中国地质大学(武汉) Oil exploitation method for improving injection and exploitation capacity of reservoir

Similar Documents

Publication Publication Date Title
CN207063950U (en) A kind of gravel particle insulates pit shaft henchnmrk test device
CN108982342B (en) Device and method for evaluating erosion resistance of sand control screen pipe of high-temperature high-pressure gas reservoir horizontal well and application of device and method
CN101705802B (en) Anti-crossflow packing particles for production sections of oil and gas wells
CN101705808B (en) Sectional flow control method for flow control filter pipe column of oil-gas well with bushing outside channel
CN101828002A (en) The permeable medium flow control that in hydrocarbon recovery, uses
CN106246143B (en) A kind of water control method and its control water sand control pipe of water outlet oil reservoir
CN207122305U (en) The oil gas well completion structure of decreasing water cut and increasing oil ability can be improved
CN204266939U (en) A kind of water and oil control second completion pipe string combination
CN203285408U (en) High pressure layered water injection tubular column
CN103195417A (en) Experiment device and method for stimulating current-limiting and sectional fracturing of horizontal well
US11466538B2 (en) Inflow control device and method for completing a wellbore
CN101975041B (en) Well cementing method for avoiding coal bed and device thereof
CN101705810A (en) Segmented current controlling method of current controlling filter pipe column of oil-gas well having perforated pipe
CN105239981B (en) Heavy crude heat extraction net horizontal section is along journey variable mass flow analogue experimental provision
CN103890312A (en) Autonomous fluid control device having a reciprocating valve for downhole fluid selection
CN203603806U (en) Rock debris transportation simulating device
CN104948149A (en) Multi-media separated injection system suitable for mine field complex oil reservoir
Sharma et al. Experimental evaluation of a prototype centrifugal packer-type downhole separator
CN208520832U (en) A kind of experimental provision for simulating gas hydrates counterflush drilling flow field change
CN207161062U (en) A kind of directional well Adaptive Second segmentation control water completion tubular column
CN112267880B (en) Horizontal well subsection sand prevention and water control pipe string and design method thereof
CN205063927U (en) Viscous crude thermal recovery horizontal section becomes mobile simulation experiment device of quality along journey
CN102108851A (en) Horizontal well steam injection method and system
US20200095851A1 (en) Inflow Control Device, and Method for Completing a Wellbore to Decrease Water Inflow
CN110685677A (en) Water control simulation experiment device and experiment method for horizontal well of heterogeneous oil reservoir

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant