CN207063176U - A kind of attachment structure of assembled architecture wall block - Google Patents

A kind of attachment structure of assembled architecture wall block Download PDF

Info

Publication number
CN207063176U
CN207063176U CN201720329982.8U CN201720329982U CN207063176U CN 207063176 U CN207063176 U CN 207063176U CN 201720329982 U CN201720329982 U CN 201720329982U CN 207063176 U CN207063176 U CN 207063176U
Authority
CN
China
Prior art keywords
wall block
attachment structure
wall
connector
assembled architecture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720329982.8U
Other languages
Chinese (zh)
Inventor
吴建海
李江安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jiangnan Decoration Co Ltd
Original Assignee
Beijing Jiangnan Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jiangnan Decoration Co Ltd filed Critical Beijing Jiangnan Decoration Co Ltd
Priority to CN201720329982.8U priority Critical patent/CN207063176U/en
Application granted granted Critical
Publication of CN207063176U publication Critical patent/CN207063176U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a kind of attachment structure of assembled architecture wall block, its drip irrigation device is:Including the first wall block and the second wall block, the first pre-buried connector is fixed with the first wall block, the second pre-buried connector is fixed with the second wall block, the first connector and the second connector are fixedly connected by fastening screw.First wall block and the second wall block are processed in processing factory respectively, are transported to job site afterwards and are carried out Assembling composition attachment structure, several attachment structures form construction wall, both facilitate and process wall block respectively, and can quickly assembles, shortens the duration.When two walls are assembled, all kinds of seals are provided between assem-bly facing, the gap between the first wall block and the second wall block is stuffed entirely with and sealed by seal, ensures the sealing of seam crossing.

Description

A kind of attachment structure of assembled architecture wall block
Technical field
Building material field is the utility model is related to, more particularly to a kind of construction wall.
Background technology
The wall of existing residential building is to build to complete at the construction field (site) mostly, and worker is first at the construction field (site) Frame structure is set up, integrated poured building packing material completes construction again afterwards.
But the frame structure is needed to set up in order successively at the construction field (site), and wall pouring could be carried out after the completion of setting up, Make the duration long, building can not come into operation as early as possible.
Utility model content
The purpose of this utility model is to provide a kind of attachment structure of assembled architecture wall block, and its advantage is can be with piecemeal Wall block is processed, then carries out quick assembling to job site and fixes, effectively shortens the duration.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of attachment structure of assembled architecture wall block, it is characterized in that:Including the first wall block and the second wall block, institute State and built-in fitting is respectively fixed with the first wall block and second wall block, two built-in fittings are fixed by fixed mechanism Connection.
Pass through above-mentioned technical proposal, the first wall block and the second wall block can be processed in processing factory respectively, it After be transported to job site carry out Assembling form attachment structure, several attachment structures form construction wall, both facilitate point Wall block is not processed, and and can quickly assembles, shortens the duration.
The utility model is further arranged to:First wall block includes the first lateral keel, second wall block Including the second lateral keel, first lateral keel and the second lateral keel are lightgage steel joist.
Pass through above-mentioned technical proposal, the first lateral keel and the second lateral keel play support to respective wall block respectively Effect.Lightgage steel joist is a kind of new construction material, light steel(Baking vanish)Keel have that in light weight, intensity is high, adapts to waterproof, be anti- Shake, dust-proof, sound insulation, sound-absorbing, constant temperature and other effects, while also there is short time limit, easy construction.On the other hand, using light The also convenient recovery of steel joist and progress secondary use, have more preferably effects of energy conservation and environmental protection.
The utility model is further arranged to:Built-in fitting on first wall block is the first connector, described first Connector includes the first fixed part and first connecting portion, and first fixed part is fixedly arranged on described first laterally by some stripped threads Among keel, the first connecting portion is parallel with first lateral keel.
Pass through above-mentioned technical proposal, the first connector are fixed among the first lateral keel, and then are fixed on the first wall On block.
The utility model is further arranged to:Built-in fitting on second wall block is the second connector, described second Connector includes the second fixed part and second connecting portion, and second fixed part is fixedly arranged on described second laterally by some stripped threads Among keel, the second connecting portion is parallel with second lateral keel.
Pass through above-mentioned technical proposal, the first connector are fixed among the first lateral keel, and then are fixed on the first wall On block.
The utility model is further arranged to:The fixed mechanism is fastening screw, the first connecting portion and described Two connecting portions are fixedly connected by the fastening screw.
Pass through above-mentioned technical proposal, fastening screw are successively screwed into first connecting portion and second connecting portion, and the two fixation is connected Connect, and then the first wall block and the second wall block are fixedly connected.
The utility model is further arranged to:Sealing strip is provided between the first connecting portion and second connecting portion.
Pass through above-mentioned technical proposal, sealing strip are arranged on first connecting portion and second connecting portion before fastening screw is screwed Between.Worker screws fastening screw, makes screwed hole, seal and second connecting portion of the fastening screw successively by first connecting portion Screwed hole, and then fixed first connecting portion and second connecting portion.Now sealing strip is squeezed power and elastic deformation, and first is connected Gap filling sealing between socket part and second connecting portion, sealing strip also act as damping, waterproof and other effects.
The utility model is further arranged to:Set between the connection gap of first wall block and second wall block It is equipped with the foam rods close to surface of wall.
Pass through above-mentioned technical proposal, in spliced wall block, foam rods are squeezed power and produce elastic deformation, by seam The space filling sealing at place, improve the sealing effectiveness of wall block seam crossing.
The utility model is further arranged to:Foaming gap filler is provided between the foam rods and the sealing strip.
Pass through above-mentioned technical proposal, foaming gap filler seal the gap filling between foam rods and sealing strip.Foaming is filled out Seam agent have waterproof, it is resistance to expand with heat and contract with cold, be heat-insulated, sound insulation and fire-retardant effect.
The utility model is further arranged to:Structure glue is provided between the foam rods and the surface of wall.
Structure glue is used for the gap filling between foam rods and surface of wall and floating.Structure glue can bear larger lotus Carry, and ageing-resistant, endurance, corrosion-resistant, stable performance.The profile pattern of attachment structure was both ensure that using structure glue, again Wall bulk strength, rigidity and stability, and easy construction, short time limit are improved, engineering time and fund cost can be saved.
In summary, the utility model has the advantages that:
(1)First wall block and the second wall block are processed in processing factory respectively, are transported to job site afterwards and are entered Row Assembling forms attachment structure, and several attachment structures form construction wall, has both facilitated and has processed wall block respectively, and can is fast Speed assembling, shorten the duration.
(2)Sealing strip, foaming gap filler, foam rods and structure glue are connected, by the first wall block and the second wall block Between gap be stuffed entirely with and seal, ensure the sealing of the seam crossing of attachment structure.
(3)First lateral keel and the second lateral keel are made by lightgage steel joist, and lightgage steel joist is used as one kind is new to build Build material, have it is in light weight, be easy to construct, convenient recovery, the effect of energy-conserving and environment-protective.
Brief description of the drawings
Fig. 1 is the structural representation of the present embodiment.
In figure, the 1, first wall block;11st, the first lateral keel;12nd, the first wall;13rd, the first connector;131st, first Fixed part;132nd, first connecting portion;2nd, the second wall block;21st, the second lateral keel;22nd, the second wall;23rd, the second connector; 231st, the second fixed part;232nd, second connecting portion;3rd, fastening screw;4th, sealing strip;5th, foam gap filler;6th, foam rods;7th, tie Structure glue;8th, stripped thread.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Embodiment:A kind of attachment structure of assembled architecture wall block, as shown in figure 1, including the first wall block 1 and second Built-in fitting is respectively fixed with wall block 2, the first wall block 1 and the second wall block 2, two built-in fittings are solid by fastening screw 3 Fixed connection.
First wall block 1 and the second wall block 2 can be processed in processing factory respectively, be transported to job site afterwards Carry out Assembling and form attachment structure, several attachment structures form construction wall, have both facilitated and have processed wall block, and can respectively Quick assembling, shorten the duration.
First wall block 1 includes the first lateral keel 11, and the first lateral keel 11 is for lightgage steel joist and to the first wall block 1 Play a supporting role.Built-in fitting on first wall block 1 is the first connector 13, and the first connector 13 includes the first fixed part 131 and first connecting portion 132.The C-shaped indentations in cross section of first fixed part 131, the first fixed part 131 are slided by several Silk 8 is fixed on the end of the first lateral keel 11, and then the first connector 13 is fixed on the first wall block 1.First connection Portion 132 is fixed on the side of the first fixed part 131 and deviates from C-shaped recess, and first connecting portion 132 and the first lateral keel 11 are flat OK, the screwed hole for extending vertically through its upper and lower surface is provided among first connecting portion 132.First wall 12 is poured with building packing material Note inside and outside, the 1 overall knot of the first wall block of the first wall 12 guarantee in the first lateral keel 11 and the first connector 13 The integrality of structure.
Second wall block 2 includes the second lateral keel 21, and the second lateral keel 21 is for lightgage steel joist and to the second wall block 2 Play a supporting role.Built-in fitting on second wall block 2 is the second connector 23, and the second connector 23 includes the second fixed part 231 and second connecting portion 232.The C-shaped indentations in cross section of second fixed part 231, the second fixed part 231 are slided by several Silk 8 is fixed on the end of the second lateral keel 21, and then the second connector 23 is fixed on the second wall block 2.Second connection Portion 232 is fixed on the side of the second fixed part 231 and deviates from C-shaped recess, and second connecting portion 232 and the second lateral keel 21 are flat OK, the screwed hole for extending vertically through its upper and lower surface is provided among second connecting portion 232.Second wall 22 is poured with building packing material Note inside and outside, the 2 overall knot of the second wall block of the second wall 22 guarantee in the second lateral keel 21 and the second connector 23 The integrality of structure.
Second wall block 2 and the relative side of the first wall block 1 to assem-bly face, the assem-bly facing of two wall blocks protrude above and The body fit of depression.
During the first wall block 1 and the second wall block 2 to be assembled to fixation, worker is relative with assem-bly facing for the two Two wall blocks are spliced in direction, and the upper and lower surface of two wall blocks is respectively at same plane, ensure the planarization of wall. The screwed hole allowed simultaneously on the screwed hole in first connecting portion 132 and the second connector 23 is concentric, and in first connecting portion 132 Sealing strip 4 is set between second connecting portion 232, fastening screw 3 is screwed afterwards and is fixed.
Worker screws fastening screw 3, the priority of fastening screw 3 is passed through the screwed hole of first connecting portion 132, seal and The screwed hole of two connecting portions 232, and then fixed first connecting portion 132 and second connecting portion 232.Now sealing strip 4 is squeezed power And elastic deformation, the gap filling between first connecting portion 132 and second connecting portion 232 is sealed, sealing strip 4, which also acts as, to be subtracted Shake, waterproof and other effects.
Two foam rods 6 are provided between the assem-bly facing of first wall block 1 and second wall block 2, foam rods 6 are distinguished Close to the upper and lower surface of wall.In spliced wall block, foam rods 6 are squeezed power and produce elastic deformation, will connect Space filling sealing at seam, improve the sealing effectiveness of wall block seam crossing.
Filled with foaming gap filler 5 in gap between foam rods 6 and sealing strip 4.The gap filler 5 that foams has waterproof, resistance to Expand with heat and contract with cold, be heat-insulated, sound insulation and fire-retardant effect.
Structure glue 7 is filled with gap between foam rods 6 and surface of wall, structure glue 7 is used for wall block junction Surface it is floating.Structure glue 7 can bear larger load, and ageing-resistant, endurance, corrosion-resistant, stable performance.Use structure glue 7 both ensure that the profile pattern of attachment structure, improve wall bulk strength, rigidity and stability, and easy construction, work again Phase is short, can save engineering time and fund cost.
Sealing strip 4, foaming gap filler 5, foam rods 6 and structure glue 7 are connected, by the first wall block 1 and the second wall Gap between block 2 is stuffed entirely with and sealed, and ensures the sealing of the seam crossing of attachment structure.
This specific embodiment is only that it is not to limitation of the present utility model, ability to explanation of the present utility model Field technique personnel can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but As long as all protected in right of the present utility model by Patent Law.

Claims (9)

1. a kind of attachment structure of assembled architecture wall block, it is characterized in that:Including the first wall block(1)With the second wall block (2), first wall block(1)With second wall block(2)On be respectively fixed with built-in fitting, two built-in fittings pass through Fixed mechanism is fixedly connected.
2. a kind of attachment structure of assembled architecture wall block according to claim 1, it is characterized in that:First wall Block(1)Including the first lateral keel(11), second wall block(2)Including the second lateral keel(21), described first laterally Keel(11)With the second lateral keel(21)It is lightgage steel joist.
3. a kind of attachment structure of assembled architecture wall block according to claim 2, it is characterized in that:First wall Block(1)On built-in fitting be the first connector(13), first connector(13)Including the first fixed part(131)Connect with first Socket part(132), first fixed part(131)Pass through some stripped threads(8)It is fixedly arranged on first lateral keel(11)Centre, institute State first connecting portion(132)With first lateral keel(11)It is parallel.
4. a kind of attachment structure of assembled architecture wall block according to claim 3, it is characterized in that:Second wall Block(2)On built-in fitting be the second connector(23), second connector(23)Including the second fixed part(231)Connect with second Socket part(232), second fixed part(231)Pass through some stripped threads(8)It is fixedly arranged on second lateral keel(21)Centre, institute State second connecting portion(232)With second lateral keel(21)It is parallel.
5. a kind of attachment structure of assembled architecture wall block according to claim 4, it is characterized in that:The fixed mechanism For fastening screw(3), the first connecting portion(132)With the second connecting portion(232)Pass through the fastening screw(3)It is fixed Connection.
6. a kind of attachment structure of assembled architecture wall block according to claim 5, it is characterized in that:First connection Portion(132)And second connecting portion(232)Between be provided with sealing strip(4).
7. a kind of attachment structure of assembled architecture wall block according to claim 6, it is characterized in that:First wall Block(1)With second wall block(2)Connection gap between be provided with foam rods close to surface of wall(6).
8. a kind of attachment structure of assembled architecture wall block according to claim 7, it is characterized in that:The foam rods (6)With the sealing strip(4)Between be provided with foaming gap filler(5).
9. a kind of attachment structure of assembled architecture wall block according to claim 7, it is characterized in that:The foam rods (6)Structure glue is provided between the surface of wall(7).
CN201720329982.8U 2017-03-30 2017-03-30 A kind of attachment structure of assembled architecture wall block Expired - Fee Related CN207063176U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720329982.8U CN207063176U (en) 2017-03-30 2017-03-30 A kind of attachment structure of assembled architecture wall block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720329982.8U CN207063176U (en) 2017-03-30 2017-03-30 A kind of attachment structure of assembled architecture wall block

Publications (1)

Publication Number Publication Date
CN207063176U true CN207063176U (en) 2018-03-02

Family

ID=61501135

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720329982.8U Expired - Fee Related CN207063176U (en) 2017-03-30 2017-03-30 A kind of attachment structure of assembled architecture wall block

Country Status (1)

Country Link
CN (1) CN207063176U (en)

Similar Documents

Publication Publication Date Title
CN108797847A (en) A kind of assembled steel frame wall filled with masonry structural system and its construction method
CN208934197U (en) The plug-in filling wall construction system of steel frame and assembled filled-in panel
CN207063176U (en) A kind of attachment structure of assembled architecture wall block
CN206873716U (en) A kind of antidetonation type unitized curtain wall
CN203769090U (en) Structural frame and connection structure of lapping position of beam column frame
CN105421615A (en) Prefabricated type shear wall horizontal bolt connecting structure
CN206143933U (en) Assembled steel core concrete column H shaped steel roof beam is from power consumption connected node that restores to throne
CN203514531U (en) Square steel tube concrete column and steel beam node connecting structure with internal diaphragms
CN205712705U (en) The assembled cell cube of a kind of ALC external wall
CN202064488U (en) Steel beam-reinforced concrete floor system
CN206769085U (en) A kind of wall connecting point structure of assembled architecture
CN204059840U (en) A kind of dry-hang keel installation structure
CN207739478U (en) A kind of assembled architecture attachment device
CN206467883U (en) Insulation wallboard and heat-preserving heat-insulating wall
CN210798003U (en) Stone curtain wall wrapping column structure
CN211949549U (en) Building scaffold wall connecting component
CN206015960U (en) A kind of fixed structure of wall element
CN205617605U (en) Compound interior wall structure of light gauge steel
CN203878779U (en) Rectangular concrete-filled steel tube column and I-steel beam rebar penetrating type joint
CN205669284U (en) The cast-in-place Integral Steel frame wall filled with masonry system that a kind of spring connects
CN214220710U (en) Maintenance structure of building steel roofing
CN203625776U (en) Arch spring anchoring structure for concrete-filled steel tube arch bridge
CN211200728U (en) Connecting node structure of precast concrete externally-hung wallboard
CN207567989U (en) Component is stitched in prefabricated reinforced concrete wall panel horizontal connection
CN202731037U (en) Curtain wall framework structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180302