CN207058852U - A kind of warming plate feeder of edge alignment device - Google Patents
A kind of warming plate feeder of edge alignment device Download PDFInfo
- Publication number
- CN207058852U CN207058852U CN201720929874.4U CN201720929874U CN207058852U CN 207058852 U CN207058852 U CN 207058852U CN 201720929874 U CN201720929874 U CN 201720929874U CN 207058852 U CN207058852 U CN 207058852U
- Authority
- CN
- China
- Prior art keywords
- frame
- cutting
- lifting
- insulation board
- crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sawing (AREA)
Abstract
一种齐边装置的保温板送入装置,属于保温板生产技术领域。其特征在于:包括物料架(1)、升降装置(5)以及输送装置,物料架(1)的两侧对称设有用于担放保温板的担放部(102),且担放部(102)沿物料架(1)的高度方向间隔设置有多个,物料架(1)设置在升降装置(5)上并随升降装置(5)同步升降,输送装置设置在升降装置(5)中部,且输送装置的进料端伸入物料架(1)内。本齐边装置的保温板送入装置的待切割的保温板的两侧担放在担放部上,升降装置与输送装置相配合,将保温板逐张输送给切割装置,实现了保温板的连续逐张输送,且当物料架上的保温板完全输送后,可将装满保温板的物料架替换空的物料架,物料补充迅速。
The utility model relates to a thermal insulation board feeding device of an edge trimming device, which belongs to the technical field of thermal insulation board production. It is characterized in that: it includes a material rack (1), a lifting device (5) and a conveying device, and both sides of the material rack (1) are symmetrically provided with carrying parts (102) for carrying heat preservation boards, and the carrying parts (102 ) along the height direction of the material rack (1) are arranged at intervals. The material rack (1) is set on the lifting device (5) and rises and falls synchronously with the lifting device (5), and the conveying device is set in the middle of the lifting device (5). And the feeding end of the conveying device extends into the material rack (1). The thermal insulation board feeding device of this edge trimming device puts the two sides of the thermal insulation board to be cut on the carrying part, and the lifting device cooperates with the conveying device to convey the thermal insulation board to the cutting device one by one, realizing the insulation of the thermal insulation board. Continuous conveying one by one, and when the insulation board on the material rack is completely conveyed, the material rack full of insulation boards can be replaced by the empty material rack, and the material replenishment is rapid.
Description
技术领域technical field
一种齐边装置的保温板送入装置,属于保温板生产技术领域。The utility model relates to a thermal insulation board feeding device of an edge trimming device, which belongs to the technical field of thermal insulation board production.
背景技术Background technique
聚苯乙烯模塑板(EPS)、聚苯乙烯挤塑板(XPS)、酚醛板、聚氨酯板、石墨聚苯板和岩棉是目前建筑上常用的外墙保温材料,这几种保温材料具有保温性能好,施工方便的特点,被全国广泛使用。但是这些保温材料除岩棉外燃烧性能达不到A级,容易引起火灾。现有技术中,平丝岩棉在使用时纤维与砂浆层平行,垂直拉拔强度低,使用后容易出现层层开裂,影响保温板的使用寿命。而且岩棉也容易吸水,造成其物理性能的破坏,从而降低保温板的使用寿命。Polystyrene molded board (EPS), extruded polystyrene board (XPS), phenolic board, polyurethane board, graphite polystyrene board and rock wool are commonly used external wall insulation materials in buildings at present. These insulation materials have It has good thermal insulation performance and convenient construction, and is widely used throughout the country. However, the combustion performance of these insulation materials, except rock wool, cannot reach Class A, which is easy to cause fire. In the prior art, the fibers of flat silk rock wool are parallel to the mortar layer during use, and the vertical drawing strength is low, and layer after layer cracking is prone to occur after use, which affects the service life of the insulation board. Moreover, rock wool is also easy to absorb water, causing damage to its physical properties, thereby reducing the service life of the insulation board.
在保温板的生产工艺中,需要在保温板上的砂浆凝固后对保温板进行齐边,既能够保证保温板的侧部整齐,又能够使保温板满足所需要的尺寸要求。目前保温板的齐边通常采用人工切割的方式进行,这种方法存在如下弊端:1、由于保温板质量重,从而导致齐边的速度较慢,进而提高了保温板的加工成本,且人工齐边导致保温板的尺寸不稳定,导致废品率较高;2、由于齐边需要在砂浆凝固之后进行,因此齐边的工作环境恶劣,对操作人员的身体危害较大。由于切割锯片的直径的限制,因此切割锯片每次只能够对一张保温板进行切割,因此如何将保温板连续的逐张输送给切割装置是必须解决的技术问题之一。In the production process of the insulation board, it is necessary to align the edges of the insulation board after the mortar on the insulation board is solidified, which can not only ensure that the sides of the insulation board are neat, but also make the insulation board meet the required size requirements. At present, the edge alignment of the insulation board is usually carried out by manual cutting. This method has the following disadvantages: 1. Due to the heavy weight of the insulation board, the speed of edge alignment is relatively slow, thereby increasing the processing cost of the insulation board, and manual alignment Edges lead to unstable dimensions of the insulation board, leading to a high scrap rate; 2. Since the edge alignment needs to be performed after the mortar solidifies, the working environment for edge alignment is harsh and poses a great hazard to the operator. Due to the limitation of the diameter of the cutting saw blade, the cutting saw blade can only cut one insulation board at a time, so how to continuously convey the insulation boards one by one to the cutting device is one of the technical problems that must be solved.
发明内容Contents of the invention
本实用新型要解决的技术问题是:克服现有技术的不足,提供一种能够将保温板逐张输送给切割装置、且能够实现连续输送的齐边装置的保温板送入装置。The technical problem to be solved by the utility model is: to overcome the deficiencies of the prior art, and to provide a thermal insulation board feeding device capable of conveying the thermal insulation boards to the cutting device one by one and realizing continuous delivery.
本实用新型解决其技术问题所采用的技术方案是:该齐边装置的保温板送入装置,其特征在于:包括物料架、升降装置以及输送装置,物料架的两侧对称设有用于担放保温板的担放部,且担放部沿物料架的高度方向间隔设置有多个,物料架设置在升降装置上并随升降装置同步升降,输送装置设置在升降装置中部,且输送装置的进料端伸入物料架内。The technical solution adopted by the utility model to solve the technical problem is: the thermal insulation board feeding device of the edge trimming device is characterized in that it includes a material rack, a lifting device and a conveying device, and the two sides of the material rack are symmetrically equipped with The loading and unloading part of the heat preservation board, and several loading and unloading parts are arranged at intervals along the height direction of the material rack. The material rack is set on the lifting device and rises and falls synchronously with the lifting device. The material end extends into the material rack.
优选的,所述的物料架为长方体框架,且物料架的宽度大于保温板的宽度,担放部设置在物料架内。Preferably, the material rack is a rectangular parallelepiped frame, and the width of the material rack is larger than the width of the insulation board, and the carrying part is arranged in the material rack.
优选的,所述的输送装置为切割输送带,切割输送带的宽度大于保温板的宽度,且小于物料架的宽度。Preferably, the conveying device is a cutting conveyor belt, and the width of the cutting conveyor belt is greater than the width of the insulation board and smaller than the width of the material rack.
优选的,所述的升降装置包括升降装置主体、滑动安装在升降装置主体内的升降架以及升降动力机构,升降动力机构设置在升降装置主体上侧,升降动力机构与升降架相连,并带动升降架升降。Preferably, the lifting device includes a main body of the lifting device, a lifting frame slidably installed in the main body of the lifting device, and a lifting power mechanism. The lifting power mechanism is arranged on the upper side of the main body of the lifting device. Rack lift.
优选的,所述的升降架为水平设置的长方体框架,升降架上水平安装有升降架输送带,物料架放置在升降架输送带上。Preferably, the lifting frame is a rectangular parallelepiped frame, on which a lifting frame conveyor belt is installed horizontally, and the material rack is placed on the lifting frame conveyor belt.
优选的,所述的升降架的两侧对称设有升降架导向轮,升降架导向轮转动安装在升降架上,升降架通过升降架导向轮滑动安装在升降装置主体上。Preferably, two sides of the lifting frame are symmetrically provided with lifting frame guide wheels, the lifting frame guiding wheels are rotatably mounted on the lifting frame, and the lifting frame is slidably mounted on the main body of the lifting device through the lifting frame guiding wheels.
优选的,所述的升降架的两侧对称设有用于对物料架导向的升降架导向杆。Preferably, two sides of the lifting frame are symmetrically provided with lifting frame guide rods for guiding the material rack.
优选的,所述的升降架导向杆的两端均为由中部至端部逐渐向升降架外侧弯折的倾斜状。Preferably, both ends of the guide rod of the lifting frame are inclined from the middle part to the end and gradually bent toward the outside of the lifting frame.
与现有技术相比,本实用新型所具有的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:
1、本齐边装置的保温板送入装置的待切割的保温板的两侧担放在担放部上,升降装置带动物料架下降,并与输送装置相配合,将保温板逐张输送给切割装置,从而实现了保温板的连续逐张输送,且当物料架上的保温板完全输送后,可将装满保温板的物料架替换空的物料架,物料补充迅速,保温板输送效率高。1. The thermal insulation board of this edge trimming device is sent into the device. The two sides of the thermal insulation board to be cut are placed on the loading part, and the lifting device drives the material rack down, and cooperates with the conveying device to convey the thermal insulation board to the Cutting device, so as to realize the continuous conveying of insulation boards one by one, and when the insulation boards on the material rack are completely conveyed, the material rack full of insulation boards can be replaced by the empty material rack, the material is replenished quickly, and the insulation board conveying efficiency is high .
2、升降架上安装有升降架输送带,能够对物料架进行水平输送,从而能够更好地与输送装置相配合,避免输送装置影响物料架的升降,而且不需要在高处补充保温板,保温板补充方便。2. The elevator conveyor belt is installed on the lifting frame, which can transport the material rack horizontally, so that it can better cooperate with the conveying device, avoid the conveying device from affecting the lifting of the material rack, and do not need to add insulation boards at high places. Insulation board replenishment is convenient.
3、升降架导向轮能够与升降装置主体相配合,对升降架进行导向,既能够保证升降架直线升降,保证物料架与输送装置恰好对正,又能够避免升降过程中升降架晃动,从而影响设备工作的稳定性。3. The guide wheel of the lifting frame can cooperate with the main body of the lifting device to guide the lifting frame, which can not only ensure the straight-line lifting of the lifting frame, but also ensure that the material frame and the conveying device are just aligned, and can avoid the shaking of the lifting frame during the lifting process, thereby affecting Stability of equipment work.
4、升降架导向杆能够对物料架的水平移动进行导向,从而避免物料架在移动过程中偏离升降架输送带,影响物料架与输送装置的配合;升降架导向杆的端部为倾斜状,使物料架更方便的进入到两个升降架导向杆之间。4. The guide rod of the lifting frame can guide the horizontal movement of the material rack, so as to prevent the material rack from deviating from the conveyor belt of the lifting frame during the movement, and affect the cooperation between the material rack and the conveying device; the end of the lifting frame guide rod is inclined, Make the material rack more convenient to enter between the two lifting frame guide rods.
附图说明Description of drawings
图1为升降装置的立体示意图。Fig. 1 is a three-dimensional schematic diagram of the lifting device.
图2为图1中A处的局部放大图。FIG. 2 is a partial enlarged view of A in FIG. 1 .
图3为物料架的立体示意图。Fig. 3 is a three-dimensional schematic diagram of a material rack.
图4为保温板齐边装置的立体示意图。Fig. 4 is a three-dimensional schematic diagram of an edge trimming device for a thermal insulation board.
图5为进料装置的立体示意图。Fig. 5 is a schematic perspective view of the feeding device.
图6为进料架的立体示意图。Fig. 6 is a three-dimensional schematic view of the feeding frame.
图7为切割装置的立体示意图。Fig. 7 is a schematic perspective view of the cutting device.
图8为图7中B处的局部放大图。FIG. 8 is a partial enlarged view of B in FIG. 7 .
图9为图7中C处的局部放大图。FIG. 9 is a partially enlarged view at point C in FIG. 7 .
图10为图7中D处的局部放大图。FIG. 10 is a partially enlarged view at D in FIG. 7 .
图11为切割平台的立体示意图。Fig. 11 is a schematic perspective view of the cutting platform.
图12为出料装置的立体示意图。Fig. 12 is a schematic perspective view of the discharging device.
图13为出料架的立体示意图。Fig. 13 is a three-dimensional schematic view of the discharge rack.
图中:1、物料架 101、物料架主体 102、担放部 2、中转架 3、进料架 4、进料架底座 5、升降装置 6、切割装置 7、出料架底座 8、出料架 9、中转架送料辊 10、中转架限位板11、送料台 12、送料台导向杆 13、送料台送料辊 14、送料驱动轴 15、进料架限位块 16、升降装置主体 17、升降架 18、升降架输送带 19、升降架导向杆 20、升降架导向轮 21、堆叠装置 22、切割平台 23、锯片安装架 24、切割输送带 25、切割架 26、切割锯片 27、导向套28、安装梁 29、切割架安装轴 30、切割架导向轮 31、切割架导轨 32、切割定位板 33、切割定位气缸 34、堆叠推板 35、推板气缸 36、堆叠架导向轮 37、堆叠架导向臂 38、堆叠架39、摆动架 40、切割托辊 41、立柱 42、摆动臂 43、摆动气缸 44、切割平台导向杆 45、堆叠导向板 46、切割装置主体 47、出料架限位块 48、出料台 49、出料台送料辊 50、出料架导向板 51、出料架限位板 52、出料架滚轮。In the figure: 1, material rack 101, material rack main body 102, carrying part 2, transfer rack 3, feeding rack 4, feeding rack base 5, lifting device 6, cutting device 7, discharging rack base 8, discharging Frame 9, transfer frame feed roller 10, transfer frame limit plate 11, feed table 12, feed table guide rod 13, feed table feed roller 14, feed drive shaft 15, feed frame limit block 16, lifting device main body 17, Lifting frame 18, lifting frame conveyor belt 19, lifting frame guide rod 20, lifting frame guide wheel 21, stacking device 22, cutting platform 23, saw blade installation frame 24, cutting conveyor belt 25, cutting frame 26, cutting saw blade 27, Guide sleeve 28, mounting beam 29, cutting frame mounting shaft 30, cutting frame guide wheel 31, cutting frame guide rail 32, cutting positioning plate 33, cutting positioning cylinder 34, stacking push plate 35, pushing plate cylinder 36, stacking frame guide wheel 37 , stacking frame guide arm 38, stacking frame 39, swing frame 40, cutting roller 41, column 42, swing arm 43, swing cylinder 44, cutting platform guide rod 45, stacking guide plate 46, cutting device main body 47, discharge frame Limiting block 48, discharge table 49, discharge table feed roller 50, discharge frame guide plate 51, discharge frame limit plate 52, discharge frame roller.
具体实施方式Detailed ways
图1~13是本实用新型的最佳实施例,下面结合附图1~13对本实用新型做进一步说明。Fig. 1~13 is the preferred embodiment of the present utility model, below in conjunction with accompanying drawing 1~13 the utility model is described further.
一种齐边装置的保温板送入装置,其特征在于:包括物料架1、升降装置5以及输送装置,物料架1的两侧对称设有用于担放保温板的担放部102,且担放部102沿物料架1的高度方向间隔设置有多个,物料架1设置在升降装置5上并随升降装置5同步升降,输送装置设置在升降装置5中部,且输送装置的进料端伸入物料架1内。本齐边装置的保温板送入装置的待切割的保温板的两侧担放在担放部102上,升降装置5带动物料架1下降,并与输送装置相配合,将保温板逐张输送给切割装置6,从而实现了保温板的连续逐张输送,且当物料架1上的保温板完全输送后,可将装满保温板的物料架1替换空的物料架1,物料补充迅速,保温板输送效率高。A thermal insulation board feeding device of an edge-aligning device is characterized in that it includes a material rack 1, a lifting device 5, and a conveying device. The two sides of the material rack 1 are symmetrically provided with carrying parts 102 for carrying the thermal insulation board, and There are a plurality of placing parts 102 at intervals along the height direction of the material rack 1. The material rack 1 is arranged on the lifting device 5 and rises and falls synchronously with the lifting device 5. The conveying device is arranged in the middle of the lifting device 5, and the feeding end of the conveying device extends Put it into material shelf 1. Both sides of the thermal insulation board to be cut in this edge trimming device are placed on the carrying part 102, and the lifting device 5 drives the material rack 1 to descend, and cooperates with the conveying device to transport the thermal insulation board one by one. To the cutting device 6, thereby realizing the continuous conveying of the insulation board one by one, and when the insulation board on the material rack 1 is completely conveyed, the material rack 1 filled with the insulation board can be replaced by the empty material rack 1, and the material is replenished quickly. The conveying efficiency of the insulation board is high.
下面结合具体实施例对本实用新型做进一步说明,然而熟悉本领域的人们应当了解,在这里结合附图给出的详细说明是为了更好的解释,本实用新型的结构必然超出了有限的这些实施例,而对于一些等同替换方案或常见手段,本文不再做详细叙述,但仍属于本申请的保护范围。The utility model will be further described below in conjunction with specific embodiments, yet those who are familiar with the art should understand that the detailed description provided in conjunction with the accompanying drawings is for better explanation, and the structure of the utility model must exceed these limited implementations For example, some equivalent replacement solutions or common means will not be described in detail herein, but still belong to the protection scope of this application.
如图1~2所示:升降装置5包括升降架17以及带动升降架17升降的升降动力机构,升降架17可上下滑动的安装在升降装置主体16上,升降动力机构安装在升降装置主体16上侧。升降装置主体16为长方体框架,升降架17为水平设置的长方形框架,升降架17的两侧对称安装有升降架导向轮20,升降架导向轮20转动安装在升降架17上,升降架17通过升降架导向轮20滑动安装在升降装置主体16内。升降架17上设有水平的升降架输送带18,升降架输送带18用于水平输送物料架1。升降动力机构与升降架17相连,并带动升降架17升降。As shown in Figures 1-2: the lifting device 5 includes a lifting frame 17 and a lifting power mechanism that drives the lifting frame 17 up and down. upper side. The lifting device main body 16 is a cuboid frame, and the lifting frame 17 is a rectangular frame arranged horizontally. The two sides of the lifting frame 17 are symmetrically equipped with lifting frame guide wheels 20, and the lifting frame guiding wheels 20 are rotatably installed on the lifting frame 17. The lifting frame 17 passes The lifting frame guide wheel 20 is slidably installed in the main body 16 of the lifting device. The lifting frame 17 is provided with a horizontal lifting frame conveyor belt 18, and the lifting frame conveyor belt 18 is used for horizontally conveying the material frame 1. Lifting power mechanism links to each other with lifting frame 17, and drives lifting frame 17 lifting.
升降动力机构包括升降电机、转动安装在升降装置主体16上的升降轴以及升降链条,升降轴有两个,间隔设置在升降装置主体16的上侧,且两个升降轴的轴线平行设置,两个升降轴通过链条相连并保持同步转动。升降电机安装在升降装置主体16的上侧,升降电机通过链条与一个升降轴相连并带动升降轴转动。每个升降轴的两端均安装有升降链轮,升降链条与升降链轮一一对应,升降链条的下端与升降架17固定连接,升降链条的上端由上侧绕过升降链轮后与升降装置主体16固定连接,从而带动升降架17升降,承重能力强,且升降架17受力均衡。The lifting power mechanism comprises a lifting motor, a lifting shaft and a lifting chain that are mounted on the lifting device main body 16 in rotation. The two lifting shafts are connected by a chain and keep rotating synchronously. The lifting motor is installed on the upper side of the lifting device main body 16, and the lifting motor is connected with a lifting shaft by a chain and drives the lifting shaft to rotate. Both ends of each lifting shaft are equipped with lifting sprockets, and the lifting chains correspond to the lifting sprockets one by one. The main body 16 of the device is fixedly connected, thereby driving the lifting frame 17 to rise and fall, the load-bearing capacity is strong, and the force of the lifting frame 17 is balanced.
升降架17的宽度大于物料架1的宽度,且升降架17的长度大于物料架1的长度,升降架17的两侧设有用于对物料架1进行导向的升降架导向杆19,升降架导向杆19水平设置在升降架17上侧,且升降架导向杆19的两端均由中部至端部逐渐向升降架17的外侧弯折,从而能够方便物料架1进入到两个升降架导向杆19之间的升降架17上。输送装置为切割输送带24。The width of lifting frame 17 is greater than the width of material rack 1, and the length of lifting frame 17 is greater than the length of material rack 1, and the both sides of lifting frame 17 is provided with the lifting frame guide rod 19 that is used to guide material rack 1, and lifting frame guides The rod 19 is horizontally arranged on the upper side of the lifting frame 17, and the two ends of the lifting frame guide rod 19 are gradually bent toward the outside of the lifting frame 17 from the middle to the end, so that the material rack 1 can be conveniently entered into the two lifting frame guides. On the lifting frame 17 between the rods 19. The conveying device is a cutting conveyor belt 24 .
如图3所示:物料架1包括物料架主体101,物料架主体101为长方体框架,物料架主体101的两侧对称设有担放部102,担放部102设置在物料架主体101内,位于同一水平面的两个担放部102 为一组。担放部102沿高度方向间隔设置有多组,从而能够在一个物料架1上放置多张保温板。物料架1能够将保温板间隔放置,从而能够方便保温板上的砂浆凝固,还能够避免保温板之间相互干扰,而且方便将保温板逐页输送至切割平台22上。As shown in Figure 3: the material rack 1 includes a material rack main body 101, the material rack main body 101 is a rectangular parallelepiped frame, and both sides of the material rack main body 101 are symmetrically provided with carrying parts 102, and the carrying parts 102 are arranged in the material rack main body 101, Two carrying parts 102 located on the same horizontal plane form a group. There are several sets of carrying parts 102 arranged at intervals along the height direction, so that a plurality of thermal insulation boards can be placed on one material rack 1 . The material rack 1 can place the insulation boards at intervals, thereby facilitating the solidification of the mortar on the insulation boards, avoiding mutual interference between the insulation boards, and conveniently transporting the insulation boards to the cutting platform 22 page by page.
如图4所示:一种保温板齐边装置,包括切割装置6、输送装置以及堆叠装置21,切割装置6的下侧设有切割平台22,输送装置设置在切割平台22的进料一侧,切割平台22的底部为出料侧,堆叠装置21可升降的设置在切割平台22的下侧。本保温板齐边装置的输送装置完成了将保温板输送至切割平台22上的工作,切割装置6与切割平台22相配合,对保温板进行切割,切割后的保温板在堆叠装置21上堆叠,从而取代了人工劳动,实现了自动化的切割,齐边速度快,且准确度高,切割后的保温板合格率高;堆叠装置21可升降的设置在切割平台22下侧,既能够避免堆叠时将保温板摔坏,又能够避免堆叠的保温板过多对切割平台22的工作造成妨碍。As shown in Figure 4: a thermal insulation board trimming device, including a cutting device 6, a conveying device and a stacking device 21, the lower side of the cutting device 6 is provided with a cutting platform 22, and the conveying device is arranged on the feeding side of the cutting platform 22 , the bottom of the cutting platform 22 is the discharge side, and the stacking device 21 is arranged on the lower side of the cutting platform 22 so as to be able to lift. The conveying device of this insulation board trimming device completes the work of conveying the insulation board to the cutting platform 22, the cutting device 6 cooperates with the cutting platform 22 to cut the insulation board, and the cut insulation board is stacked on the stacking device 21 , thereby replacing manual labor, realizing automatic cutting, fast edge trimming, high accuracy, and high pass rate of the insulation board after cutting; the stacking device 21 can be lifted and lowered on the lower side of the cutting platform 22, which can avoid stacking When the insulation board is broken, it can avoid that too many stacked insulation boards hinder the work of the cutting platform 22.
保温板齐边装置还包括设置在切割平台22进料一侧的进料装置、设置在堆叠装置21出料一侧的出料装置以及用于放置待切割保温板的物料架1,进料装置和切割平台22之间设有升降装置5。进料装置将放满待切割保温板的物料架1输送给升降装置5,升降装置5与输送装置相配合,将物料架1上的待切割保温板输送至切割平台22上,切割装置6与切割平台22相配合对切割平台22上的保温板进行切割,切割后的保温板落至堆叠装置21上,并在堆叠装置21上堆叠。当堆叠装置21上堆叠满保温板时,堆叠装置21将叠放好的保温板送至出料装置上,并由铲车移走。The thermal insulation board trimming device also includes a feeding device arranged on the cutting platform 22 feeding side, a discharging device arranged on the stacking device 21 discharging side and a material rack 1 for placing the thermal insulation board to be cut, and the feeding device A lifting device 5 is provided between the cutting platform 22. The feeding device transports the material rack 1 full of thermal insulation boards to be cut to the lifting device 5, and the lifting device 5 cooperates with the conveying device to transport the thermal insulation boards to be cut on the material rack 1 to the cutting platform 22, and the cutting device 6 and The cutting platform 22 cooperates to cut the insulation board on the cutting platform 22 , and the cut insulation board falls onto the stacking device 21 and is stacked on the stacking device 21 . When the stacking device 21 is full of insulation boards, the stacking device 21 sends the stacked insulation boards to the discharge device, and is removed by a forklift.
如图5~6所示:进料装置包括进料架底座4以及滑动设置在进料架底座4上的进料架3,进料架底座4为长方体框架,进料架底座4的沿物料输送方向的宽度大于进料架3的宽度。进料架3滑动设置在进料架底座4的上侧,进料架3也为长方体框架,且进料架3的长度大于物料架1的长度,进料架3的宽度大于物料架1的宽度,从而能够顺畅的将物料架1输送至升降装置5上,并将空的物料架1输送至进料架3上。进料架3的两侧均设有进料架滚轮,进料架3通过进料架滚轮滑动安装在进料架底座4上,进料架底座4的两侧设有用于对进料架3进行限位的进料架限位块15,避免进料架3与进料架底座4脱离。进料架3连接有推动其运动的送料驱动机构,进料架3的运动方向与物料架1的输送方向相反。As shown in Figures 5 to 6: the feeding device includes a feed frame base 4 and a feed frame 3 slidingly arranged on the feed frame base 4, the feed frame base 4 is a cuboid frame, and the material along the feed frame base 4 The width in the conveying direction is greater than the width of the feed frame 3 . Feeding rack 3 is slidingly arranged on the upper side of feeding rack base 4, and feeding rack 3 is also a cuboid frame, and the length of feeding rack 3 is greater than the length of material rack 1, and the width of feeding rack 3 is greater than that of material rack 1. Width, so that the material rack 1 can be smoothly transported to the lifting device 5, and the empty material rack 1 can be transported to the feeding rack 3. The both sides of feed frame 3 are all provided with feed frame roller, and feed frame 3 is installed on the feed frame base 4 by the sliding of feed frame roller, and the both sides of feed frame base 4 are provided with for feeding frame 3 Carry out the feeding rack limit block 15 of spacing, prevent feeding rack 3 from breaking away from feeding rack base 4. The feeding frame 3 is connected with a feeding driving mechanism to promote its movement, and the moving direction of the feeding frame 3 is opposite to the conveying direction of the material frame 1 .
进料架3上设有用于对物料架1进行导向的送料台导向杆12,从而在进料架3的两侧分别形成一个送料台11,送料台11为长方形,每个送料台11上均间隔设有多个送料台送料辊13,送料台送料辊13的中部直径小于两侧直径,物料架1的两侧放置在送料台送料辊13的两侧,从而完成物料的输送,送料台送料辊13连接有带动其转动的送料电机。两个送料台11交替将物料架1送至升降装置5上,且在一个送料台11将物料架1送至升降装置5上的过程中,另一个送料台11既可以承接升降装置5上空的物料架1,还可以将空的物料架1替换为装满保温板的物料架1,从而实现了连续的送料,并能够满足切割装置6实现连续性切割。The feed frame 3 is provided with a feed table guide rod 12 for guiding the material frame 1, thereby forming a feed table 11 respectively on both sides of the feed frame 3, the feed table 11 is a rectangle, and each feed table 11 has a A plurality of feeding table feeding rollers 13 are arranged at intervals, the diameter of the middle part of the feeding table feeding roller 13 is smaller than the diameter of both sides, and the two sides of the material rack 1 are placed on the both sides of the feeding table feeding roller 13, thereby completing the conveying of the material, the feeding table feeding Roller 13 is connected with the feeding motor that drives it to rotate. The two feeding tables 11 alternately send the material rack 1 to the lifting device 5, and during the process of sending the material rack 1 to the lifting device 5 by one feeding table 11, the other feeding table 11 can accept the space above the lifting device 5. The material rack 1 can also replace the empty material rack 1 with the material rack 1 filled with insulation boards, thereby realizing continuous feeding and meeting the requirements of the cutting device 6 for continuous cutting.
送料驱动机构设置在两个送料台11之间的进料架3上,送料驱动机构包括送料驱动轴14以及送料驱动电机,送料驱动轴14转动安装在进料架3下侧,且送料驱动轴14的轴线与物料架1的输送方向垂直,送料驱动轴14的两端安装有送料驱动轮,送料驱动轮转动安装在进料架底座4上侧。送料驱动电机安装在进料架3上,且送料驱动电机的输出轴通过链条与送料驱动轴14相连,并带动送料驱动轴14转动,从而实现了进料架3的移动。The feeding drive mechanism is arranged on the feed frame 3 between the two feed tables 11. The feed drive mechanism includes a feed drive shaft 14 and a feed drive motor. The axis of 14 is perpendicular to the conveying direction of material rack 1, and the two ends of feeding drive shaft 14 are equipped with feeding driving wheels, and the feeding driving wheels rotate and are installed on feeding rack base 4 upper sides. The feeding drive motor is installed on the feed frame 3, and the output shaft of the feed drive motor links to each other with the feed drive shaft 14 through a chain, and drives the feed drive shaft 14 to rotate, thereby realizing the movement of the feed frame 3.
位于前侧的送料台11的后侧设有送料台导向杆12,且前侧的送料台11的左端设有送料定位板,物料架1由前侧的送料台11的前侧送入送料台11内。前侧的送料台11的送料台导向杆12右端为由中部至端部逐渐向外的倾斜状,从而方便空的物料架1回送至该送料台11内。The rear side of the feeding table 11 on the front side is provided with a feeding table guide bar 12, and the left end of the feeding table 11 on the front side is provided with a feeding positioning plate, and the material rack 1 is sent into the feeding table by the front side of the feeding table 11 on the front side. within 11. The right end of the feed table guide bar 12 of the feed table 11 on the front side is gradually outwardly inclined from the middle to the end, so that the empty material rack 1 is conveniently returned to the feed table 11.
后侧的送料台11的前后两侧对称设有送料台导向杆12,送料台导向杆12的左右两端均为由中部至端部逐渐向外的倾斜状,从而使两个送料台导向杆12端部的间距由中部至端部逐渐增大,从而方便将物料架1送入送料台11上,且装满保温板的物料架1由后侧的送料台11的左侧送入。The front and rear sides of the feed table 11 on the rear side are symmetrically provided with feed table guide rods 12, and the left and right ends of the feed table guide rods 12 are gradually outwardly inclined from the middle to the end, so that the two feed table guide rods The spacing of 12 ends gradually increases from the middle to the end, so that the material rack 1 is sent into the feeding table 11 conveniently, and the material rack 1 filled with insulation board is sent in by the left side of the feeding table 11 on the rear side.
进料架底座4的左侧设有中转架2,中转架2用于将装满保温板的物料架1送入后侧的送料台11上,中转架2设置在进料架底座4的后侧。中转架2为长方形框架,中转架2上间隔设有多个中转架送料辊9,中转架送料辊9的结构与送料台送料辊13的结构相同,且中转架送料辊9连接有带动其转动的中转架电机。中转架2的后侧设有中转架限位板10,中转架限位板10的上部前侧为由上至下逐渐向后的倾斜状,从而既能够在放置物料架1时对物料架1进行导向,又能够对物料架1进行限位,中转架2的左侧中部设有中转架挡板,从而对物料架1进行限位。由于中转架2的存在,使物料架1均从前侧即可放入两个送料台11,不需要在进料架底座4两侧均留出放置物料架1的空间,使设备占用空间小,且通过铲车放置物料架1方便,不需要过多的调头,操作方便且补料速度快。The left side of the feed rack base 4 is provided with a transfer rack 2, the transfer rack 2 is used to send the material rack 1 filled with insulation boards to the feed table 11 on the rear side, and the transfer rack 2 is arranged at the rear of the feed rack base 4 side. The transfer frame 2 is a rectangular frame, and the transfer frame 2 is provided with a plurality of transfer frame feed rollers 9 at intervals. The structure of the transfer frame feed rollers 9 is the same as that of the feed table feed roller 13, and the transfer frame feed rollers 9 are connected to drive them to rotate. The transfer frame motor. The rear side of the transfer frame 2 is provided with a transfer frame limit plate 10, and the upper front side of the transfer frame limit plate 10 is gradually inclined backward from top to bottom, so that the material frame 1 can be adjusted when the material frame 1 is placed. The guide can be used to limit the position of the material rack 1, and the middle part of the left side of the transfer frame 2 is provided with a transfer frame baffle, so as to limit the position of the material rack 1. Due to the existence of the transfer rack 2, the material rack 1 can be put into two feeding tables 11 from the front side, and there is no need to reserve a space for placing the material rack 1 on both sides of the feed rack base 4, so that the equipment occupies a small space. Moreover, it is convenient to place the material rack 1 by a forklift, without too many U-turns, and the operation is convenient and the feeding speed is fast.
如图7所示:切割装置6、切割平台22以及输送装置均安装在切割装置主体46上,切割装置主体46为长方体框架,堆叠装置21可上下滑动的安装在切割装置主体46上。切割平台22设置在切割装置6和堆叠装置21之间,输送装置设置在切割平台22和升降装置5之间,且输送装置一端与切割平台22相连,另一端伸入升降装置主体16上部内。在本实施例中,输送装置为切割输送带24。As shown in Figure 7: the cutting device 6, the cutting platform 22 and the conveying device are all installed on the cutting device main body 46, the cutting device main body 46 is a cuboid frame, and the stacking device 21 is mounted on the cutting device main body 46 so as to slide up and down. The cutting platform 22 is arranged between the cutting device 6 and the stacking device 21, and the conveying device is arranged between the cutting platform 22 and the lifting device 5, and one end of the conveying device is connected with the cutting platform 22, and the other end extends into the upper part of the lifting device main body 16. In this embodiment, the conveying device is a cutting conveyor belt 24 .
堆叠装置21包括堆叠架38以及带动堆叠架38升降的堆叠升降机构。堆叠架38为水平设置的长方形框架,堆叠架38的宽度大于保温板的宽度,且堆叠架38的长度大于切割平台22的长度。堆叠架38上间隔设置有多个堆叠架输送辊,多个堆叠架输送辊均水平设置,堆叠架38上还安装有带动堆叠架输送辊转动的堆叠架输送电机,堆叠架输送电机的输出轴通过链条带动堆叠架输送辊转动,从而将切割好的保温板送出。堆叠架输送辊为圆柱状。堆叠升降机构设置在切割装置主体46的上侧,且堆叠升降机构与堆叠架38相连,并带动堆叠架38升降。The stacking device 21 includes a stacking frame 38 and a stacking lifting mechanism that drives the stacking frame 38 up and down. The stacking frame 38 is a rectangular frame arranged horizontally, the width of the stacking frame 38 is greater than the width of the insulation board, and the length of the stacking frame 38 is greater than the length of the cutting platform 22 . On the stacking frame 38, a plurality of stacking frame conveying rollers are arranged at intervals, and a plurality of stacking frame conveying rollers are arranged horizontally. The chain drives the conveying roller of the stacking frame to rotate, so that the cut insulation board is sent out. The stacking frame conveying roller is cylindrical. The stacking lifting mechanism is arranged on the upper side of the cutting device main body 46, and the stacking lifting mechanism is connected with the stacking frame 38, and drives the stacking frame 38 to lift.
堆叠架38的两侧设有对下落的保温板进行导向的堆叠导向板45,堆叠导向板45为长方形板,堆叠导向板45安装在堆叠架38上的切割装置主体46上,从而保证堆叠的保温板的两侧对齐。The both sides of stacking frame 38 are provided with the stacking guide plate 45 that the insulation plate that falls is guided, and stacking guide plate 45 is a rectangular plate, and stacking guide plate 45 is installed on the cutting device main body 46 on the stacking frame 38, thereby guarantees stacking. Align the sides of the insulation board.
堆叠升降机构包括堆叠升降电机、堆叠升降轴以及堆叠链条,堆叠升降轴转动安装在切割装置主体46的上侧,两个堆叠升降轴的轴线平行设置,两个堆叠升降轴通过链条相连并保持同步转动,堆叠升降电机设置在切割装置主体46上侧,堆叠升降电机通过链条带动堆叠升降轴转动。堆叠升降轴的两端均安装有堆叠升降链轮,堆叠链条一端与堆叠架8固定连接,另一端由堆叠升降链轮上侧绕过堆叠升降链轮并与切割装置主体46固定连接,堆叠升降电机与堆叠升降轴相连并带动堆叠升降轴转动。The stacking lifting mechanism includes a stacking lifting motor, a stacking lifting shaft and a stacking chain. The stacking lifting shaft is rotatably installed on the upper side of the main body 46 of the cutting device. The axes of the two stacking lifting shafts are arranged in parallel. The two stacking lifting shafts are connected by a chain and kept in sync. Rotate, the stacking lifting motor is arranged on the upper side of the cutting device main body 46, and the stacking lifting motor drives the stacking lifting shaft to rotate through the chain. Both ends of the stacking lifting shaft are equipped with stacking lifting sprockets, one end of the stacking chain is fixedly connected with the stacking frame 8, and the other end is bypassed by the upper side of the stacking lifting sprocket and fixedly connected with the main body 46 of the cutting device. The motor is connected with the stacking lifting shaft and drives the stacking lifting shaft to rotate.
如图8所示:切割装置6包括切割架25、转动安装在切割架25上的切割锯片26以及切割电机。切割架25连接有带动其运动的切割行走装置,切割架25的移动方向与保温板的输送方向垂直,从而能够通过切割锯片26对保温板的两端进行切割并齐边。切割电机安装在切割架25上,切割锯片26通过锯片安装轴转动安装在切割架25上,切割电机的输出轴通过链条与锯片安装轴相连并带动锯片安装轴转动,切割锯片26与锯片安装轴同步转动。在本实施例中,切割锯片26设置有三个,锯片安装轴和切割电机均与切割锯片26一一对应,从而既能够实现对保温板两端的齐边工作,还能够同步实现保温板的切断工作。切割行走装置带动切割架25移动,从而完成保温板的切割。切割装置主体46上还设有为切割装置6送水的喷水管,喷水管安装在切割架25上并随切割架25同步移动,喷水管的出水端设置在切割锯片26一侧,且喷水管与切割锯片26一一对应。As shown in FIG. 8 , the cutting device 6 includes a cutting frame 25 , a cutting saw blade 26 rotatably mounted on the cutting frame 25 , and a cutting motor. Cutting frame 25 is connected with the cutting walking device that drives its motion, and the moving direction of cutting frame 25 is perpendicular to the conveying direction of insulation board, thereby can cut and align the two ends of insulation board by cutting saw blade 26. The cutting motor is installed on the cutting frame 25, and the cutting saw blade 26 is installed on the cutting frame 25 through the rotation of the saw blade mounting shaft. 26 rotate synchronously with saw blade mounting shaft. In this embodiment, there are three cutting saw blades 26, and the saw blade installation shaft and the cutting motor are in one-to-one correspondence with the cutting saw blades 26, so that both ends of the insulation board can be aligned, and the heat preservation board can also be realized synchronously. cutting work. The cutting traveling device drives the cutting frame 25 to move, thereby completing the cutting of the insulation board. The cutting device main body 46 is also provided with a water spray pipe for cutting device 6 to deliver water. The water spray pipe is installed on the cutting frame 25 and moves synchronously with the cutting frame 25. The water outlet end of the water spray pipe is arranged on the cutting saw blade 26 side. And the water spray pipe corresponds to the cutting saw blade 26 one by one.
切割架25上侧设有水平的安装梁28,安装梁28的轴线与保温板的输送方向平行。安装梁28上设有锯片安装架23,锯片安装架23的上侧设有导向套27,锯片安装架23与导向套27固定连接并保持同步移动,导向套27可轴向滑动的套设在安装梁28外。导向套27连接有用于调节锯片安装架23位置的调节机构。锯片安装轴转动安装在锯片安装架23上,且锯片安装轴水平设置,切割电机安装在导向套27上侧。A horizontal installation beam 28 is arranged on the upper side of the cutting frame 25, and the axis of the installation beam 28 is parallel to the conveying direction of the insulation board. The mounting beam 28 is provided with a saw blade mounting frame 23, and the upper side of the saw blade mounting frame 23 is provided with a guide sleeve 27. The saw blade mounting frame 23 is fixedly connected with the guide sleeve 27 and keeps moving synchronously. The guide sleeve 27 can slide axially. Set outside the mounting beam 28. The guide sleeve 27 is connected with an adjusting mechanism for adjusting the position of the saw blade mounting frame 23 . The saw blade installation shaft is rotatably installed on the saw blade installation frame 23, and the saw blade installation shaft is horizontally arranged, and the cutting motor is installed on the guide sleeve 27 upper side.
调节机构包括调节杆以及调节螺母,调节杆转动安装在安装梁28上,且调节杆与安装梁28的轴线平行,调节螺母安装在导向套27上,调节杆上设有与调节螺母相配合的螺纹,调节杆的端部伸入调节螺母内并与调节螺母通过螺纹连接,转动调节杆即可调节导向套27的位置,进而调节切割锯片26的位置,从而能够根据生产的保温板的尺寸调节,使本齐边装置能够适应任意尺寸的保温板的齐边工作,适用范围广。The adjustment mechanism includes an adjustment rod and an adjustment nut. The adjustment rod is rotatably mounted on the installation beam 28, and the adjustment rod is parallel to the axis of the installation beam 28. The adjustment nut is installed on the guide sleeve 27. screw thread, the end of the adjusting rod extends into the adjusting nut and is threadedly connected with the adjusting nut, the position of the guide sleeve 27 can be adjusted by turning the adjusting rod, and then the position of the cutting saw blade 26 can be adjusted, so that it can be adjusted according to the size of the insulation board produced Adjustment, so that the trimming device can adapt to the trimming work of insulation boards of any size, and has a wide range of applications.
切割行走装置包括切割架安装轴29以及切割行走电机,切割架安装轴29转动安装在切割架25下侧,切割架安装轴29有间隔设置的两个,且切割架安装轴29的轴线与安装梁28的轴线平行,切割架安装轴29的两端均安装有切割架导向轮30,切割装置主体46上设有切割架导轨31,切割架导轨31有水平设置的两个,且切割架导轨31的轴线与切割架安装轴29的轴线垂直。每个切割架安装轴29两端的切割架导向轮30分别担放在两个切割架导轨31上,切割架导轨31和切割架导向轮30相配合,形成了用于对切割架25导向的切割机导向机构,从而保证切割架25直线移动,保证保温板的齐边效果,避免出现不合格品。切割行走电机安装在切割架25上,切割行走电机通过链条与切割架安装轴29相连并带动切割架安装轴29转动,从而实现了切割架25的行走。Cutting walking device comprises cutting frame mounting shaft 29 and cutting travel motor, and cutting frame mounting shaft 29 is rotated and installed on the cutting frame 25 lower side, and cutting frame mounting shaft 29 has two that are arranged at intervals, and the axis of cutting frame mounting shaft 29 and installation The axes of the beam 28 are parallel, and the two ends of the cutting frame installation shaft 29 are equipped with a cutting frame guide wheel 30, and the cutting device main body 46 is provided with a cutting frame guide rail 31, and the cutting frame guide rail 31 has two horizontally arranged, and the cutting frame guide rail The axis of 31 is perpendicular to the axis of cutting frame mounting shaft 29. The cutting frame guide wheels 30 at each cutting frame mounting shaft 29 two ends are placed on two cutting frame guide rails 31 respectively, and the cutting frame guide rails 31 and the cutting frame guide wheels 30 cooperate to form a cutting frame for guiding the cutting frame 25. Machine guide mechanism, so as to ensure that the cutting frame 25 moves in a straight line, ensures the edge-alignment effect of the insulation board, and avoids unqualified products. Cutting walking motor is installed on the cutting frame 25, and cutting walking motor links to each other with cutting frame mounting shaft 29 by chain and drives cutting frame mounting shaft 29 to rotate, thus has realized the walking of cutting frame 25.
如图9所示:切割平台22远离切割输送带24的一端设有保温板定位机构,保温板定位机构用于对待切割的保温板进行定位,从而保证保温板的切割位置准确且一致,保证了保温板质量和尺寸精度。切割平台22的两端还对称设有堆叠定位机构,堆叠定位机构设置在保温板定位机构下侧,从而保证了保温板堆叠整齐。As shown in Figure 9: the cutting platform 22 is provided with a thermal insulation board positioning mechanism away from the end of the cutting conveyor belt 24, and the thermal insulation board positioning mechanism is used to locate the thermal insulation board to be cut, thereby ensuring that the cutting position of the thermal insulation board is accurate and consistent, ensuring Insulation board quality and dimensional accuracy. Both ends of the cutting platform 22 are symmetrically provided with a stacking positioning mechanism, and the stacking positioning mechanism is arranged on the lower side of the thermal insulation board positioning mechanism, thereby ensuring that the thermal insulation boards are stacked neatly.
保温板定位机构包括切割定位板32以及切割定位气缸33,切割定位气缸33水平安装在切割平台22上侧,切割定位板32安装在切割定位气缸33的活塞杆上。切割定位板32的上部靠近保温板的一侧设有内凹的定位口,当切割输送带24将保温板送入切割平台22后,保温板远离切割输送带24的一端进入到切割定位板32的定位口内,此时切割定位气缸33推动切割定位板32向靠近切割输送带24的方向移动一段距离,从而完成带切割保温板的定位,并使保温板的待切割位置与切割锯片26对正。切割定位气缸33通过切割定位板32推动保温板移动,从而使保温板的待切割位置与切割装置6对正,提高了切割精度,而且能过保证保温板切割位置准确;切割定位板32的上部设有定位口,使切割定位板32能够更好地与保温板贴合。The insulation board positioning mechanism includes a cutting positioning plate 32 and a cutting positioning cylinder 33, the cutting positioning cylinder 33 is horizontally installed on the cutting platform 22 upper side, and the cutting positioning plate 32 is installed on the piston rod of the cutting positioning cylinder 33. The upper part of the cutting positioning plate 32 is provided with a recessed positioning opening on the side close to the insulation board. When the cutting conveyor belt 24 sends the insulation board to the cutting platform 22, the end of the insulation board away from the cutting conveyor belt 24 enters the cutting positioning plate 32. At this time, the cutting positioning cylinder 33 pushes the cutting positioning plate 32 to move a certain distance towards the direction of the cutting conveyor belt 24, thereby completing the positioning of the cutting insulation board, and making the position to be cut of the insulation board aligned with the cutting saw blade 26 just. The cutting positioning cylinder 33 pushes the insulation board to move through the cutting positioning board 32, so that the position to be cut of the insulation board is aligned with the cutting device 6, which improves the cutting accuracy and can ensure that the cutting position of the insulation board is accurate; the top of the cutting positioning board 32 A positioning opening is provided, so that the cutting positioning plate 32 can fit better with the heat preservation board.
堆叠定位机构包括堆叠推板34以及推板气缸35,堆叠推板34为倒置的“T”形板,堆叠推板34的竖直部上端转动安装在切割装置主体46上,推板气缸35安装在切割装置主体46上,推板气缸35的活塞杆与堆叠推板34相连并推动堆叠推板34摆动。堆叠推板34能够对下落的保温板进行导向,从而保证保温板堆叠整齐,推板气缸35推动堆叠推板34摆动,从而能够对叠放好的保温板对正,使叠放好的保温板两端对齐,既方便保温板的存放,又避免保温板堆叠不齐导致保温板倾倒摔坏。The stack positioning mechanism includes a stack push plate 34 and a push plate cylinder 35. The stack push plate 34 is an inverted “T” shaped plate. On the main body 46 of the cutting device, the piston rod of the push plate cylinder 35 is connected with the stack push plate 34 and pushes the stack push plate 34 to swing. The stacking push plate 34 can guide the falling insulation boards, thereby ensuring that the insulation boards are stacked neatly, and the push plate cylinder 35 pushes the stacking push plate 34 to swing, so that the stacked insulation boards can be aligned, so that the stacked insulation boards The two ends are aligned, which not only facilitates the storage of the insulation board, but also prevents the insulation board from being dumped and damaged due to uneven stacking of the insulation board.
如图10所示:堆叠架38和切割装置主体46之间设有堆叠架导向机构。堆叠架导向机构包括堆叠架导向臂37以及转动安装在堆叠架导向臂37上的堆叠架导向轮36。堆叠架导向臂37有四个,对称设置在堆叠架38的两侧,堆叠架导向轮36与堆叠架导向臂37一一对应,堆叠架导向轮36设置在切割装置主体46内侧,并支撑在切割装置主体46上,从而对堆叠架38进行导向,保证堆叠架38直线升降,又能够避免堆叠架38在升降过程中晃动,既方便保证保温板堆叠整齐,又能够避免晃动导致堆叠的保温板倾倒。切割装置主体46上可拆卸的安装有卡固螺栓,卡固螺栓通过堆叠架导向轮36对堆叠架38进行卡固,避免设备不工作时堆叠架38忽然下落引发安全事故。As shown in FIG. 10 , a stacking frame guiding mechanism is provided between the stacking frame 38 and the main body 46 of the cutting device. The stacker guide mechanism includes a stacker guide arm 37 and a stacker guide wheel 36 rotatably mounted on the stacker guide arm 37 . There are four stacker guide arms 37, symmetrically arranged on both sides of the stacker 38, the stacker guide wheels 36 correspond to the stacker guide arms 37 one by one, the stacker guide wheels 36 are arranged on the inside of the cutting device main body 46, and are supported on cutting device main body 46, so as to guide the stacking frame 38, to ensure that the stacking frame 38 rises and falls in a straight line, and to avoid the shaking of the stacking frame 38 during the lifting process, which is convenient to ensure that the insulation boards are stacked neatly, and can avoid shaking to cause stacked insulation boards dump. The cutting device main body 46 is detachably provided with fastening bolts, and the fastening bolts fasten the stacking frame 38 through the stacking frame guide wheels 36, so as to avoid safety accidents caused by the sudden fall of the stacking frame 38 when the equipment is not working.
如图11所示:切割平台22包括间隔设置的两个摆动架39以及摆动气缸43。切割装置主体46的两侧对称设有立柱41,且切割装置主体46的每一侧均间隔设有两个立柱41,位于同一侧的两个立柱41的间距大于保温板的宽度。摆动架39为开口向上的“匚”形,摆动架39的竖直部的两端均转动安装在两侧的立柱41上,从而使两个摆动架39间隔设置,且两个摆动架39的间距大于保温板的宽度。每个摆动架39上均间隔设置有多个承托部,承托部为水平设置的切割托辊40,切割托辊40设置在摆动架39内侧,且切割托辊40设置在摆动架39上侧,从而能够避免摆动架39对切割锯片26的切割工作造成妨碍。每个摆动架39的上侧还设有用于对保温板进行导向的切割平台导向杆44,切割平台导向杆44与摆动架39位于同一竖直面内。每个摆动架39的中部连接有水平的摆动臂42,摆动臂42的一端与摆动架39固定连接,另一端为自由端。摆动气缸43设置在摆动臂42下侧,摆动气缸43转动安装在切割装置主体46上,摆动气缸43的活塞杆与摆动臂42的自由端转动连接,摆动气缸43通过摆动臂42推动摆动架39摆动,使摆动气缸43与摆动架39间隔设置,即能够增大摆动气缸43的力矩,又能够避免摆动气缸43对保温板的切割造成妨碍。当切割平台22上的保温板切割完成后,两侧的摆动气缸43推动摆动架39摆动,从而使保温板由两个摆动架39之间下落至下侧的叠放架38上。As shown in FIG. 11 , the cutting platform 22 includes two swing frames 39 and swing cylinders 43 arranged at intervals. Both sides of the cutting device main body 46 are symmetrically provided with uprights 41, and each side of the cutting device main body 46 is provided with two uprights 41 at intervals, and the distance between the two uprights 41 on the same side is greater than the width of the insulation board. The swing frame 39 is a "匚" shape with an upward opening, and the two ends of the vertical part of the swing frame 39 are rotated and installed on the columns 41 on both sides, so that the two swing frames 39 are arranged at intervals, and the two swing frames 39 are arranged at intervals. The spacing is greater than the width of the insulation board. Each swing frame 39 is provided with a plurality of supporting parts at intervals. The supporting parts are cutting idlers 40 arranged horizontally. side, so as to prevent the swing frame 39 from obstructing the cutting work of the cutting saw blade 26 . The upper side of each swing frame 39 is also provided with a cutting platform guide rod 44 for guiding the insulation board, and the cutting platform guide rod 44 and the swing frame 39 are located in the same vertical plane. The middle part of each swing frame 39 is connected with a horizontal swing arm 42, one end of the swing arm 42 is fixedly connected with the swing frame 39, and the other end is a free end. The swing cylinder 43 is arranged on the lower side of the swing arm 42, and the swing cylinder 43 is rotatably installed on the cutting device main body 46. The piston rod of the swing cylinder 43 is rotatably connected with the free end of the swing arm 42. Swing, so that the swing cylinder 43 and the swing frame 39 are spaced apart, the moment of the swing cylinder 43 can be increased, and the swing cylinder 43 can be prevented from hindering the cutting of the insulation board. After the cutting of the insulation board on the cutting platform 22 is completed, the swing cylinders 43 on both sides push the swing frame 39 to swing, so that the insulation board falls from between the two swing frames 39 to the stacking frame 38 on the lower side.
在本实施例中,堆叠定位机构和保温板定位机构均安装在立柱41上。In this embodiment, both the stacking positioning mechanism and the insulation board positioning mechanism are installed on the column 41 .
切割输送带24设置在切割平台22的进料端,且切割输送带24的两侧设有用于对保温板进行导向的切割输送带导向板,切割输送带导向板的左端为由左至右逐渐向内的倾斜状,从而使保温板能够更顺畅的进入到两侧的切割输送带导向板之间,并对保温板进行导向,保证切割整齐,且尺寸精确。Cutting conveyor belt 24 is arranged on the feeding end of cutting platform 22, and the both sides of cutting conveyor belt 24 are provided with the cutting conveyor belt guide plate that is used to guide thermal insulation board, and the left end of cutting conveyor belt guide plate is from left to right gradually The inward slope enables the insulation board to enter between the guide plates of the cutting conveyor belt on both sides more smoothly, and guide the insulation board to ensure neat cutting and accurate size.
如图12~13所示:出料机构包括出料架底座7以及出料架8,出料架底座7为长方形框架,出料架底座7的宽度大于出料架8的宽度,出料架底座7的两侧对称设有用于对出料架8进行限位的出料架限位块47,从而避免出料架8与出料架底座7脱离。出料架8也为长方形框架,出料架8的中部设有出料架安装板,从而将出料架8分隔成两个出料台48,每个出料台48上均间隔设有多个出料台送料辊49,出料台送料辊49为圆柱状,每个出料台48的出料台送料辊49均连接有带动其转动的出料台电机,从而将保温板整体输送至出料台48上部。出料台送料辊49凸出于出料架8设置,从而方便用铲车将出料架8上的保温板移出。出料台48的宽度大于保温板的宽度,且出料台48的长度大于切割后保温板的长度。As shown in Figures 12 to 13: the discharge mechanism includes a discharge frame base 7 and a discharge frame 8, the discharge frame base 7 is a rectangular frame, the width of the discharge frame base 7 is greater than the width of the discharge frame 8, and the discharge frame Both sides of the base 7 are symmetrically provided with a discharge frame limit block 47 for limiting the discharge frame 8 , so as to prevent the discharge frame 8 from being separated from the discharge frame base 7 . The discharge frame 8 is also a rectangular frame, and the middle part of the discharge frame 8 is provided with a discharge frame mounting plate, thereby the discharge frame 8 is divided into two discharge platforms 48, and each discharge platform 48 is evenly spaced with multiple A discharge table feed roller 49, the discharge table feed roller 49 is cylindrical, and the discharge table feed roller 49 of each discharge table 48 is connected with a discharge table motor that drives it to rotate, so that the insulation board is integrally transported to Discharging table 48 tops. The discharge table feeding roller 49 protrudes from the discharge rack 8 and is arranged so as to facilitate the removal of the insulation plate on the discharge rack 8 with a forklift. The width of the discharge platform 48 is greater than the width of the insulation board, and the length of the discharge platform 48 is greater than the length of the insulation board after cutting.
出料架8的两侧转动安装有出料架滚轮52,出料架8通过出料架滚轮52转动安装在出料架底座7上,出料架滚轮52连接有带动其转动的出料架移动电机,从而实现出料架8的行走。使两个出料台48实现了交替工作,即一个出料台48承接堆叠架38上的保温板时,可以通过铲车将另一个出料台48上的保温板移走。The both sides of discharge frame 8 are rotated and installed with discharge frame roller 52, and discharge frame 8 is installed on the discharge frame base 7 by the rotation of discharge frame roller 52, and discharge frame roller 52 is connected with the discharge frame that drives it to rotate. Mobile motor, thereby realizes the walking of discharging frame 8. The two discharge platforms 48 are realized to work alternately, that is, when one discharge platform 48 accepts the insulation board on the stacking frame 38, the insulation board on the other discharge platform 48 can be removed by a forklift.
出料架8的两侧对称设有用于对导向板导向的出料架导向板50,从而对进入到出料架8上的保温板进行导向,出料架8远离进料端的一端设有出料架限位板51,从而避免保温板与出料架8脱离。Both sides of the discharge frame 8 are symmetrically provided with a discharge frame guide plate 50 for guiding the guide plate, so as to guide the insulation board entering the discharge frame 8, and the end of the discharge frame 8 away from the feed end is provided with a discharge frame. The material rack limiter plate 51, thereby avoids insulation plate and discharge rack 8 to break away from.
一种上述的保温板齐边装置的齐边工艺,其特征在于:包括如下步骤:A kind of trimming process of the above-mentioned thermal insulation board trimming device, is characterized in that: comprises the following steps:
(1)输送装置将待切割保温板逐张输送至切割平台22上;(1) The conveying device conveys the thermal insulation boards to be cut to the cutting platform 22 one by one;
将装满带切割保温板的物料架1直接放置在进料架3上,或将装满带切割保温板的物料架1放置在中转架2上,再由中转架2将物料架1送入进料架3上。升降架17下降至与进料架3水平,然后将空的物料架1送入进料架3的空的送料台11上,进料架3移动至装满保温板的物料架1与升降架17对齐,且送料台11将装满保温板的物料架1送至升降架17上。空的物料架1由铲车直接从进料架3上移走,或由中转架2上移走。Place the material rack 1 full of cutting insulation boards directly on the feeding rack 3, or place the material rack 1 full of cutting insulation boards on the transfer rack 2, and then the transfer rack 2 will send the material rack 1 into On the feeding rack 3. Lifting rack 17 descends to the level with feeding rack 3, then empty material rack 1 is sent to the empty feeding table 11 of feeding rack 3, and feeding rack 3 moves to material rack 1 filled with insulation board and lifting rack 17 are aligned, and the feeding platform 11 sends the material rack 1 full of insulation boards to the elevating frame 17. The empty material rack 1 is removed directly from the feed rack 3 by a forklift, or removed from the transfer rack 2 .
升降架17带动装满保温板的物料架1移动至升降装置主体16的最上方,然后升降架17带动物料架1向靠近切割输送带24的方向移动,并使切割输送带24伸入物料架1最下侧的保温板下侧,切割输送带24将保温板输送至切割平台22上,保温板担放在两个摆动架39的切割托辊40上。升降架17带动物料架1下移并使切割输送带24再次与最下侧的保温板接触,从而将保温板逐张输送至切割平台22上。The lifting frame 17 drives the material rack 1 filled with insulation boards to move to the top of the lifting device main body 16, and then the lifting frame 17 drives the material rack 1 to move in a direction close to the cutting conveyor belt 24, and makes the cutting conveyor belt 24 stretch into the material rack 1. On the lower side of the lowermost insulation board, the cutting conveyor belt 24 transports the insulation board to the cutting platform 22, and the insulation board is placed on the cutting rollers 40 of the two swing frames 39. The lifting frame 17 drives the material rack 1 to move down and makes the cutting conveyor belt 24 contact with the lowermost heat preservation board again, thereby conveying the heat preservation board to the cutting platform 22 one by one.
(2)切割装置6与切割平台22相配合,对切割平台22上的保温板切割;(2) The cutting device 6 cooperates with the cutting platform 22 to cut the insulation board on the cutting platform 22;
保温板输送至切割平台22上后,切割定位气缸33通过切割定位板32推动保温板向靠近切割输送带24的方向移动,从而使保温板与切割装置6的切割锯片26对正。切割架25带动切割锯片26移动,从而完成保温板的齐边切割。After the insulation board is delivered to the cutting platform 22, the cutting positioning cylinder 33 pushes the insulation board to move towards the direction of the cutting conveyor belt 24 through the cutting positioning plate 32, so that the insulation board and the cutting saw blade 26 of the cutting device 6 are aligned. The cutting frame 25 drives the cutting saw blade 26 to move, thereby completing the edge-aligned cutting of the insulation board.
(3)切割好的保温板在堆叠装置21上堆叠,且堆叠装置21带动堆叠的保温板下降。(3) The cut insulation boards are stacked on the stacking device 21 , and the stacking device 21 drives the stacked insulation boards down.
切割完成后,摆动气缸43推动摆动架39摆动,切割好的保温板由两个摆动架39之间下落至堆叠架38上,同时堆叠架38下移一张保温板厚度的距离,以待下一张保温板下落。待堆叠架38上的保温板堆叠至指定数量后,推板气缸35推动堆叠推板34摆动,并使堆叠好的保温板对齐。堆叠架38将堆叠好的保温板输送至出料架8上,并由铲车运走,完成保温板的齐边工作。After the cutting is completed, the swing cylinder 43 pushes the swing frame 39 to swing, and the cut insulation board falls from between the two swing frames 39 to the stacking frame 38, and the stacking frame 38 moves down by a distance of the thickness of the insulation board for the next step. An insulation board falls. After the thermal insulation boards on the stacking rack 38 are stacked to a specified number, the push plate cylinder 35 pushes the stacked push pedal 34 to swing, and aligns the stacked thermal insulation boards. The stacking frame 38 transports the stacked insulation boards to the discharge rack 8, and is transported away by a forklift to complete the trimming of the insulation boards.
以上所述,仅是本实用新型的较佳实施例而已,并非是对本实用新型作其它形式的限制,任何熟悉本专业的技术人员可能利用上述揭示的技术内容加以变更或改型为等同变化的等效实施例。但是凡是未脱离本实用新型技术方案内容,依据本实用新型的技术实质对以上实施例所作的任何简单修改、等同变化与改型,仍属于本实用新型技术方案的保护范围。The above is only a preferred embodiment of the utility model, and is not intended to limit the utility model in other forms. Any skilled person who is familiar with this profession may use the technical content disclosed above to change or remodel it into an equivalent change. Equivalent embodiment. However, any simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the present utility model without departing from the content of the technical solution of the utility model still belong to the protection scope of the technical solution of the utility model.
Claims (8)
- A kind of 1. warming plate feeder of edge alignment device, it is characterised in that:Including material frame(1), lowering or hoisting gear(5)It is and defeated Send device, material frame(1)Both sides be arranged with and put the load of warming plate for carrying on a shoulder pole and put portion(102), and load puts portion(102)Along material Frame(1)Short transverse be arranged at intervals with multiple, material frame(1)It is arranged on lowering or hoisting gear(5)Above and with lowering or hoisting gear(5)It is synchronous Lifting, conveying device are arranged on lowering or hoisting gear(5)Middle part, and the feed end of conveying device stretches into material frame(1)It is interior.
- 2. the warming plate feeder of edge alignment device according to claim 1, it is characterised in that:Described material frame(1) For cuboid framework, and material frame(1)Width be more than warming plate width, load put portion(102)It is arranged on material frame(1)It is interior.
- 3. the warming plate feeder of edge alignment device according to claim 1, it is characterised in that:Described conveying device is Cut conveyer belt(24), cut conveyer belt(24)Width be more than the width of warming plate, and be less than material frame(1)Width.
- 4. the warming plate feeder of edge alignment device according to claim 1, it is characterised in that:Described lowering or hoisting gear (5)Including lowering or hoisting gear main body(16), be slidably mounted on lowering or hoisting gear main body(16)Interior crane(17)And lifting drive Mechanism, lifting drive mechanism are arranged on lowering or hoisting gear main body(16)Upside, lifting drive mechanism and crane(17)It is connected, and band Dynamic crane(17)Lifting.
- 5. the warming plate feeder of edge alignment device according to claim 4, it is characterised in that:Described crane(17) For horizontally disposed cuboid framework, crane(17)On be horizontally installed with crane conveyer belt(18), material frame(1)It is placed on Crane conveyer belt(18)On.
- 6. the warming plate feeder of edge alignment device according to claim 4, it is characterised in that:Described crane(17) Both sides be arranged with crane directive wheel(20), crane directive wheel(20)It is rotatably installed in crane(17)On, crane (17)Pass through crane directive wheel(20)It is slidably mounted on lowering or hoisting gear main body(16)On.
- 7. the warming plate feeder of edge alignment device according to claim 5, it is characterised in that:Described crane(17) Both sides be arranged with for material frame(1)The crane guide rod of guiding(19).
- 8. the warming plate feeder of edge alignment device according to claim 7, it is characterised in that:Described crane is oriented to Bar(19)Both ends be from middle part to end gradually to crane(17)Outside is bent skewed.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720929874.4U CN207058852U (en) | 2017-07-28 | 2017-07-28 | A kind of warming plate feeder of edge alignment device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720929874.4U CN207058852U (en) | 2017-07-28 | 2017-07-28 | A kind of warming plate feeder of edge alignment device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207058852U true CN207058852U (en) | 2018-03-02 |
Family
ID=61516824
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720929874.4U Expired - Fee Related CN207058852U (en) | 2017-07-28 | 2017-07-28 | A kind of warming plate feeder of edge alignment device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207058852U (en) |
-
2017
- 2017-07-28 CN CN201720929874.4U patent/CN207058852U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109129724B (en) | A highly automated plate processing production line for conveying plates | |
| CN109049145B (en) | A non-damaging high-quality plate processing production line | |
| CN104876039B (en) | Cardboard automatic charging machine | |
| CN110127258A (en) | A kind of automatic access material library | |
| CN111215695A (en) | Automatic aluminum bar cutting, stacking and unstacking production line | |
| US12421039B2 (en) | Automatic high-speed stacking machine | |
| CN110408759A (en) | An automatic feeding device | |
| CN111319936A (en) | A flexible production line for sawing and stacking aluminum bars | |
| CN109304747A (en) | A kind of Cutting platform of insulation board edge alignment device | |
| CN212711414U (en) | Feeding equipment | |
| CN207058721U (en) | A kind of feed arrangement of edge alignment device | |
| CN216426054U (en) | High-order hacking machine | |
| CN207061748U (en) | A kind of lowering or hoisting gear of edge alignment device | |
| CN207058853U (en) | A kind of warming plate edge alignment device | |
| CN207058739U (en) | A kind of stack device of warming plate edge alignment device | |
| CN209427657U (en) | artifact caching facility | |
| CN110436246A (en) | A kind of connection conveying equipment | |
| CN207058852U (en) | A kind of warming plate feeder of edge alignment device | |
| CN216638183U (en) | Stacking device used after plate cutting | |
| CN215556487U (en) | A mechanism for material distribution and vertical feeding in bar trough | |
| CN105905609B (en) | A kind of heavy and frangible quick despatch transmission transport device | |
| CN207058679U (en) | A kind of Cutting platform of warming plate edge alignment device | |
| CN107310019B (en) | Trimming device and trimming process for heat insulation board | |
| CN207808239U (en) | A kind of sponge production system | |
| CN109304755A (en) | A kind of feeding device of edge alignment device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180302 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |