CN207048053U - Corrosion resistant steelframe attachment structure - Google Patents

Corrosion resistant steelframe attachment structure Download PDF

Info

Publication number
CN207048053U
CN207048053U CN201721020201.3U CN201721020201U CN207048053U CN 207048053 U CN207048053 U CN 207048053U CN 201721020201 U CN201721020201 U CN 201721020201U CN 207048053 U CN207048053 U CN 207048053U
Authority
CN
China
Prior art keywords
train wheel
wheel bridge
girder steel
steel
attachment structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721020201.3U
Other languages
Chinese (zh)
Inventor
余明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Shenghong Technology Co Ltd
Original Assignee
Guizhou Shenghong Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Shenghong Technology Co Ltd filed Critical Guizhou Shenghong Technology Co Ltd
Priority to CN201721020201.3U priority Critical patent/CN207048053U/en
Application granted granted Critical
Publication of CN207048053U publication Critical patent/CN207048053U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of corrosion resistant steelframe attachment structure, including steel column, girder steel, steel column is fixedly connected with girder steel, wherein girder steel is I-beam, train wheel bridge and lower plate are provided with steel column, girder steel is plugged between train wheel bridge and lower plate, together with the entablature portion of wherein girder steel is bolted to connection between train wheel bridge, together with the sill portion of girder steel is bolted to connection between lower plate;Gluing lid is installed on the upper surface of train wheel bridge, lower Jiao Gai is installed on the lower surface of lower plate, gluing lid and lower Jiao Gai are fixedly sleeved on steel column;The beneficial effects of the utility model are:It is arranged on by the way that train wheel bridge and lower plate girder steel energy are more stable on steel column, and the rainwater that also be able to can also prevent from leaking down from roof by train wheel bridge, which immerses, causes the junction of girder steel and steel column to corrode, and gluing lid and lower Jiao Gai then can further improve the corrosion resistance of the present apparatus.

Description

Corrosion resistant steelframe attachment structure
Technical field
It the utility model is related to steelframe attachment structure, and in particular to corrosion resistant steelframe attachment structure.
Background technology
It is well known that in recent years, build green, energy-conservation, healthy building turns into our fundamental state policy, to standardize, Industry turns to the industrialization the mode of project construction of mark, it is desirable to which based on engineering construction batch production is prefabricated, site machineryization assembling is matched somebody with somebody Close, but concrete component it is prefabricated need to template system it is more complicated, cost is higher, the operation that is connected between component not side Just, globality poor, at the same the decay resistance of steelframe attachment structure be also influence steelframe bonding strength principal element, Jin Erying The development to pre-cast building is rung, therefore is badly in need of finding a kind of technical measures for solving these problems.
Utility model content
The purpose of this utility model is to provide a kind of corrosion resistant steelframe attachment structure solve traditional steel column and girder steel Service life is not grown, the more environment of rainwater gets rusty easily, reduces bonding strength the problem of.
To solve above-mentioned technical problem, the utility model uses following technical scheme:
Corrosion resistant steelframe attachment structure, including steel column, girder steel, steel column are fixedly connected with girder steel, and wherein girder steel is I-shaped Beam, train wheel bridge and lower plate is provided with steel column, girder steel is plugged between train wheel bridge and lower plate, wherein the entablature portion of girder steel Together with being bolted to connection between train wheel bridge, it is bolted to connection between the sill portion of girder steel and lower plate Together;
Gluing lid is installed on the upper surface of train wheel bridge, lower Jiao Gai is installed on the lower surface of lower plate, gluing lid and under Jiao Gai is fixedly sleeved on steel column.
Further technical scheme is that above-mentioned screw bolt passes entablature portion, train wheel bridge and gluing lid will be so that will Girder steel, train wheel bridge and gluing lid are fixed together.
Further technical scheme, which is that above-mentioned gluing covers, is provided with water-proof rubber sleeve, and water-proof rubber sleeve is in funnel-form, is prevented The upper end open of gelatine sleeve is less than lower ending opening, and the upper end open of water-proof rubber sleeve is socketed on steel column, and the lower end of water-proof rubber sleeve is opened Muzzle is connected in the outer rim of train wheel bridge.
Further technical scheme is cavity between above-mentioned gluing lid and water-proof rubber sleeve be present, is filled with cavity Dry particle.
Further technical scheme is that waterproof gear is also horizontally outward extended with the upper end open of above-mentioned water-proof rubber sleeve Plate.
Further technical scheme is, it is above-mentioned on the water-proof rubber sleeve with the socket place of steel column and with outside train wheel bridge Clips are provided with the socket place of edge.
Further technical scheme is that above-mentioned lower plate is provided with brace rod between steel column.
Further technical scheme is that protective case is additionally provided between above-mentioned gluing lid and lower glue lid, on protective case Offer the I-shaped through hole for facilitating girder steel to insert.
Further technical scheme is to be provided with work between the above-mentioned hole wall of I-shaped through hole and the lateral wall of girder steel The rubber gasket of font, and rubber gasket is set parallel to plane where I-shaped through hole aperture, rubber gasket has two It is more than piece.
Compared with prior art, the beneficial effects of the utility model are at least one of following:
1st, the utility model is arranged on steel column by the way that train wheel bridge and lower plate girder steel energy are more stable, and also can Can also prevent the rainwater that leaks down from roof from immersing to cause the junction of girder steel and steel column to corrode by train wheel bridge, and glue lid and under Jiao Gai then can further improve the corrosion resistance of the present apparatus.
2nd, girder steel, train wheel bridge and gluing lid are fixed together, the gap between gluing lid and train wheel bridge can be made smaller, from And aqueous vapor is avoided to enter.
3rd, the rainwater that water-proof rubber sleeve can further prevent the rainwater to leak down from factory building roof or be fallen when using out of doors Directly contacted with girder steel with the junction of steel column and caused by corrosion phenomenon.
4th, drier can be further ensured that the drying of water-proof rubber sleeve internal cavity, so as to ensure the corrosion-resistant of this attachment structure Performance.
5th, water bar can further prevent rainwater from entering cavity.
6th, clips improve the connection of water-proof rubber sleeve and steel column and train wheel bridge, avoid aqueous vapor from entering.
7th, brace rod improves the enabling capabilities of lower plate.
8th, protective case further protects the junction of girder steel and steel column.
9th, rubber gasket improves the sealability of protective case, avoids aqueous vapor from the contact position of I-shaped through hole and girder steel Into.
Brief description of the drawings
Fig. 1 is the utility model structure diagram.
Fig. 2 is the structural representation that the utility model carries water-proof rubber sleeve.
Fig. 3 is the structural representation that the utility model carries protective case.
Fig. 4 is that the protective case in Fig. 3 at A-A is connected sectional view with girder steel.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only explaining The utility model, it is not used to limit the utility model.
Embodiment 1
As shown in figure 1, corrosion resistant steelframe attachment structure, including steel column 1, girder steel 2, steel column 1 are fixedly connected with girder steel 2, Wherein girder steel 2 is I-beam, is provided with train wheel bridge 3 and lower plate 4 on steel column 1, girder steel 2 be plugged in train wheel bridge 3 and lower plate 4 it Between, wherein it is fixed together between the entablature portion 5 of girder steel 2 and train wheel bridge 3 by bolt 6, the sill portion 7 of girder steel 2 It is fixed together between lower plate 4 by bolt 6;Gluing lid 8 is installed on the upper surface of train wheel bridge 3, lower plate 4 Lower glue lid 9 is installed on lower surface, lid 8 is glued and lower glue lid 9 is fixedly sleeved on steel column 1.
In the present embodiment, girder steel 2 is arranged on train wheel bridge 3 and lower plate 4 on steel column 1, and is fixed by bolt 6, this Sample can install multigroup girder steel 2 on a steel column 1 by train wheel bridge 3 and lower plate 4, and in order to prevent train wheel bridge 3 and lower plate 4 On receive rainwater or moisture and influence, therefore gluing lid 8 is set and lower glue lid 9 avoid rainwater or moisture be directly immersed in bolt 6 with it is upper On the junction or bolt 6 of clamping plate 3 and lower plate 4 and the junction of girder steel 2, and then improve the anti-corrosion energy of this attachment structure Power, and then improve service life.
Embodiment 2
As illustrated in fig. 1 and 2, in contrast to embodiment 1, the present embodiment optimizes bolt 6, and bolt 6 sequentially passes through entablature portion 5th, train wheel bridge 3 and gluing lid 8 are so that girder steel 2, train wheel bridge 3 and gluing lid 8 are fixed together.
In the present embodiment, reality installation process in, due to gluing lid 8 in order to avoid by rain drop erosion and with it is upper Clamping plate 3 misplaces, therefore needs certain installation strength, therefore is fixed on entablature portion 5, train wheel bridge 3 and gluing lid 8 by bolt 6 It ensure that train wheel bridge 3 together and gluing the bonding strength between lid 8, also reducing train wheel bridge 3 and glue the seam between lid 8 Gap, avoid the erosion of moisture.
Embodiment 3
As shown in Fig. 2 in contrast to embodiment 2, the present embodiment optimizes gluing lid 8, glues and is provided with water-proof rubber sleeve on lid 8 10, water-proof rubber sleeve 10 is in funnel-form, and the upper end open 12 of water-proof rubber sleeve 10 is less than lower ending opening 13, and the upper end of water-proof rubber sleeve 10 is opened Mouth 12 is socketed on steel column 1, and the lower ending opening 13 of water-proof rubber sleeve 10 is socketed in the outer rim of train wheel bridge 3.
In the present embodiment, in the environment that moisture is heavier or rainy weather is more, bolt 6 exposed on lid 8 is glued Moisture invasion is usually easily received, so as to get rusty, so reduces the service life of bolt 6, and in order to avoid this phenomenon Occur, so as to further improve decay resistance, then bolt 6 exposed on gluing lid 8 protected by water-proof rubber sleeve 10, So as to improve service life.
Embodiment 4
As shown in Fig. 2 in contrast to embodiment 3, the present embodiment optimizes gluing lid 8, glues between lid 8 and water-proof rubber sleeve 10 Cavity 11 be present, dry particle is filled with cavity 11.
In the present embodiment, dry particle maintains the drying in cavity 11.
Embodiment 5
As shown in Fig. 2 in contrast to embodiment 3, the present embodiment optimizes water-proof rubber sleeve 10, the upper end open of water-proof rubber sleeve 10 Water bar 14 is also horizontally outward extended with 12.
In the present embodiment, water bar 14 can further prevent rainwater from entering cavity 11.
Embodiment 6
As shown in Fig. 2 in contrast to embodiment 3, the present embodiment optimizes water-proof rubber sleeve 10, on water-proof rubber sleeve 10 with steel column 1 socket place and with being provided with clips 15 on the socket place of the outer rim of train wheel bridge 3.
In the present embodiment, clips 15 strengthen the bonding strength of upper end open 12 and steel column 1, also strengthen lower end and open Mouth 13 and the bonding strength of the outer rim of train wheel bridge 3.
Embodiment 7
As shown in Figure 1, 2, 3, in contrast to embodiment 3, the present embodiment optimizes water-proof rubber sleeve 10, lower plate 4 with steel column 1 Between be provided with brace rod 16.
In the present embodiment, brace rod 16 supports lower plate 4 so that the enabling capabilities of lower plate 4 are stronger.
Embodiment 8
As shown in figure 3, in contrast to embodiment 1, the present embodiment optimizes gluing lid 8 and lower glue lid 9, glues lid 8 and lower glue Protective case 17 is additionally provided between lid 9, the I-shaped through hole 18 for facilitating girder steel 2 to insert is offered on protective case 17.
In the present embodiment, protective case 17 further protects girder steel 2 and the steel between train wheel bridge 3 and lower plate 4 The junction of post 1, improves service life.
Embodiment 9
As shown in Figure 3,4, in contrast to embodiment 8, the present embodiment optimizes I-shaped through hole 18, the hole of I-shaped through hole 18 I-shaped rubber gasket 19 is provided between the lateral wall of wall and girder steel 2, and rubber gasket 19 is parallel to I-shaped logical Plane is set where the aperture of hole 18, and rubber gasket 19 has more than two panels.
In the present embodiment, rubber gasket 19 improves the sealability of protective case 17, avoids aqueous vapor from leading to from I-shaped Hole 18 and the contact position of girder steel 2 enter.
Although reference be made herein to the utility model is described multiple explanatory embodiments of the present utility model, still, It should be understood that those skilled in the art can be designed that a lot of other modifications and embodiment, these modifications and embodiment It will fall within spirit disclosed in the present application and spirit.More specifically, in disclosure, drawings and claims In the range of, a variety of variations and modifications can be carried out to the building block and/or layout of theme combination layout.Except to building block And/or outside the modification and improvement of layout progress, to those skilled in the art, other purposes also will be apparent.

Claims (9)

1. corrosion resistant steelframe attachment structure, including steel column(1), girder steel(2), the steel column(1)With girder steel(2)It is fixedly connected, Wherein girder steel(2)For I-beam, it is characterised in that:The steel column(1)On be provided with train wheel bridge(3)And lower plate(4), the steel Beam(2)It is plugged in train wheel bridge(3)With lower plate(4)Between, wherein girder steel(2)Entablature portion(5)With train wheel bridge(3)Between lead to Cross bolt(6)It is fixed together, girder steel(2)Sill portion(7)With lower plate(4)Between pass through bolt(6)It is fixed to connect It is connected together;
The train wheel bridge(3)Upper surface on be provided with gluing lid(8), lower plate(4)Lower surface on lower Jiao Gai is installed (9), the gluing lid(8)With lower Jiao Gai(9)It is fixedly sleeved in steel column(1)On.
2. corrosion resistant steelframe attachment structure according to claim 1, it is characterised in that:The bolt(6)Sequentially pass through Entablature portion(5), train wheel bridge(3)Covered with gluing(8)So as to by the girder steel(2), train wheel bridge(3)Covered with gluing(8)It is fixed to connect It is connected together.
3. corrosion resistant steelframe attachment structure according to claim 2, it is characterised in that:The gluing lid(8)Upper setting There is water-proof rubber sleeve(10), the water-proof rubber sleeve(10)In funnel-form, the water-proof rubber sleeve(10)Upper end open(12)Under being less than End opening(13), the water-proof rubber sleeve(10)Upper end open(12)It is socketed in steel column(1)On, the water-proof rubber sleeve(10)Under End opening(13)It is socketed in train wheel bridge(3)Outer rim on.
4. corrosion resistant steelframe attachment structure according to claim 3, it is characterised in that:The gluing lid(8)With waterproof Gum cover(10)Between cavity be present(11), the cavity(11)It is interior to be filled with dry particle.
5. corrosion resistant steelframe attachment structure according to claim 3, it is characterised in that:The water-proof rubber sleeve(10)It is upper End opening(12)Place is also horizontally outward extended with water bar(14).
6. corrosion resistant steelframe attachment structure according to claim 3, it is characterised in that:In the water-proof rubber sleeve(10)On With steel column(1)Socket place and and train wheel bridge(3)Clips are provided with the socket place of outer rim(15).
7. corrosion resistant steelframe attachment structure according to claim 1, it is characterised in that:The lower plate(4)And steel Post(1)Between be provided with brace rod(16).
8. corrosion resistant steelframe attachment structure according to claim 1, it is characterised in that:The gluing lid(8)With lower glue Lid(9)Between be additionally provided with protective case(17), the protective case(17)On offer and facilitate girder steel(2)The I-shaped through hole of insertion (18).
9. corrosion resistant steelframe attachment structure according to claim 8, it is characterised in that:The I-shaped through hole(18)'s Hole wall and girder steel(2)Lateral wall between be provided with I-shaped rubber gasket(19), and rubber gasket(19)Parallel to I-shaped through hole(18)Plane is set where aperture, the rubber gasket(19)Have more than two panels.
CN201721020201.3U 2017-08-15 2017-08-15 Corrosion resistant steelframe attachment structure Expired - Fee Related CN207048053U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721020201.3U CN207048053U (en) 2017-08-15 2017-08-15 Corrosion resistant steelframe attachment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721020201.3U CN207048053U (en) 2017-08-15 2017-08-15 Corrosion resistant steelframe attachment structure

Publications (1)

Publication Number Publication Date
CN207048053U true CN207048053U (en) 2018-02-27

Family

ID=61502921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721020201.3U Expired - Fee Related CN207048053U (en) 2017-08-15 2017-08-15 Corrosion resistant steelframe attachment structure

Country Status (1)

Country Link
CN (1) CN207048053U (en)

Similar Documents

Publication Publication Date Title
CN200971472Y (en) Water-proof covering for slope chain
CN106121041A (en) A kind of steel column one-way bolt plug-in type splicing node and installation method
CN105525723A (en) Steel column internally provided with stainless steel downpipes and installing method of steel column
CN206052952U (en) A kind of steel column one-way bolt plug-in type splices node
CN207048053U (en) Corrosion resistant steelframe attachment structure
CN205370029U (en) Steel construction photovoltaic power generation factory building
CN209686390U (en) A kind of energy saving and environment friendly high strength prestressed concrete pipe pile
CN206865046U (en) Combined type SMC cable testing bridges
CN202787697U (en) Metal coping structure for parapet wall
CN109706847A (en) A kind of construction method assisting steel structure bridge Speed Pinyin
CN205857553U (en) A kind of building in the style of the ancients roofing eave rafter is hoped
CN210946531U (en) Road and bridge crack reinforcing and repairing structure
CN209556742U (en) A kind of rain-proof window mounting structure
CN210564051U (en) Anti-leakage device for closing profile of system door and window
CN207405487U (en) High-performance durable anti-corrosion dragline anchorage
CN210032399U (en) Awning side plate and upper and lower plate connecting node structure
CN105545028B (en) A kind of steel construction photovoltaic generation factory building
CN101608427B (en) Method for connecting and sealing hot-extrusion coating steel wire inhaul cables and cable clips
CN206971418U (en) Leakproof repair apparatus in gap between high parapet
CN207612233U (en) A kind of water repellent component applied to photovoltaic module installation
CN201214859Y (en) Exterior reinforced component for roof board
CN206128323U (en) Coupling assembling is tied to prefabricated heat preservation wallboard structure of integration and wallboard back of body
CN220306933U (en) Device for effectively reducing noise influence of power transmission line
CN211143536U (en) Metal roof gutter waterproof construction
CN220908735U (en) Anti-leakage structure for deformation joint of building floor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180227

Termination date: 20200815

CF01 Termination of patent right due to non-payment of annual fee