CN207034429U - A kind of jacking construction method low pressure cylinder concrete pipe - Google Patents

A kind of jacking construction method low pressure cylinder concrete pipe Download PDF

Info

Publication number
CN207034429U
CN207034429U CN201720936262.8U CN201720936262U CN207034429U CN 207034429 U CN207034429 U CN 207034429U CN 201720936262 U CN201720936262 U CN 201720936262U CN 207034429 U CN207034429 U CN 207034429U
Authority
CN
China
Prior art keywords
pipe
steel
concrete
tubing
low pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720936262.8U
Other languages
Chinese (zh)
Inventor
高健宝
王�华
张振山
李怀亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SANHE JINGLONG NEW PIPELINE CO Ltd
Original Assignee
SANHE JINGLONG NEW PIPELINE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SANHE JINGLONG NEW PIPELINE CO Ltd filed Critical SANHE JINGLONG NEW PIPELINE CO Ltd
Priority to CN201720936262.8U priority Critical patent/CN207034429U/en
Application granted granted Critical
Publication of CN207034429U publication Critical patent/CN207034429U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of jacking construction method low pressure cylinder concrete pipe, include some pipe of concrete main bodys of head and the tail connection successively, double steel bar skeleton is provided with the tube wall of pipe of concrete main body, the steel cylinder being arranged concentrically with pipe of concrete main body is provided between double steel bar skeleton, plug steel ring is fixedly connected with the inside of steel cylinder head end, bellmouth steel loop is fixedly connected with the inside of steel cylinder tail end, some pipe of concrete main bodys are connected from beginning to end successively by the mutual cooperation of plug steel ring and bellmouth steel loop.Set on the outside of tubing both ends and strengthen steel ring, tubing jacking construction process not cracky, enhancing two-port top power, constructed beneficial to relatively long distance, reduce construction and engineering cost;High-frequency excitation power is big, and concrete impervious ability is strong, and bearing Intermediate High Pressure with tubing matches;It can effectively block and be seeped water outside tubing to inside tubing;In pipeline jack-in process, tube hub is not easy to deviate, and pipe joint is not easy to misplace, and without spillage phenomenon in work progress tubing, is greatly easy to smooth construction.

Description

A kind of jacking construction method low pressure cylinder concrete pipe
Technical field
Pipe of concrete technical field is the utility model is related to, it particularly relates to a kind of jacking construction method low pressure steel cylinder Pipe of concrete.
Background technology
JC/T2092-2011 jacking construction methods are poured with being only applicable to vertical vibrating method in low pressure steel cylinder concrete pipe standards The tubing suitable for jacking construction method is made in filling tube wall concrete formation.Manufacture jacking pressure concrete is molded using vertical vibrating Following items shortcoming be present in pipe, and 1)Cracky during concrete jacking construction on the outside of tubing both ends, two-port top power weaken, no Constructed beneficial to relatively long distance;2)Tubing is manufactured using plastic concrete, the ratio of mud is big, and concrete strength will compared with dry concrete It is low, relatively long distance jacking construction is not suitable for equally;3)It is molded using vertical vibrating method, vibration force will compared with core dither Small, concrete density is inadequate, and concrete impervious ability is relative weak;4) vertical vibrating moulding process is used, makes often section pipe Material needs one set of die, and uses the manufacture tubing batch production of core technique only to need one set of die, and vertical vibrating technique is relative to be made Cost is high, and mould Meteorological is higher by 3-5 times of core technique manufacture;5)Vertical vibrating technique manufactures tubing because of number of molds More, inconsistent per mold processing technology deviation, product manufacturing quality assurance is poor.
The problem of in correlation technique, effective solution is not yet proposed at present.
Utility model content
For the above-mentioned technical problem in correlation technique, mixed the utility model proposes a kind of jacking construction method with low pressure steel cylinder Solidifying soil pipe, antiseepage effect of anti-cracking are good.
To realize above-mentioned technical purpose, what the technical solution of the utility model was realized in:
A kind of jacking construction method low pressure cylinder concrete pipe, including some pipe of concrete main bodys of head and the tail connection successively, Double steel bar skeleton is provided with the tube wall of the pipe of concrete main body, is provided between the double steel bar skeleton and is mixed with described The steel cylinder that native pipe main body is arranged concentrically is coagulated, plug steel ring, the steel cylinder tail end inner side are fixedly connected with the inside of the steel cylinder head end Bellmouth steel loop is fixedly connected with, some pipe of concrete main bodys are first successively by the mutual cooperation of plug steel ring and bellmouth steel loop Tail connects.
Further, on the outside of the head end of the steel cylinder between the double steel bar skeleton and the bellmouth steel loop it is outer U-shaped reinforcement is each provided between side and the double steel bar skeleton.
Further, two seals groove, the sealed groove and institute are offered in the circumferential direction of the plug steel ring State and sealed by O-ring seal between bellmouth steel loop.
Further, the plug steel ring offers pressure testing water injection hole between sealed groove described in twice.
Further, it is each provided with strengthening steel ring on the outer tube wall at the pipe of concrete main body head and the tail both ends.
Further, sealing plate is pasted between the tube wall of the adjacent two pipe of concrete main bodys, the sealing plate is glue Plate or headblock.
Further, it is provided with water-swellable adhesive tape on the outside of the bellmouth steel loop.
The beneficial effects of the utility model:Set on the outside of tubing both ends and strengthen steel ring, tubing jacking construction process is not fragile Damage, enhancing two-port top power, constructs beneficial to relatively long distance, reduces construction and engineering cost;High-frequency excitation power is big, agent on crack resistance of concrete It is strong to ooze ability, bearing Intermediate High Pressure with tubing matches;Water-swellable adhesive tape can effectively be blocked and seeped water outside tubing to inside tubing; In pipeline jack-in process, tube hub is not easy to deviate, and pipe joint is not easy to misplace, without spillage phenomenon in work progress tubing, greatly Be easy to smooth construction;Conduit running maintenance cost can be significantly reduced, it is significantly comprehensive to improve social benefit and environmental benefit.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art In the required accompanying drawing used be briefly described, it should be apparent that, drawings in the following description are only of the present utility model Some embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other accompanying drawings.
Fig. 1 is the half section of the jacking construction method low pressure cylinder concrete pipe according to the utility model embodiment Figure;
When Fig. 2 is the more jacking construction method low pressure cylinder concrete pipes connection according to the utility model embodiment Lateral partial structurtes sectional view.
In figure:
1st, steel cylinder;2nd, O-ring seal;3rd, bellmouth steel loop;4th, plug steel ring;5th, sealing plate;6th, double steel bar skeleton;7、 Water-swellable adhesive tape;8th, U-shaped reinforcement;9th, steel ring is strengthened;10th, pressure testing water injection hole.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, every other embodiment that those of ordinary skill in the art are obtained all belongs to In the scope of the utility model protection.
As shown in Figure 1-2, a kind of jacking construction method low pressure steel cylinder concrete according to the utility model embodiment Pipe, including some pipe of concrete main bodys of head and the tail connection successively, are provided with double steel bar in the tube wall of the pipe of concrete main body Skeleton 6, the steel cylinder 1 being arranged concentrically with the pipe of concrete main body, the steel cylinder 1 are provided between the double steel bar skeleton 6 Plug steel ring 4 is fixedly connected with the inside of head end, bellmouth steel loop 3, some coagulations are fixedly connected with the inside of the tail end of steel cylinder 1 Native pipe main body is connected from beginning to end successively by the mutual cooperation of plug steel ring 4 and bellmouth steel loop 3.
In a specific embodiment of the present utility model, head end outside and the double steel bar skeleton 6 of the steel cylinder 1 Between and the outside of the bellmouth steel loop 3 and the double steel bar skeleton 6 between be each provided with U-shaped reinforcement 8.
It is close that twice are offered in a specific embodiment of the present utility model, in the circumferential direction of the plug steel ring 4 Groove is sealed, is sealed between the sealed groove and the bellmouth steel loop 3 by O-ring seal 2.
In a specific embodiment of the present utility model, the plug steel ring 4 is opened between sealed groove described in twice Provided with pressure testing water injection hole 10.
In a specific embodiment of the present utility model, respectively set on the outer tube wall at the pipe of concrete main body head and the tail both ends It is equipped with and strengthens steel ring 9.
In a specific embodiment of the present utility model, it is pasted between the tube wall of the adjacent two pipe of concrete main body Sealing plate 5, the sealing plate 5 are offset plate or headblock.
In a specific embodiment of the present utility model, the outside of the bellmouth steel loop 3 is provided with water-swellable adhesive tape 7。
In order to facilitate above-mentioned technical proposal of the present utility model is understood, below by way of new to this practicality in specifically used mode The above-mentioned technical proposal of type is described in detail.
The mode described in the utility model that is fixedly connected can use the conventional technical means such as welding, bonding to replace.
Jacking construction method described in the utility model is in JC/T2092-2011 jacking constructions with low pressure cylinder concrete pipe The method requirement and difficult point that are made on the basis of low pressure steel cylinder concrete pipe standards for tubing, overcome current tubing making side The deficiency in face, and that researches and develops is applied to core technique manufacture jacking construction method low pressure cylinder concrete pipe.
The specification of pipe of concrete main body is DN2000*3000*200 millimeters, and pipe of concrete body outer wall default 2 strengthens steel Circle 9, head end both ends each 1, it is ensured that possess enough top power during jacking construction.
Steel cylinder 1 is put in pipe of concrete main body, the impervious and cracking resistance of tubing is greatly improved, meets mesolow Hydraulic piping can the requirement of long range jacking construction.
Bellmouth steel loop 3 and plug steel ring 4 use Q235 steel plate materialses, the interior outside use of bellmouth steel loop 3 and plug steel ring 4 Corrosion-resistant grade is high, wearability is good, drinking water tank paint brushing that water pollution is relatively low 2 times(200um)Protection, is installed non-after the completion of construction Chang Yanmi, will not because bellmouth steel loop 3 and plug steel ring 4 using high-grade drinking water tank paint brushing anti-corrosion and have concrete protective There is corrosion phenomenon, substantially prolongs the service life of joint
Sealed between the interface of bellmouth steel loop 3 and plug steel ring 4 using two pass O-ring seal 2, it is ensured that the effective antiseepage of interface Water, interface is very tight, has fabulous sealing property, is matched with the anti-internal pressure of body.
Offset plate or wood washer are pasted in the end of adjacent two pipe of concretes main body, add port buffering thickness and flexibility, subtract Whole ring end face top power uneven phenomenon and top power concentration phenomenon in few jacking.
Water-swellable adhesive tape 7 is added between bellmouth steel loop 3 and concrete, tubing outside underground water can be effectively played along bellmouth Steel loop 3 is seeped into inside tubing with concrete gap.
Every pipe of concrete main body can carry out Leakage Test, inspection cost by the butt joint of pressure testing water injection hole 10 immediately It is low, efficiency high.
Pipe of concrete main body uses dry high-grade concrete, improves and pushes up power during jacking construction.
The technique that jacking construction method low pressure cylinder concrete pipe is manufactured by core:
Semi-finished product one:Steel plate cutting → edge rolling → rises circle → bellmouth steel loop 3 and plug steel ring 4;
Semi-finished product two:Sheet metal blanking → loading bellmouth steel loop 3 and plug steel ring 4 → edge rolling → welding fabrication → hydraulic pressure inspection Test;
Semi-finished product three:Wire rod → cold rolled reinforcing steel bar with ribs is processed → makes double steel bar skeleton 6;
Semi-finished product four:The measuring raw materials such as cement, sand, stone → stirring → prepare concrete;
Production process:The steel cylinder 1 for being connected with bellmouth steel loop 3 and plug steel ring 4 is loaded in mould chassis → placed Bottom strengthens steel ring 9 → place double steel bar 6 → double steel bar of skeleton skeleton 6 position → and is inserted in external mold → be inserted in internal model → placement Steel ring 9 → welding U-shaped reinforcement 8 → welding anchor bar → installation bellmouth mould is strengthened on top and positioner position → to mould Inside it is distributed into concrete formation → trimming, inspection → sign, maintenance → form removal → trimming, inspection → adhesive seal plate 5(Offset plate or wood Pad).
Design of Bearing Capacity and inside and outside load calculation basis CECS143:2002 and CECS140:2002《Water and Waste Water Engineering Buried precast concrete circular pipe and Prestressed concrete cylinder pipe structure design code》, Reinforcement Design is according to GB50010- 2002 concrete design specifications.
To sum up, the reinforcement steel ring of protection is set by means of above-mentioned technical proposal of the present utility model, tubing both ends outside, Tubing jacking construction process not cracky, enhancing two-port top power, constructs beneficial to relatively long distance, reduce construction and engineering into This;Tubing is made using dry concrete, concrete strength is high, is equally applicable to relatively long distance jacking construction;Using core Technique productions tubing, high-frequency excitation power is big, and concrete density is high, and concrete impervious ability is strong, and Intermediate High Pressure is born with tubing Matching;Tubing is manufactured using core technique, every kind of specification batch production only needs one set of die, and technique is simple, less investment, tubing system Cause low;Tubing is manufactured with core technique, its physical dimension deviation is small(Especially tubing circularity and wall thickness dimension), product manufacturing Quality assurance will height;Solves non-excavation-use under the defeated drainage system field Special zone of the pressure such as water conservancy, municipal administration, geological conditions Tubing used in a kind of band pressure of pipeline;Water-swellable adhesive tape is added between bellmouth steel loop and concrete, can effectively block tubing Seep water to inside tubing outside;Solves in common tubing jack-in process the steel mouth easily displacement caused by correction and protection should be had by losing The technological difficulties such as effect;In pipeline jack-in process, tube hub is not easy to deviate, and pipe joint is not easy to misplace, in work progress tubing Without spillage phenomenon, greatly it is easy to smooth construction;Conduit running maintenance cost can be significantly reduced, it is significantly comprehensive to improve social benefit And environmental benefit;Have developed can manufacture a kind of coming of new technology of jacking steel cylinder pipe product.
Preferred embodiment of the present utility model is these are only, it is all in this practicality not to limit the utility model Within new spirit and principle, any modification, equivalent substitution and improvements made etc., guarantor of the present utility model should be included in Within the scope of shield.

Claims (7)

1. a kind of jacking construction method low pressure cylinder concrete pipe, including some pipe of concrete main bodys of head and the tail connection successively, its It is characterised by, double steel bar skeleton is provided with the tube wall of the pipe of concrete main body(6), the double steel bar skeleton(6)It Between be provided with the steel cylinder being arranged concentrically with the pipe of concrete main body(1), the steel cylinder(1)Plug is fixedly connected with the inside of head end Steel ring(4), the steel cylinder(1)Bellmouth steel loop is fixedly connected with the inside of tail end(3), some pipe of concrete main bodys pass through plug Steel ring(4)With bellmouth steel loop(3)Mutual cooperation connect from beginning to end successively.
2. jacking construction method according to claim 1 low pressure cylinder concrete pipe, it is characterised in that the steel cylinder(1) Head end on the outside of with the double steel bar skeleton(6)Between and the bellmouth steel loop(3)Outside and the clad steel muscles and bones Frame(6)Between be each provided with U-shaped reinforcement(8).
3. jacking construction method according to claim 1 low pressure cylinder concrete pipe, it is characterised in that the plug steel ring (4)Circumferential direction on offer two seals groove, the sealed groove and the bellmouth steel loop(3)Between by O-shaped close Seal(2)Sealing.
4. jacking construction method according to claim 3 low pressure cylinder concrete pipe, it is characterised in that the plug steel ring (4)Pressure testing water injection hole is offered between sealed groove described in twice(10).
5. jacking construction method according to claim 1 low pressure cylinder concrete pipe, it is characterised in that the pipe of concrete It is each provided with strengthening steel ring on the outer tube wall at main body head and the tail both ends(9).
6. jacking construction method according to claim 1 low pressure cylinder concrete pipe, it is characterised in that adjacent two is described mixed Sealing plate is pasted between the tube wall of solidifying native pipe main body(5), the sealing plate(5)For offset plate or headblock.
7. jacking construction method according to claim 1 low pressure cylinder concrete pipe, it is characterised in that the bellmouth steel loop (3)Outside be provided with water-swellable adhesive tape(7).
CN201720936262.8U 2017-07-31 2017-07-31 A kind of jacking construction method low pressure cylinder concrete pipe Active CN207034429U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720936262.8U CN207034429U (en) 2017-07-31 2017-07-31 A kind of jacking construction method low pressure cylinder concrete pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720936262.8U CN207034429U (en) 2017-07-31 2017-07-31 A kind of jacking construction method low pressure cylinder concrete pipe

Publications (1)

Publication Number Publication Date
CN207034429U true CN207034429U (en) 2018-02-23

Family

ID=61463104

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720936262.8U Active CN207034429U (en) 2017-07-31 2017-07-31 A kind of jacking construction method low pressure cylinder concrete pipe

Country Status (1)

Country Link
CN (1) CN207034429U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110030430A (en) * 2019-03-12 2019-07-19 上海城建水务工程有限公司 A kind of pipe jacking construction method for cylinder concrete pipe
CN113944811A (en) * 2020-07-30 2022-01-18 国家电投集团科学技术研究院有限公司 PCCP pipe

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110030430A (en) * 2019-03-12 2019-07-19 上海城建水务工程有限公司 A kind of pipe jacking construction method for cylinder concrete pipe
CN113944811A (en) * 2020-07-30 2022-01-18 国家电投集团科学技术研究院有限公司 PCCP pipe

Similar Documents

Publication Publication Date Title
CN101776187B (en) Prestressed concrete glass fiber reinforced plastic compound tubing structure and manufacture process thereof
CN204267915U (en) Strengthen the two rubber sealing reinforced concrete sewer pipe of jacking construction corrosion protection
CN207034429U (en) A kind of jacking construction method low pressure cylinder concrete pipe
CN110029599A (en) Steel connecting structure of prefabricated culvert and construction method
CN201495558U (en) Plastic inspection chamber
CN104832720A (en) Novel reinforced bar type ultra-high-performance concrete pipeline and preparing method thereof
CN201103753Y (en) Modified polyvinyl chloride drain with compound steel reinforced concrete as inner lining
CN104496321A (en) Drainage pipe and preparation method thereof
CN203286163U (en) Combined concrete pipe with lining pipe
CN201621382U (en) Prestressed concrete and glass fiber reinforced plastic composite jack pipe
CN104908157A (en) Super-high performance concrete compound pipeline preparation method
CN204004780U (en) Can peg graft concrete drain tile and the socket steel ring for this waste pipe
CN104829182A (en) Preparation method of concrete pipeline with ultrahigh performance
CN104653902B (en) Water-saving irrigation pipeline and construction method thereof
CN105672248A (en) Irregular shallow karst cavity ribbing and grouting filling structure and construction method
CN201621381U (en) Prestressed concrete and glass fiber reinforced plastic composite pipe
CN206054970U (en) Framework of steel reinforcement steel pipe concrete pipe and the pipeline being made from it
CN206867795U (en) A kind of filter plate for filter tank
CN205421207U (en) Assembled rectangle reinforced concrete groove of economizing on water
CN206054961U (en) Penstock reinforcing bar composite concrete pipe and the pipeline being made from it
CN204647580U (en) A kind of ultra-high performance concrete pipeline of novel form of reinforcement
CN204692797U (en) A kind of two flat walls entwining tube
CN206888029U (en) A kind of prefabricated box culvert structure containing glass fiber-reinforced polymer
CN214699575U (en) Steel cylinder concrete pipe
CN210890421U (en) UHPC water pipe structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant