CN207032483U - Building steel frame construction - Google Patents

Building steel frame construction Download PDF

Info

Publication number
CN207032483U
CN207032483U CN201720958069.4U CN201720958069U CN207032483U CN 207032483 U CN207032483 U CN 207032483U CN 201720958069 U CN201720958069 U CN 201720958069U CN 207032483 U CN207032483 U CN 207032483U
Authority
CN
China
Prior art keywords
plate
frame construction
reinforcing plate
steel frame
building steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720958069.4U
Other languages
Chinese (zh)
Inventor
郝向义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Dongfang Zhongtian Construction Engineering Co Ltd
Original Assignee
Tianjin Dongfang Zhongtian Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Dongfang Zhongtian Construction Engineering Co Ltd filed Critical Tianjin Dongfang Zhongtian Construction Engineering Co Ltd
Priority to CN201720958069.4U priority Critical patent/CN207032483U/en
Application granted granted Critical
Publication of CN207032483U publication Critical patent/CN207032483U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

It the utility model is related to building steel frame construction, including polylith steel part, steel part assembly and connection forms supporting part, steel part includes side wall, upper plate, lower plate and reinforcing plate, the side wall includes two pieces of supporting plates, depressed part is provided between supporting plate, the upper plate and lower plate are separately positioned on side wall both sides, reinforcing plate includes the first reinforcing plate and the second reinforcing plate, first reinforcing plate is arranged on upper plate side, second reinforcing plate is arranged on lower plate side, first, it is opening portion between second reinforcing plate, the depressed part includes bottom plate, bottom plate is provided with string holes, the supporting plate is provided with first through hole, first reinforcing plate is provided with the second through hole, second reinforcing plate is provided with thread barrel.Building steel frame construction of the present utility model can be easy to later stage pipeline to arrange, avoid steel frame construction from hindering pipeline arrangement, can effectively protect pipeline;Meanwhile the weight of steel part is alleviated, steel frame construction deadweight is reduced, lift structure intensity, reduces cost.

Description

Building steel frame construction
Technical field
It the utility model is related to technical field of buildings, more particularly to building steel frame construction.
Background technology
For steel building compares traditional concrete construction, armored concrete, intensity are instead of with steel plate or shaped steel Higher, shock resistance is more preferable.And because component can be made with batch production, in-site installation, thus greatly reduce the duration.Due to steel Repeatable utilization, building waste can be greatly reduced, it is more green, thus more and more applied in industrial building In civil buildings.Steel frame construction generally use welding or bolt connection, by the connection of a variety of steel plates, is formed in assembling Steel frame construction.Existing steel frame construction weight is larger, makes it higher to Structural strength calls;In addition, building has many pipes Line, when connecting up installation in the later stage, steel frame construction may interfere with threading, destroy the stabilization of steel frame construction again by the way of perforate Property.
Utility model content
The utility model is in order to solve problem of the prior art, there is provided a kind of structural strength is higher, lighter in weight, is easy to The building steel frame construction of pipeline arrangement.
Concrete technical scheme is as follows:Building steel frame construction, including polylith steel part, steel part assembly and connection form supporting part, Steel part includes side wall, upper plate, lower plate and reinforcing plate, and the side wall includes two pieces of supporting plates, depressed part, institute are provided between supporting plate State upper plate and lower plate is separately positioned on side wall both sides, reinforcing plate includes the first reinforcing plate and the second reinforcing plate, and the first reinforcing plate is set Put in upper plate side, the second reinforcing plate is arranged on lower plate side, is opening portion between first, second reinforcing plate, the depressed part Including bottom plate, bottom plate is provided with string holes, and the supporting plate is provided with first through hole, and first reinforcing plate is provided with the second through hole, described Second reinforcing plate is provided with thread barrel.
It is attached technical scheme of the present utility model below.
Preferably, it is provided with internal thread in the thread barrel.
Preferably, building steel frame construction includes shrouding, and shrouding is connected with steel part and closes the opening portion.
Preferably, the shrouding includes first connecting portion, second connecting portion and connecting plate, and described first, second Connecting portion is arranged on connecting plate both sides and is connected with connecting plate.
Preferably, first, second connecting portion is provided with third through-hole, and first, second connecting portion leads to steel part Cross mode connects for screw.
Preferably, building steel frame construction includes securing plate, and securing plate is arranged on adjacent supports portion junction, added Gu plate is connected with steel part.
Preferably, two pieces of adjacent securing plates are L-shaped.
Technique effect of the present utility model:Building steel frame construction of the present utility model can be easy to later stage pipeline to arrange, Avoid steel frame construction from hindering pipeline arrangement, can effectively protect pipeline;Meanwhile the weight of steel part is alleviated, reduce steel frame construction Deadweight, lift structure intensity, reduces cost, and the roof supported beam frame structure for house uses.
Brief description of the drawings
Fig. 1 is the schematic diagram of the building steel frame construction of the utility model embodiment.
Fig. 2 is the schematic diagram of the steel part of the utility model embodiment.
Fig. 3 is the schematic diagram that the shrouding of the utility model embodiment and steel part are connected.
Embodiment
Below, substantive distinguishing features of the present utility model and advantage are further described with reference to example, but this practicality is new Type is not limited to listed embodiment.
As shown in Figure 1 to Figure 3, the building steel frame construction of the present embodiment includes polylith steel part 1, and steel part assembly and connection is formed Supporting part 2.Steel part 1 includes side wall 11, upper plate 12, lower plate 13 and reinforcing plate 14, and the side wall 11 includes two pieces of supporting plates 15, branch Depressed part 16 is provided between fagging 15.The upper plate 12 and lower plate 13 are separately positioned on the both sides of side wall 11.Reinforcing plate 14 includes the One reinforcing plate 141 and the second reinforcing plate 142, the first reinforcing plate 141 are arranged on upper plate side, and the second reinforcing plate 142 is arranged on down Plate side, it is opening portion 17 between first, second reinforcing plate.The depressed part 16 includes bottom plate 18, and bottom plate 18 is provided with string holes 181.The supporting plate 15 is provided with first through hole 151, and first reinforcing plate 141 is provided with the second through hole 143, and described second strengthens Plate 142 is provided with thread barrel 144.Pass through above-mentioned technical proposal, steel part weight can be mitigated, while ensure steel part intensity;By setting String holes is put, can be easy to thread, connect up, so as to reduce the perforate on steel frame construction, avoid steel frame construction from being damaged.Two pieces of steel parts 1 Can be staggered relatively, then it is fixedly connected by screw, screw is connected through the first through hole with thread barrel, in the thread barrel Provided with internal thread.
As shown in Figure 1 to Figure 3, further, building steel frame construction includes shrouding 3, and shrouding 3 is connected and sealed with steel part 1 The opening portion 17 is closed, by setting shrouding, the circuit being located in steel part can be protected, meanwhile, it is capable to strengthen steel frame construction Intensity.The shrouding 3 includes first connecting portion 31, second connecting portion 32 and connecting plate 33, and first, second connecting portion is set Put in the both sides of connecting plate 33 and be connected with connecting plate.First, second connecting portion is provided with third through-hole 34, and first, second connects Socket part is connected with steel part by screw 4.Building steel frame construction includes securing plate 4, and securing plate 4 is arranged on adjacent supports portion 2 and connected Place is met, securing plate 4 is connected with steel part 1, by being arranged on securing plate, can be lifted the support force to the junction of supporting part, be kept away Exempt from junction to be damaged, in the present embodiment, two pieces of adjacent securing plates are L-shaped, and securing plate is connected by screw with steel part.
The building steel frame construction of the present embodiment can be easy to later stage pipeline to arrange, avoid steel frame construction from hindering pipeline cloth Put, can effectively protect pipeline;Meanwhile the weight of steel part is alleviated, steel frame construction deadweight is reduced, lift structure intensity, is reduced Cost.
It is pointed out that above-mentioned preferred embodiment is only to illustrate technical concepts and features of the present utility model, its purpose It is to allow person skilled in the art to understand content of the present utility model and implements according to this, this reality can not be limited with this With new protection domain.All equivalent change or modifications made according to the utility model Spirit Essence, should all cover in this reality Within new protection domain.

Claims (7)

1. building steel frame construction, including polylith steel part, it is characterised in that steel part assembly and connection forms supporting part, and steel part includes Side wall, upper plate, lower plate and reinforcing plate, the side wall include two pieces of supporting plates, are provided with depressed part between supporting plate, the upper plate and Lower plate is separately positioned on side wall both sides, and reinforcing plate includes the first reinforcing plate and the second reinforcing plate, and the first reinforcing plate is arranged on upper plate Side, the second reinforcing plate are arranged on lower plate side, are opening portion between first, second reinforcing plate, and the depressed part includes bottom plate, Bottom plate is provided with string holes, and the supporting plate is provided with first through hole, and first reinforcing plate is provided with the second through hole, second reinforcing plate Provided with thread barrel.
2. building steel frame construction as claimed in claim 1, it is characterised in that be provided with internal thread in the thread barrel.
3. building steel frame construction as claimed in claim 2, it is characterised in that building steel frame construction includes shrouding, shrouding It is connected with steel part and closes the opening portion.
4. building steel frame construction as claimed in claim 3, it is characterised in that the shrouding includes first connecting portion, and second Connecting portion and connecting plate, first, second connecting portion are arranged on connecting plate both sides and are connected with connecting plate.
5. building steel frame construction as claimed in claim 4, it is characterised in that first, second connecting portion is provided with the 3rd Through hole, first, second connecting portion are connected by screw with steel part.
6. building steel frame construction as claimed in claim 5, it is characterised in that building steel frame construction includes securing plate, adds Gu plate is arranged on adjacent supports portion junction, securing plate is connected with steel part.
7. building steel frame construction as claimed in claim 6, it is characterised in that two pieces of adjacent securing plates are L-shaped.
CN201720958069.4U 2017-08-02 2017-08-02 Building steel frame construction Active CN207032483U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720958069.4U CN207032483U (en) 2017-08-02 2017-08-02 Building steel frame construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720958069.4U CN207032483U (en) 2017-08-02 2017-08-02 Building steel frame construction

Publications (1)

Publication Number Publication Date
CN207032483U true CN207032483U (en) 2018-02-23

Family

ID=61474082

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720958069.4U Active CN207032483U (en) 2017-08-02 2017-08-02 Building steel frame construction

Country Status (1)

Country Link
CN (1) CN207032483U (en)

Similar Documents

Publication Publication Date Title
CN204960269U (en) Integral pylon
CN207276111U (en) Large space light cellular partition board mast-up
CN104358309A (en) Quickly installed high-strength house structure
CN104989017A (en) Impact resistance waterproof back-bolt type stone curtain wall
CN207032483U (en) Building steel frame construction
CN204781441U (en) Assembled reinforced concrete wallboard frame construction
CN204475529U (en) The syndeton of a kind of assembling type outer wall and beam
CN207079898U (en) Outer hanging basket structure
CN205116222U (en) Basement outer wall structure of hole department is opened to roof
CN205955024U (en) A plastic tile for archaize building roof
CN209618732U (en) Weight tower crane conversion section
CN206667471U (en) Lightning protection steel house
CN206971834U (en) Pin-connected panel electronic box protection canopy
CN202990179U (en) Curtain wall cross frame
CN206888340U (en) A kind of steam pressurized sheet material of crack resistance type
CN206289997U (en) Construction protection safety net
CN206110472U (en) Foaming cement composite board
CN205976677U (en) Multidimension direction surrender power consumption mild steel sinker
CN205724426U (en) The simple distribution box support in a kind of job site
CN205276847U (en) Safety device is assisted to scaffold
CN203998537U (en) The embedded operator's compartment of elevator craning cage
CN204023600U (en) Pillar crane composite base structure
CN205242421U (en) A ground foundation structure for mobile home
CN208024044U (en) A kind of low multilayer assembled heat insulation energy saving building
CN217204877U (en) Integrative structural slab of frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant