CN207032308U - The spliced inspection shaft of new precast panel - Google Patents

The spliced inspection shaft of new precast panel Download PDF

Info

Publication number
CN207032308U
CN207032308U CN201720959525.7U CN201720959525U CN207032308U CN 207032308 U CN207032308 U CN 207032308U CN 201720959525 U CN201720959525 U CN 201720959525U CN 207032308 U CN207032308 U CN 207032308U
Authority
CN
China
Prior art keywords
mainboard
holes
bottom plate
side panels
inspection shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720959525.7U
Other languages
Chinese (zh)
Inventor
关鑫鑫
赵和惠
李大民
王春菊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING HANJIAN HESHAN PIPELINE Co Ltd
Original Assignee
BEIJING HANJIAN HESHAN PIPELINE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING HANJIAN HESHAN PIPELINE Co Ltd filed Critical BEIJING HANJIAN HESHAN PIPELINE Co Ltd
Priority to CN201720959525.7U priority Critical patent/CN207032308U/en
Application granted granted Critical
Publication of CN207032308U publication Critical patent/CN207032308U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

It the utility model is related to a kind of spliced inspection shaft of new precast panel, the predominantly power supply of Urban Underground infrastructure, feedwater, draining, communication, cable television, gas pipe, public lighting circuit etc. install and it is easy to maintenance and set, it is by the top cover (1) with manhole, mainboard (2) with holes, connect corner post (3), preset nut (4), connecting bolt (5), locking nut (6), solid side panels (7), accept bottom plate (8) composition, can preferably solve the brick inspection shaft poor waterproof properties of tradition, the unfavorable factor such as perishable, and form by being prefabricated in the factory ensures concrete quality, improve concrete strength, increase inspection shaft service life, and in the case where reducing artificial input, greatly improve installation effectiveness.

Description

The spliced inspection shaft of new precast panel
Technical field:
It the utility model is related to a kind of spliced inspection shaft of new precast panel, the predominantly confession of Urban Underground infrastructure Electricity, feedwater, draining, communication, cable television, gas pipe, public lighting circuit etc. install and it is easy to maintenance and set.
Background technology:
In China, inspection shaft is divided into brick inspection shaft and concrete cast-in-situ inspection shaft at present, prevents wherein brick inspection shaft is present The unfavorable factor such as water poor performance, perishable, influences the service life of inspection shaft, and now due to the demand of national policy, Through the manufacturing for prohibiting common brick.In addition, concrete cast-in-situ inspection shaft formwork be present and assembling reinforcement is wasted time and energy, scene is poured The difficult control of concrete quality, larger, the various unfavorable factors such as product intensity grade is low affected by environment are built, often result in the construction period It is delayed and wastes time and energy.
The content of the invention:
The purpose of this utility model is:A kind of spliced inspection shaft of new precast panel is designed, can effectively be prevented Effluent seepage, raising structural strength is effective against periphery soil load, increase inspection shaft service life reduces repair rate of doing over again, can Make raising operating efficiency easier for installation.
Based on this purpose, by design and research repeatedly, we develop the spliced inspection shaft of new precast panel, it General principle is by pouring out various prefabricated armored concrete board members in production and processing workshop, passes through embedded nut And each prefabricated components are stitched together and form it into an entirety by screw rod, each splicing gap is filled out by water-swellable adhesive tape Fill, reach the effect that water is closed in sealing.
The basic structure of the spliced inspection shaft of new precast panel is by the top cover (1) with manhole, mainboard with holes (2), joint angle Post (3), preset nut (4), connecting bolt (5), locking nut (6), solid side panels (7), undertaking bottom plate (8) composition, preset spiral shell Female (4) are embedded in mainboard with holes (2) and solid side panels (7) both ends and undertaking bottom plate (8) bottom respectively, mainboard (2) with holes and Connection corner post (3) and solid side panels (7), which are individually positioned in, to be accepted in bottom plate (8), by connecting bolt (5) and is embedded in undertaking The preset nut (4) of bottom plate (8) bottom is connected as one and locked by locking nut (6), and connection corner post (3) one end passes through Connecting bolt (5) is connected as one and by locking nut (6) with being embedded in the preset nut (4) at mainboard with holes (2) both ends Locked, connection corner post (3) other end is by connecting bolt (5) and is embedded in the preset nut (4) at solid side panels (7) both ends even Be connected into and be integrated and locked by locking nut (6), by the top cover (1) with manhole be sealed on it is final it is assembled complete on the whole, Wherein respectively splicing gap is filled with by water-swellable adhesive tape, and floating with mortar.
The utility model can preferably solve the unfavorable factor such as the brick inspection shaft poor waterproof properties of tradition, perishable, and And the form by being prefabricated in the factory ensures concrete quality, concrete strength is improved, increase inspection shaft service life, and In the case where reducing artificial input, installation effectiveness is greatly improved.
Brief description of the drawings:
Accompanying drawing 1 is the utility model structure diagram, by the top cover (1) with manhole, mainboard with holes (2), connection corner post (3), preset nut (4), connecting bolt (5), locking nut (6), undertaking bottom plate (8) composition.
Accompanying drawing 2 is the utility model side schematic view, by the top cover (1) with manhole, connection corner post (3), preset nut (4), connecting bolt (5), locking nut (6), solid side panels (7), undertaking bottom plate (8) composition.
Accompanying drawing 3 is the utility model top plan view, by mainboard with holes (2), connection corner post (3), solid side panels (7), is held Connect bottom plate (8) composition.
Accompanying drawing 4 is the utility model top view, is made up of the top cover (1) with manhole.
Embodiment:
In actual use, steel reinforcement cage, is then placed in mould and pours coagulation by banding steel cage first Soil, produce the top cover (1) with manhole, mainboard with holes (2), connection corner post (3), solid side panels (7) and accept bottom plate (8) reinforcing bar Concrete prefabricated element, and preset nut (4) is embedded in mainboard with holes (2) and solid side panels (7) both ends and undertaking respectively Bottom plate (8) bottom, mainboard (2) perforate size with holes carry out reserved perforate according to the pipeline laid, and will accept first during installation Bottom plate (8) is placed into the installation site of given line, then by mainboard with holes (2) and connection corner post (3) and solid side panels (7) It is individually positioned in and accepts in bottom plate (8), by connecting bolt (5) and is embedded in the preset nut (4) of undertaking bottom plate (8) bottom even Be connected into and be integrated and locked by locking nut (6), then will connection corner post (3) one end by connecting bolt (5) with being embedded in The preset nut (4) at mainboard (2) both ends with holes is connected as one and locked by locking nut (6), and connection corner post (3) is in addition One end is by connecting bolt (5) and is embedded in the preset nut (4) at solid side panels (7) both ends and is connected as one and passes through locking Nut (6) is locked, and the top cover (1) with manhole is sealed on into final assembled completion on the whole, finally wherein will respectively splice gap It is filled with by water-swellable adhesive tape, and can passes through mainboard with holes with the floating installation for completing inspection shaft of mortar, feed-line (2) it is connected with the spliced inspection shaft of new precast panel, later stage inspection personnel can be entered by the manhole on the top cover (1) with manhole Later stage repair and maintenance work is carried out inside to inspection shaft.

Claims (2)

1. the spliced inspection shaft of new precast panel, it is characterised in that:By the top cover (1) with manhole, mainboard with holes (2), joint angle Post (3), preset nut (4), connecting bolt (5), locking nut (6), solid side panels (7), undertaking bottom plate (8) composition, preset spiral shell Female (4) are embedded in mainboard with holes (2) and solid side panels (7) both ends and undertaking bottom plate (8) bottom respectively, mainboard (2) with holes and Connection corner post (3) and solid side panels (7), which are individually positioned in, to be accepted in bottom plate (8), by connecting bolt (5) and is embedded in undertaking The preset nut (4) of bottom plate (8) bottom is connected as one and locked by locking nut (6), and connection corner post (3) one end passes through Connecting bolt (5) is connected as one and by locking nut (6) with being embedded in the preset nut (4) at mainboard with holes (2) both ends Locked, connection corner post (3) other end is by connecting bolt (5) and is embedded in the preset nut (4) at solid side panels (7) both ends even Be connected into and be integrated and locked by locking nut (6), by the top cover (1) with manhole be sealed on it is final it is assembled complete on the whole, Wherein respectively splicing gap is filled with by water-swellable adhesive tape, and floating with mortar.
2. the spliced inspection shaft of new precast panel as claimed in claim 1, it is characterised in that:The described top cover with manhole (1), mainboard (2) with holes, connection corner post (3), solid side panels (7) and undertaking bottom plate (8) are by banding steel cage, then by steel Muscle cage is placed on casting concrete in mould, produce the top cover (1) with manhole, mainboard with holes (2), connection corner post (3), Solid side panels (7) and undertaking bottom plate (8) precast member for reinforcing bar concrete, and preset nut (4) is embedded in mainboard with holes respectively (2) and solid side panels (7) both ends and accept bottom plate (8) bottom.
CN201720959525.7U 2017-08-03 2017-08-03 The spliced inspection shaft of new precast panel Expired - Fee Related CN207032308U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720959525.7U CN207032308U (en) 2017-08-03 2017-08-03 The spliced inspection shaft of new precast panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720959525.7U CN207032308U (en) 2017-08-03 2017-08-03 The spliced inspection shaft of new precast panel

Publications (1)

Publication Number Publication Date
CN207032308U true CN207032308U (en) 2018-02-23

Family

ID=61474159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720959525.7U Expired - Fee Related CN207032308U (en) 2017-08-03 2017-08-03 The spliced inspection shaft of new precast panel

Country Status (1)

Country Link
CN (1) CN207032308U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109462954A (en) * 2018-11-20 2019-03-12 合肥安捷电子科技有限公司 A kind of Water-proof mouse constant temperature traffic signal controller cabinet
CN112681766A (en) * 2020-12-15 2021-04-20 安徽晶宫绿建集团有限公司 Construction device and method for water seepage prevention prefabricated slab

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109462954A (en) * 2018-11-20 2019-03-12 合肥安捷电子科技有限公司 A kind of Water-proof mouse constant temperature traffic signal controller cabinet
CN112681766A (en) * 2020-12-15 2021-04-20 安徽晶宫绿建集团有限公司 Construction device and method for water seepage prevention prefabricated slab

Similar Documents

Publication Publication Date Title
CN205276316U (en) Modular prefabricated piping lane
CN105839667B (en) The construction manufacture craft of complete prefabricated overlapping assembled underground pipe gallery
CN104805866A (en) Prefabricated comprehensive pipe gallery and construction method
CN107254884A (en) A kind of detachable prefabricated assembled concrete-filled steel square tubular column pin node
CN207348091U (en) A kind of assembled pipe gallery
CN206189455U (en) Piping lane
CN206376276U (en) A kind of prefabricated pipe gallery
CN106284655B (en) Precast concrete beam stud connects connecting node and connection method
CN204753627U (en) Prefabricated comprehensive piping lane
CN107516866A (en) A kind of Prefabricated cable duct
CN104712079B (en) The assembled polypropylene fibre sludge ceramsite concrete wall and its construction method connected based on mat surface
CN105756087A (en) Assembling-type anchoring structure for adjacent plates of prefabricated comprehensive pipe rack
CN207032308U (en) The spliced inspection shaft of new precast panel
CN108643585A (en) Precast concrete sandwich heat preservation Side fascia and its preparation construction method
CN109610311A (en) Prefabrication and assembly construction L-type floorings seam construction and implementation method
CN106958203A (en) The packaged type bridges grouting connecting-type sleeve of large scale high intensity half
CN207749657U (en) A kind of waterproofing node structure of the prefabricated composite wallboard in underground and cast in place frame column seam crossing
CN203701145U (en) Underground pipe network inspection well concrete assembly
CN207063610U (en) Transformer substation building spliced by prefabricated parts
CN107916727A (en) A kind of prefabricated composite wallboard in underground and the waterproofing node structure of cast in place frame column seam crossing
CN206189456U (en) Three cabin piping lanes
CN205753309U (en) Prefabricated cable duct
CN109137984A (en) Assembled integral mixes prefabricated pipe gallery
CN104234071A (en) Prefabricated and assembled power transmission line tower footing and construction method thereof
CN210288461U (en) Communication monitoring pole basis

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180223

Termination date: 20210803

CF01 Termination of patent right due to non-payment of annual fee