CN207032265U - Combined Anti-sliding supporting - Google Patents
Combined Anti-sliding supporting Download PDFInfo
- Publication number
- CN207032265U CN207032265U CN201720934895.5U CN201720934895U CN207032265U CN 207032265 U CN207032265 U CN 207032265U CN 201720934895 U CN201720934895 U CN 201720934895U CN 207032265 U CN207032265 U CN 207032265U
- Authority
- CN
- China
- Prior art keywords
- steel
- pipe pile
- soil nailing
- coupling beam
- sliding supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a kind of Combined Anti-sliding supporting, including soil nailing, coupling beam and the steel-pipe pile for being inserted in landslide layer and stabilized zone, described soil nailing one end is inserted in the other end in stabilized zone and is connected with the steel-pipe pile upper end, and the coupling beam connects horizontally adjacent steel-pipe pile upper end.The setting of soil nailing is drawn to the upper end of steel-pipe pile, the part Thrust of Landslide that steel-pipe pile is subject to can be shared, and coupling beam connects horizontally adjacent steel-pipe pile, the part power that steel-pipe pile is subject to then is passed into adjacent steel-pipe pile, so as to which the adjacent less steel-pipe pile of stress can share certain power when local steel-pipe pile stress is excessive.
Description
Technical field
Preventing land slide technical field is the utility model is related to, more particularly to a kind of Combined Anti-sliding supporting.
Background technology
It is harm of the preventing and treating landslide on building and influence, it is necessary to necessary engineering measure be set in landslide front portion, with resistance
Only it is slided.In China, the development of Anti-slide engineering mainly experienced following several stages:
(1) before the 1960s, retaining engineering uses antiskid retaining wall and minor diameter more in preventing land slide both at home and abroad
Friction pile.There is significant limitation in this technical measures, particularly big to Thrust of Landslide, sliding surface is deeper in actual applications
Major landslip, long and short anchor arm and small bore friction pile are then helpless, and excavate retaining wall foundation suitable danger be present
Property, quantity of masonry is big, and construction costs is high.
(2) after the 1960s, applicant with other Railway Design departments Chengdu-Kunming railway construction in, joint research
Heavy in section borehole reinforced concrete pile, and it is successful on the husky northern 1# landslides of Chengdu-Kunming railway and Ganluo station 2# landslides first Application.But
Similarly there is the problem of foregoing in this heavy in section stake holes of being excavated before slip mass, produce stake deformation in practice and excessively topple over mistake
The example of effect is quite a few.
(3) the aforementioned structure popularization and application in railway subgrade works quickly after the seventies, and constantly improve is innovated, and is successively gone out
" ∏ " the shaped steel frame row of piles set by the iron forth academy in branch willow line sieve according to small stream landslide and Chengdu Railway Bureau are showed in nineteen eighty-three in river
" h " type framed bent friction pile used at the line K180 embankment slides of Guizhou Province.
Friction pile has been developed as a kind of ripe landslide control engineering measure at present, and its main antiskid principle is:
The soil arching effect formed by means of the frictional resistance of antiskid section below pile body sliding surface and the stake back of the body soil body and stake both sides is slided with stable
Body, its mechanism of action are to be passed to down the Thrust of Landslide of lack of equilibrium in gliding mass by friction pile using the stake being embedded in slider bed
In the stable Rock And Soil in portion, so as to stabilization and slopes are balanced, reach the purpose of harnessing landslide.Common friction pile has quantity of masonry
Small, construction safety is reliable, flexible arrangement facility, the advantages that strong adaptability.
But with the increase of Thrust of Landslide, need effectively to disperse away these internal force to reduce Internal forces.
Utility model content
The purpose of this utility model is to provide a kind of Combined Anti-sliding supporting, and it can effectively disperse the thrust on landslide, enhancing
The structural strength of antiskid supporting.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of Combined Anti-sliding supporting, including soil nailing, coupling beam and the steel-pipe pile for being inserted in landslide layer and stabilized zone, the soil
Nail one end is inserted in the other end in stabilized zone and is connected with the steel-pipe pile upper end, and the coupling beam is connected on horizontally adjacent steel-pipe pile
End.
By using above-mentioned technical proposal, the setting of soil nailing is drawn to the upper end of steel-pipe pile, can share steel-pipe pile by
The part Thrust of Landslide arrived.And coupling beam connects horizontally adjacent steel-pipe pile, then the part power that steel-pipe pile is subject to is passed to adjacent
Steel-pipe pile, so as to when local steel-pipe pile stress is excessive the adjacent less steel-pipe pile of stress can share certain power.
Further, the angle of the soil nailing and the steel-pipe pile is in 45-60 °.
By using above-mentioned technical proposal, 45-60 ° of angle can increase horizontal component of the soil nailing to steel-pipe pile pulling force.
Further, two soil nailings are connected with the steel-pipe pile, the angle between the soil nailing is in 10-20 °.
By using above-mentioned technical proposal, the setting of two soil nailings can share what half was subject to relative to a soil nailing respectively
Power, improve the resistance to plucking of soil nailing.Two soil nailings can provide bigger pulling force in the case where not damaging for steel-pipe pile.
Further, the steel-pipe pile is in hollow structure, and cement block is filled with the steel-pipe pile.
By using above-mentioned technical proposal, cost can be reduced in the case where ensureing structural strength.
Further, the soil nailing includes Ribbed Bar and the cement layer being wrapped in outside soil nailing.
By using above-mentioned technical proposal, cement layer is after Ribbed Bar inserts stabilized zone, is formed along Ribbed Bar
Hole pour, cement layer mixes with soil, stabilized zone, can increase the withdrawal resistance of soil nailing.
Further, the coupling beam is C60 concrete blocks.
By using above-mentioned technical proposal, the coupling beam made of C60 concrete, for the concrete block of high intensity, can improve
The resistance to plucking of coupling beam.
In summary, the utility model has the advantages that:The setting of soil nailing is drawn to the upper end of steel-pipe pile,
The part Thrust of Landslide that steel-pipe pile is subject to can be shared, and coupling beam connects horizontally adjacent steel-pipe pile, the then portion being subject to steel-pipe pile
Component passes to adjacent steel-pipe pile, so as to which when local steel-pipe pile stress is excessive, the adjacent less steel-pipe pile of stress can share one
Fixed power.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment one;
Fig. 2 is mounting structure schematic diagram of the antiskid supporting in landslide;
Fig. 3 is the structural representation of embodiment two.
In figure, 1, soil nailing;2nd, coupling beam;3rd, steel-pipe pile;4th, cement block;11st, Ribbed Bar;12nd, cement layer.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
This specific embodiment is only that it is not to limitation of the present utility model, ability to explanation of the present utility model
Field technique personnel can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but
As long as all protected in the scope of protection of the utility model by Patent Law.
A kind of Combined Anti-sliding supporting, as shown in figure 1, including soil nailing 1, coupling beam 2 and being inserted in landslide layer and stabilized zone
Steel-pipe pile 3, the one end of soil nailing 1 are inserted in the other end in stabilized zone and are connected with the upper end of steel-pipe pile 3, and coupling beam 2 connects horizontally adjacent steel
The upper end of pile tube 3.As shown in Fig. 2 wherein a quarter of steel-pipe pile 3 or so is inserted in stabilized zone, 2/3rds or so are inserted in
Come down layer, and ten halfs or so expose connection soil nailing 1 and coupling beam 2 on the layer of landslide.Coupling beam 2 is mixed by the C60 of high intensity
Solidifying soil, which pours, to be formed, and can improve the resistance to plucking of coupling beam 2.
In order to increase horizontal pull of the soil nailing 1 to steel-pipe pile 3, the angle between soil nailing 1 and steel-pipe pile 3 is 45-60 °
Steel-pipe pile 3 is in hollow structure, and cement block 4 is filled with steel-pipe pile 3.In work progress, steel-pipe pile 3 is firstly inserted into
Come down layer and stabilized zone, and then injecting cement mortar to it forms cement block 4.Cement mortar also may be cast in outside steel-pipe pile 3, prevent steel
Pile tube 3 gets rusty, and makes the outside of steel-pipe pile 3 and soil adhesion, so as to improve the withdrawal resistance of steel-pipe pile 3.
Soil nailing 1 when mounted, takes drilling in soil to insert Ribbed Bar 11, and form cement layer 12 along hole total length slip casting
Method makes soil nailing 1.
Embodiment two:A kind of Combined Anti-sliding supporting, as shown in figure 3, unlike embodiment, in the base of embodiment one
On plinth, two soil nailings 1 are connected with steel-pipe pile 3, the angle between soil nailing 1 is in 10-20 °, and two in the main stress direction of steel-pipe pile 3
Side is symmetrical arranged.The setting of two soil nailings 1 can share the power that half is subject to relative to a soil nailing 1 respectively, improve the anti-of soil nailing 1
Pulling out property.And two soil nailings 1 are not in the case where damaging, and can be that steel-pipe pile 3 provides bigger pulling force.
Claims (6)
1. a kind of Combined Anti-sliding supporting, it is characterized in that:Including soil nailing (1), coupling beam (2) and it is inserted in landslide layer and stabilized zone
Steel-pipe pile (3), described soil nailing (1) one end are inserted in the other end in stabilized zone and are connected with the steel-pipe pile (3) upper end, the coupling beam
(2) horizontally adjacent steel-pipe pile (3) upper end is connected.
2. Combined Anti-sliding supporting according to claim 1, it is characterized in that:The soil nailing (1) and the steel-pipe pile (3)
Angle is in 45-60 °.
3. Combined Anti-sliding supporting according to claim 2, it is characterized in that:Two soil are connected with the steel-pipe pile (3)
Follow closely (1), the angle between the soil nailing (1) is in 10-20 °.
4. Combined Anti-sliding supporting according to claim 1, it is characterized in that:The steel-pipe pile (3) is in hollow structure, described
Cement block (4) is filled with steel-pipe pile (3).
5. Combined Anti-sliding supporting according to claim 1, it is characterized in that:The soil nailing (1) includes Ribbed Bar (11)
Be wrapped in the cement layer (12) of soil nailing (1) outside.
6. Combined Anti-sliding supporting according to claim 1, it is characterized in that:The coupling beam (2) is C60 concrete blocks.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720934895.5U CN207032265U (en) | 2017-07-28 | 2017-07-28 | Combined Anti-sliding supporting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720934895.5U CN207032265U (en) | 2017-07-28 | 2017-07-28 | Combined Anti-sliding supporting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207032265U true CN207032265U (en) | 2018-02-23 |
Family
ID=61463168
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720934895.5U Expired - Fee Related CN207032265U (en) | 2017-07-28 | 2017-07-28 | Combined Anti-sliding supporting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207032265U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115162374A (en) * | 2022-07-12 | 2022-10-11 | 四川省公路规划勘察设计研究院有限公司 | Multilayer sliding surface landslide supporting structure |
-
2017
- 2017-07-28 CN CN201720934895.5U patent/CN207032265U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115162374A (en) * | 2022-07-12 | 2022-10-11 | 四川省公路规划勘察设计研究院有限公司 | Multilayer sliding surface landslide supporting structure |
CN115162374B (en) * | 2022-07-12 | 2023-09-26 | 四川省公路规划勘察设计研究院有限公司 | Multi-layer sliding surface landslide support structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100535263C (en) | Construction method for vertical prestressed anchor rope friction pile slope-sliding prevention and treatment | |
CN106638673B (en) | A kind of construction method of compound retaining structure | |
CN103835729B (en) | Deep distance roadway surrounding rock pre grouting from the surface reinforcement process | |
CN105239586B (en) | Method for supporting foundation pit by adopting support structure | |
CN201099859Y (en) | Multi-segment pocket type squeezing -type anchor rod | |
CN203741868U (en) | Reinforced concrete retaining wall structure with combined anchor wire | |
CN103526773B (en) | Cantilever type vertical anchor rod composite retaining wall and design and construction method thereof | |
CN109538216A (en) | Pass through mined out and subsidence area constructing tunnel technique | |
CN103898916A (en) | Mini-pile combined support structure and construction method thereof | |
WO2015103862A1 (en) | Method for supporting by means of full-length pre-stressed anchorage with paste material being first poured and last anchored | |
CN104863108B (en) | A kind of ground-connecting-wall soil lateral pressure box embedded device | |
CN104164875A (en) | Tension and compression combination-type anchor rod | |
CN205776250U (en) | A kind of Double-row-piles Structure system being provided with dilazep anchor pattern | |
CN207032265U (en) | Combined Anti-sliding supporting | |
CN206971247U (en) | A kind of concrete plinth foundation ruggedized construction being placed on Unloading Rock | |
CN108532647A (en) | A kind of structure and method of the antiseismic liquefaction uplifting in subway station | |
CN205576957U (en) | Stake end pilework | |
CN208996052U (en) | The drilling tool of supporting construction and use that foundation pit anchor wall draws anchor supporting to be formed | |
CN208472713U (en) | A kind of composite structure mini pile for administering small-sized landslide | |
CN1044272C (en) | Engineering method for consolidating mountain slip surface and raising resistance to sliding | |
CN201406687Y (en) | Deep foundation pit supporting structure | |
CN203559430U (en) | Cantilever type composite retaining wall provided with perpendicular anchor rods | |
CN203583501U (en) | Deep-layer shear resistant device capable of preventing rock sliding | |
CN206768832U (en) | Support, anchor cable post-tensioning H type component building enclosures before a kind of steel pipe | |
CN206220104U (en) | A kind of Frozen Soil Cylinder Foundation Supported with Composite Soil Nailing system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180223 Termination date: 20190728 |