CN207032059U CN201720984921.5U CN201720984921U CN207032059U CN 207032059 U CN207032059 U CN 207032059U CN 201720984921 U CN201720984921 U CN 201720984921U CN 207032059 U CN207032059 U CN 207032059U
Authority
CN
China
Prior art keywords
steel box
girder
pipe bending
counter
slipway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720984921.5U
Other languages
Chinese (zh)
Inventor
李兴全
支有
朱江川
朱东明
熊秋林
张延辉
蒋新闻
杨灿辉
张丕云
李爱民
高继武
冉明军
梁辉
范桂玲
乐常慈
付杰
朱富
邓俊
浦仕龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Jiaotong Highway Construction Sixth Engineering Co., Ltd.
China Railway Jiujiang Bridge Engineering Co Ltd
Original Assignee
Yunnan Referendum Construction Group Sixth Engineering Co Ltd
China Railway Jiujiang Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Referendum Construction Group Sixth Engineering Co Ltd, China Railway Jiujiang Bridge Engineering Co Ltd filed Critical Yunnan Referendum Construction Group Sixth Engineering Co Ltd
Priority to CN201720984921.5U priority Critical patent/CN207032059U/en
Application granted granted Critical
Publication of CN207032059U publication Critical patent/CN207032059U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of pushing tow power set available for Large-span Steel Box Beam construction, belong to a kind of corollary apparatus of bridge construction, including pipe bending cylinder, one end of the pipe bending cylinder is arranged on the end of steel box-girder, the other end is arranged on oil cylinder counter-force seat, the oil cylinder counter-force seat is arranged on slipway beam, and the steel box-girder is placed in the top of slipway beam.By the way that oil cylinder counter-force seat is arranged on slipway beam, so that pipe bending cylinder is after power is exported, counter-force backward is obtained from slipway beam, steel box-girder is promoted to be moved forward on slipway beam using the counter-force backward, and by changing position of the oil cylinder counter-force seat on slipway beam, you can pipe bending cylinder pushing steel box girder is constantly moved forward on slipway beam, be advantageous to lift the convenience to move forward in steel box girder construction, without the other crane gear auxiliary of peripheral hardware, Temporary Piers are set up without because steel box-girder moves forward;Simultaneously of the present utility model simple in construction, suitable for being installed and used in all kinds of places, application is wide.

Description

Pushing tow power set available for Large-span Steel Box Beam construction
Technical field
A kind of corollary apparatus of bridge construction is the utility model is related to, in particular, the utility model relates generally to one Kind can be used for the pushing tow power set of Large-span Steel Box Beam construction.
Background technology
Steel box girder incremental launching method construction is so that its construction cost is low, speed of application is fast, construction stationarity is good, construction period controllability By force, in constructing need not in obtain more and more extensive application many advantages, such as traffic under bridge cut-off, be particularly suitable for use in across busy The bridge of traffic route, shipping river.But with the development of Bridges in Our Country cause, due to being influenceed and design form by landform Variation, part steel box girder bridge beam span is larger, across road or river because traffic or geology, hydrologic condition reason can not be set Put Temporary Piers.Bridge linear of this kind of steel box-girder in work progress controls, the reaction of supports controls, steel box-girder itself Stress Control Very high requirement is proposed etc. many aspects.Thus it is necessary for the push construction method of Large-span Steel Box Beam and with being arranged The structure applied further is studied and improved.
Utility model content
One of the purpose of this utility model is to be directed to above-mentioned deficiency, there is provided a kind of to can be used for what Large-span Steel Box Beam was constructed Pushing tow power set, it is larger it is expected to solve steel box girder bridge beam span in the prior art, it is difficult for bridge linear and the reaction of supports With technical problems such as controls.
To solve above-mentioned technical problem, the utility model uses following technical scheme:
A kind of pushing tow power set available for Large-span Steel Box Beam construction provided by the utility model, including pushing tow oil Cylinder, one end of the pipe bending cylinder are arranged on the end of steel box-girder, and the other end is arranged on oil cylinder counter-force seat, and the oil cylinder is anti- Power seat is arranged on slipway beam, and the steel box-girder is placed in the top of slipway beam.
Preferably, further technical scheme is:The slipway beam is provided with multiple pin shaft holes, and multiple pin shaft hole phases The distance between mutual equal, the oil cylinder counter-force seat is arranged on slipway beam by pin shaft hole.
Further technical scheme is:Multiple pin shaft holes arrange when slipway beam is horizontal positioned along horizontal line.
Further technical scheme is:The end of the pipe bending cylinder is arranged on oil cylinder counter-force seat, clutch end Installed in the end of steel box-girder.
Further technical scheme is:It is also equipped with leading between the output end of the pipe bending cylinder and the end of steel box-girder To seat, the output end with pipe bending cylinder, the end of steel box-girder are fixedly connected the guide holder respectively.
Further technical scheme is:Power transmission bearing beam is also equipped between guide holder and the end of steel box-girder.
Further technical scheme is:The pipe bending cylinder two, the slipway beam are two, and two slipway beams point The both sides of steel box-girder are not placed in, and two pipe bending cylinders are respectively placed in respective slipway beam top.
Compared with prior art, one of the beneficial effects of the utility model are:By the way that oil cylinder counter-force seat is arranged on into slideway Liang Shang so that pipe bending cylinder obtains counter-force backward after power is exported from slipway beam, and steel is promoted using the counter-force backward Box beam moves forward on slipway beam, and by changing position of the oil cylinder counter-force seat on slipway beam, you can make pipe bending cylinder pushing tow Steel box-girder constantly moves forward on slipway beam, is advantageous to lift the convenience to move forward in steel box girder construction, without the other liftings of peripheral hardware Equipment is aided in, and Temporary Piers are set up without because steel box-girder moves forward, at the same it is provided by the utility model it is a kind of can be used for greatly across The pushing tow powerplant configuration of degree steel box girder construction is simple, and suitable for being installed and used in all kinds of places, application is wide.
Brief description of the drawings
Fig. 1 is the structural representation for illustrating the utility model one embodiment;
Fig. 2 is Fig. 1 A to schematic diagram;
In figure, 1 it is pipe bending cylinder, 2 is steel box-girder, 3 is oil cylinder counter-force seat, 4 is slipway beam, 5 is pin shaft hole, 6 is guiding Seat, 7 are power transmission bearing beam.
Embodiment
The utility model is further elaborated below in conjunction with the accompanying drawings.
With reference to shown in figure 1, one embodiment of the present utility model is a kind of pushing tow available for Large-span Steel Box Beam construction Power set, including pipe bending cylinder 1, one end of the pipe bending cylinder 1 are arranged on the end of steel box-girder 2, and the other end is arranged on oil On cylinder counter-force seat 3, the oil cylinder counter-force seat 3 need to be arranged on slipway beam 4, and steel box-girder 2 is placed in the top of slipway beam 4.And then make steel Box beam 2 is slided in the presence of jacking force in the top of slipway beam 4.
In the present embodiment, by the way that oil cylinder counter-force seat 3 is arranged on slipway beam 4 so that pipe bending cylinder 1 is in output power Afterwards, counter-force backward is obtained from slipway beam 4, promotes steel box-girder 2 to be moved forward on slipway beam 4 using the counter-force backward, and By changing 3 position on slipway beam 4 of oil cylinder counter-force seat, you can make the pushing steel box girder 2 of pipe bending cylinder 1 on slipway beam 4 not Move forward disconnectedly, be advantageous to lift the convenience to move forward during steel box-girder 2 is constructed, aided in without the other crane gears of peripheral hardware, without Temporary Piers are set up because steel box-girder moves forward.
Go out as shown in Figure 1, in another embodiment of the present utility model, for ease of installation oil cylinder counter-force seat 3, go back Multiple pin shaft holes 5 can be set on above-mentioned slipway beam 4, and the mutual distance of multiple pin shaft holes 5 is disposed as it is equal, so Oil cylinder counter-force seat 3 is arranged on slipway beam 4 by pin shaft hole 5 afterwards.And then pipe bending cylinder 1 is set to be obtained every time from slipway beam 4 Counter-force, the distance for promoting steel box-girder 2 to move forward is all equal, contributes to pushing steel box girder 2 at the uniform velocity to move forward;Foregoing multiple pins Axis hole 5 preferably arranges when slipway beam 4 is horizontal positioned along horizontal line, is conveniently adjusted the position of oil cylinder counter-force seat 3, ensures steel box-girder The stability of 2 lateral displacements.And oil cylinder counter-force seat 3 is installed on slipway beam 4 by inserting the latch of pin shaft hole, can also be lifted The convenience that oil cylinder counter-force seat 3 dismounts.And oil cylinder counter-force seat 3 is just played only at the end of pipe bending cylinder 1 portion mounted thereto and made With, therefore the quantity of the oil cylinder counter-force seat 3 on slipway beam 4 can set one or more according to being actually needed, when being arranged to multiple, The dismounting number of oil cylinder counter-force seat 3 in work progress can be reduced.
On the other hand, referring still to shown in Fig. 1, according to another embodiment of the present utility model, pushing tow is lifted to be further The stability of the power output of oil cylinder 1, its end can be arranged on oil cylinder counter-force seat 3, and clutch end is then arranged on steel case The end of beam 2.
Further, a guide holder 6 can be also installed again between the output end of pipe bending cylinder 1 and the end of steel box-girder 2, The output end with pipe bending cylinder 1, the end of steel box-girder 2 are fixedly connected the guide holder 6 respectively;It is corresponding, can also be upper State and a power transmission bearing beam 7 is installed again between the end of guide holder 6 and steel box-girder 2;By foregoing structure, steel box-girder can be lifted The harmony of 2 end stress, i.e., the point of pipe bending cylinder 1 is exported by power by guide holder 6 and power transmission bearing beam 7 and be converted to face output Power, the lifting surface area of steel box-girder 2 is expanded, when the weight of steel box-girder 2 is larger, steel box-girder 2 can be ensured in this way It can smoothly be moved forward in slipway beam 4, avoid making the end of steel box-girder 2 that depression or curved occur because of the point output power of pipe bending cylinder Folding.
It is suitable in the utility model is used to solve technical problem more preferably your one embodiment with reference to shown in Fig. 2 The width of steel box-girder 2 is answered, slipway beam 4 can be two, then puts two slipway beams 4 respectively by above-mentioned pipe bending cylinder 1 two The respective top of slipway beam 4 is respectively placed in the both sides of steel box-girder 2, then by two pipe bending cylinders 1, is controlling pipe bending cylinder 1 In the presence of device, synchronization telescope is realized, i.e., both obtain counter-force on respective oil cylinder counter-force seat 3 simultaneously, synchronous to steel case The power of the end output reach of beam 2, moves forward from the both sides synchronous drive steel box-girder 2 of steel box-girder 2.
Than that described above, it is also necessary to which explanation is " one embodiment ", " another implementation spoken of in this manual Example ", " embodiment " etc., refer to that the specific features, structure or the feature that combine embodiment description are included in the application summary Property description at least one embodiment in.It is not necessarily to refer to same reality that statement of the same race, which occur, in multiple places in the description Apply example.Furthermore, it is understood that when describing a specific features, structure or feature with reference to any embodiment, what is advocated is knot Other embodiment is closed to realize that this feature, structure or feature also fall in the scope of the utility model.
Although reference be made herein to the utility model is described multiple explanatory embodiments of the present utility model, still, It should be understood that those skilled in the art can be designed that a lot of other modifications and embodiment, these modifications and embodiment It will fall within spirit disclosed in the present application and spirit.More specifically, in disclosure, drawings and claims In the range of, a variety of variations and modifications can be carried out to the building block and/or layout of theme combination layout.Except to building block And/or outside the variations and modifications of layout progress, to those skilled in the art, other purposes also will be apparent.

Claims (7)

1. a kind of pushing tow power set available for Large-span Steel Box Beam construction, including pipe bending cylinder (1), it is characterised in that:Institute The one end for stating pipe bending cylinder (1) is arranged on the end of steel box-girder (2), and the other end is arranged on oil cylinder counter-force seat (3), the oil Cylinder counter-force seat (3) is arranged on slipway beam (4), and the steel box-girder (2) is placed in the top of slipway beam (4).
2. the pushing tow power set according to claim 1 available for Large-span Steel Box Beam construction, it is characterised in that:It is described Slipway beam (4) is provided with multiple pin shaft holes (5), and multiple pin shaft holes (5) it is mutual distance it is equal, the oil cylinder counter-force seat (3) it is arranged on by pin shaft hole (5) on slipway beam (4).
3. the pushing tow power set according to claim 2 available for Large-span Steel Box Beam construction, it is characterised in that:It is described Multiple pin shaft holes (5) arrange when slipway beam (4) is horizontal positioned along horizontal line.
4. the pushing tow power set according to claim 1 available for Large-span Steel Box Beam construction, it is characterised in that:It is described The end of pipe bending cylinder (1) is arranged on oil cylinder counter-force seat (3), and clutch end is arranged on the end of steel box-girder (2).
5. the pushing tow power set that can be used for Large-span Steel Box Beam construction according to claim 1 or 4, it is characterised in that: Guide holder (6), the guide holder (6) point are also equipped between the output end of the pipe bending cylinder (1) and the end of steel box-girder (2) Output end, the end of steel box-girder (2) not with pipe bending cylinder (1) are fixedly connected.
6. the pushing tow power set according to claim 5 available for Large-span Steel Box Beam construction, it is characterised in that:It is described Power transmission bearing beam (7) is also equipped between the end of guide holder (6) and steel box-girder (2).
7. the pushing tow power set according to claim 5 available for Large-span Steel Box Beam construction, it is characterised in that:It is described Pipe bending cylinder (1) two, the slipway beam (4) is two, and two slipway beams (4) are respectively placed in the both sides of steel box-girder (2), two Individual pipe bending cylinder (1) is respectively placed in respective slipway beam (4) top.
CN201720984921.5U 2017-08-08 2017-08-08 Pushing tow power set available for Large-span Steel Box Beam construction Active CN207032059U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720984921.5U CN207032059U (en) 2017-08-08 2017-08-08 Pushing tow power set available for Large-span Steel Box Beam construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720984921.5U CN207032059U (en) 2017-08-08 2017-08-08 Pushing tow power set available for Large-span Steel Box Beam construction

Publications (1)

Publication Number Publication Date
CN207032059U true CN207032059U (en) 2018-02-23

Family

ID=61474758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720984921.5U Active CN207032059U (en) 2017-08-08 2017-08-08 Pushing tow power set available for Large-span Steel Box Beam construction

Country Status (1)

Country Link
CN (1) CN207032059U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020215651A1 (en) * 2019-04-23 2020-10-29 山东省路桥集团有限公司 Limiting guide device for steel box girder incremental launching construction and limiting construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020215651A1 (en) * 2019-04-23 2020-10-29 山东省路桥集团有限公司 Limiting guide device for steel box girder incremental launching construction and limiting construction method

Similar Documents

Publication Publication Date Title
CN102535343B (en) Method for erecting girder on top of main tower mound of steel truss girder cable-stayed bridge
CN100543235C (en) The method and system of erecting steel trusses by stay cable auxiliary complete cantilever
CN2863902Y (en) Guiding device for sinking steel pile casting
CN204266134U (en) Heavy duty longspan steel truss girder walking type pushing device
CN207079483U (en) Guiding and deviation correcting device available for Large-span Steel Box Beam construction
CN206986749U (en) Platform for lining available for Large-span Steel Box Beam construction
CN106368129B (en) A kind of push construction method of single-track railway steel truss bridge using nose girder
CN105672353B (en) A kind of cast-in-place diaphram wall and assembled metro station construction integral method
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN105672673A (en) Quick locating device and method for prefabricated floor slabs
CN105951608A (en) Pushing construction method for corrugated steel web prestressed concrete combination beam
CN110172922B (en) Construction method of environment-friendly downlink self-propelled steel trestle structure
CN101324054B (en) Incremental launching positioning construction method of bridge subsection girder temporary pier
CN105484168B (en) Rotary hoisting equipment for stiffening beam of suspension bridge and erecting method of stiffening beam
CN207032059U (en) Pushing tow power set available for Large-span Steel Box Beam construction
CN109056534B (en) Movable cast-in-situ bored pile construction platform and method
CN206986750U (en) Buttress support available for Large-span Steel Box Beam construction
CN102587280B (en) Main tower area steel truss girder erection method of base support auxiliary frame beam crane and base support
CN110158470B (en) Method for constructing continuous highway beam by longitudinally and transversely moving movable formwork in complex environment
CN203768817U (en) Equipment for erecting beams in tunnel
CN203742198U (en) Monolithic movement slip device of building
CN105672236A (en) Pin type rapid lifting mechanism and lifting method thereof
CN206986751U (en) Available for pier device on the nose girder of Large-span Steel Box Beam construction
CN203174516U (en) Suspension bridge closure segment construction beam segment traction pre-deflection device
CN111945572B (en) Multi-connected arch bridge erecting machine and multi-connected arch bridge erecting method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 650000 5th floor of an office building, phase II, Liu Jiaying District, 101 Anrui Road, Xishan District, Kunming City, Yunnan Province

Co-patentee after: China Railway Jiujiang Bridge Engineering Co., Ltd.

Patentee after: Yunnan Jiaotong Highway Construction Sixth Engineering Co., Ltd.

Address before: 650000 5th floor of an office building, phase II, Liu Jiaying District, 101 Anrui Road, Xishan District, Kunming City, Yunnan Province

Co-patentee before: China Railway Jiujiang Bridge Engineering Co., Ltd.

Patentee before: Yunnan referendum Construction Group Sixth Engineering Co., Ltd.