CN207028909U - Conduit in a kind of tunnel - Google Patents

Conduit in a kind of tunnel Download PDF

Info

Publication number
CN207028909U
CN207028909U CN201720675310.2U CN201720675310U CN207028909U CN 207028909 U CN207028909 U CN 207028909U CN 201720675310 U CN201720675310 U CN 201720675310U CN 207028909 U CN207028909 U CN 207028909U
Authority
CN
China
Prior art keywords
steel pipe
mounting bracket
conduit
installing plate
spacing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720675310.2U
Other languages
Chinese (zh)
Inventor
周华
王贞
王贞一
罗天昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangyang Xinpu Electrification Engineering Co Ltd
Original Assignee
Xiangyang Xinpu Electrification Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiangyang Xinpu Electrification Engineering Co Ltd filed Critical Xiangyang Xinpu Electrification Engineering Co Ltd
Priority to CN201720675310.2U priority Critical patent/CN207028909U/en
Application granted granted Critical
Publication of CN207028909U publication Critical patent/CN207028909U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model provides conduit in a kind of tunnel.Include the steel pipe of an arc, the section of steel pipe is square, and the centre of steel pipe lower surface hollows out the mounting groove for being provided with strip;Described steel pipe upper surface is provided with the mounting bracket of left, center, right three, wherein the mounting bracket on the right is fixedly welded on steel pipe, middle and the left side mounting bracket is bascule;Described centre and the mounting bracket on the left side include the installing plate of a rectangle, installing plate lower surface is provided with two blocks of steel plates vertical with installing plate, spacing is remained between steel plate, the size of spacing is equal to the width of steel pipe, and mounting bracket is stuck in the enterprising line slip of steel pipe by spacing;Two waist round hole are also symmetrically offered above described installing plate, are attached for the infrastructure with conduit.The utility model is simple in construction, can adapt to different conduit installation requirements, and easy for installation, cost is low, and not waste of materials, may be reused, improves production efficiency.

Description

Conduit in a kind of tunnel
Technical field
Railway tunnel facility technology field is the utility model is related to, is related specifically to conduit in a kind of tunnel.
Background technology
Contact net is the high voltage transmission line for taking stream for pantograph in electric railway, and it is responsible for handle from traction power transformation The electric energy obtained is delivered directly to the vital task that electric locomotive uses, therefore the quality of contact net and working condition will be direct Affect the transport capacity of electric railway.The installation positioning of overhead contact built-in conduit is very important pass during constructing tunnel One of key process, pre-buried channel flow is difficult to remedy after tunnel-liner installation, and maintenance cost is higher, the peace of pre-buried channel flow Dress effect directly affects the operation situation of later stage railway.
Well in advance conduit when conduit has tunnel wall shaping in railway tunnel at present, but without special product and standard Formulate this type products so that although conduit is all arc, installation site and corresponding fixture are all different, therefore Many problems are run into when installation, many accessories can only be disposable, cannot be continuing with, make after the conduit renewed Into great waste.
The content of the invention
Technical problem to be solved in the utility model is the defects of overcoming prior art, there is provided a kind of simple in construction, energy Different conduit installation requirements is enough adapted to, easy for installation, cost is low, and not waste of materials, in the tunnel that may be reused Conduit.
To achieve these goals, the utility model uses following technical scheme:
Conduit in a kind of tunnel, it is characterised in that include the steel pipe of an arc, the section of steel pipe is square, steel pipe The centre of lower surface hollows out the mounting groove for being provided with strip;Described steel pipe upper surface is provided with the mounting bracket of left, center, right three, The mounting bracket on wherein the right is fixedly welded on steel pipe, and middle and the left side mounting bracket is bascule;Described centre and a left side The mounting bracket on side includes the installing plate of a rectangle, and installing plate lower surface is provided with two blocks of steel plates vertical with installing plate, steel Spacing is remained between plate, the size of spacing is equal to the width of steel pipe, and mounting bracket is stuck in the enterprising line slip of steel pipe by spacing;Institute Two waist round hole are also symmetrically offered above the installing plate stated, are attached for the infrastructure with conduit.
In such scheme, the mounting bracket on described the right is the flat board of one piece of rectangle, and two are also symmetrically arranged with flat board Individual waist round hole.
In such scheme, described two blocks of steel plates vertical with installing plate are in approximately the same plane, two blocks of steel plates The spacing retained between clamps steel pipe.
In such scheme, the left end of described mounting groove is got through in the opening position close to steel pipe left end, forms groove, peace End at the mounting bracket of the extreme position of the right-hand member of tankage on the right.
The utility model is by adopting the above-described technical solution, have the advantages that:
The utility model is simple in construction, can adapt to different conduit installation requirements, and easy for installation, cost is low, and not It waste of materials, may be reused, improve production efficiency.
Brief description of the drawings
Fig. 1 is the utility model embodiment front view;
Fig. 2 is the utility model embodiment upward view;
In figure:1 steel pipe, 2 mounting grooves, 3 installing plates, 4 steel plates.
Embodiment
In order that content of the present utility model is readily apparent understood, below according to specific embodiment and combine attached Figure, is described in further detail to the utility model.
The conduit in tunnel as shown in Fig. 1 Fig. 2, includes the steel pipe 1 of an arc, and the section of steel pipe 1 is square, steel pipe 1 The centre of lower surface hollows out the mounting groove 2 for being provided with strip;The described upper surface of steel pipe 1 is provided with the installation of left, center, right three Frame, wherein the mounting bracket on the right is fixedly welded on steel pipe 1, middle and the left side mounting bracket is bascule;Described centre Include the installing plate 3 of a rectangle with the mounting bracket on the left side, the lower surface of installing plate 3 is provided with two blocks of steel vertical with installing plate Plate 4, remains with spacing between steel plate 4, and the size of spacing is equal to the width of steel pipe 1, and it is enterprising that mounting bracket by spacing is stuck in steel pipe 1 Line slip;Described installing plate 3 also symmetrically offers two waist round hole above, is attached for the infrastructure with conduit.
In the present embodiment, the mounting bracket on described the right is the flat board of one piece of rectangle, and two are also symmetrically arranged with flat board Individual waist round hole.
In the present embodiment, the described two blocks steel plates 4 vertical with installing plate are in approximately the same plane, two blocks of steel plates 4 The spacing retained between clamps steel pipe 1.
In the present embodiment, the left end of described mounting groove 2 is got through in the opening position close to the left end of steel pipe 1, forms groove, End at the mounting bracket of the extreme position of the right-hand member of mounting groove 2 on the right.
Particular embodiments described above, technical problem, technical scheme and the beneficial effect solved to the utility model are entered Further description is gone, should be understood that and the foregoing is only specific embodiment of the utility model, and do not have to In limitation the utility model, all within the spirit and principles of the utility model, any modification, equivalent substitution and improvements done Deng should be included within the scope of protection of the utility model.

Claims (4)

1. conduit in a kind of tunnel, it is characterised in that include the steel pipe of an arc, the section of steel pipe is square, under steel pipe The centre on surface hollows out the mounting groove for being provided with strip;Described steel pipe upper surface is provided with the mounting bracket of left, center, right three, its The mounting bracket on middle the right is fixedly welded on steel pipe, and middle and the left side mounting bracket is bascule;Described centre and the left side Mounting bracket include the installing plate of a rectangle, installing plate lower surface is provided with two blocks of steel plates vertical with installing plate, steel plate Between remain with spacing, the size of spacing is equal to the width of steel pipe, and mounting bracket is stuck in the enterprising line slip of steel pipe by spacing;It is described Installing plate above also symmetrically offer two waist round hole, be attached for the infrastructure with conduit.
2. conduit in tunnel as claimed in claim 1, it is characterised in that the mounting bracket on described the right is the flat of one piece of rectangle Plate, two waist round hole are also symmetrically arranged with flat board.
3. conduit in tunnel as claimed in claim 1, it is characterised in that two blocks of described steel plates vertical with installing plate are in In approximately the same plane, the spacing retained between of two blocks of steel plates clamps steel pipe.
4. conduit in tunnel as claimed in claim 1, it is characterised in that the left end of described mounting groove is close to steel pipe left end Opening position get through, form groove, end at the mounting bracket of the extreme position of the right-hand member of mounting groove on the right.
CN201720675310.2U 2017-06-12 2017-06-12 Conduit in a kind of tunnel Expired - Fee Related CN207028909U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720675310.2U CN207028909U (en) 2017-06-12 2017-06-12 Conduit in a kind of tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720675310.2U CN207028909U (en) 2017-06-12 2017-06-12 Conduit in a kind of tunnel

Publications (1)

Publication Number Publication Date
CN207028909U true CN207028909U (en) 2018-02-23

Family

ID=61471224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720675310.2U Expired - Fee Related CN207028909U (en) 2017-06-12 2017-06-12 Conduit in a kind of tunnel

Country Status (1)

Country Link
CN (1) CN207028909U (en)

Similar Documents

Publication Publication Date Title
CN203939507U (en) A kind of can separate assembling lining trolley
CN203820048U (en) Adjustable hand grip
CN207028909U (en) Conduit in a kind of tunnel
CN206903690U (en) A kind of overhead contact built-in conduit
CN203767627U (en) Transporter for production line
CN202687787U (en) Gantry crane rail transfer device for heavy haul railway beam yard
CN204527193U (en) Track installation and repairing maintenance machine
CN204035414U (en) Metal wire straightener
CN204156119U (en) A kind of novel grounded electrode structure
CN203143966U (en) Movable simple hoisting device
CN203942212U (en) wire stretcher special safety clip
CN207385703U (en) A kind of device for improving slag produced from steel-smelting efficiency of magnetic separation
CN206759011U (en) Support for the section cable laying of track traffic underground
CN202642802U (en) Automatic turnover device
CN207130554U (en) A kind of railroad sleeper more exchange device
CN203610438U (en) Positioning structure of rolling-assisting device frame body
CN203975904U (en) A kind of channel-dividing device
CN202684193U (en) Bevel shearing machine for steel plate
CN204611229U (en) Aluminium process equipment railroad shoe
CN207724238U (en) Novel battery disassembling apparatus
CN204490920U (en) A kind of hello pompon nodularization room
CN203638632U (en) Telescopic triangular groove type bracket
CN203834372U (en) Trolley for culvert and channel cover plate construction
CN203283765U (en) Upper carrier roller support capable of adjusting groove angle
CN204162962U (en) Stiffening device stablized by a kind of solid concrete roabed railway

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180223

Termination date: 20190612