CN207028909U - Conduit in a kind of tunnel - Google Patents
Conduit in a kind of tunnel Download PDFInfo
- Publication number
- CN207028909U CN207028909U CN201720675310.2U CN201720675310U CN207028909U CN 207028909 U CN207028909 U CN 207028909U CN 201720675310 U CN201720675310 U CN 201720675310U CN 207028909 U CN207028909 U CN 207028909U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- mounting bracket
- conduit
- installing plate
- spacing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model provides conduit in a kind of tunnel.Include the steel pipe of an arc, the section of steel pipe is square, and the centre of steel pipe lower surface hollows out the mounting groove for being provided with strip;Described steel pipe upper surface is provided with the mounting bracket of left, center, right three, wherein the mounting bracket on the right is fixedly welded on steel pipe, middle and the left side mounting bracket is bascule;Described centre and the mounting bracket on the left side include the installing plate of a rectangle, installing plate lower surface is provided with two blocks of steel plates vertical with installing plate, spacing is remained between steel plate, the size of spacing is equal to the width of steel pipe, and mounting bracket is stuck in the enterprising line slip of steel pipe by spacing;Two waist round hole are also symmetrically offered above described installing plate, are attached for the infrastructure with conduit.The utility model is simple in construction, can adapt to different conduit installation requirements, and easy for installation, cost is low, and not waste of materials, may be reused, improves production efficiency.
Description
Technical field
Railway tunnel facility technology field is the utility model is related to, is related specifically to conduit in a kind of tunnel.
Background technology
Contact net is the high voltage transmission line for taking stream for pantograph in electric railway, and it is responsible for handle from traction power transformation
The electric energy obtained is delivered directly to the vital task that electric locomotive uses, therefore the quality of contact net and working condition will be direct
Affect the transport capacity of electric railway.The installation positioning of overhead contact built-in conduit is very important pass during constructing tunnel
One of key process, pre-buried channel flow is difficult to remedy after tunnel-liner installation, and maintenance cost is higher, the peace of pre-buried channel flow
Dress effect directly affects the operation situation of later stage railway.
Well in advance conduit when conduit has tunnel wall shaping in railway tunnel at present, but without special product and standard
Formulate this type products so that although conduit is all arc, installation site and corresponding fixture are all different, therefore
Many problems are run into when installation, many accessories can only be disposable, cannot be continuing with, make after the conduit renewed
Into great waste.
The content of the invention
Technical problem to be solved in the utility model is the defects of overcoming prior art, there is provided a kind of simple in construction, energy
Different conduit installation requirements is enough adapted to, easy for installation, cost is low, and not waste of materials, in the tunnel that may be reused
Conduit.
To achieve these goals, the utility model uses following technical scheme:
Conduit in a kind of tunnel, it is characterised in that include the steel pipe of an arc, the section of steel pipe is square, steel pipe
The centre of lower surface hollows out the mounting groove for being provided with strip;Described steel pipe upper surface is provided with the mounting bracket of left, center, right three,
The mounting bracket on wherein the right is fixedly welded on steel pipe, and middle and the left side mounting bracket is bascule;Described centre and a left side
The mounting bracket on side includes the installing plate of a rectangle, and installing plate lower surface is provided with two blocks of steel plates vertical with installing plate, steel
Spacing is remained between plate, the size of spacing is equal to the width of steel pipe, and mounting bracket is stuck in the enterprising line slip of steel pipe by spacing;Institute
Two waist round hole are also symmetrically offered above the installing plate stated, are attached for the infrastructure with conduit.
In such scheme, the mounting bracket on described the right is the flat board of one piece of rectangle, and two are also symmetrically arranged with flat board
Individual waist round hole.
In such scheme, described two blocks of steel plates vertical with installing plate are in approximately the same plane, two blocks of steel plates
The spacing retained between clamps steel pipe.
In such scheme, the left end of described mounting groove is got through in the opening position close to steel pipe left end, forms groove, peace
End at the mounting bracket of the extreme position of the right-hand member of tankage on the right.
The utility model is by adopting the above-described technical solution, have the advantages that:
The utility model is simple in construction, can adapt to different conduit installation requirements, and easy for installation, cost is low, and not
It waste of materials, may be reused, improve production efficiency.
Brief description of the drawings
Fig. 1 is the utility model embodiment front view;
Fig. 2 is the utility model embodiment upward view;
In figure:1 steel pipe, 2 mounting grooves, 3 installing plates, 4 steel plates.
Embodiment
In order that content of the present utility model is readily apparent understood, below according to specific embodiment and combine attached
Figure, is described in further detail to the utility model.
The conduit in tunnel as shown in Fig. 1 Fig. 2, includes the steel pipe 1 of an arc, and the section of steel pipe 1 is square, steel pipe 1
The centre of lower surface hollows out the mounting groove 2 for being provided with strip;The described upper surface of steel pipe 1 is provided with the installation of left, center, right three
Frame, wherein the mounting bracket on the right is fixedly welded on steel pipe 1, middle and the left side mounting bracket is bascule;Described centre
Include the installing plate 3 of a rectangle with the mounting bracket on the left side, the lower surface of installing plate 3 is provided with two blocks of steel vertical with installing plate
Plate 4, remains with spacing between steel plate 4, and the size of spacing is equal to the width of steel pipe 1, and it is enterprising that mounting bracket by spacing is stuck in steel pipe 1
Line slip;Described installing plate 3 also symmetrically offers two waist round hole above, is attached for the infrastructure with conduit.
In the present embodiment, the mounting bracket on described the right is the flat board of one piece of rectangle, and two are also symmetrically arranged with flat board
Individual waist round hole.
In the present embodiment, the described two blocks steel plates 4 vertical with installing plate are in approximately the same plane, two blocks of steel plates 4
The spacing retained between clamps steel pipe 1.
In the present embodiment, the left end of described mounting groove 2 is got through in the opening position close to the left end of steel pipe 1, forms groove,
End at the mounting bracket of the extreme position of the right-hand member of mounting groove 2 on the right.
Particular embodiments described above, technical problem, technical scheme and the beneficial effect solved to the utility model are entered
Further description is gone, should be understood that and the foregoing is only specific embodiment of the utility model, and do not have to
In limitation the utility model, all within the spirit and principles of the utility model, any modification, equivalent substitution and improvements done
Deng should be included within the scope of protection of the utility model.
Claims (4)
1. conduit in a kind of tunnel, it is characterised in that include the steel pipe of an arc, the section of steel pipe is square, under steel pipe
The centre on surface hollows out the mounting groove for being provided with strip;Described steel pipe upper surface is provided with the mounting bracket of left, center, right three, its
The mounting bracket on middle the right is fixedly welded on steel pipe, and middle and the left side mounting bracket is bascule;Described centre and the left side
Mounting bracket include the installing plate of a rectangle, installing plate lower surface is provided with two blocks of steel plates vertical with installing plate, steel plate
Between remain with spacing, the size of spacing is equal to the width of steel pipe, and mounting bracket is stuck in the enterprising line slip of steel pipe by spacing;It is described
Installing plate above also symmetrically offer two waist round hole, be attached for the infrastructure with conduit.
2. conduit in tunnel as claimed in claim 1, it is characterised in that the mounting bracket on described the right is the flat of one piece of rectangle
Plate, two waist round hole are also symmetrically arranged with flat board.
3. conduit in tunnel as claimed in claim 1, it is characterised in that two blocks of described steel plates vertical with installing plate are in
In approximately the same plane, the spacing retained between of two blocks of steel plates clamps steel pipe.
4. conduit in tunnel as claimed in claim 1, it is characterised in that the left end of described mounting groove is close to steel pipe left end
Opening position get through, form groove, end at the mounting bracket of the extreme position of the right-hand member of mounting groove on the right.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720675310.2U CN207028909U (en) | 2017-06-12 | 2017-06-12 | Conduit in a kind of tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720675310.2U CN207028909U (en) | 2017-06-12 | 2017-06-12 | Conduit in a kind of tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207028909U true CN207028909U (en) | 2018-02-23 |
Family
ID=61471224
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720675310.2U Expired - Fee Related CN207028909U (en) | 2017-06-12 | 2017-06-12 | Conduit in a kind of tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207028909U (en) |
-
2017
- 2017-06-12 CN CN201720675310.2U patent/CN207028909U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203939507U (en) | A kind of can separate assembling lining trolley | |
CN203820048U (en) | Adjustable hand grip | |
CN207028909U (en) | Conduit in a kind of tunnel | |
CN206903690U (en) | A kind of overhead contact built-in conduit | |
CN203767627U (en) | Transporter for production line | |
CN202687787U (en) | Gantry crane rail transfer device for heavy haul railway beam yard | |
CN204527193U (en) | Track installation and repairing maintenance machine | |
CN204035414U (en) | Metal wire straightener | |
CN204156119U (en) | A kind of novel grounded electrode structure | |
CN203143966U (en) | Movable simple hoisting device | |
CN203942212U (en) | wire stretcher special safety clip | |
CN207385703U (en) | A kind of device for improving slag produced from steel-smelting efficiency of magnetic separation | |
CN206759011U (en) | Support for the section cable laying of track traffic underground | |
CN202642802U (en) | Automatic turnover device | |
CN207130554U (en) | A kind of railroad sleeper more exchange device | |
CN203610438U (en) | Positioning structure of rolling-assisting device frame body | |
CN203975904U (en) | A kind of channel-dividing device | |
CN202684193U (en) | Bevel shearing machine for steel plate | |
CN204611229U (en) | Aluminium process equipment railroad shoe | |
CN207724238U (en) | Novel battery disassembling apparatus | |
CN204490920U (en) | A kind of hello pompon nodularization room | |
CN203638632U (en) | Telescopic triangular groove type bracket | |
CN203834372U (en) | Trolley for culvert and channel cover plate construction | |
CN203283765U (en) | Upper carrier roller support capable of adjusting groove angle | |
CN204162962U (en) | Stiffening device stablized by a kind of solid concrete roabed railway |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180223 Termination date: 20190612 |