CN207028244U - A kind of composite material tube weld port inspection body - Google Patents

A kind of composite material tube weld port inspection body Download PDF

Info

Publication number
CN207028244U
CN207028244U CN201720483193.XU CN201720483193U CN207028244U CN 207028244 U CN207028244 U CN 207028244U CN 201720483193 U CN201720483193 U CN 201720483193U CN 207028244 U CN207028244 U CN 207028244U
Authority
CN
China
Prior art keywords
support bar
semi
ring
loop
failure detector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201720483193.XU
Other languages
Chinese (zh)
Inventor
黄启航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Voyage Ltd By Share Ltd
Original Assignee
Shenzhen Voyage Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Voyage Ltd By Share Ltd filed Critical Shenzhen Voyage Ltd By Share Ltd
Priority to CN201720483193.XU priority Critical patent/CN207028244U/en
Application granted granted Critical
Publication of CN207028244U publication Critical patent/CN207028244U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining Or Joining Of Plastics Or The Like (AREA)

Abstract

It the utility model is related to welding field, a kind of composite material tube weld port inspection body, including the guide frame installed in welder work top, support bar, ring-shaped guide rail and failure detector, guide frame and extend across the welding position of welder;The support bar first end is connected and can translated along guide frame bearing of trend in guide frame, the end of support bar second is installed by ring-shaped guide rail, the ring-shaped guide rail expansible is simultaneously looped around pipe weld port, the failure detector can move along ring-shaped guide rail inner ring surface, and the test surface of failure detector is towards pipe weld port.Guide frame may be such that failure detector slides to guide frame and is oppositely oriented structure rotation so that failure detector is movable at pipe welding junction.Wherein failure detector is rotatably moved to circular tube welding junction or removed, and is convenient to operation and is combined failure detector and pipe welder and pipe end planing tool so that the present apparatus is readily integrated on composite material tube welding jig.

Description

A kind of composite material tube weld port inspection body
Technical field
Welding field is the utility model is related to, particularly a kind of failure detector met after tubes of material welding.
Background technology
The welding of PE pipes mainly includes being that material prepares:Circularity for the tubing of heat fusion welded fitting should be higher than that standard value, blanking When to reserve 10-20mm chipping allowance.Two tubing to be welded should be placed in flat ground when being connected for pipeline and clamp tubing According to the basic fixture of the pipe fitting replacing being welded, suitable slips is selected, institute's welded tube section must be clamped before cutting.Cutting:Cut The impurity and oxide layer of institute's welded tube section end face are cut, ensures that two docking end faces are smooth, bright and clean.Centering:The misalignment of two butt welding pipeline sections should It is the smaller the better, if misalignment is big, stress concentration can be caused, the 10% of wall thickness is not to be exceeded in misalignment.Heating:Ensure there be enough melt Melting material, in case molecule mutually spreads during butt-fusion.Switching:This period is switching week since heating terminates to butt-fusion It is phase, more short better for guarantee butt-fusion quality, switching cycle.Butt-fusion:It is the key of welding, butt-fusion process should begin Carried out eventually under melt pressure.Cooling:Because plastic material poor thermal conductivity, cooling velocity are accordingly slow.Weld material Shrink, the forming process of structure is carried out with slow speed in a long time.Therefore, the cooling of weld seam must be in certain pressure Lower progress.
In the prior art, the quality testing for meeting tubes of material welding end surface is always important problem, and there is presently no one Kind can be directed to the device that can check flaw detection in time that multi-angle welding meet the device design of tubes of material.
Utility model content
To solve the above problems, the utility model provides a kind of composite material tube weld port inspection body, can examine in time Look into the quality for meeting the welding of material tube end.
To achieve the above object, the technical solution adopted in the utility model is:
A kind of composite material tube weld port inspection body, including guide frame installed in welder work top, Support bar, ring-shaped guide rail and failure detector, guide frame extend across the welding position of welder;The support bar first Hold and connect and can be translated along guide frame bearing of trend in guide frame, ring-shaped guide rail, the ring are installed in the end of support bar second Shape guide rail expansible is simultaneously looped around pipe weld port, and the failure detector can move along ring-shaped guide rail inner ring surface, and dress of detecting a flaw The test surface put is towards pipe weld port.
As preferable, the guide frame is that cross section is circular guide pillar.
As preferable, the first end of the support bar is loop configuration, and the first end of the support bar is sleeved on guide pillar Outer ring surface.
As preferable, the support bar includes first support bar, second support bar and the 3rd support bar, wherein first The first end of strut is connected with guide frame, and the second end of first support bar and the first end of second support bar connect, second Second end of strut is connected with the first end of the 3rd support bar, the second end installation ring-shaped guide rail of the 3rd support bar, and described first The bearing of trend of support bar, second support bar and the 3rd support bar in the same plane, and first support bar, second support bar and 3rd support bar combines the shape to form inflection.
As preferable, described ring-shaped guide rail one end is hinged with the support bar.
As preferable, the ring-shaped guide rail includes the first semi-loop and the second semi-loop, wherein the first semi-ring knot Structure first end and the first end of the second semi-loop are hinged with support bar, first the second end of semi-loop and the second semi-loop The second end may move and close so that the first semi-loop and the second semi-loop composition annular.
As preferable, the side of the ring-shaped guide rail has slideway, and a part for the failure detector is embedded in slideway Interior, failure detector can slide along slideway.
As preferable, the side of first semi-loop and the second semi-loop is equipped with slideway, and described the first half One failure detector is installed respectively in the slideway of ring structure and the second semi-loop.
As preferable, the slideway of first semi-loop and led respectively positioned at annular with the slideway of the second semi-loop Two sides of rail.
It is using the beneficial effects of the utility model:
The present apparatus may be such that failure detector slides to guide frame and is oppositely oriented structure rotation by guide frame, So that failure detector is movable at pipe welding junction, or removed at pipe welding junction.Wherein failure detector rotatably moves To circular tube welding junction or remove, be convenient to operation and be combined failure detector and pipe welder and pipe end planing tool, make The present apparatus is obtained to be readily integrated on composite material tube welding jig.
Brief description of the drawings
Fig. 1 is that the overall structure of the utility model composite material tube weld port inspection body limb detent mechanism is illustrated Figure.
Fig. 2 is the schematic diagram after hoop component rotation in the utility model composite material tube weld port inspection body.
Fig. 3 is that the plan structure in the utility model composite material tube weld port inspection body after hoop component rotation is shown It is intended to.
Fig. 4 is the signal of the utility model composite material tube weld port inspection body limb detent mechanism bottom views Figure.
Fig. 5 is hoop component side schematic view in the utility model composite material tube weld port inspection body.
Fig. 6 is partial approach figure in A portions in Fig. 1.
Fig. 7 is B portions partial enlarged drawing in Fig. 4.
Fig. 8 is the overall structure diagram of the utility model composite material tube weld port inspection body.
Fig. 9 is the overall structure diagram at another visual angle of the utility model composite material tube weld port inspection body.
Figure 10 is C portions partial enlarged drawing in Fig. 8.
Reference includes:
10- limb detent mechanism 20- welding mechanism 21- pad supports
22- pad main body 23- pad handle 24- handle connectors
25- guide pillar 26- planing tool support 27- planing tool disks
28- drive mechanism 2801- power connectors hole 29- planing tool handles
2901- safety pin 30- control cabinet 40- safety posts
50- inspection body 51- thick pillar body 52- first support bars
The first semi-loops of support bar 55- of 53- second support bars 54- the 3rd
56- slideway 57- failure detectors the second semi-loops of 58-
100- bottom plate 210- power set 220- contiguous blocks
230- the first slide rail group 240- the first sliding block group 310- handwheels
320- screw rodb base 330- screw mandrel 340- set levers
350- the second slide rail group 360- the second sliding block group 410- installing plates
Anchor ear under 420- flap 430- hoop components 431-
The upper anchor ear 433- articulated sections 434- pads of 432-
435- position fixing handle 440- angle regulator 441- angular adjustment handles
442- angle indicator 443- angle scale 500- range markers
510- range marker pointer 520- length scales
Embodiment
The utility model is described in detail below in conjunction with accompanying drawing.
The present embodiment provides a kind of composite material tube weld port inspection body, including installed in welder work top Guide frame, support bar, ring-shaped guide rail and failure detector 57, guide frame extends across the welding position of welder; Support bar first end is connected with guide frame and can translated along guide frame bearing of trend, and the end of support bar second installation annular is led Rail, the ring-shaped guide rail expansible are simultaneously looped around pipe weld port, and failure detector 57 can move along ring-shaped guide rail inner ring surface, and visit Hinder the test surface of device 57 towards pipe weld port.In the present embodiment, support bar first end is thick pillar body 51.
The mechanism such as limb detent mechanism 10 and welding mechanism 20 as described in Figure 8, control cabinet 30, by the inspection in the present apparatus Look into mechanism 50 and be arranged on the position that is mutually matched with limb detent mechanism 10 and welding mechanism 20 so that inspection body 50 can be with Limb detent mechanism 10 and welding mechanism 20 integrate.
As shown in Figure 10, the failure detector 57 in the present embodiment is connected by support bar with guide frame, may be such that flaw detection Device 57 is rotated to sliding on guide frame and be oppositely oriented structure so that and failure detector 57 is movable at pipe welding junction, Or removed at pipe welding junction.Wherein failure detector 57 is rotatably moved to circular tube welding junction or removed, and can conveniently grasp Make and be combined failure detector 57 and pipe welder and pipe end planing tool.Wherein ring-shaped guide rail can be looped around pipe welding junction Place so that the quality and inner case of the detectable pipe welding junction of failure detector 57.Inspection body 50 is easily removed or is moved to Correct position so that the present apparatus is readily integrated on composite material tube welding jig.
Specifically, it is circular guide pillar that guide frame, which is cross section,.The first end of support bar is loop configuration, support bar First end is sleeved on the outer ring surface of guide pillar.Welding mechanism 20 is combined below, and its operating principle is described in detail.
In the present embodiment, support bar includes first support bar 52, the support bar 54 of second support bar 53 and the 3rd, wherein the The first end of one support bar 52 is connected with guide frame, and the second end of first support bar 52 connects with the first end of second support bar 53 Connect, the second end of second support bar 53 is connected with the first end of the 3rd support bar 54, the second end mounting ring of the 3rd support bar 54 Shape guide rail, first support bar 52, the support bar 54 of second support bar 53 and the 3rd bearing of trend in the same plane, and first Strut 52, the combination of the support bar 54 of second support bar 53 and the 3rd form the shape of inflection, when avoiding rotating ring-shaped guide rail, annular ring Shape guide rail and other structures produce interference.
Ring-shaped guide rail one end is hinged with support bar.Ring-shaped guide rail includes the first semi-loop 55 and the second semi-loop 58, The wherein first end of the first semi-loop 55 and the first end of the second semi-loop 58 is hinged with support bar, the first semi-loop 55 Second end and the second end of the second semi-loop 58 may move and close so that the first semi-loop 55 and the second semi-loop 58 Composition annular.In the present embodiment, ring-shaped guide rail uses two semiorbicular structures so that ring-shaped guide rail is easy to be looped around pipe weldering At connection interface.
The side of ring-shaped guide rail has slideway 56, and a part for failure detector 57 is embedded in slideway 56, failure detector 57 It can be slided along slideway 56, it, which has, is easily achieved failure detector 57 moved on ring-shaped guide rail the characteristics of.In other embodiment In, slideway 56 may be provided at the inner ring surface of ring-shaped guide rail.In the present embodiment, the part that failure detector 57 is embedded in slideway 56 is provided with Micro-machine and driving wheel so that failure detector 57 can be self-driven.
With reference to shown in Fig. 8, Fig. 9, the side of the first semi-loop 55 and the second semi-loop 58 is equipped with slideway 56, and first A failure detector 57 is installed respectively in the slideway 56 of the semi-loop 58 of semi-loop 55 and second.The cunning of first semi-loop 55 Road 56 and two sides for being located at ring-shaped guide rail respectively with the slideway 56 of the second semi-loop 58.
As shown in Fig. 1-Figure 10, the present embodiment provides a kind of composite material tube welding mechanism 20, and it is positioned installed in limb The side of mechanism 10, the limb detent mechanism 10 include being used for the hoop component 430 for clamping two adapters to be welded, composite material tube weldering Connection mechanism 20 includes being horizontally set on guide frame, and pad support 21 is provided with guide frame, and the first of the pad support 21 End is arranged on guide frame, and the pad main body 22 that end face is solder side is provided with the main body of pad support 21;Pad support 21 First end can translate along guide frame, and pad support 21 can rotate around guide frame and drive pad main body 22 to turn to two Between individual hoop component 430.
As shown in figure 8, limb detent mechanism 10 can clamp two sections of pipes in mechanism, and it can suitably adjust two end pipe axis Angle, you can dock two end pipes into move angle.In the present embodiment in welding mechanism 20, guide frame is horizontally mounted, and Guiding mechanism can both ends the end face of pipe is clamped across two two hoop components 430 so that welding mechanism 20 can be along guiding Structure is moved to the suitable end of pipe.Guiding mechanism in the present embodiment is that cross section is circular linear guide poles 25.And pad The first end of support 21 is ring-type, and the first end of pad support 21 is sleeved on guide pillar 25.I.e. in pipe axis bearing of trend row, Welding mechanism 20 can slide along this direction.After correct position is moved to, the first end of pad support 21 can surround 25 turns of guide pillar It is dynamic so that pad main body 22 is moved to the relative position of end surfaces, and in the present embodiment, pad main body 22 is disk-like structure, weldering The end face of disc main body 22 is heating surface.
As preferable, it is provided with pad main body 22 and is arranged on weldering for hand-held pad handle 23, pad handle 23 Disc main body 22 is close to the side of limb detent mechanism 10.Pad can be moved to suitable position by operator by hand-held pad handle 23 Put.In the present embodiment, the lateral circumference face of pad main body 22 is provided with handle connector 24, and handle connector 24 is located at close to pipe The side of angle detent mechanism 10.
After pipe is angularly offset, end surfaces can not dock, to solve the above problems, the composite wood that the present embodiment provides Expects pipe welding mechanism 20 also includes planer tool apparatus, and the planer tool apparatus includes the planing tool disk 27 of planing tool support 26 and end face for knife face, The first end of planing tool support 26 is sleeved on guide pillar 25, and planing tool disk 27 is arranged on planing tool support 26, and the first end of planing tool support 26 can Along the axial translation of guide pillar 25, and planing tool support 26 can rotate around guide pillar 25 and drive planing tool disk 27 to be moved to two hoop components Between.
As shown in figure 9, planer tool apparatus is similar with pad support 21 in welding mechanism 20, can be driven by planing tool support 26 Planing tool is moved and rotated along pipe axial direction, and after tube end cutting, pipe end can be aligned, and after planing tool disk 27 is removed, Move into pad main body 22 so that pipe end welds.The present embodiment is by the hand-holdable operation planing tool support 26 of planing tool handle 29 in guide pillar Slided on 25.
Planer tool apparatus includes being used for the drive mechanism 28 for transferring power to planing tool disk 27, and drive mechanism 28 is arranged on planing tool On support 26, the drive mechanism 28 has the power connector hole 2801 for being used for inserting power set turning end., can in the present embodiment Power set are used as by devices such as motors, the turning end of power set is inserted into power connector hole 2801, are tied by being driven Structure 28 drives planing tool disk 27 to rotate, and realizes and pipe end is cut, and can be achieved without increase transmission device in addition.
Limb detent mechanism 10 is provided with safety post 40 with respect to the opposite side of guide pillar 25;Planer tool apparatus also has safety pin 2901, the safety pin 2901 can be driven by planing tool support 26 and be rotated, and is stuck on safety post 40.When safety pin 2901 is de- After safety post 40, planing tool disk 27 stops operating, and avoids because maloperation operating personnel accidentally injure.
In the present embodiment, the solder side of pad main body 22 is vertical with the axial direction of guide pillar 25;The planing tool of planing tool disk 27 Face is vertical with the axial direction of guide pillar 25, conveniently can cut soldering angle by adjustment pipe.
As shown in Figure 10, the present apparatus provides a kind of inspection body 50, and this inspection body 50 is sleeved on by thick pillar body 51 and led On post 25, connector is formed by first support bar 52, second support bar 53, the 3rd support bar 54, on the connector, is hinged First semi-loop 55 and the second semi-loop 58, the first semi-loop 55 and the second semi-loop 58 can rotate along hinged place Form loop configuration.When not needing inspection body 50, can be made by rotating the first semi-loop 55 and the second semi-loop 58 Both are obtained to remove from pipe welding ends.
After first semi-loop 55 and the second semi-loop 58 composition loop configuration, the slideway that failure detector 57 is walked is formed 56, failure detector 57 can be along sliding, and in the present embodiment, the first semi-loop 55 and the second semi-loop 58 have respectively There is slideway 56, a failure detector 57 is equipped with each slideway 56 so that two failure detectors 57 can slide along slip, In other embodiment, the first semi-loop 55 and the second semi-loop 58 can form an annular slideway 56, it is only necessary to one The interface of failure detector 57 is walked in this annular slide track 56.In the present embodiment, control cabinet 30 be used for the present apparatus provide it is automatically controlled and Electric power.
As shown in Fig. 1-Fig. 7, the present embodiment provides a kind of limb detent mechanism 10, including bottom plate 100, power set 210 Being loaded respectively needs two hoop components 430 of welded pipe, and hoop component 430 can be by the power end drives edge of power set 210 First direction to movement, and causes the end contact of pipe;Hoop component 430 includes turn for rotating pipe opposed bottom 100 Dynamic component.
Specifically, the hoop component 430 installed on bottom plate 100 relative can slide, in the present embodiment, on bottom plate 100 First slide rail group 230 is installed, hoop component 430 can slide along the first slide rail group 230, in other embodiments, hoop component 430 can also be realized by diversified forms such as driving-chain, transmission belts.Hoop component 430 has two, wherein the first hoop component 430 hold one tightly with pipe, and the second hoop component 430 holds another pipe, after two end heats relative with pipe, hoop component tightly 430 relatively move the ends contact for causing two pipes, compression, and two pipes can be completed to weld.
Runner assembly wherein in hoop component 430 may be such that pipe opposed bottom 100 rotates certain angle, so as to realize The welding of pipe end, for example, after two hooping structures rotate identical angle to the same side, the axle center of two pipes is in same straight line On, then cutting tube corresponding end again so that pipe end is parallel to each other, you can carries out subsequent technique so that two pipes are welded on one Rise.When hoop component 430 by the runner assembly of bottom to one angle of ipsilateral rotation after, form knot as shown in Figures 2 and 3 Structure.
The flap 420 that hoop component 430 includes installing plate 410, bottom is connected by rotating shaft with installing plate 410;Flap 420 On be provided with lower anchor ear 431 and and 432 turns of the upper anchor ear 432 laterally hinging with lower anchor ear 431, lower anchor ear 431 and upper anchor ear The loop configuration for holding tube wall tightly is internally formed when moving into closure lockup state.
As shown in figure 1, plate on the basis of installing plate 410, the center of installing plate 410 is provided with a rotating shaft, and rotating shaft turns Moved end is stretched out upwards, and flap 420 is arranged on the turning end of rotating shaft, and can be mounted opposite plate 410 around rotating shaft and horizontally rotate.Flap There is the support body of the lower anchor ear 431 of installation, support body includes leg, and wherein leg is triangle, and leg is in support body away from welding on 420 The side of end face.The effect of leg is to avoid, when two tube ends abut together, hooping structure entirety lateral deflection, to carry High welding quality and welding precision.Lower anchor ear 431 in this implementation is rack-mount, and upper anchor ear 432 passes through the be hinged of side Portion 433 is be hinged with lower anchor ear 431, and upper anchor ear 432 and lower anchor ear 431 can lock in the side relative with articulated section 433, this implementation Locking mechanism in example rotates the upper anchor ear 432 of engaging and lower anchor ear 431 to be mechanical by position fixing handle 435, when upper armful After hoop 432 and lower anchor ear 431 are held tightly, you can hold pipe outer circle wall tightly.A few anchor ear is mounted respectively on each flap 420, In the present embodiment, two anchor ears are installed so that when end surfaces compress, anchor ear will not downward shift or a left side on each flap 420 Right avertence is moved.
Hooping structure in the present embodiment is after locking, the internal loop configuration that can form holding pipe outer wall, multiple armfuls The center of the loop configuration of hoop is leading in a horizontal plane, no matter how pipe rotates, the shaft core of pipe, can in same straight line It is preliminary to ensure pipe welding rearward end alignment.
Relative, the flexible material of internal annular wall of lower anchor ear 431 and upper anchor ear 432 with upper anchor ear 432 and lower anchor ear 431 Pad 434 made of material, in upper anchor ear 432 and lower anchor ear 431 closure locking state, lower anchor ear 431 and upper anchor ear 432 inwall Pad 434 enclose extruding tube wall elastic ring.The effect of elastic ring is can to avoid the hard position extruded tube of hooping structure Wall produces defect, provides pipe extra enclasping force in addition, prevents pipe from being skidded in ends contact.Pad in the present embodiment 434 be that elastomeric material is made or other organic elastic materials, such as silica gel etc..
As preferable, pad 434 is provided with circumferentially spaced-apart hollow out.In the present embodiment, interval hollow out in pad 434 can be When pad 434 extrudes tube wall, a less deformation is produced, provides tube wall enclasping force by natural resiliency, while interval is engraved Sky has the advantages of causing the weight of pad 434 low.
As shown in figure 1, bottom plate 100 has the slide rail group 230 of power set 210 and first, a hoop component 430 is arranged on On slide rail, the power end of power set 210 connects the hoop component 430 and can promote the hoop component 430 along the first slide rail Group 230 is slided to another hoop component 430.
First slide rail group 230 includes two one slide rails of upper extension along a first direction, and the first sliding block group is installed on slide rail 240, hoop component 430 is arranged in the first sliding block group 240 so that hoop component 430 can follow the first sliding block group 240 along the One direction acts.This group of hooping structure is the first hooping structure, and the power end of power set 210 is connected to by contiguous block 220 The bottom of first hooping structure, power set 210 can drive the first hoop component 430 to slide by the stretching or withdrawal of power end It is dynamic.
Another hoop component 430 is the second hoop component 430, and longitudinal adjusting mechanism is provided with bottom plate 100, and the alignment is adjusted Section mechanism may be such that second direction translation of the hoop component 430 along vertical first direction.When hoop component 430 rotates Afterwards, after cutting, end can adjust pipe end position it is possible that situation about can not be aligned by longitudinal adjusting mechanism for the end of pipe Put so that the end alignment of two pipes.
In the present embodiment, the second slide rail group 350, and in the second slide rail group 350 are installed on bottom plate 100 Two sliding block groups 360, the bearing of trend of the second slide rail group 350 are vertical with the bearing of trend of the first slide rail group 230.
With reference to shown in Fig. 1 and Fig. 7, specifically, alignment governor motion include the axle center screw mandrel 330 vertical with first direction, The screw rodb base 320 and handwheel 310 coordinated with screw mandrel 330, the bottom installation screw rodb base 320 of a hoop component 430, the anchor ear group Part 430 rotates driving by screw mandrel 330 and translated to second direction.Second hoop component 430 and the mirror image of the first hoop component 430 are set To put, the bottom plate 100 in the second hoop component 430 is arranged in the second sliding block group 360, when rotary screw rod 330, the second anchor ear group Part 430 translates along the second slide rail group 350, by adjusting screw mandrel 330, the lengthwise position of fine-tuning whole second hoop component 430, So that the end of two pipes is relative.Screw mandrel 330 in this implementation can be manually adjusted, and 330 turns of screw mandrel is driven by rotation hand wheel 310 It is dynamic.
Being directed at governor motion includes translating lockable mechanism along leading screw for locking hoop component 430.At the end of two pipes After portion's alignment, it will not in a second direction be translated by pushing the hoop component 430 of set lever 340 second, avoid grasping by mistake Error caused by work or pipe end extrude.In other embodiments, screw mandrel 330 can pass through electric control gear drive control.
Alignment governor motion includes range marker pointer 510, is provided with bottom plate 100 with hoop component 430 along second party The length scales 520 to match to shift length, range marker pointer 510 and the location matches of length scales 520.In the present embodiment The side of bottom plate 100 there are a length scales 520, a range marker pointer is installed on the second hoop component 430 510, after the translation of the second hoop component 430, pass through the coordinate difference prompted in length scales 520, you can draw the second hoop component The distance of 430 translations.
As shown in fig. 6, angle regulator 440 includes the hollow out on flap 420 with arc, have on installing plate 410 The angle indicator 442 of column, the angle indicator 442 are inserted into hollow part, when flap 420, which is mounted opposite plate 410, to be rotated, angle Pointer 442 rotates along hollow part;Hollow part has the angle to match with flap 420 and the relative rotation of installing plate 410 angle Scale 443.For example, 30 degree of angle between the extended line and another section of pipe of one section of pipe, the first hoop component 430 rotation 15 Degree, the second hoop component 430 rotate 15 degree, you can realize.The first hoop component 430 and the second hoop component in this implementation The angle of 430 rotations is identical, and end surfaces could be caused to keep alignment after cutting.In the present embodiment, hoop component 430, which rotates, is Plate 410 being mounted opposite for flap 420 to rotate, operating personnel can rotate hoop component 430 manually by angular adjustment handle 441, And the angle of the rotation of hoop component 430 is intuitively observed by angle scale 443.
Above content is only preferred embodiment of the present utility model, for one of ordinary skill in the art, according to this reality , in specific embodiments and applications can be so that many changes may be made, as long as these changes are without departing from this with new thought The design of utility model, belongs to the scope of protection of the utility model.

Claims (9)

  1. A kind of 1. composite material tube weld port inspection body, it is characterised in that:Including installed in welder work top Guide frame, support bar, ring-shaped guide rail and failure detector, guide frame extend across the welding position of welder;It is described Support bar first end is connected and can translated along guide frame bearing of trend in guide frame, the end of the support bar second installation annular Guide rail, the ring-shaped guide rail expansible are simultaneously looped around pipe weld port, and the failure detector can move along ring-shaped guide rail inner ring surface, And the test surface of failure detector is towards pipe weld port.
  2. 2. composite material tube weld port inspection body according to claim 1, it is characterised in that:The guide frame is Cross section is circular guide pillar.
  3. 3. composite material tube weld port inspection body according to claim 2, it is characterised in that:The of the support bar One end is loop configuration, and the first end of the support bar is sleeved on the outer ring surface of guide pillar.
  4. 4. composite material tube weld port inspection body according to claim 1, it is characterised in that:The support bar includes First support bar, second support bar and the 3rd support bar, the first end of wherein first support bar are connected with guide frame, first Second end of strut and the first end of second support bar connect, and the second end of second support bar connects with the first end of the 3rd support bar Connect, the second end installation ring-shaped guide rail of the 3rd support bar, the extension of the first support bar, second support bar and the 3rd support bar In the same plane, and first support bar, second support bar and the 3rd support bar combine the shape to form inflection in direction.
  5. 5. composite material tube weld port inspection body according to claim 1, it is characterised in that:The ring-shaped guide rail one End is hinged with the support bar.
  6. 6. composite material tube weld port inspection body according to claim 5, it is characterised in that:The ring-shaped guide rail bag Include the first semi-loop and the second semi-loop, wherein the first semi-loop first end and the first end of the second semi-loop with Support bar is hinged, and the second end of first the second end of semi-loop and the second semi-loop may move and close so that the first semi-ring Structure and the second semi-loop composition annular.
  7. 7. composite material tube weld port inspection body according to claim 5, it is characterised in that:The ring-shaped guide rail Side has slideway, and a part for the failure detector is embedded in slideway, and failure detector can slide along slideway.
  8. 8. composite material tube weld port inspection body according to claim 6, it is characterised in that:The first semi-ring knot The side of structure and the second semi-loop is equipped with slideway, pacifies respectively in the slideway of first semi-loop and the second semi-loop Fill a failure detector.
  9. 9. composite material tube weld port inspection body according to claim 8, it is characterised in that:The first semi-ring knot The slideway of structure and two sides for being located at ring-shaped guide rail respectively with the slideway of the second semi-loop.
CN201720483193.XU 2017-05-03 2017-05-03 A kind of composite material tube weld port inspection body Withdrawn - After Issue CN207028244U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720483193.XU CN207028244U (en) 2017-05-03 2017-05-03 A kind of composite material tube weld port inspection body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720483193.XU CN207028244U (en) 2017-05-03 2017-05-03 A kind of composite material tube weld port inspection body

Publications (1)

Publication Number Publication Date
CN207028244U true CN207028244U (en) 2018-02-23

Family

ID=61478832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720483193.XU Withdrawn - After Issue CN207028244U (en) 2017-05-03 2017-05-03 A kind of composite material tube weld port inspection body

Country Status (1)

Country Link
CN (1) CN207028244U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107020755A (en) * 2017-05-03 2017-08-08 深圳远航股份有限公司 A kind of composite material tube weld port inspection body

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107020755A (en) * 2017-05-03 2017-08-08 深圳远航股份有限公司 A kind of composite material tube weld port inspection body
CN107020755B (en) * 2017-05-03 2020-05-22 深圳远航股份有限公司 Inspection mechanism for welding port of composite pipe

Similar Documents

Publication Publication Date Title
CN207207157U (en) A kind of composite material tube welding mechanism
CN206811400U (en) A kind of pipe welding machine angle positioning
CN107031057A (en) A kind of composite material tube welding mechanism
CN107009084A (en) A kind of pipe welding machine angle positioning
CN110238575B (en) Visual autonomous welding robot
KR101158400B1 (en) Pipe chamfering apparatus
CN205851908U (en) Flange four-jaw chuck
CN108637702A (en) A kind of Intelligent welding equipment
CN110696372B (en) Hot melting device for butt joint of plastic pipes
CN206663813U (en) Hot molten butt welding machine of plastic tubing
CN208880144U (en) A kind of Intelligent welding equipment
CN207028244U (en) A kind of composite material tube weld port inspection body
KR101526521B1 (en) Welding device for pipes
CN117139980A (en) Automobile pipe fitting welding device
CN201619249U (en) Pressing device for laser plastic welding
CN104669164B (en) A kind of novel remote controls formula sensor holder
CN107020755A (en) A kind of composite material tube weld port inspection body
CN215588244U (en) Positioning assembly for manual welding
KR101397939B1 (en) Welding device
CN218592216U (en) Welding equipment for hot-melting saddle-shaped welding
CN206343775U (en) A kind of laser rotary cutter device
CN204109357U (en) A kind of pipe hot melting angle welder
CN103381521A (en) Mine saw blade automatic welding machine
CN212145049U (en) Welding device for skylight support
CN210451375U (en) Clamping mechanism and base body positioning device of laser welding machine for diamond thin-wall drill

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20180223

Effective date of abandoning: 20200522

AV01 Patent right actively abandoned