CN207017673U - One kind is applied to water conservancy construction safety device - Google Patents

One kind is applied to water conservancy construction safety device Download PDF

Info

Publication number
CN207017673U
CN207017673U CN201720663456.5U CN201720663456U CN207017673U CN 207017673 U CN207017673 U CN 207017673U CN 201720663456 U CN201720663456 U CN 201720663456U CN 207017673 U CN207017673 U CN 207017673U
Authority
CN
China
Prior art keywords
fixedly connected
groove
hanging basket
pin
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720663456.5U
Other languages
Chinese (zh)
Inventor
殷赞兴
梁连卿
胡跃权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heyuan Water Conservancy And Hydropower Engineering Co Ltd
Original Assignee
Heyuan Water Conservancy And Hydropower Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heyuan Water Conservancy And Hydropower Engineering Co Ltd filed Critical Heyuan Water Conservancy And Hydropower Engineering Co Ltd
Priority to CN201720663456.5U priority Critical patent/CN207017673U/en
Application granted granted Critical
Publication of CN207017673U publication Critical patent/CN207017673U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses one kind to be applied to water conservancy construction safety device, including Hanging Basket, the both sides upper end of the Hanging Basket has been bolted to connection tool box, the upper end in the tool box is hinged with case lid by hinge, the side upper end in the tool box is fixedly connected with the first fixture block, the side of the case lid is provided with the second groove, the internal slide of second groove is socketed with motion bar, one end of the motion bar is fixedly connected with the second fixture block, the surface fixed cover of the motion bar is connected to fixed plate, the side of the fixed plate is fixedly connected with spring, the other end of the spring is fixedly connected with the second groove, the inside both sides upper end of the Hanging Basket has been fixedly connected with retainer ring, the inside fixed cover of the retainer ring is connected to bandage, the surface of the bandage is provided with VELCRO, the bandage is bundled with lifebuoy by VELCRO.This is applied to water conservancy construction safety device and avoids the occurrence of the situation that maintenance tool is lost in tool box and worker drowns.

Description

One kind is applied to water conservancy construction safety device
Technical field
Water conservancy construction technical field is the utility model is related to, is specially that one kind is applied to water conservancy construction safety device.
Background technology
Hydraulic engineering is the surface water and groundwater for controlling and allocating nature, reaches and removes the evil emerging sharp purpose and build Engineering.Also referred to as Hydraulic Projects.Water is human being's production and essential precious resources of living, but the state of its naturally occurring is simultaneously Not in full conformity with the needs of the mankind.Hydraulic engineering is only built, current could be controlled, prevent flood, water-filling amount of going forward side by side Regulation and distribution, to meet the needs of people's lives and production to water resource.Hydraulic engineering needs to build dam, dike, spillway, water Lock, water inlet, channel, the different types of hydraulic structure such as mortise, log chute, fish pass is crossed, to realize its target.
Present Hanging Basket contributes to manned and places maintenance tool use in bridge, dam safeguard construction, and existing Hanging Basket be all manned Hanging Basket is transferred to by bridge by rope and mechanical arm, the specified location of dam carries out maintenance construction, But rope fatigue and the situation of mechanical arm damage occurs in Hanging Basket in use, causes manned Hanging Basket to drop Danger, still, existing Hanging Basket does not have safeguard procedures mostly, maintenance tool easily occurs and loses and worker's situation about drowning.
Utility model content
The purpose of this utility model is that providing one kind is applied to water conservancy construction safety device, to solve above-mentioned background The problem of being proposed in technology.
To achieve the above object, the utility model provides following technical scheme:One kind is applied to water conservancy construction security protection Device, including Hanging Basket, the lower surface of the Hanging Basket are provided with the first groove, and the inside of first groove is fixedly connected with air bag, The side of the Hanging Basket is provided with circular hole, and the inflation inlet of the fixedly sleeved air bag in inside of the circular hole, the lower surface of the air bag is consolidated Surely cover plate is connected with, the lower surface of the Hanging Basket is fixedly connected with the first pin-and-hole, and the lower surface of the cover plate is fixedly connected with Two pin-and-holes, the inside of first pin-and-hole and the second pin-and-hole are connected with pin rod, and the both sides upper end of the Hanging Basket passes through bolt Tool box is fixedly connected with, the upper end in the tool box is hinged with case lid by hinge, and the side upper end in the tool box is fixed The first fixture block is connected with, the side of the case lid is provided with the second groove, and the internal slide of second groove is socketed with motion bar, One end of the motion bar is fixedly connected with the second fixture block, and the other end of the motion bar is fixedly connected with draw ring, the activity The surface fixed cover of bar is connected to fixed plate, and the side of the fixed plate is fixedly connected with spring, and the other end of the spring is fixed The second groove is connected, the inside both sides upper end of the Hanging Basket has been fixedly connected with retainer ring, the inside fixed cover of the retainer ring Bandage is connected to, the surface of the bandage is provided with VELCRO, and the bandage is bundled with lifebuoy by VELCRO.
Preferably, the internal sleeve connects cover plate of first groove.
Preferably, the position of first pin-and-hole and the second pin-and-hole is mutually corresponding.
Preferably, the position of first fixture block and the position of the second groove are mutually corresponding.
Compared with prior art, the beneficial effects of the utility model are:It should lead to applied to water conservancy construction safety device Cross and press case lid so that second the first fixture block of fixture block clamping fixes case lid, avoids the occurrence of maintenance tool in tool box and loses Situation;Pull bandage so that VELCRO separates, and so as to which lifebuoy is taken out, avoids the occurrence of the situation that worker drowns.
Brief description of the drawings
Fig. 1 is overall structure front view of the present utility model;
Fig. 2 is overall structure top view of the present utility model;
Fig. 3 is tool box sectional view of the present utility model;
Fig. 4 is bandage plan of the present utility model.
In figure:1 Hanging Basket, 2 first grooves, 3 air bags, 4 circular holes, 5 cover plates, 6 first pin-and-holes, 7 second pin-and-holes, 8 pin rods, 9 works Have case, 10 case lids, 11 first fixture blocks, 12 second grooves, 13 motion bars, 14 second fixture blocks, 15 draw rings, 16 fixed plates, 17 springs, 18 retainer rings, 19 bandages, 20 VELCROs, 21 lifebuoys.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
In description of the present utility model, it is to be understood that term " longitudinal direction ", " transverse direction ", " on ", " under ", " preceding ", The orientation or position relationship of the instruction such as " rear ", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " be based on Orientation shown in the drawings or position relationship, it is for only for ease of description the utility model, rather than instruction or the dress for implying meaning Put or element there must be specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to the utility model Limitation.
Fig. 1-4 are referred to, the utility model provides a kind of technical scheme:One kind is applied to water conservancy construction security protection and filled Put, including Hanging Basket 1, the lower surface of Hanging Basket 1 are provided with the first groove 2, the inside of the first groove 2 is fixedly connected with air bag 3, Hanging Basket 1 Side be provided with circular hole 4, the inflation inlet of the fixedly sleeved air bag 3 in inside of circular hole 4, the lower surface of air bag 3 is fixedly connected with cover plate 5, the internal sleeve connects cover plate 5 of the first groove 2 so that air bag 3 and cover plate 5 can take in the inside of the first groove 2, avoid the occurrence of gas The situation that capsule 3 is scratched, the lower surface of Hanging Basket 1 are fixedly connected with the first pin-and-hole 6, and the lower surface of cover plate 5 is fixedly connected with second The inside of pin-and-hole 7, the first pin-and-hole 6 and the second pin-and-hole 7 is connected with pin rod 8, and the position of the first pin-and-hole 6 and the second pin-and-hole 7 is mutual It is corresponding, it is pinned at by pin rod 8 inside the first pin-and-hole 6 and the second pin-and-hole 7, air bag 3 can be avoided the occurrence of and cover plate 5 skids off automatically Situation, the both sides upper end of Hanging Basket 1 has been bolted to connection tool box 9, and the upper end in tool box 9 is hinged with by hinge Case lid 10, the side upper end in tool box 9 are fixedly connected with the first fixture block 11, and the side of case lid 10 is provided with the second groove 12, and first The position of fixture block 11 and the position of the second groove 12 are mutually corresponding so that the second fixture block 14 can be connected under the first fixture block 11 Surface, be easy to that case lid 10 is fixed, the situation for avoiding having when Hanging Basket 1 is overboard maintenance tool from losing, the second groove 12 it is interior Portion's slip cap is connected to motion bar 13, and one end of motion bar 13 is fixedly connected with the second fixture block 14, and the other end of motion bar 13 is fixed Draw ring 15 is connected with, the surface fixed cover of motion bar 13 is connected to fixed plate 16, and the side of fixed plate 16 is fixedly connected with spring 17, The other end of spring 17 is fixedly connected with the second groove 12, and the inside both sides upper end of Hanging Basket 1 has been fixedly connected with retainer ring 18, fixed The inside fixed cover of ring 18 is connected to bandage 19, and the surface of bandage 19 is provided with VELCRO 20, and bandage 19 is bundled with by VELCRO 20 Lifebuoy 21 is enclosed on waist by lifebuoy 21, worker, when overboard, by pulling bandage 19 so that VELCRO 20 separates, worker It can be fallen into the water with lifebuoy 21, so that worker swims in the water surface, avoid the occurrence of worker and pushed down by Hanging Basket 1 and led Cause drowned situation.
The utility model is in the specific implementation:By the inflation inlet of air bag 3 to the inside gas injection of air bag 3, pass through rope Rope and manned Hanging Basket 1 is transferred to bridge by mechanical arm, the specified location of dam carries out maintenance construction, when Hanging Basket 1 is overboard, Worker presses case lid 10 so that the first fixture block 11 extrudes the second fixture block 14, and the second fixture block 14 drives motion bar 13 to overcome spring 17 Resistance moves to the inside of the second groove 12, so that the first fixture block of clamping 11 of the second fixture block 14 fixes case lid 11 Firmly, the situation that maintenance tool is lost in tool box 9 is avoided the occurrence of, then pulls bandage 19 again so that VELCRO 20 separates, so as to Lifebuoy 21 can be taken out, avoid the occurrence of the situation that worker drowns, and Hanging Basket 1 can swim in the water surface by air bag 3, just In salvaging.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (4)

1. one kind is applied to water conservancy construction safety device, including Hanging Basket(1), it is characterised in that:The Hanging Basket(1)Following table Face is provided with the first groove(2), first groove(2)Inside be fixedly connected with air bag(3), the Hanging Basket(1)Side set There is circular hole(4), the circular hole(4)The fixedly sleeved air bag in inside(3)Inflation inlet, the air bag(3)Lower surface fix connect It is connected to cover plate(5), the Hanging Basket(1)Lower surface be fixedly connected with the first pin-and-hole(6), the cover plate(5)Lower surface fix It is connected with the second pin-and-hole(7), first pin-and-hole(6)With the second pin-and-hole(7)Inside be connected with pin rod(8), the Hanging Basket (1)Both sides upper end be bolted to connection tool box(9), the tool box(9)Upper end be hinged with by hinge Case lid(10), the tool box(9)Side upper end be fixedly connected with the first fixture block(11), the case lid(10)Side be provided with Second groove(12), second groove(12)Internal slide be socketed with motion bar(13), the motion bar(13)One end It is fixedly connected with the second fixture block(14), the motion bar(13)The other end be fixedly connected with draw ring(15), the motion bar (13)Surface fixed cover be connected to fixed plate(16), the fixed plate(16)Side be fixedly connected with spring(17), the bullet Spring(17)The other end be fixedly connected with the second groove(12), the Hanging Basket(1)Inside both sides upper end be fixedly connected with fixation Ring(18), the retainer ring(18)Inside fixed cover be connected to bandage(19), the bandage(19)Surface be provided with VELCRO (20), the bandage(19)Pass through VELCRO(20)It is bundled with lifebuoy(21).
2. one kind according to claim 1 is applied to water conservancy construction safety device, it is characterised in that:Described first is recessed Groove(2)Internal sleeve connects cover plate(5).
3. one kind according to claim 1 is applied to water conservancy construction safety device, it is characterised in that:First pin Hole(6)With the second pin-and-hole(7)Position it is mutually corresponding.
4. one kind according to claim 1 is applied to water conservancy construction safety device, it is characterised in that:First card Block(11)Position and the second groove(12)Position it is mutually corresponding.
CN201720663456.5U 2017-06-09 2017-06-09 One kind is applied to water conservancy construction safety device Expired - Fee Related CN207017673U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720663456.5U CN207017673U (en) 2017-06-09 2017-06-09 One kind is applied to water conservancy construction safety device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720663456.5U CN207017673U (en) 2017-06-09 2017-06-09 One kind is applied to water conservancy construction safety device

Publications (1)

Publication Number Publication Date
CN207017673U true CN207017673U (en) 2018-02-16

Family

ID=61485564

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720663456.5U Expired - Fee Related CN207017673U (en) 2017-06-09 2017-06-09 One kind is applied to water conservancy construction safety device

Country Status (1)

Country Link
CN (1) CN207017673U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797685A (en) * 2019-01-14 2019-05-24 彭伶铭 A kind of municipal works safety device convenient for assembling
CN111502228A (en) * 2020-03-24 2020-08-07 苏建国 Be applied to water conservancy construction safety device
CN114875802A (en) * 2022-06-14 2022-08-09 山东省路桥集团有限公司 Folding and unfolding type bridge hanging basket construction device with windproof shaking structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797685A (en) * 2019-01-14 2019-05-24 彭伶铭 A kind of municipal works safety device convenient for assembling
CN111502228A (en) * 2020-03-24 2020-08-07 苏建国 Be applied to water conservancy construction safety device
CN111502228B (en) * 2020-03-24 2022-05-31 广东旭峰建筑工程有限公司 Be applied to water conservancy construction safety device
CN114875802A (en) * 2022-06-14 2022-08-09 山东省路桥集团有限公司 Folding and unfolding type bridge hanging basket construction device with windproof shaking structure
CN114875802B (en) * 2022-06-14 2023-07-14 山东省路桥集团有限公司 Folding and unfolding type bridge hanging basket construction device with windproof shaking structure

Similar Documents

Publication Publication Date Title
CN207017673U (en) One kind is applied to water conservancy construction safety device
CN106628073B (en) A kind of submarine navigation device water damping seat lower supporter
CN205636696U (en) Water surface garbage cleaning device
CN111502228B (en) Be applied to water conservancy construction safety device
CN205759550U (en) A kind of multi-functional auxiliary swimming water bleaching device
CN202124105U (en) Portable fording rescue platform
CN206813259U (en) A kind of enteromorpha prolifera collection boat
CN108236764A (en) A kind of novel anti-falling falls safety belt
CN208660183U (en) A kind of portable inflatable aircraft underground lifesaving apparatus
CN207332287U (en) A kind of water conservancy construction security protection Hanging Basket
CN210239095U (en) High-rise building outer wall construction is with safe type manned hanging flower basket
CN211230535U (en) Coal mine water-permeable self-rescue device
CN202574594U (en) Lifesaving device for ice hole falling
CN202892709U (en) Rapid mire rescue apparatus
CN203564664U (en) Eccentric device of deep well life-saving device
CN207142783U (en) A kind of chute type aerial ladder
CN201469935U (en) Narrow well life net
CN214296387U (en) Life saving equipment of swimsuit
CN205434751U (en) Underground lifesaving device
CN216428138U (en) Safety device is used in hydraulic engineering construction
CN209258355U (en) A kind of capsule-type lifesaving unit under water
DE102014002516A1 (en) Rescue system for persons in the water
CN109334899A (en) A kind of capsule-type lifesaving unit under water
CN109649602A (en) Frame structure is salvaged in a kind of helicopter or the rescue of the unmanned plane water surface
CN214583538U (en) Hydraulic engineering measuring device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180216

Termination date: 20210609