CN207009298U - A kind of weighting meter - Google Patents
A kind of weighting meter Download PDFInfo
- Publication number
- CN207009298U CN207009298U CN201720894800.1U CN201720894800U CN207009298U CN 207009298 U CN207009298 U CN 207009298U CN 201720894800 U CN201720894800 U CN 201720894800U CN 207009298 U CN207009298 U CN 207009298U
- Authority
- CN
- China
- Prior art keywords
- insulating bar
- bar body
- air bag
- cyclic spring
- spring air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Arc-Extinguishing Devices That Are Switches (AREA)
Abstract
The utility model discloses a kind of weighting meter, including insulating bar body, it is arranged on the electroscope of the insulating bar body upper end and is arranged on the buoyant means of the insulating bar body upper part;The buoyant means include the helium tank being arranged on the insulating bar body, the fixed seat being arranged on the insulating bar body and the cyclic spring air bag being set on the insulating bar body, the cyclic spring air bag bottom is fixed in the fixed seat, the bottom of the cyclic spring air bag sets air inlet, and the air inlet is connected by pipeline with the exhaust outlet of the valve switch of the helium tank.The buoyancy that the utility model is provided using buoyant means can substantially reduce the labor intensity of power equipment maintaining personnel to reduce the physical demands of maintenance personal, improve repairing speed.
Description
Technical field
Power maintenance technology field is the utility model is related to, more particularly, to a kind of weighting meter.
Background technology
Electric power is the energy using electric energy as power.Invention starts in 19 century 70s, the invention and application of electric power
Second of industrialization climax.Since 18th century of human history, one of scientific and technological revolution three times of world's generation, from this section's technological transformation
The life of people is become.The large-scale electrical power system that 20th century occurred is one of most important achievement in the human engineering history of science,
By generating electricity, transmitting electricity, the power generation and consumption system that power transformation, the link such as distribution and electricity consumption form.It by nature once
The energy changes into electric power by mechanical energy device, then supplies power to each user through transmission of electricity, power transformation and distribution.In order to ensure electricity
Power safe operation, vast power equipment maintaining personnel have paid arduous labor in a line, and power equipment maintaining personnel often make at work
Use insulating bar.However, insulating bar can be divided into 3 meters by length, 4 meters, 5 meters, 6 meters, 8 meters, 10 meters, most short insulation is grasped
Make bar also have it is 3 meters long, power equipment maintaining personnel operation when generally require to consume many physical efficiencys, even if the insulation material using lightweight
Insulating bar made of material can still run into the problem of identical in operation.
Therefore, it is badly in need of setting a new insulating bar, solves the operation inconvenience brought due to insulating bar length length
Problem.
Patent publication No. is that 206098182U utility model patent discloses one kind for livewire work maintenance and safeguarded
Insulating bar, it includes insulating bar, insulation is operated a switch head and electroscope;The upper end of insulating bar is fixed with insulation brake pull-rod
Head;The upper end of insulating bar is fixed with electroscope;It is characterized in that:The operate a switch upper center of head of insulation is provided with screw, insulation
Head of operating a switch is threadedly coupled by screw with the bottom of bar, and the upper end of bar is conehead;The top of bar is provided with curved knife;Insulation
The upper right end for head of operating a switch is blade.The utility model is simple in construction, simple, convenient, safe, operating efficiency
Height, there are multiple functions.However, the still unresolved operation inconvenience brought due to insulating bar length length of the utility model is asked
Topic.
Utility model content
In view of this, the purpose of this utility model is in view of the shortcomings of the prior art, there is provided a kind of multifunction insulating operation
Bar, the labor intensity of power equipment maintaining personnel can be substantially reduced, improve repairing speed.
To reach above-mentioned purpose, the utility model uses following technical scheme:
A kind of weighting meter, including insulating bar body, it is arranged on the insulating bar body upper end
Electroscope and be arranged on the buoyant means of the insulating bar body upper part;The buoyant means are described exhausted including being arranged on
Helium tank, the fixed seat that is arranged on the insulating bar body in edge operation bar body and it is set in the insulation operation
Cyclic spring air bag in bar body, the cyclic spring air bag bottom are fixed in the fixed seat, the cyclic spring gas
The bottom of capsule sets air inlet, and the air inlet is connected by pipeline with the exhaust outlet of the valve switch of the helium tank.
Further, limiting plate is set on the insulating bar body and above the cyclic spring air bag.
Further, the insulating bar body upper surface opens up screwed hole, the electroscope bottom set with it is described
The threaded rod that corresponding threaded holes close.
Further, the insulating bar body upper part first side sets insulation to operate a switch head.
Further, the insulating bar body upper part second side sets curved knife.
The beneficial effects of the utility model are:
For the utility model for current insulating bar in use because length is long, power equipment maintaining personnel are past
Toward the problem of needing to expend many physical efficiencys, and then influence repairing speed, there is provided a kind of weighting meter, including insulation
Operation bar body, it is arranged on the electroscope of insulating bar body upper end and is arranged on the buoyancy machine or engine of insulating bar body upper part
Structure;The utility model realizes circuit electrical verification operation using the electroscope of insulating bar body upper end, and is using buoyant means
Insulating bar body provides upward buoyancy, to reduce the consuming of maintenance personal's physical efficiency, greatly reduces labor intensity.Its
In, buoyant means include the helium tank being arranged on insulating bar body, the fixed seat being arranged on insulating bar body
With the cyclic spring air bag being set on insulating bar body, and cyclic spring air bag bottom is fixed in fixed seat,
The bottom of cyclic spring air bag sets air inlet, and air inlet is connected by pipeline with the exhaust outlet of the valve switch of helium tank
Connect, so during insulating bar is operated, maintenance personal's sack valve switch so that be filled with density in cyclic spring air bag
Less than the helium of air, at this moment cyclic spring air bag can be provided upward effect for insulating bar body by the buoyancy of air
Power, so as to reduce maintenance personal's arm by downward active force, greatly reduce labor intensity.The utility model utilizes buoyancy
The buoyancy that mechanism provides can substantially reduce the labor intensity of power equipment maintaining personnel, carry to reduce the physical demands of maintenance personal
Height repairing speed.
Brief description of the drawings
Fig. 1 is the structural representation of the first embodiment of the utility model;
Fig. 2 is the structural representation of second of embodiment of the utility model;
Fig. 3 is the structural representation of the third embodiment of the utility model.
Embodiment
It is new below in conjunction with this practicality to make the purpose, technical scheme and advantage of the utility model embodiment clearer
The accompanying drawing of type embodiment, the technical scheme of the utility model embodiment is clearly and completely described.Obviously, it is described
Embodiment is part of the embodiment of the present utility model, rather than whole embodiments.Based on described of the present utility model
Embodiment, the every other embodiment that those of ordinary skill in the art are obtained, belong to the scope that the utility model is protected.
Embodiment 1:
As shown in figure 1, a kind of weighting meter, including insulating bar body 1, it is arranged on the insulation operation
The electroscope 2 of the upper end of bar body 1 and the buoyant means for being arranged on the top of insulating bar body 1;The buoyant means bag
The and of fixed seat 4 for include the helium tank 3 being arranged on the insulating bar body 1, being arranged on the insulating bar body 1
The cyclic spring air bag 5 being set on the insulating bar body 1, the bottom of cyclic spring air bag 5 are fixed on described solid
In reservation 4, the bottom of the cyclic spring air bag 5 sets air inlet 6, and the air inlet 6 passes through pipeline 7 and the helium tank 3
The exhaust outlet of valve switch 8 be connected.
In the embodiment, there is provided a kind of weighting meter, including insulating bar body, be arranged on insulation operation
The electroscope of bar body upper end and the buoyant means for being arranged on insulating bar body upper part;The utility model is operated using insulation
The electroscope of bar body upper end realizes circuit electrical verification operation, and provides upward float using buoyant means for insulating bar body
Power, to reduce the consuming of maintenance personal's physical efficiency, greatly reduce labor intensity.Wherein, buoyant means include being arranged on insulation behaviour
Make the helium tank in bar body, the fixed seat being arranged on insulating bar body and the ring being set on insulating bar body
Shape elastic bag, and cyclic spring air bag bottom is fixed in fixed seat, and air inlet is set in the bottom of cyclic spring air bag,
And air inlet is connected by pipeline with the exhaust outlet of the valve switch of helium tank, so during insulating bar is operated,
Maintenance personal's sack valve switch so that the helium that density is less than air is filled with cyclic spring air bag, at this moment cyclic spring gas
Capsule can be provided upward active force for insulating bar body by the buoyancy of air, so as to reduce maintenance personal's arm by
Under active force, greatly reduce labor intensity.The utility model utilizes the buoyancy that buoyant means provide to reduce maintenance personal
Physical demands, the labor intensity of power equipment maintaining personnel can be substantially reduced, improve repairing speed.
Embodiment 2:
As shown in Fig. 2 a kind of weighting meter, including insulating bar body 1, it is arranged on the insulation operation
The electroscope 2 of the upper end of bar body 1 and the buoyant means for being arranged on the top of insulating bar body 1;The buoyant means bag
The and of fixed seat 4 for include the helium tank 3 being arranged on the insulating bar body 1, being arranged on the insulating bar body 1
The cyclic spring air bag 5 being set on the insulating bar body 1, the bottom of cyclic spring air bag 5 are fixed on described solid
In reservation 4, the bottom of the cyclic spring air bag 5 sets air inlet 6, and the air inlet 6 passes through pipeline 7 and the helium tank 3
The exhaust outlet of valve switch 8 be connected.
Limiting plate 9 is set on the insulating bar body 1 and positioned at the top of cyclic spring air bag 5.
The upper surface of insulating bar body 1 opens up screwed hole 10, and the bottom of electroscope 2 is set and the screwed hole
10 threaded rods 11 being engaged.
In the embodiment, lived after cyclic spring air bag is filled with helium expansion in order to avoid cyclic spring air bag top is in
Dynamic state and be unable to provider to stable buoyancy, set in insulating bar body and above cyclic spring air bag limited
Cyclic spring air bag, can so be fixed between limiting plate and fixed seat by position plate.In addition, for the ease of changing different model
Electroscope, offer screwed hole in insulating bar body upper surface, electroscope bottom sets the spiral shell closed with corresponding threaded holes
Rasp bar, it so can quickly realize dismounting and change.
Embodiment 3:
As shown in figure 3, a kind of weighting meter, including insulating bar body 1, it is arranged on the insulation operation
The electroscope 2 of the upper end of bar body 1 and the buoyant means for being arranged on the top of insulating bar body 1;The buoyant means bag
The and of fixed seat 4 for include the helium tank 3 being arranged on the insulating bar body 1, being arranged on the insulating bar body 1
The cyclic spring air bag 5 being set on the insulating bar body 1, the bottom of cyclic spring air bag 5 are fixed on described solid
In reservation 4, the bottom of the cyclic spring air bag 5 sets air inlet 6, and the air inlet 6 passes through pipeline 7 and the helium tank 3
The exhaust outlet of valve switch 8 be connected.
Limiting plate 9 is set on the insulating bar body 1 and positioned at the top of cyclic spring air bag 5.
The upper surface of insulating bar body 1 opens up screwed hole 10, and the bottom of electroscope 2 is set and the screwed hole
10 threaded rods 11 being engaged.
The upper portion first side face of insulating bar body 1 sets insulation to operate a switch head 12.
The top second side of insulating bar body 1 sets curved knife 13.
In the embodiment, for the ease of carrying out operation of operating a switch using this insulating bar, in insulating bar body upper part
First side is provided with insulation and operated a switch head.In addition, for the ease of different on power line to being wrapped in using this insulating bar
Thing carries out cutting off cleaning, and insulating bar body upper part second side is provided with curved knife.
Finally illustrate, above example only to illustrate the technical solution of the utility model and unrestricted, this area
Other modifications or equivalent substitution that those of ordinary skill is made to the technical solution of the utility model, without departing from this practicality
The spirit and scope of new technique scheme, it all should cover among right of the present utility model.
Claims (5)
- A kind of 1. weighting meter, it is characterised in that:Including insulating bar body, it is arranged on the insulating bar The electroscope of body upper end and the buoyant means for being arranged on the insulating bar body upper part;The buoyant means include setting Helium tank on the insulating bar body, the fixed seat being arranged on the insulating bar body and it is set in described Cyclic spring air bag on insulating bar body, the cyclic spring air bag bottom are fixed in the fixed seat, the ring The bottom of shape elastic bag sets air inlet, the exhaust outlet phase that the air inlet passes through pipeline and the valve switch of the helium tank Connection.
- A kind of 2. weighting meter according to claim 1, it is characterised in that:On the insulating bar body And limiting plate is set above the cyclic spring air bag.
- A kind of 3. weighting meter according to claim 1, it is characterised in that:On the insulating bar body End face opens up screwed hole, and the electroscope bottom sets the threaded rod closed with the corresponding threaded holes.
- A kind of 4. weighting meter according to claim 1, it is characterised in that:On the insulating bar body Portion first side sets insulation to operate a switch head.
- A kind of 5. weighting meter according to claim 1, it is characterised in that:On the insulating bar body Portion's second side sets curved knife.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720894800.1U CN207009298U (en) | 2017-07-24 | 2017-07-24 | A kind of weighting meter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720894800.1U CN207009298U (en) | 2017-07-24 | 2017-07-24 | A kind of weighting meter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207009298U true CN207009298U (en) | 2018-02-13 |
Family
ID=61455733
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720894800.1U Expired - Fee Related CN207009298U (en) | 2017-07-24 | 2017-07-24 | A kind of weighting meter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207009298U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108400030A (en) * | 2018-04-28 | 2018-08-14 | 广东电网有限责任公司 | Flame insulating bar and flame component |
-
2017
- 2017-07-24 CN CN201720894800.1U patent/CN207009298U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108400030A (en) * | 2018-04-28 | 2018-08-14 | 广东电网有限责任公司 | Flame insulating bar and flame component |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106877572B (en) | A kind of tension membrane type wave energy generating set | |
CN109185066A (en) | A kind of floating wind energy, wave energy, tide energy combined generating system | |
CN207009298U (en) | A kind of weighting meter | |
CN206575104U (en) | A kind of attachment means between the power line network bridge and power line of stable connection | |
CN203398004U (en) | Rainproof cover for transformer Buchholz relay | |
CN105888956A (en) | Concentric-square-shaped lever type wave power generation device | |
CN202131593U (en) | Ship lock capable of being used for power generation | |
CN108590939A (en) | A kind of wave energy reforming unit based on leverage | |
CN204704060U (en) | Cumulative hydroelectric installation | |
CN207333101U (en) | A kind of combined generation of wind power and hydropower device | |
CN207470339U (en) | A kind of anti-extreme sea condition locks float certainly | |
CN102338017A (en) | Rainwater power generating device | |
CN103821670A (en) | Conical wind wheel and one new wind power generation scheme | |
CN106787110A (en) | A kind of breaker angle of solar battery system controls power supply | |
CN203862813U (en) | Special portable punching machine for punching electric parts | |
CN203082777U (en) | Wind and solar street lamp | |
CN208686857U (en) | A kind of off-course brake friction disc wear instruction alarm system | |
CN212640626U (en) | Hydrogen generator for VOCs on-line monitoring system | |
CN205646978U (en) | Rotation type solar power system | |
CN207939873U (en) | It is a kind of by solar powered integrated chassis | |
CN204859033U (en) | Wind pressure generating device | |
CN211924564U (en) | Current collector convenient to install | |
CN203301292U (en) | Power generation device | |
CN202851244U (en) | Wind energy hydro electric generating set | |
CN206129495U (en) | Adjustable digital display electrical power generating system based on wind -force power supply |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180213 Termination date: 20200724 |