CN207006469U - A kind of equipment integral control system - Google Patents

A kind of equipment integral control system Download PDF

Info

Publication number
CN207006469U
CN207006469U CN201720731011.6U CN201720731011U CN207006469U CN 207006469 U CN207006469 U CN 207006469U CN 201720731011 U CN201720731011 U CN 201720731011U CN 207006469 U CN207006469 U CN 207006469U
Authority
CN
China
Prior art keywords
ambient parameter
switch board
humidity
equipment
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720731011.6U
Other languages
Chinese (zh)
Inventor
何玉雪
钟兴宁
刘纯
马书明
姜春苗
丁文涛
王聪
杨金龙
黄俊睿
李业明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201720731011.6U priority Critical patent/CN207006469U/en
Application granted granted Critical
Publication of CN207006469U publication Critical patent/CN207006469U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of equipment integral control system.Wherein, the system includes:Interaction platform, multiple switch boards and multiple equipment positioned at different zones;Interaction platform, for obtaining ambient parameter, the ambient parameter is sent to the switch board;Switch board, for the operation according to the environment parameter control with one or more equipment in region.Pass through the utility model, solve the problems, such as how transformer station's miscellaneous function realizes overall-in-one control schema in the prior art, the seamless connection of the electric equipment and hvac equipment of transformer station is realized, the energy-saving safety of the electric equipment and hvac equipment that ensure to become electrical equipment is reliably run.

Description

A kind of equipment integral control system
Technical field
Transformer station's technical field is the utility model is related to, in particular to a kind of equipment integral control system.
Background technology
With carrying forward vigorously for intelligent grid construction, design and equipment to accessory systems such as transformer station's heating and ventilation air-conditionings Function proposes higher requirement.At present, transformer station generally uses distributing ventilation and air conditioning system, design concept lack innovation, Functions of the equipments are single, intelligence degree is low, and comprehensive energy consumption is higher, and are difficult to effectively hold in the mouth with intelligent substation assist control system Connect, can not effectively match construction and the service requirement of intelligent substation.
For the problem of how transformer station's miscellaneous function realizes overall-in-one control schema in the prior art, not yet propose at present effective Solution.
Utility model content
A kind of equipment integral control system is provided in the utility model embodiment, it is auxiliary to solve transformer station in the prior art The problem of how assist can realize overall-in-one control schema.
In order to solve the above technical problems, the utility model provides a kind of equipment integral control system, wherein, the system Including:Interaction platform, multiple switch boards and multiple equipment positioned at different zones;Interaction platform, will for obtaining ambient parameter The ambient parameter is sent to the switch board;Switch board, for according to the environment parameter control with one in region or more The operation of individual equipment.
Preferably, the switch board, specifically in the case where not receiving ambient parameter, controlling blower fan and shutter Open;In the case where receiving ambient parameter, the operation according to the environment parameter control with a multiple equipment in region.
Preferably, the switch board, specifically for when the ambient parameter meets first condition, control device opens system Chill formula, blower fan and shutter is controlled to close;It is additionally operable to when the ambient parameter meets second condition, control device is closed; Afterwards if the ambient parameter meets third condition, then blower fan and shutter is controlled to open;It is additionally operable in the ambient parameter When meeting fourth condition, control device opens heating mode, controls blower fan and shutter to close;It is additionally operable in the ambient parameter When meeting fifth condition, control device is closed;Afterwards if the ambient parameter meets Article 6 part, then blower fan and blinds are controlled Window is opened.
Preferably, the ambient parameter comprises at least one below:Indoor temperature, indoor humidity, outdoor temperature, outdoor are wet Degree.
Preferably, the first condition is:The indoor temperature >=preset temperature the upper limit, or, the indoor humidity >=pre- If top limit of humidity;The second condition is:The indoor temperature < preset temperature upper limits described in preset temperature lower limit <, and, the room Interior humidity≤default humidity lower limit;The third condition is:Indoor temperature described in the outdoor temperature <, and, the outdoor is wet Spend and top limit of humidity is preset described in <;The fourth condition is:The indoor temperature≤preset temperature lower limit, or, the interior are wet Degree >=default top limit of humidity;The fifth condition is:The indoor temperature < preset temperature upper limits described in preset temperature lower limit <, and, The indoor humidity≤default humidity lower limit;The Article 6 part is:Indoor temperature described in the outdoor temperature >, and, it is described Outside humidity < presets top limit of humidity.
Preferably, the switch board comprises at least:Frequency conversion fan switch board, for controlling the frequency conversion wind of same district device within the domain The running frequency of machine;Double Speed Fan switch board, the speed of service of the Double Speed Fan for controlling same district device within the domain.
Preferably, the frequency conversion fan switch board, specifically for it is determined that frequency conversion fan sets frequency to start it with minimum Afterwards, meet in the ambient parameter after Article 7 part reaches preset duration, improve the running frequency of frequency conversion fan;It is additionally operable in institute State ambient parameter to meet after Article 8 part reaches preset duration, reduce the running frequency of frequency conversion fan.
Preferably, the Double Speed Fan switch board, reach default specifically for meeting Article 7 part in the ambient parameter After duration, the speed of service of Double Speed Fan is improved;It is additionally operable to meet after Article 8 part reaches preset duration in the ambient parameter, Reduce the speed of service of Double Speed Fan.
Preferably, the ambient parameter comprises at least:Indoor temperature;The Article 7 part is:Described in preset temperature value < The indoor temperature < preset temperature upper limits;The Article 8 part is:Indoor temperature≤preset temperature value described in preset temperature lower limit <.
Preferably, the switch board includes:Controller and communication conversion module;The controller, turned by the communication Change the mold block and establish connection with the equipment, for controlling the operation with one or more equipment in region.
Preferably, the system also includes:Temperature Humidity Sensor, it is connected with one or more switch boards, for gathering Ambient parameter, and the ambient parameter is sent to the switch board;The interaction platform, it is additionally operable to obtain from each switch board Ambient parameter, the ambient parameter is shared to other switch boards that the same area is in each switch board.
Preferably, the interaction platform, it is additionally operable to receive the remote operation instruction of user, according to the remote operation instruction Control instruction is sent to the switch board, with the operation of control device.
Preferably, the switch board, it is additionally operable to monitor trouble-signal;After trouble-signal is monitored, control in same region All devices are closed, and control blower fan and shutter to open, and control frequency conversion fan sets frequency to run with maximum, controls Double Speed Fan To preset high-speed cruising.
Preferably, the interaction platform is computer and/or touch-screen.
Preferably, the same area includes the room that one or more possesses same environmental requirement.
Preferably, the number of a switch board control device is up to 128.
Using the technical solution of the utility model, multiple equipment is divided into different zones, each region is corresponding with one Or multiple switch boards, by switch board control with the operation of one or more equipment in region, solve and become in the prior art The problem of how power station miscellaneous function realizes overall-in-one control schema, realize transformer station electric equipment and hvac equipment it is seamless Linking, the energy-saving safety of the electric equipment and hvac equipment that ensure to become electrical equipment are reliably run.
Brief description of the drawings
Fig. 1 is the structured flowchart according to the equipment integral control system of the utility model embodiment;
Fig. 2 is the network architecture diagram according to the equipment integral control system of the utility model embodiment;
Fig. 3 is the control Organization Chart according to the equipment integral control system of the utility model embodiment.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings, but not as to this practicality New restriction.
Embodiment one
Fig. 1 is according to the structured flowchart of the equipment integral control system of the utility model embodiment, as shown in figure 1, should System includes:Interaction platform, multiple switch boards and multiple equipment positioned at different zones;Wherein, interaction platform, for obtaining ring Border parameter, ambient parameter is sent to switch board;Switch board, for being set according to environment parameter control with one or more in region Standby operation.
Ambient parameter in the present embodiment can at least include one below:Indoor temperature, indoor humidity, outdoor temperature, Outside humidity.
A. the equipment integral control system of the present embodiment can realize automatic control mode:
1st, it is automatic control mode to select system model, then automated system operation, without manual operation equipment;
2nd, when in region without available ambient parameter (not receiving ambient parameter), electric-powered shutter and blower fan is controlled to open Open;
3rd, when there is ambient parameter (receiving ambient parameter) in region, same district device within the domain is carried out according to ambient parameter Automatically control, it is specific as follows:
1) when ambient parameter meets first condition, switch board control device open refrigeration mode, if now blower fan and Shutter has turned on, then controls blower fan and shutter to close;
Above-mentioned first condition is:Indoor temperature >=preset temperature the upper limit, or, indoor humidity >=default top limit of humidity.
2) when ambient parameter meets second condition, switch board control device is closed;Afterwards if ambient parameter meets Three conditions, then blower fan and shutter is controlled to open;
Above-mentioned second condition is:The preset temperature lower limit < indoor temperature < preset temperature upper limits, and, indoor humidity≤default Humidity lower limit;
Above-mentioned third condition is:Outdoor temperature < indoor temperatures, and, outside humidity < presets top limit of humidity.
3) when ambient parameter meets fourth condition, switch board control device open heating mode, if now blower fan and Shutter has turned on, then controls blower fan and shutter to close;
Above-mentioned fourth condition is:Indoor temperature≤preset temperature lower limit, or, indoor humidity >=default top limit of humidity.
4) when ambient parameter meets fifth condition, switch board control device is closed;Afterwards if ambient parameter meets Six conditions, then blower fan and shutter is controlled to open.
Above-mentioned fifth condition is:The preset temperature lower limit < indoor temperature < preset temperature upper limits, and, indoor humidity≤default Humidity lower limit;
Above-mentioned Article 6 part is:Outdoor temperature > indoor temperatures, and, outside humidity < presets top limit of humidity.
Based on this, the operation to equipment in real time can carry out accurately controlling adjustment according to ambient parameter, such as run The switching of pattern, keying of equipment etc..Equipment overall-in-one control schema is realized, ensures that the energy-saving safety of equipment is reliably run.
B. the equipment integral control system of the present embodiment can realize air-blower control pattern:
In the present embodiment, switch board can be divided into the frequency conversion fan switch board of control frequency conversion fan and shutter, and, Control the Double Speed Fan switch board of Double Speed Fan and shutter, can freely be arranged in pairs or groups according to actual conditions in the same area this two Kind switch board.Frequency conversion fan switch board, the running frequency of the frequency conversion fan for controlling same district device within the domain;Double Speed Fan controls Cabinet, the speed of service of the Double Speed Fan for controlling same district device within the domain.
Specifically,
1) raising frequency controls
Frequency conversion fan switch board, for it is determined that frequency conversion fan with minimum set frequency start after, ambient parameter accord with Close after Article 7 part reaches preset duration, improve frequency conversion fan running frequency (such as:The running frequency of frequency conversion fan is improved F1Hz)。
2) frequency reducing controls
Frequency conversion fan switch board, for meeting in ambient parameter after Article 8 part reaches preset duration, reduce frequency conversion fan Running frequency (such as:The running frequency of frequency conversion fan is reduced into F2Hz).
3) High-speed Control
Double Speed Fan switch board, for meeting in ambient parameter after Article 7 part reaches preset duration, improve Double Speed Fan The speed of service (for example, the speed of service of Double Speed Fan is increased to above default high speed value).
4) low speed controls
Double Speed Fan switch board, for meeting in ambient parameter after Article 8 part reaches preset duration, reduce Double Speed Fan The speed of service (for example, the speed of service of Double Speed Fan is decreased below into default low speed value).
Above-mentioned ambient parameter comprises at least:Indoor temperature;Article 7 part is:The default temperature of preset temperature value < indoor temperatures < Spend the upper limit;Article 8 part is:Preset temperature lower limit < indoor temperatures≤preset temperature value.
Based on this, the operation to equipment in real time can carry out accurately controlling adjustment according to ambient parameter, such as frequency conversion The running frequency of blower fan, the speed of service of Double Speed Fan.Equipment overall-in-one control schema is realized, ensures that the energy-saving safety of equipment is reliable Operation.
Switch board in the present embodiment includes:Controller, communication conversion module and ensure switch board normal operation its His supplementary module.Controller is established to be connected by communication conversion module with equipment to carry out data transmission, for controlling with region The operation of one or more equipment.
Said system also includes:Temperature Humidity Sensor, it is connected with one or more switch boards, for gathering environment ginseng Number, and ambient parameter is sent to switch board;Interaction platform, it is additionally operable to obtain ambient parameter from each switch board, environment is joined Number is shared to other switch boards that the same area is in each switch board.Based on this, by all ambient parameters of the same area Shared, be easy to follow-up equipment to control.
The technical scheme of the present embodiment can also realize the remote control of user, specifically, above-mentioned interaction platform, be additionally operable to The remote operation instruction of user is received, control instruction is sent to switch board according to remote operation instruction, with the operation of control device. It is distance control mode by system call interception based on this, remote control of the user to equipment can be realized, improves equipment control effect Fruit.
The technical scheme of the present embodiment can also realize the accident monitoring of system, specifically, above-mentioned switch board, be additionally operable to supervise Survey trouble-signal;After trouble-signal is monitored, control all devices in same region to close, control blower fan and shutter to open, Control frequency conversion fan to set frequency to run with maximum, control Double Speed Fan to preset high-speed cruising.Based on this, monitored in switch board To after trouble-signal, system is automatically regulated to be emergency repair pattern, when there is equipment operation switch board region, then closes institute There is equipment, so as to avoid fault spread, improve security of system.
The equipment integral control system of the present embodiment is also equipped with local operation function, realizes field control equipment start-stop, Set interaction platform can not carry out equipment control, the convenient direct manipulation to equipment at the scene.
It should be noted that the interaction platform in the present embodiment can be computer and/or touch-screen.Computer is Control Room people Machine interactive software, user can be controlled by computer to system and equipment.Touch-screen is live man-machine interactive operation platform, is touched Touching screen can be arranged on switch board or have dispatch control effect to the equipment of regional installed in other positions, touch-screen.
One region can access one or more sets Temperature Humidity Sensors, and Temperature Humidity Sensor accesses the switch board of respective regions In (can access same switch board or multiple switch boards in), touch-screen reads the Temperature Humidity Sensor data of each switch board, And all data syn-chronizations are issued in each switch board of respective regions, region is reached information sharing.
The same area in the present embodiment includes the room that one or more possesses same environmental requirement.That is, one Individual region can be a single room, or the room of multiple close humiture requirements.One switch board is at most controllable 128 equipment (such as air-conditioning) are made, if equipment number more than 128, needs to be further added by switch board, one switch board of common engineering Can meet demand.
It should be noted that the preset temperature upper limit being related in the present embodiment, preset temperature lower limit, default top limit of humidity, The preset values such as default humidity lower limit, preset temperature value, preset duration, can be set, this practicality is new according to the actual requirements Type is not construed as limiting to this.
Fig. 2 be according to the network architecture diagram of the equipment integral control system of the utility model embodiment, as shown in Fig. 2 The system is divided into m region altogether, and region 1 includes two switch boards:Switch board 1 and switch board 2, region 2 include 5 controls Cabinet, etc..Touch-screen is established with each switch board and connected, and can be sent and instructed to switch board by touch-screen, realized and set to each Standby control.The communication port of computer and touch-screen also can be replaced other communication ports in addition to shown in Fig. 2.
Fig. 3 be according to the control Organization Chart of the equipment integral control system of the utility model embodiment, as shown in figure 3, Control instruction can be sent to regional by touch-screen, each region includes each switch boards of n and n platform air-conditionings, Fig. 3 be with It is schematically illustrate that one switch board controls an air-conditioning to carry out, and a switch board also can control more air-conditionings.
It was found from description more than, the utility model mainly realizes following technique effect:
1st, transformer station's heating, ventilation, the integrated and system function moduleization combination of air-conditioning are realized;
2nd, realize that transformer station's fresh air pattern is applied in good time, Room air distribution design Optimization of Energy Saving runs form;
3rd, transformer station's heating ventilation air-conditioning system intellectuality operational mode and safe operation guarantee are realized, realizes long-range monitoring and control System.
The technical solution of the utility model possesses higher practical value and application prospect, and will turn into China's intelligent grid The part of key technology.
Certainly, above is preferred embodiment of the present utility model.It should be pointed out that the ordinary skill for the art For personnel, on the premise of the utility model general principle is not departed from, some improvements and modifications can also be made, these improvement The scope of protection of the utility model is also considered as with retouching.

Claims (16)

1. a kind of equipment integral control system, it is characterised in that the system includes:Interaction platform, positioned at different zones Multiple switch boards and multiple equipment;
Interaction platform, for obtaining ambient parameter, the ambient parameter is sent to the switch board;
Switch board, for the operation according to the environment parameter control with one or more equipment in region.
2. system according to claim 1, it is characterised in that
The switch board, specifically in the case where not receiving ambient parameter, controlling blower fan and shutter to open;Receiving In the case of ambient parameter, the operation according to the environment parameter control with a multiple equipment in region.
3. system according to claim 1, it is characterised in that
The switch board, specifically for when the ambient parameter meets first condition, control device opens refrigeration mode, control Blower fan and shutter are closed;
It is additionally operable to when the ambient parameter meets second condition, control device is closed;Afterwards if the ambient parameter meets Third condition, then blower fan and shutter is controlled to open;
It is additionally operable to when the ambient parameter meets fourth condition, control device opens heating mode, controls blower fan and shutter Close;
It is additionally operable to when the ambient parameter meets fifth condition, control device is closed;Afterwards if the ambient parameter meets Article 6 part, then blower fan and shutter is controlled to open.
4. system according to claim 3, it is characterised in that the ambient parameter comprises at least one below:Indoor Temperature Degree, indoor humidity, outdoor temperature, outside humidity.
5. system according to claim 4, it is characterised in that
The first condition is:The indoor temperature >=preset temperature the upper limit, or, the indoor humidity >=default top limit of humidity;
The second condition is:The indoor temperature < preset temperature upper limits described in preset temperature lower limit <, and, the indoor humidity≤ Default humidity lower limit;
The third condition is:Indoor temperature described in the outdoor temperature <, and, preset described in the outside humidity < in humidity Limit;
The fourth condition is:The indoor temperature≤preset temperature lower limit, or, the indoor humidity >=default top limit of humidity;
The fifth condition is:The indoor temperature < preset temperature upper limits described in preset temperature lower limit <, and, the indoor humidity≤ Default humidity lower limit;
The Article 6 part is:Indoor temperature described in the outdoor temperature >, and, the outside humidity < presets top limit of humidity.
6. system according to claim 1, it is characterised in that the switch board comprises at least:
Frequency conversion fan switch board, the running frequency of the frequency conversion fan for controlling same district device within the domain;
Double Speed Fan switch board, the speed of service of the Double Speed Fan for controlling same district device within the domain.
7. system according to claim 6, it is characterised in that
The frequency conversion fan switch board, specifically for it is determined that frequency conversion fan with minimum set frequency start after, in the ring Border parameter meets after Article 7 part reaches preset duration, improves the running frequency of frequency conversion fan;It is additionally operable in the ambient parameter Meet after Article 8 part reaches preset duration, reduce the running frequency of frequency conversion fan.
8. system according to claim 6, it is characterised in that
The Double Speed Fan switch board, specifically for meeting in the ambient parameter after Article 7 part reaches preset duration, improve The speed of service of Double Speed Fan;It is additionally operable to meet after Article 8 part reaches preset duration in the ambient parameter, reduces double speed wind The speed of service of machine.
9. the system according to claim 7 or 8, it is characterised in that the ambient parameter comprises at least:Indoor temperature;
The Article 7 part is:The indoor temperature < preset temperature upper limits described in preset temperature value <;
The Article 8 part is:Indoor temperature≤preset temperature value described in preset temperature lower limit <.
10. system according to claim 1, it is characterised in that the switch board includes:Controller and communication modulus of conversion Block;
The controller, established and connected by the communication conversion module and the equipment, for controlling with one in region or The operation of multiple equipment.
11. system according to claim 1, it is characterised in that
The system also includes:Temperature Humidity Sensor, it is connected with one or more switch boards, for gathering ambient parameter, and The ambient parameter is sent to the switch board;
The interaction platform, be additionally operable to from each switch board obtain ambient parameter, by the ambient parameter share to each control Cabinet processed is in other switch boards of the same area.
12. system according to claim 1, it is characterised in that
The interaction platform, it is additionally operable to receive the remote operation instruction of user, according to the remote operation instruction to the control Cabinet sends control instruction, with the operation of control device.
13. system according to claim 1, it is characterised in that
The switch board, it is additionally operable to monitor trouble-signal;After trouble-signal is monitored, all devices in same region are controlled to close Close, control blower fan and shutter to open, control frequency conversion fan sets frequency to run with maximum, and control Double Speed Fan is with default high speed Operation.
14. system according to claim 1, it is characterised in that the interaction platform is computer and/or touch-screen.
15. system according to claim 1, it is characterised in that the same area possesses same environment including one or more It is required that room.
16. system according to claim 1, it is characterised in that the number of a switch board control device is up to 128 Platform.
CN201720731011.6U 2017-06-21 2017-06-21 A kind of equipment integral control system Active CN207006469U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720731011.6U CN207006469U (en) 2017-06-21 2017-06-21 A kind of equipment integral control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720731011.6U CN207006469U (en) 2017-06-21 2017-06-21 A kind of equipment integral control system

Publications (1)

Publication Number Publication Date
CN207006469U true CN207006469U (en) 2018-02-13

Family

ID=61448409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720731011.6U Active CN207006469U (en) 2017-06-21 2017-06-21 A kind of equipment integral control system

Country Status (1)

Country Link
CN (1) CN207006469U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108444076A (en) * 2018-03-08 2018-08-24 广东美的制冷设备有限公司 Method for pushing, the apparatus of air conditioning, mobile terminal and storage medium
CN108488987A (en) * 2018-03-08 2018-09-04 广东美的制冷设备有限公司 Control method, storage medium and the equipment of the apparatus of air conditioning

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108444076A (en) * 2018-03-08 2018-08-24 广东美的制冷设备有限公司 Method for pushing, the apparatus of air conditioning, mobile terminal and storage medium
CN108488987A (en) * 2018-03-08 2018-09-04 广东美的制冷设备有限公司 Control method, storage medium and the equipment of the apparatus of air conditioning
CN108444076B (en) * 2018-03-08 2020-03-06 广东美的制冷设备有限公司 Push method, air conditioning equipment, mobile terminal and storage medium
CN108488987B (en) * 2018-03-08 2020-04-07 广东美的制冷设备有限公司 Control method of air conditioning apparatus, storage medium, and apparatus

Similar Documents

Publication Publication Date Title
CN108361937B (en) Intelligent central air-conditioning energy-saving control method and system
CN104832445B (en) A kind of fan control system based on Internet of Things and method
CN206234965U (en) Air-conditioning networking linked system
CN104793671A (en) Temperature and humidity regulating system and temperature and humidity regulating method of control cubicle of intelligent substation
CN207006469U (en) A kind of equipment integral control system
CN102354167B (en) Building equipment analog control system
CN106444418A (en) Intelligent socket, control method for intelligent socket and intelligent housing system
CN206439981U (en) A kind of air purifier control panel
CN206817703U (en) A kind of energy-saving wireless sensor network central air-conditioning temperature control system
CN107505848A (en) Intelligent home furnishing control method with self-teaching and dynamic adjustment function
CN106940076A (en) A kind of energy-saving wireless sensor network central air-conditioning temperature control system
CN105258306A (en) Automatic demand response device oriented to central air conditioning system and application method
CN103822330A (en) Far-end intelligent energy-saving control system and method for central air-conditioner
CN107045294A (en) A kind of intelligent substation heating ventilation air-conditioning system and its control method
CN203203187U (en) Anti-moisture-condensation control device used for capillary tube air conditioner
CN204595655U (en) A kind of intelligent substation convergence control cabinet temperature humidity regulating system
CN202547014U (en) Working environment monitoring and conditioning system for 10kV power distribution station
CN204903986U (en) Energy -conserving long -range air conditioner controller of intelligence
CN204423007U (en) Support the passive intelligent visitor Ore-controlling Role of client
CN201114874Y (en) Intelligent lighting control device
CN203533790U (en) Fuzzy control system of cooling water device of central air conditioner
CN107328019A (en) A kind of equipment integrated control method, apparatus and system
WO2019100716A1 (en) Cabinet, cabinet operation control method and device
CN202734152U (en) Energy-saving control device of split-type air conditioner
WO2013152503A1 (en) Distributed control system for building ecology

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant