CN207003684U - A kind of cell curtain wall lifting circular orbit outrigger and ring beam fixedly connected part - Google Patents
A kind of cell curtain wall lifting circular orbit outrigger and ring beam fixedly connected part Download PDFInfo
- Publication number
- CN207003684U CN207003684U CN201720869158.1U CN201720869158U CN207003684U CN 207003684 U CN207003684 U CN 207003684U CN 201720869158 U CN201720869158 U CN 201720869158U CN 207003684 U CN207003684 U CN 207003684U
- Authority
- CN
- China
- Prior art keywords
- outrigger
- ring beam
- interfacing
- curtain wall
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000003014 reinforcing effect Effects 0.000 claims description 8
- 125000003003 spiro group Chemical group 0.000 claims description 7
- 238000003032 molecular docking Methods 0.000 claims description 6
- 239000003973 paint Substances 0.000 claims description 6
- 238000010276 construction Methods 0.000 abstract description 5
- 239000000463 material Substances 0.000 abstract description 5
- 229910000831 Steel Inorganic materials 0.000 description 6
- 239000010959 steel Substances 0.000 description 6
- 238000010586 diagram Methods 0.000 description 4
- 238000005266 casting Methods 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model proposes a kind of cell curtain wall lifting circular orbit outrigger and ring beam fixedly connected part, including two interfacing parts transversely docked, each interfacing part is provided with transversely to be docked to form interconnection through the transverse groove set, the transverse groove of described two interfacing parts.Lift socket part is provided with the downside of the interface of each interfacing part, the lift socket part of described two installed parts, which docks to be formed, lifts platform.The utility model is simple in construction, can improve the bonding strength between outrigger and ring beam, practical.Cell curtain wall lifting circular orbit outrigger provided by the utility model can be recycled with ring beam fixedly connected part, to save material.
Description
Technical field
The utility model is related to curtain wall construction technical field, more particularly to a kind of cell curtain wall lifting circular orbit outrigger with
Ring beam fixedly connected part.
Background technology
Cell curtain wall is widely used in skyscraper.During being lifted to cell curtain wall, often need
Outrigger that is vertical with the agent structure outward flange of building along one week arrangement of agent structure of building and stretching out in outside building,
And need that ring beam is fixedly mounted in the downside of outrigger outer end, ring beam is manufactured with I-steel or H profile steel mostly, multiple ring beam first places phase
Connect to form ring-shaped guide rail, electric block and remote operated vehicle can be installed in the downside of ring-shaped guide rail, to facilitate staff to list
First curtain wall is installed.Outrigger of the prior art is typically fixed with ring beam using simple steel bushing and bolt connection, fixed structure
Low intensity, stability is poor, and steel bushing often not reproducible utilization, causes the waste of material.
Utility model content
Main purpose of the present utility model is to propose that a kind of cell curtain wall lifting circular orbit outrigger is fixedly connected with ring beam
Part, it is intended to improve the bonding strength between outrigger and ring beam, and save material.
In order to realize above-mentioned technical purpose, the utility model proposes a kind of cell curtain wall lifting circular orbit outrigger and ring beam
Fixedly connected part, including two interfacing parts transversely docked, each interfacing part are provided with transversely through the transverse direction set
Groove, the transverse groove of described two interfacing parts dock to form interconnection;
Lift socket part is provided with the downside of the interface of each interfacing part, the lift socket part of described two installed parts docks to form support
Lift platform.
Preferably, the interface of each interfacing part offers the mounting groove along longitudinally through setting, is located at being formed
Lift socket part on the downside of the interface of the interfacing part.
Preferably, longitudinal both sides convex of each interfacing part is provided with connecting portion, and each connecting portion is provided with transversely
Through the connecting hole of setting, the connecting hole through described two interfacing parts is provided with connecting bolt, to connect described two docking
Part.
Preferably, the connecting hole is set in slotted hole along the vertical direction.
Preferably, the cell curtain wall lifting circular orbit outrigger also includes bolt, institute with ring beam fixedly connected part
State bolt to be threadedly coupled with the positioning spiro pit located at interfacing part top and/or sidepiece, the bolt passes through
The positioning spiro pit is set, to be crimped to outrigger.
Preferably, described two interfacing parts respectively include:
Bottom plate;
Two side plates, are transversely set, and are upwardly extended from the upper surface of the bottom plate, and there is the bottom plate lift to connect
Portion;And
Top plate, it is connected with the top of two side plates, encloses to form the transverse direction with the bottom plate, described two side plates
Groove.
Preferably, the junction on the outside of the side plate with the bottom plate is provided with the first reinforcing plate.
Preferably, the junction of the side plate and the connecting portion is provided with the second reinforcing plate.
Preferably, the interfacing part outer surface is coated with red lead anti-corrosive paint layer.
Preferably, the average thickness of the red lead anti-corrosive paint layer is not less than 70um.
In technical scheme provided by the utility model, first interfacing part can be sheathed on outrigger, and be bolted,
Gap is bumped into the relative position that the modes such as wedge are fixed between outrigger and interfacing part.By adjusting the phase between two interfacing parts
To position, using lift socket part dock to be formed lift platform, the upper cross plate of ring beam has been lifted, likewise it is possible to pass through bolt again
It is fixed, be bumped into the modes such as wedge in gap ring beam be fixed.The utility model is simple in construction, can improve outrigger and ring
Bonding strength between beam, it is practical.Cell curtain wall lifting circular orbit outrigger provided by the utility model is fixed with ring beam
Connector can be recycled, to save material.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art
Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only
It is some embodiments of the utility model, for those of ordinary skill in the art, is not paying the premise of creative work
Under, other accompanying drawings can also be obtained according to the structure shown in these accompanying drawings.
Fig. 1 is that cell curtain wall provided by the utility model lifts circular orbit outrigger and an implementation of ring beam fixedly connected part
The dimensional structure diagram of example;
Fig. 2 is the dimensional structure diagram of interfacing part shown in Fig. 1;
Fig. 3 is another dimensional structure diagram of interfacing part shown in Fig. 1;
Fig. 4 is that cell curtain wall shown in Fig. 1 lifts circular orbit outrigger and the top view of ring beam fixedly connected part;
Fig. 5 be A shown in Fig. 4 to view;
Fig. 6 be B shown in Fig. 4 to view;
Fig. 7 is that cell curtain wall provided by the utility model lifts circular orbit outrigger and another reality of ring beam fixedly connected part
Apply the overall structure diagram of example.
Drawing reference numeral explanation:
Label | Title | Label | Title |
100 | Interfacing part | 4 | Transverse groove |
200 | Outrigger | 5 | Connecting portion |
300 | Ring beam | 51 | Connecting hole |
1 | Bottom plate | 6 | Connecting bolt |
11 | Lift socket part | 7 | Bolt |
2 | Side plate | 8 | Positioning spiro pit |
21 | Mounting groove | 9 | First reinforcing plate |
3 | Top plate | 10 | Second reinforcing plate |
Realization, functional characteristics and the advantage of the utility model purpose will be described further referring to the drawings in conjunction with the embodiments.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only part of the embodiment of the present utility model, rather than all
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not making creative work premise
Lower obtained every other embodiment, belong to the scope of the utility model protection.
If it is to be appreciated that related in the utility model embodiment directionality instruction (such as upper and lower, left and right, it is preceding,
Afterwards ...), then directionality instruction be only used for explain it is relative between each part under a certain particular pose (as shown in drawings)
Position relationship, motion conditions etc., if the particular pose changes, directionality instruction also correspondingly changes therewith.
If, should " first ", " the in addition, relate to the description of " first ", " second " etc. in the utility model embodiment
Two " etc. description is only used for describing purpose, and it is not intended that instruction or implying its relative importance or implicit indicating meaning
The quantity of the technical characteristic shown.Thus, " first " is defined, the feature of " second " can express or implicitly include at least one
Individual this feature.In addition, the technical scheme between each embodiment can be combined with each other, but must be with ordinary skill
Personnel can be implemented as basis, and this technical side is will be understood that when the combination appearance of technical scheme is conflicting or can not realize
The combination of case is not present, also not within the protection domain of the requires of the utility model.
Fig. 1 to Fig. 6 shows that cell curtain wall lifting circular orbit outrigger provided by the utility model is fixedly connected with ring beam
One embodiment of part.The cell curtain wall lifting circular orbit outrigger and ring beam fixedly connected part, including two transversely docked
Individual interfacing part 100, each interfacing part 100 are provided with transversely through the transverse groove 4 set, the transverse direction of described two interfacing parts 100
The docking of groove 4 forms interconnection.As shown in Figures 2 and 3, lift socket part 11 is provided with the downside of the interface of each interfacing part 100, it is described
Platform is lifted in the docking formation of lift socket part 11 of two installed parts.In engineering, ring beam 300 is typically made up of I-steel or H profile steel,
As shown in figure 1, ring beam 300 has upper cross plate, lower cross plate and the riser of the connection upper cross plate and lower cross plate, such as Fig. 1 institutes
Show, interfacing part 100 can be sheathed on outrigger 200, can be bolted, the modes such as wedge are bumped into gap, it is fixed
Relative position between outrigger 200 and interfacing part 100.By adjusting the relative position between two interfacing parts 100, connect using lift
What the docking of portion 11 was formed lifts platform, the upper cross plate of ring beam 300 has been lifted, likewise it is possible to be bolted again, in space
Place is bumped into the modes such as wedge and ring beam 300 is fixed.Interfacing part 100 can be formed by polylith metal plate weld, can also be whole
Part casting.The utility model is simple in construction, can improve the bonding strength between outrigger 200 and ring beam 300, practicality
By force.Cell curtain wall lifting circular orbit outrigger provided by the utility model can be recycled with ring beam fixedly connected part, with section
About material.
To strengthen the positioning to ring beam 300 and outrigger 200, as shown in figure 1, the interface of each interfacing part 100 is opened
Provided with the mounting groove 21 along longitudinally through setting, to form the lift socket part 11 on the downside of the interface of the interfacing part 100.By
It is contained in the upper cross plate of ring beam 300 in mounting groove 21, when being installed, the interface of two interfacing parts 100 can be accomplished tightly
Closely connected to connect, such structure can strengthen the positioning to ring beam 300 and outrigger 200 than stronger.
Specifically, longitudinal both sides convex of each interfacing part 100 is provided with connecting portion 5, and each connecting portion 5 is provided with transversely
Through the connecting hole 51 of setting, the connecting hole 51 through described two interfacing parts 100 is provided with connecting bolt 6, described to connect
Two interfacing parts 100.Two interfacing parts 100 are bolted, fixation, and are easy to dismount.Really, interfacing part 100 it
Between be not limited to bolted mode, clamping etc. can also be used to be fixedly connected with mode known to other, will not be repeated here.
In order to which on the basis of ensureing that two interfacing parts 100 are connected firmly, convenient construction personnel install connecting bolt 6, institute
Connecting hole 51 is stated to set in slotted hole along the vertical direction.To prevent because of manufacture deviation, connecting bolt 6 can not be installed.
In order to preferably be positioned to outrigger 200, the cell curtain wall lifting circular orbit outrigger is fixed with ring beam to be connected
Fitting also includes bolt 7, the bolt 7 and the positioning spiro pit located at the top of interfacing part 100 and/or sidepiece
8 threaded connections, the bolt 7 set through the positioning spiro pit 8, to be crimped to outrigger 200, outrigger 200 are entered
Row positioning is fixed.In order to strengthen the fixed effect of positioning, bolt 7 can be provided with multiple.
Specifically, described two interfacing parts 100 can respectively include 1, two side plate 2 of bottom plate and top plate 3.The side plate 2
Transversely set, upwardly extended from the upper surface of the bottom plate 1, the bottom plate 1 has the lift socket part 11.The top plate 3 with
The top connection of two side plates 2, encloses to form the transverse groove 4 with the bottom plate 1, described two side plates 2.Bottom plate 1, side
Plate 2 can be fixedly connected with top plate 3 by way of welding, so be easier to manufacture, and really, interfacing part 100 can also be whole
Individual casting.Interfacing part 100 of the present utility model is not limited to the shape shown in Fig. 1 to Fig. 6, can also equally be manufactured into such as figure
Shape shown in 7, as shown in fig. 7, lift socket part 11 is set out from the interface convex of bottom plate 1, not by setting mounting groove 21
Formed, the upper cross plate of ring beam 300 is contained in the space between lift socket part 11 and outrigger 200, can equally realize to the He of outrigger 200
The fixation of ring beam 300, the interfacing part 100 of remaining known shape can be used for the utility model.
In order to increase the intensity of interfacing part 100, as shown in Figures 2 and 3, the outside of side plate 2 and the connection of the bottom plate 1
Place can be provided with the first reinforcing plate 9, and the junction of the side plate 2 and the connecting portion 5 can be provided with the second reinforcing plate 10.
, can be first to interfacing part after the completion of all machinings and welding sequence in order to improve the rustless property of interfacing part 100
100 are derusted, twice of brush red lead anti-corrosive paint.Preferably ensure that the average thickness of the red lead anti-corrosive paint layer is not less than 70um.
Preferred embodiment of the present utility model is the foregoing is only, not thereby limits the scope of the claims of the present utility model,
Every equivalent structure change under inventive concept of the present utility model, made using the utility model specification and accompanying drawing content
Change, or directly/be used in other related technical areas indirectly and be included in scope of patent protection of the present utility model.
Claims (10)
1. a kind of cell curtain wall lifting circular orbit outrigger and ring beam fixedly connected part, it is characterised in that including transversely docking
Two interfacing parts, each interfacing part be provided with transversely through set transverse groove, the transverse groove of described two interfacing parts
Docking forms interconnection;
Be provided with lift socket part on the downside of the interface of each interfacing part, the lift socket part of described two installed parts dock to be formed lift it is flat
Platform.
2. cell curtain wall lifting circular orbit outrigger as claimed in claim 1 and ring beam fixedly connected part, it is characterised in that every
The interface of one interfacing part offers the mounting groove along longitudinally through setting, to form the interface located at the interfacing part
The lift socket part of downside.
3. cell curtain wall lifting circular orbit outrigger as claimed in claim 1 and ring beam fixedly connected part, it is characterised in that every
Longitudinal both sides convex of one interfacing part is provided with connecting portion, and each connecting portion is provided with the connecting hole for transversely running through and setting,
Connecting hole through described two interfacing parts is provided with connecting bolt, to connect described two interfacing parts.
4. cell curtain wall lifting circular orbit outrigger as claimed in claim 3 and ring beam fixedly connected part, it is characterised in that institute
Connecting hole is stated to set in slotted hole along the vertical direction.
5. cell curtain wall lifting circular orbit outrigger as claimed in claim 1 and ring beam fixedly connected part, it is characterised in that also
Including bolt, the bolt is threadedly coupled with the positioning spiro pit located at interfacing part top and/or sidepiece, institute
State bolt to set through the positioning spiro pit, to be crimped to outrigger.
6. cell curtain wall lifting circular orbit outrigger as claimed in claim 1 and ring beam fixedly connected part, it is characterised in that institute
Stating two interfacing parts respectively includes:
Bottom plate;
Two side plates, are transversely set, and are upwardly extended from the upper surface of the bottom plate, and the bottom plate has the lift socket part;With
And
Top plate, it is connected with the top of two side plates, encloses to form the transverse groove with the bottom plate, described two side plates.
7. cell curtain wall lifting circular orbit outrigger as claimed in claim 6 and ring beam fixedly connected part, it is characterised in that institute
State the junction on the outside of side plate with the bottom plate and be provided with the first reinforcing plate.
8. cell curtain wall lifting circular orbit outrigger as claimed in claim 6 and ring beam fixedly connected part, it is characterised in that institute
The junction for stating side plate and the connecting portion is provided with the second reinforcing plate.
9. cell curtain wall lifting circular orbit outrigger as claimed in claim 1 and ring beam fixedly connected part, it is characterised in that institute
State interfacing part outer surface and be coated with red lead anti-corrosive paint layer.
10. cell curtain wall lifting circular orbit outrigger as claimed in claim 9 and ring beam fixedly connected part, it is characterised in that
The average thickness of the red lead anti-corrosive paint layer is not less than 70um.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720869158.1U CN207003684U (en) | 2017-07-17 | 2017-07-17 | A kind of cell curtain wall lifting circular orbit outrigger and ring beam fixedly connected part |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720869158.1U CN207003684U (en) | 2017-07-17 | 2017-07-17 | A kind of cell curtain wall lifting circular orbit outrigger and ring beam fixedly connected part |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207003684U true CN207003684U (en) | 2018-02-13 |
Family
ID=61455043
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720869158.1U Expired - Fee Related CN207003684U (en) | 2017-07-17 | 2017-07-17 | A kind of cell curtain wall lifting circular orbit outrigger and ring beam fixedly connected part |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207003684U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108946466A (en) * | 2018-07-21 | 2018-12-07 | 国网福建省电力有限公司 | Ring rail lifts Special safety device |
-
2017
- 2017-07-17 CN CN201720869158.1U patent/CN207003684U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108946466A (en) * | 2018-07-21 | 2018-12-07 | 国网福建省电力有限公司 | Ring rail lifts Special safety device |
CN108946466B (en) * | 2018-07-21 | 2019-10-22 | 国网福建省电力有限公司 | Ring rail lifts Special safety device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207003684U (en) | A kind of cell curtain wall lifting circular orbit outrigger and ring beam fixedly connected part | |
CN107326813A (en) | A kind of attachment structure being connected applied to I-steel with beret truss | |
CN203127978U (en) | Combined type automatic escalator truss | |
CN108661179A (en) | A kind of container house bottom | |
CN206337830U (en) | Wallboard hanging component | |
CN215563448U (en) | Novel assembled building floor transverse joint optimization structure | |
CN107161830A (en) | Elevator skeleton and gallery structure and its installation method | |
CN106516482B (en) | Tank container | |
CN204236479U (en) | For the headwall reinforced structure of hopper car | |
CN206928314U (en) | Base steel stake and the attachment structure of floor beam | |
CN204738229U (en) | Two bearing plate cable -stay bridge cable wire tower steel anchor case anchor structures | |
CN214995811U (en) | Shaping auxiliary plate at vertical rod | |
CN208327085U (en) | A kind of elevator shaft connected by semi-enclosed prefabricated component by bi-lug plate | |
CN204715835U (en) | A kind of levelling stall barrier for horizontal mobile multi-storied garage | |
CN204222864U (en) | For the built-in top chord of hopper car and the connection structure of dividing plate and side wall | |
CN206003871U (en) | Battery modules and suspender | |
CN213413790U (en) | Connecting beam of motor train unit | |
CN204983158U (en) | Wall body of various steel sheet building and connecting piece of roofing | |
CN216276366U (en) | Outer individual layer ring track structure of slope curtain floor | |
CN204222863U (en) | Headwall for hopper car strengthens structure | |
CN210530129U (en) | Building girder steel trompil reinforcing apparatus | |
CN215592308U (en) | Modular sliding fence door for construction elevator | |
KR102152458B1 (en) | Combination structure of carbon boom forming aerial work vehicle | |
CN203767883U (en) | Web member and main chord member connecting structure of tower crane standard section | |
CN114809590B (en) | Building aluminum alloy template structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 518108 Guangdong Baoan District Shenzhen Shiyan Street Ru rented community Huang Feng Ling Industrial Zone 2 big two, three floors. Patentee after: SHENZHEN GRANDLAND FANGTE TECHNOLOGY CONSTRUCTION GROUP Co.,Ltd. Address before: 518000 Fangda Second Industrial Park, Huang Feng Ling Industrial Zone, Shiyan Town, Baoan District, Shenzhen, Guangdong Patentee before: SHENZHEN GRANDLAND FANGTE FACADE TECHNOLOGY Co.,Ltd. |
|
CP03 | Change of name, title or address | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180213 |
|
CF01 | Termination of patent right due to non-payment of annual fee |