CN207003442U - It is a kind of to be easy to assembled foundation pit supporting construction - Google Patents

It is a kind of to be easy to assembled foundation pit supporting construction Download PDF

Info

Publication number
CN207003442U
CN207003442U CN201720288351.6U CN201720288351U CN207003442U CN 207003442 U CN207003442 U CN 207003442U CN 201720288351 U CN201720288351 U CN 201720288351U CN 207003442 U CN207003442 U CN 207003442U
Authority
CN
China
Prior art keywords
prefabricated pile
arc prefabricated
arc
breach
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720288351.6U
Other languages
Chinese (zh)
Inventor
徐昌发
武勇
乔坚强
徐晨飞
徐静如
徐亚星
王远洋
余宝应
叶名强
宋荣兵
马甜
唐敏娟
沈瑞
宋海群
侯思卿
聂玉政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI CHANGFA GEOTECHNICAL ENGINEERING TECHNOLOGY Co Ltd
Original Assignee
SHANGHAI CHANGFA GEOTECHNICAL ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI CHANGFA GEOTECHNICAL ENGINEERING TECHNOLOGY Co Ltd filed Critical SHANGHAI CHANGFA GEOTECHNICAL ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201720288351.6U priority Critical patent/CN207003442U/en
Application granted granted Critical
Publication of CN207003442U publication Critical patent/CN207003442U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

It the utility model is related to a kind of foundation pit supporting construction for being easy to assembly, including the arc prefabricated pile for foundation ditch earth-retaining and sealing, the i shaped steel for increasing arc prefabricated pile anti-side rigidity is connected with the peripheral sidewall of arc prefabricated pile, the left and right sides of arc prefabricated pile stretches out to form flat board, and arc prefabricated pile right-hand end forms the upper breach that breach is rectangle, arc prefabricated pile left end forms the lower breach that breach is rectangle, during two neighboring arc prefabricated pile splicing, the upper breach of one of arc prefabricated pile matches with the lower breach of another arc prefabricated pile, form complete slab construction.Arc prefabricated pile upper surface is horizontal plane, and the fore-and-aft direction of arc prefabricated pile upper surface arcuately prefabricated pile is provided with the spill link slot of insertion, and i shaped steel is plugged in spill link slot.Compared with prior art, the utility model foundation pit supporting construction is easy to splice, simple in construction, and steadiness is strong.

Description

It is a kind of to be easy to assembled foundation pit supporting construction
Technical field
Geotechnical Engineering is the utility model is related to, is easy to assembled foundation pit supporting construction more particularly, to a kind of.
Background technology
Accelerate with the paces of Urbanization in China, the utilization of the underground space obtain fast development, foundation depth Also it is increasingly deeper, therefore, more and more higher is required for the support technology of foundation ditch.
In each field of civil engineering, base pit engineering support pile, slope project slope protection pile and riverbank shore protection stake, frequently with brill Hole pouring pile, but this method has that speed of application is slow, and mud emission amount is big, and environmental pollution is serious, and is conserved after concrete perfusion The shortcomings of time is long;Traditional semicircle piling bar, U-shaped Larsen steel sheet pile or prefabricated pile, it, which is individually used for pattern foundation pit supporting structure, is present Anti-side rigidity is less than normal, deforms the shortcomings of excessive, it is applied to surrounding enviroment protection and requires higher and dig deep larger deep basal pit Engineering is restricted.
Its area distributions of i shaped steel are reassigned than reasonable than moderate, strong, and longitudinal bending resistance is strong, construction is convenient, again Amount is light and economy is high, but because i shaped steel does not have lock or connector in itself, when being individually used for foundation pit supporting construction, only Energy earth-retaining, it is impossible to sealing, it is impossible to meet the requirement of protection foundation ditch surrounding enviroment.
Chinese patent CN 205062819U disclose the pattern foundation pit supporting structure knot that a kind of arc prefabricated pile combines with i shaped steel Structure, including for foundation ditch earth-retaining and the arc prefabricated pile of sealing, be connected with the peripheral sidewall of arc prefabricated pile for increasing arc The i shaped steel of shape prefabricated pile anti-side rigidity, is connected between arc prefabricated pile and i shaped steel by connection fastener.The arc Its section of prefabricated pile is curved, and two at arc opening end sets the spill being connected with adjacent arc prefabricated pile respectively Plug-in unit and convex plug-in unit.Its realize finish structure anti-side rigidity is big, speed of application is fast, have earth-retaining concurrently and water stopping function, suitable for compared with The big purpose for digging deep basal pit.
Spill plug-in unit and convex plug-in unit in above-mentioned patent is complex in making cell structure, and is easy to damaged, simultaneously The phenomenon that two neighboring arc prefabricated pile stitching position easily seeps water be present.
Utility model content
The purpose of this utility model is exactly to be easy to assembled to provide one kind the defects of overcoming above-mentioned prior art to exist Foundation pit supporting construction.
The purpose of this utility model can be achieved through the following technical solutions:
It is a kind of to be easy to assembled foundation pit supporting construction including pre- for foundation ditch earth-retaining and the arc prefabricated pile of sealing, arc The i shaped steel for increasing arc prefabricated pile anti-side rigidity is connected with the peripheral sidewall of stake processed, described arc prefabricated pile The left and right sides stretches out to form flat board, and arc prefabricated pile right-hand end forms the upper breach that breach is rectangle, and arc is pre- Stake left end processed forms the lower breach that breach is rectangle, and when two neighboring arc prefabricated pile splices, one of arc is prefabricated The lower breach of the upper breach and another arc prefabricated pile of stake matches, and forms complete slab construction.
Described upper breach is located above arc prefabricated pile right-hand end, and penetrates the front and rear of arc prefabricated pile right planar Both sides, upper notch depth are the half of arc prefabricated pile right planar thickness;
Described lower breach is located at below arc prefabricated pile left end, and penetrates the front and rear of arc prefabricated pile left planar Both sides, lower notch depth are the half of arc prefabricated pile left planar thickness;
Arc prefabricated pile left planar thickness is equal with arc prefabricated pile right planar.
Described arc prefabricated pile upper surface is horizontal plane, and before and after arc prefabricated pile upper surface arcuately prefabricated pile Direction is provided with the spill link slot of insertion, and described i shaped steel is plugged in spill link slot.
The arcuately fore-and-aft direction of prefabricated pile, described i shaped steel can move forward and backward along spill link slot, arcuately in advance The left and right sides direction of stake processed, described i shaped steel are limited and spacing by the structure of spill link slot.
Pile center's spacing of the arc prefabricated pile is identical with i shaped steel center spacing.
The action of the arc prefabricated pile is 1.3 times of i shaped steel depth of section.
Compared with prior art, the utility model has advantages below and effective:
Arc prefabricated pile both ends are arranged to the shape of upper breach and lower breach by the utility model, and one side breach is square Shape, it is easy to make, while in the absence of raised or salient angle, it is not easy to damage, secondly, two faces of breach are horizontal plane respectively and erected Face directly, when two arc prefabricated piles splice, easily alignment, again, after two arc prefabricated piles splicings, one of arc is prefabricated The lower breach of the upper breach and another arc prefabricated pile of stake matches, and two vertical sealing surfaces and one are formed in breach stitching portion Individual horizontal seal face, sealing effectiveness is more preferable, and easily gluing or coated with adhesive on upper breach or lower breach, is connected with strengthening Connect intensity.
In the utility model, spill link slot is arranged to the fore-and-aft direction insertion of arcuately prefabricated pile, thus can root The i shaped steel of suitable number is connected on arc prefabricated pile according to needs, and i shaped steel can be adjusted according to demand in arc Position on the fore-and-aft direction of prefabricated pile.
In the utility model, spill link slot is arranged on below arc prefabricated pile upper surface so that spill link slot upper table Face sees or horizontal that, without ridge, be easy to arc prefabricated pile is positioned over conveying on the whole.
In the utility model, spill link slot is arranged on below arc prefabricated pile upper surface, it is not necessary to sets extra use In the connecting elements of connection i shaped steel, the installation time of the foundation pit supporting construction is simplified, while also save connection I-shaped The cost of manufacture of the connecting elements of shaped steel, and looked in structure more succinct.
Brief description of the drawings
Fig. 1 is to be easy to assembled foundation pit supporting construction schematic diagram in embodiment 1;
Fig. 2 is structural representation after two arc prefabricated piles combinations in embodiment 1.
Embodiment
The utility model is described in detail with specific embodiment below in conjunction with the accompanying drawings.
Embodiment
It is a kind of to be easy to assembled foundation pit supporting construction, as shown in Figure 1 and Figure 2, including for foundation ditch earth-retaining and the arc of sealing Prefabricated pile 1, the i shaped steel 2 for increasing the anti-side rigidity of arc prefabricated pile 1 is connected with the peripheral sidewall of arc prefabricated pile 1, The left and right sides of arc prefabricated pile 1 stretches out to form flat board, and the right-hand end of arc prefabricated pile 1 forms breach as rectangle Upper breach 4, the left end of arc prefabricated pile 1 forms the lower breach 5 that breach is rectangle, when two neighboring arc prefabricated pile 1 splices, The upper breach 4 of one of arc prefabricated pile 1 matches with the lower breach 5 of another arc prefabricated pile 1, forms complete flat board Structure.
Upper breach 4 is located above the right-hand end of arc prefabricated pile 1, and penetrates front and rear the two of the right planar of arc prefabricated pile 1 Side, the upper depth of breach 4 are the half of the right planar thickness of arc prefabricated pile 1;
Lower breach 5 is located at below the left end of arc prefabricated pile 1, and penetrates front and rear the two of the left planar of arc prefabricated pile 1 Side, the lower depth of breach 5 are the half of the left planar thickness of arc prefabricated pile 1;
The left planar thickness of arc prefabricated pile 1 is equal with the right planar of arc prefabricated pile 1.
The upper surface of arc prefabricated pile 1 is horizontal plane, and in the front and back of the upper surface of arc prefabricated pile 1 arcuately prefabricated pile 1 To the spill link slot 3 for being provided with insertion, i shaped steel 2 is plugged in spill link slot 3.
The arcuately fore-and-aft direction of prefabricated pile 1, i shaped steel 2 can be movable along spill link slot 3, arcuately prefabricated pile 1 left and right sides direction, i shaped steel 2 are limited and spacing by the structure of spill link slot 3.
Pile center's spacing of arc prefabricated pile 1 is identical with the center spacing of i shaped steel 2.
The action of arc prefabricated pile 1 is 1.3 times of the depth of section of i shaped steel 2.
The both ends of arc prefabricated pile 1 are arranged to the shape of upper breach 4 and lower breach 5 by the present embodiment, and one side breach is square Shape, it is easy to make, while in the absence of raised or salient angle, it is not easy to damage, secondly, two faces of breach are horizontal plane respectively and erected Face directly, when two arc prefabricated piles 1 splice, easily alignment, again, after two arc prefabricated piles 1 splice, one of arc is pre- The upper breach 4 of stake 1 processed matches with the lower breach 5 of another arc prefabricated pile 1, and two vertical sealings are formed in breach stitching portion Face and a horizontal seal face, sealing effectiveness is more preferable, and easily gluing or coated with adhesive on upper breach 4 or lower breach 5, To strengthen bonding strength.
In the present embodiment, spill link slot 3 is arranged to the fore-and-aft direction insertion of arcuately prefabricated pile 1, thus can root The i shaped steel 2 of suitable number is connected on arc prefabricated pile 1 according to needs, and i shaped steel 2 can be adjusted according to demand and existed Position on the fore-and-aft direction of arc prefabricated pile 1.
In the present embodiment, spill link slot 3 is arranged on below the upper surface of arc prefabricated pile 1 so that the upper table of spill link slot 3 Face sees or horizontal that, without ridge, be easy to arc prefabricated pile 1 is positioned over conveying on the whole.
In the present embodiment, spill link slot 3 is arranged on below the upper surface of arc prefabricated pile 1, it is not necessary to sets extra use In the connecting elements of connection i shaped steel, the installation time of the foundation pit supporting construction is simplified, while also save connection I-shaped The cost of manufacture of the connecting elements of shaped steel, and looked in structure more succinct.
The above-mentioned description to embodiment is understood that for ease of those skilled in the art and using practicality It is new.Person skilled in the art obviously can easily make various modifications to these embodiments, and illustrating herein General Principle be applied in other embodiment without by performing creative labour.Therefore, the utility model is not limited to above-mentioned Embodiment, those skilled in the art according to announcement of the present utility model, do not depart from improvement that the utility model category made and Modification all should be within the scope of protection of the utility model.

Claims (6)

1. a kind of be easy to assembled foundation pit supporting construction, including for foundation ditch earth-retaining and the arc prefabricated pile (1) of sealing, arc is pre- The i shaped steel (2) for increasing arc prefabricated pile (1) anti-side rigidity is connected with the peripheral sidewall of stake (1) processed, its feature exists In the left and right sides of described arc prefabricated pile (1) stretches out to form flat board, and arc prefabricated pile (1) right-hand end shape Into breach be rectangle upper breach (4), arc prefabricated pile (1) left end formed breach be rectangle lower breach (5), adjacent two During individual arc prefabricated pile (1) splicing, upper breach (4) and another arc prefabricated pile (1) of one of arc prefabricated pile (1) Lower breach (5) matches, and forms complete slab construction.
A kind of 2. foundation pit supporting construction for being easy to assembly according to claim 1, it is characterised in that described upper breach (4) above arc prefabricated pile (1) right-hand end, and the front and rear sides of arc prefabricated pile (1) right planar, upper breach are penetrated (4) depth is the half of arc prefabricated pile (1) right planar thickness;
Described lower breach (5) is located at below arc prefabricated pile (1) left end, and penetrates arc prefabricated pile (1) left planar Front and rear sides, lower breach (5) depth be arc prefabricated pile (1) left planar thickness half;
Arc prefabricated pile (1) left planar thickness is equal with arc prefabricated pile (1) right planar.
3. a kind of foundation pit supporting construction for being easy to assembly according to claim 1, it is characterised in that described arc is prefabricated Stake (1) upper surface is horizontal plane, and arcuately the fore-and-aft direction of prefabricated pile (1) is provided with and passed through in arc prefabricated pile (1) upper surface Logical spill link slot (3), described i shaped steel (2) are plugged in spill link slot (3).
A kind of 4. foundation pit supporting construction for being easy to assembly according to claim 3, it is characterised in that arcuately prefabricated pile (1) fore-and-aft direction, described i shaped steel (2) can be movable along spill link slot (3), arcuately a left side for prefabricated pile (1) Right two side directions, described i shaped steel (2) are limited and spacing by the structure of spill link slot (3).
A kind of 5. foundation pit supporting construction for being easy to assembly according to claim 1, it is characterised in that the arc prefabricated pile (1) pile center's spacing is identical with i shaped steel (2) center spacing.
A kind of 6. foundation pit supporting construction for being easy to assembly according to claim 1, it is characterised in that the arc prefabricated pile (1) action is 1.3 times of i shaped steel (2) depth of section.
CN201720288351.6U 2017-03-23 2017-03-23 It is a kind of to be easy to assembled foundation pit supporting construction Expired - Fee Related CN207003442U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720288351.6U CN207003442U (en) 2017-03-23 2017-03-23 It is a kind of to be easy to assembled foundation pit supporting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720288351.6U CN207003442U (en) 2017-03-23 2017-03-23 It is a kind of to be easy to assembled foundation pit supporting construction

Publications (1)

Publication Number Publication Date
CN207003442U true CN207003442U (en) 2018-02-13

Family

ID=61429156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720288351.6U Expired - Fee Related CN207003442U (en) 2017-03-23 2017-03-23 It is a kind of to be easy to assembled foundation pit supporting construction

Country Status (1)

Country Link
CN (1) CN207003442U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924400A (en) * 2019-12-09 2020-03-27 广东华固工程有限公司 Prefabricated building enclosure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924400A (en) * 2019-12-09 2020-03-27 广东华固工程有限公司 Prefabricated building enclosure
CN110924400B (en) * 2019-12-09 2021-06-11 广东华固工程有限公司 Prefabricated building enclosure

Similar Documents

Publication Publication Date Title
CN206928299U (en) A kind of foundation pit supporting construction with wedge-shaped splicing construction
CN205224016U (en) Vertical mosaic structure of precast underground continuous wall
CN211038655U (en) Connecting structure for fast assembling shield segments
CN109056650A (en) A kind of assembled sheet pile combination shore protection and its construction method
CN105350521A (en) Vertical splicing structure and method of prefabricated underground diaphragm walls
CN207003442U (en) It is a kind of to be easy to assembled foundation pit supporting construction
CN203334295U (en) Large-diameter arc-shaped steel sheet pile foundation pit supporting structure
CN105544559B (en) The structure and method of pattern foundation pit supporting structure are carried out using prefabricated components
CN217758841U (en) Layered sectional type upright self-stabilizing enclosure structure
CN109056649A (en) A kind of sheet pile combination shore protection and its construction method
CN203654304U (en) Grouting concrete stiffness core anchoring slide-resistant structure
CN211312487U (en) Steel pipe and steel plate combined sheet pile enclosure structure
CN215408678U (en) Arched tunnel composite lining structure
CN205369269U (en) Adopt prefabricated component to carry out excavation supporting's structure
CN209011082U (en) A kind of assembled peg board combination shore protection
CN211113687U (en) Double friction pile supporting construction of style of calligraphy
CN206503118U (en) A kind of protection slope
CN206681016U (en) Dash earth-retaining building structure
CN206438524U (en) A kind of geomembrane steel framework cofferdam structure
CN217128240U (en) Novel stagnant water envelope
CN213476943U (en) High-strength prefabricated foundation device with splicing grooves
CN212865800U (en) Ecological river levee slope protection structure
CN210288420U (en) Assembled foundation pit enclosure shear wall
CN213867851U (en) Take off-wall type utility tunnel foundation ditch of vibrator to backfill auxiliary device
CN220013551U (en) Prefabricated inserted sheet pile shore protection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180213

CF01 Termination of patent right due to non-payment of annual fee