CN206987851U - A kind of advance timbering beam structure - Google Patents
A kind of advance timbering beam structure Download PDFInfo
- Publication number
- CN206987851U CN206987851U CN201720867972.XU CN201720867972U CN206987851U CN 206987851 U CN206987851 U CN 206987851U CN 201720867972 U CN201720867972 U CN 201720867972U CN 206987851 U CN206987851 U CN 206987851U
- Authority
- CN
- China
- Prior art keywords
- plate
- fixedly connected
- advance timbering
- contiguous block
- beam structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A kind of advance timbering beam structure, the cage bar for be arrangeding in parallel including two and being connected by top plate, the first side plate has been fixedly connected with below two cage bars, two the first side plates are connected by two the second side plates for being separately positioned on its both ends, the width of the top plate is 300 600mm, and two caps for being used to connect the scalable column of advance timbering are symmetrically arranged between described two second side plates.Connection between back timber described in the utility model and scalable column is more stable, greatly reduces advance timbering and situation about toppling over occurs, back timber will not clash with the anchor shaft anchor cable in tunnel during use, substantially increase production efficiency.
Description
Technical field
It the utility model is related to advance timbering technical field, and in particular to a kind of advance timbering beam structure.
Background technology
Roadway support is most important for Safety of Coal Mine Production in mine, and at present, carrying out supporting using advance timbering is
Conventional supporting means., it is necessary to enter drop frame, move frame process, traditional advance timbering is usual during using advance timbering
It is made up of back timber and scalable column, but the stability connected between back timber and scalable column is not high, and advance timbering is easy
Topple over, greatly reduce the service life of advance timbering.And the structure design of back timber is unreasonable, during use easily with
Anchor shaft anchor cable in tunnel mutually conflicts, it is often necessary to removes anchor shaft anchor cable, loses time, influences to produce.
Utility model content
In order to solve that the stability that is connected between the back timber of advance timbering and scalable column is not high and back timber often with
Anchor shaft anchor cable in tunnel technical problem, the purpose of this utility model such as mutually conflict is to provide a kind of advance timbering back timber knot
Structure, the connection between back timber and scalable column is more stable, greatly reduces advance timbering and situation about toppling over occurs, used
Back timber will not clash with the anchor shaft anchor cable in tunnel in journey, substantially increase production efficiency.
Technical scheme is used by the utility model:A kind of advance timbering beam structure, including two be arranged in parallel
And the cage bar being connected by top plate, two cage bars lower sections have been fixedly connected with the first side plate, two the first side plates pass through two
It is separately positioned on the second side plate connection at its both ends, the width of the top plate is 300-600mm, between described two second side plates
Two caps for being used to connect the scalable column of advance timbering are symmetrically arranged with, the cap includes top and fixes company with top plate
The contiguous block connect, two through holes set along top plate width, the connection between two through holes are provided with contiguous block
Block block bottom is to top plate direction indent and forms groove, the connecting rod in inverted " u " font is provided with below the groove, and connect
It is embedded at the top of bar in groove, the cap is provided with reinforcement supporting plate close to the side of the second side plate, and opposite side, which is provided with, to be added
Strong support member, wherein, the top for strengthening supporting plate is fixedly connected with contiguous block, and bottom is fixedly connected with the second side plate, described to add
Strong support member include being arranged on vertical gripper shoe below contiguous block and with vertical gripper shoe is set in parallel first is connected
Plate, the top of vertical gripper shoe are fixedly connected with contiguous block, and the top of the first connecting plate is fixedly connected with top plate, vertical gripper shoe
Bottom be fixedly connected with the bottom of the first connecting plate by the second connecting plate.
Described two reinforcement supporting members are connected by two the 3rd connecting plates be arrangeding in parallel, the both ends of the 3rd connecting plate
It is vertical with the first connecting plate of two reinforcement supporting members respectively to be fixedly connected.
Rings seat is provided with second side plate, suspension ring are provided with rings seat.
Plate body bottom of first side plate between two reinforcement supporting members is provided with the breach in isosceles trapezoid.
Compared with prior art, the utility model has the advantages that:
First, a kind of advance timbering beam structure described in the utility model, back timber is in use by cap with that can stretch
Contracting column connects, and cap is more stable under carrying of the reinforcement supporting member with strengthening supporting plate so that back timber with it is scalable
Column connection is more stable, greatly reduces advance timbering and situation about toppling over occurs, and improves the service life of advance timbering;
2nd, beam structure described in the utility model is reasonable in design, can be moved freely between the anchor shaft anchor cable in tunnel, from
And make it that anchor shaft anchor cable need not be removed when using advance timbering, the time is saved, substantially increases production efficiency.
Brief description of the drawings
Fig. 1 is overlooking the structure diagram of the present utility model;
Fig. 2 is cross section structure diagram of the present utility model.
Embodiment
The utility model is elaborated with specific embodiment below in conjunction with the accompanying drawings, the present embodiment is with the utility model skill
Premised on art scheme, detailed embodiment and specific operating process are given, but the scope of protection of the utility model is unlimited
In following embodiments.
As illustrated, a kind of advance timbering beam structure, including two masters for be arrangeding in parallel and being connected by top plate 3
Muscle 1, two lower sections of cage bar 1 have been fixedly connected with the first side plate 6, and two the first side plates 6 are separately positioned on its both ends by two
The second side plate 2 connect, it is characterised in that:The width of the top plate 3 can be 300mm, 400mm, 450mm, 500mm or
600mm, two caps 5 for being used to connect the scalable column of advance timbering are symmetrically arranged between described two second side plates 2,
The cap 5 includes the contiguous block 501 that top is fixedly connected with top plate 3, and two are provided with along the width of top plate 3 on contiguous block 501
The through hole 502 that direction is set, the block bottom of contiguous block 501 between two through holes 502 to the direction indent of top plate 3 and is formed
Groove, groove lower section is provided with the connecting rod 503 in inverted " u " font, and the top of connecting rod 503 is embedded in groove, described
Cap 5 is provided with close to the side of the second side plate 2 strengthens supporting plate 4, and opposite side is provided with reinforcement supporting member 7, wherein, strengthen branch
The top of fagging 4 is fixedly connected with contiguous block 501, and bottom is fixedly connected with the second side plate 2, and the reinforcement supporting member 7 includes setting
The first connecting plate 703 put the vertical gripper shoe 701 below contiguous block 501 and be set in parallel with vertical gripper shoe 701,
The top of vertical gripper shoe 701 is fixedly connected with contiguous block 501, and the top of the first connecting plate 703 is fixedly connected with top plate 3, is erected
The bottom of allotment fagging 701 is fixedly connected with the bottom of the first connecting plate 703 by the second connecting plate 702.
Be basic embodiment of the present utility model above, can more than on the basis of further improved, optimized and limited
It is fixed:
Such as, described two reinforcement supporting members 7 are connected by two the 3rd connecting plates 703 be arrangeding in parallel, the 3rd connection
The both ends of plate 703 are vertical with the first connecting plate 703 of two reinforcement supporting members 7 respectively to be fixedly connected.
And for example, rings seat 10 is provided with second side plate 2, suspension ring 11 are provided with rings seat 10.
And for example, plate body bottom of first side plate 6 between two reinforcement supporting members 7 is provided with isosceles trapezoid
Breach.
Claims (4)
1. a kind of advance timbering beam structure, including two top plates that be arranged in parallel and pass through(3)The cage bar being connected(1), two
Individual cage bar(1)Lower section has been fixedly connected with the first side plate(6), two the first side plates(6)Its both ends is separately positioned on by two
The second side plate(2)Connection, it is characterised in that:The top plate(3)Width be 300-600mm, described two second side plates(2)
Between be symmetrically arranged with two be used for connect advance timbering scalable column caps(5), the cap(5)Including top with
Top plate(3)The contiguous block being fixedly connected(501), contiguous block(501)On be provided with two along top plate(3)Width is set logical
Hole(502), positioned at two through holes(502)Between contiguous block(501)Block bottom is to top plate(3)Direction indent is simultaneously formed recessed
Groove, groove lower section are provided with the connecting rod in inverted " u " font(503), and connecting rod(503)Top is embedded in groove, institute
State cap(5)Close to the second side plate(2)Side be provided with reinforcement supporting plate(4), opposite side is provided with reinforcement supporting member(7),
Wherein, supporting plate is strengthened(4)Top and contiguous block(501)It is fixedly connected, bottom and the second side plate(2)It is fixedly connected, it is described
Reinforcement supporting member(7)Including being arranged on contiguous block(501)The vertical gripper shoe of lower section(701)And and vertical gripper shoe(701)
The first connecting plate being set in parallel(703), vertical gripper shoe(701)Top and contiguous block(501)It is fixedly connected, first connects
Fishplate bar(703)Top and top plate(3)It is fixedly connected, vertical gripper shoe(701)Bottom and the first connecting plate(703)Bottom
Pass through the second connecting plate(702)It is fixedly connected.
A kind of 2. advance timbering beam structure as claimed in claim 1, it is characterised in that:Described two reinforcement supporting members
(7)Pass through two the 3rd connecting plates be arrangeding in parallel(703)It is connected, the 3rd connecting plate(703)Both ends respectively with two plus
Strong support member(7)The first connecting plate(703)Vertically it is fixedly connected.
A kind of 3. advance timbering beam structure as claimed in claim 1, it is characterised in that:Second side plate(2)On set
It is equipped with rings seat(10), rings seat(10)On be provided with suspension ring(11).
A kind of 4. advance timbering beam structure as claimed in claim 1, it is characterised in that:First side plate(6)It is located at
Two reinforcement supporting members(7)Between plate body bottom be provided with breach in isosceles trapezoid.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720867972.XU CN206987851U (en) | 2017-07-18 | 2017-07-18 | A kind of advance timbering beam structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720867972.XU CN206987851U (en) | 2017-07-18 | 2017-07-18 | A kind of advance timbering beam structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206987851U true CN206987851U (en) | 2018-02-09 |
Family
ID=61405585
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720867972.XU Expired - Fee Related CN206987851U (en) | 2017-07-18 | 2017-07-18 | A kind of advance timbering beam structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206987851U (en) |
-
2017
- 2017-07-18 CN CN201720867972.XU patent/CN206987851U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106400701B (en) | A kind of list girder low level balanced cantilever assembly Bridge Erector | |
CN107044090B (en) | A kind of construction method of dual deck bridge | |
CN102628368A (en) | Tunnel self-advancing support shed | |
CN107119578A (en) | The Bridge Erector of the whole two-way erection in hole on a kind of asymmetric framing prefabricated case beam beam of achievable large-tonnage | |
CN105887658A (en) | Multi-purpose continuous construction temporary beam structure and construction method thereof | |
CN202544887U (en) | Tunnel self-moving supporting shed | |
CN105369745A (en) | Bridge support exchanging and lifting reaction frame | |
CN206987851U (en) | A kind of advance timbering beam structure | |
CN203008942U (en) | Fully-mechanized-face crossheading non-empty-caving forepoling bracket | |
CN201128879Y (en) | High-level transferring support for bridge erector | |
CN214196358U (en) | Safety support device for mine roadway | |
CN102587951B (en) | Hydraulic U-type steel bracket supporting machine | |
CN110284904A (en) | A kind of lining trolley and its construction method | |
CN204343153U (en) | Multiplex sequential production just girder construction | |
CN205954500U (en) | Balanced free cantilever erection frame bridge crane of single girder low level | |
CN206065298U (en) | A kind of suspension type reinforcement cage processing device | |
CN206457955U (en) | A kind of oblique close rib composite wall board structure | |
CN202788900U (en) | Circulating mobile fore support | |
CN202673316U (en) | Step-shaped tunnel self-moving supporting shed | |
CN215444095U (en) | Subway tunnel inner supporting structure | |
CN205617790U (en) | Building templates puts up subassembly | |
CN206987862U (en) | A kind of lateral arrangement air way advance timbering group of firm support | |
CN212867576U (en) | Tunnel trolley with safety and stability | |
CN106429821B (en) | Adobe stone tongs | |
CN206203668U (en) | Adobe stone tongs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180209 Termination date: 20200718 |