CN206986914U - A kind of shaped steel tower crane basis steel platform - Google Patents

A kind of shaped steel tower crane basis steel platform Download PDF

Info

Publication number
CN206986914U
CN206986914U CN201720748141.0U CN201720748141U CN206986914U CN 206986914 U CN206986914 U CN 206986914U CN 201720748141 U CN201720748141 U CN 201720748141U CN 206986914 U CN206986914 U CN 206986914U
Authority
CN
China
Prior art keywords
steel
tower crane
platform
main girder
lattice column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720748141.0U
Other languages
Chinese (zh)
Inventor
王成荟
柏品松
宋松
沈兴东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201720748141.0U priority Critical patent/CN206986914U/en
Application granted granted Critical
Publication of CN206986914U publication Critical patent/CN206986914U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of shaped steel tower crane basis steel platform, including cast-in-situ bored pile, steel lattice column, steel platform;Cast-in-situ bored pile is equipped with steel lattice column to arrange four bored concrete piles of squarely at the top of every bored concrete pile;Steel lattice column includes billet, is supported on steel platform corner by billet with the square column on billet and located at stiffener of the square column per side, steel lattice column;Steel platform corner includes two main girder steels, four auxiliary girder steels and four pull bars, two main girder steel right-angled intersections, infalls are fixed provided with connecting plate, four pull bars form square frame between being connected to the two neighboring angle steel joint of main girder steel, and 1/4 Liang Chu that four auxiliary girder steels are connected to two main girder steels forms square inside casing.The utility model steel platform is integrated type structure, only need to bottom steel lattice column is fixed can install tower crane, dismounting is also convenient for, and saves the construction period.

Description

A kind of shaped steel tower crane basis steel platform
Technical field
A kind of shaped steel tower crane basis steel platform is the utility model is related to, belongs to technical field of building construction.
Background technology
For tower crane as vertical transport equipment essential in Construction of Engineering Projects, its basic engineering must be examined in construction Consider and solve the problems, such as.Increase and substrate soil qualitative diversity with excavation of foundation pit depth, traditional concrete bearing platform tower crane Basis can not meet the requirement of construction speed and construction technology.
In order to solve above-mentioned tower crane installation question, tower crane bottom absolute altitude is raised to by primary field by using steel lattice column More than ground soil absolute altitude, tower crane can also be installed without first earth excavation.Traditional steel latticework formula tower crane uses concrete bearing platform Form, this form needs progress cushion cap formwork to tie up reinforcing bar and casting concrete process, relatively time-consuming, and to tower crane built-in fitting Required precision is higher.Later stage also needs to abolish concrete platform, arduously takes a lot of work.This described steel platform lattice column tower crane base Plinth can perfection solve the above problems.
The content of the invention
Goal of the invention:The utility model purpose is in view of the shortcomings of the prior art, there is provided a kind of shaped steel tower crane basis steel Platform, solves the problems such as traditional tower crane foundation construction time-consuming and not reproducible utilization.
Technical scheme:Shaped steel tower crane basis described in the utility model steel platform, including cast-in-situ bored pile, steel lattice column, steel Platform;The cast-in-situ bored pile is equipped with the steel latticework to arrange four bored concrete piles of squarely at the top of every bored concrete pile Post;The steel lattice column includes billet, the square column being connected with billet and the stiffener located at the every side of square column, Steel lattice column is supported on steel platform corner by billet;;The steel platform corner include two main girder steels, four auxiliary girder steels and Four pull bars, two main girder steel right-angled intersections, infalls are fixed provided with connecting plate, and it is two neighboring that four pull bars are connected to main girder steel Square frame is formed between angle steel joint, 1/4 Liang Chu that four auxiliary girder steels are connected to two main girder steels forms square inside casing.
Above-mentioned technical proposal is further improved, the stake footpath of the bored concrete pile is 0.8m.
Further, the steel lattice column includes four 440 mm × 300 mm × 12mm batten plates and 4 140 × 14mm of Gen ∟ Angle steel, angle steel form form of fracture as the square of 460 mm × 460mm between being welded on adjacent batten plate, and batten plate centre-to-centre spacing is 800mm。
Further, the steel platform size is 4000mm × 4000mm × 668mm.
Further, the pull bar is 14#a channel-section steels.
Further, the main girder steel reserves standard section of tower crane bolt hole with auxiliary girder steel intersection.
Further, the main girder steel Half Beam is connected using stiffened steel plates up and down, and steel plate specification is 250 × 700 × 30mm
Beneficial effect:The utility model steel platform is integrated type structure, only need to be fixed with bottom steel lattice column Tower crane is installed, dismounting is also convenient for, and saves the construction period, and position opens up on request in tower crane bolt hole, and precision is high;Two main girder steels Right-angled intersection, used steel are saved, reduced steel platform deadweight, be easy to the later stage to lift, auxiliary girder steel is in main girder steel surrounding Set, significantly increase the monolithic stability of steel platform;Steel platform is repeatable to be utilized, is cost-effective, factory can be used to carry out prefabricated, Quality is guaranteed.
Brief description of the drawings
Fig. 1 is the structural representation of steel lattice column in the utility model;
Fig. 2 is the structural representation of steel platform in the utility model;
In figure:1st, billet;2nd, stiffener;3rd, main girder steel;4th, auxiliary girder steel;5th, pull bar;6th, connecting plate;7th, standard section of tower crane Bolt hole.
Embodiment
Technical solutions of the utility model are described in detail below by accompanying drawing, but the scope of protection of the utility model It is not limited to the embodiment.
Embodiment 1:Shaped steel tower crane basis steel platform as shown in Figure 1 and Figure 2, including cast-in-situ bored pile, steel lattice column, steel Platform.
Cast-in-situ bored pile quantity is four, and the line of stake position is square, and stake footpath is 0.8m, and steel lattice column includes billet 1st, the square column that is connected with billet 1 and located at stiffener 2 of the square column per side, steel lattice column pass through billet 1 Support is in steel platform corner;Square column is using 4 Gen ∟ 140mm × 14mm angle steel and -440mm × 300mm × 12mm batten plates welding Form, form of fracture is that 460 × 460mm is square, and batten plate centre-to-centre spacing 800mm, steel lattice column fixes with bored concrete pile reinforcement welding Bored concrete pile body concrete afterwards.
The size of steel platform is 4000mm × 4000mm × 668mm, comprising two main girder steels 3, four auxiliary girder steels 4 and four Pull bar 5, the two main right-angled intersections of girder steel 3, infalls are fixed provided with connecting plate 6, and four pull bars 5 are connected to main girder steel 3 adjacent two Square frame is formed between individual angle steel joint, 1/4 Liang Chu that four auxiliary girder steels 4 are connected to two main girder steels 3 forms square inside casing.It is main The specification of girder steel 3 is HK650C, and the specification of pull bar 5 is 14#a channel-section steels.The main Half Beam of girder steel 3 is connected using stiffened steel plates up and down, steel plate rule Lattice are 250 × 700 × 30mm.Main girder steel 3 reserves standard section of tower crane bolt hole 7 with the auxiliary intersection of girder steel 4, and steel platform is hung to lattice It is welded and fixed on structure column bracket plate, every main girder steel 3 is corresponding to be supported by two diagonal steel lattice columns.Tower crane passes through tower crane mark Quasi- section bolt hole 7 is fixed with steel platform.
In Excavation Process, with excavation of foundation pit from it is last and under tie-rod is successively installed, by four supporting bored concrete piles connect It is integral to protect the stability of bored concrete pile;The leveling of steel lattice column top, welding steel lattice column top billet 1;Steel platform master Girder steel 3 is fixed by welding on the billet 1 of lattice top end, and two main diagonal cross of girder steel 3, each girder steel is by diagonal two Lattice column supports.
Above-mentioned steel platform tower crane is made using the H profile steel of unified specification, convenient processing.Two main crosses of girder steel 3 are handed over Fork, has saved used steel, reduces steel platform deadweight, is easy to the later stage to lift.The main right-angled intersection of girder steel 3, auxiliary girder steel 4 exist The main surrounding of girder steel 3 is set, and significantly increases the monolithic stability of steel platform.
As described above, although the utility model has been represented and described with reference to specific preferred embodiment, but it must not It is construed to the limitation to the utility model itself.In the spirit and scope of the present utility model for not departing from appended claims and defining Under the premise of, can various changes can be made in the form and details to it.

Claims (7)

1. a kind of shaped steel tower crane basis steel platform, including cast-in-situ bored pile, steel lattice column, steel platform;It is characterized in that:The brill Hole pouring pile is equipped with the steel lattice column to arrange four bored concrete piles of squarely at the top of every bored concrete pile;The steel lattice Structure post includes billet, the square column being connected with billet and led to located at stiffener of the square column per side, steel lattice column Cross billet and be supported on steel platform corner;The steel platform corner includes two main girder steels, four auxiliary girder steels and four pull bars, and two The main girder steel right-angled intersection of root, infall are fixed provided with connecting plate, and four pull bars are connected between the two neighboring angle steel joint of main girder steel Square frame is formed, 1/4 Liang Chu that four auxiliary girder steels are connected to two main girder steels forms square inside casing.
2. shaped steel tower crane basis according to claim 1 steel platform, it is characterised in that:The stake footpath of the bored concrete pile is 0.8m。
3. shaped steel tower crane basis according to claim 1 steel platform, it is characterised in that:The steel lattice column includes four 440 mm × 300 mm × 12mm batten plates and 4 Gen ∟ 140 × 14mm angle steel, angle steel form section shape between being welded on adjacent batten plate Formula is the square of 460 mm × 460mm, and batten plate centre-to-centre spacing is 800mm.
4. shaped steel tower crane basis according to claim 1 steel platform, it is characterised in that:The steel platform size is 4000mm ×4000mm×668mm。
5. shaped steel tower crane basis according to claim 1 steel platform, it is characterised in that:The pull bar is 14#a channel-section steels.
6. shaped steel tower crane basis according to claim 1 steel platform, it is characterised in that:The main girder steel has a common boundary with auxiliary girder steel The reserved standard section of tower crane bolt hole in place.
7. shaped steel tower crane basis according to claim 1 steel platform, it is characterised in that:The main girder steel Half Beam uses up and down Stiffened steel plates connect, and steel plate specification is 250 × 700 × 30mm.
CN201720748141.0U 2017-06-23 2017-06-23 A kind of shaped steel tower crane basis steel platform Expired - Fee Related CN206986914U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720748141.0U CN206986914U (en) 2017-06-23 2017-06-23 A kind of shaped steel tower crane basis steel platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720748141.0U CN206986914U (en) 2017-06-23 2017-06-23 A kind of shaped steel tower crane basis steel platform

Publications (1)

Publication Number Publication Date
CN206986914U true CN206986914U (en) 2018-02-09

Family

ID=61399040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720748141.0U Expired - Fee Related CN206986914U (en) 2017-06-23 2017-06-23 A kind of shaped steel tower crane basis steel platform

Country Status (1)

Country Link
CN (1) CN206986914U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868285A (en) * 2018-05-07 2018-11-23 南京宁风能源科技有限公司 A kind of wind-powered electricity generation place anemometer tower suitable for different terrain
CN109322490A (en) * 2018-11-21 2019-02-12 北京市建筑工程研究院有限责任公司 A kind of material distributing machine and steel platform connection structure of climbing
CN110700303A (en) * 2019-10-12 2020-01-17 重庆建工建筑产业技术研究院有限公司 Pile foundation profile steel combined tower crane foundation construction method
CN111809647A (en) * 2020-06-04 2020-10-23 陕西建工第六建设集团有限公司 Connection structure of lattice column and concrete cushion cap foundation
CN115305944A (en) * 2022-09-02 2022-11-08 中建八局第三建设有限公司 Construction method for supporting pile serving as tower crane foundation pile

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868285A (en) * 2018-05-07 2018-11-23 南京宁风能源科技有限公司 A kind of wind-powered electricity generation place anemometer tower suitable for different terrain
CN109322490A (en) * 2018-11-21 2019-02-12 北京市建筑工程研究院有限责任公司 A kind of material distributing machine and steel platform connection structure of climbing
CN110700303A (en) * 2019-10-12 2020-01-17 重庆建工建筑产业技术研究院有限公司 Pile foundation profile steel combined tower crane foundation construction method
CN111809647A (en) * 2020-06-04 2020-10-23 陕西建工第六建设集团有限公司 Connection structure of lattice column and concrete cushion cap foundation
CN111809647B (en) * 2020-06-04 2022-08-12 陕西建工第六建设集团有限公司 Connection structure of lattice column and concrete cushion cap foundation
CN115305944A (en) * 2022-09-02 2022-11-08 中建八局第三建设有限公司 Construction method for supporting pile serving as tower crane foundation pile

Similar Documents

Publication Publication Date Title
CN206986914U (en) A kind of shaped steel tower crane basis steel platform
CN103485360B (en) A kind of steel platform tower crane foundation and construction method thereof
CN103184722B (en) Large-span double-layer Bailey truss structure and construction method thereof
CN105908902A (en) Positioning frame for prefabricated pier column reinforcing bar cages and construction method of pier column reinforcing bar cages
CN109610817A (en) Cross beam falsework and its design and construction method
CN104674665A (en) Installation method for corridor bridge of large space steel structure
CN207362866U (en) A kind of bolt collar fixed structure
CN201099989Y (en) High altitude great cantilever reinforced concrete structure high formwork base
CN210239246U (en) Wide flat beam type assembled concrete canopy for railway platform
CN109339479B (en) Internal replacement structure and method for existing reinforced concrete building
CN203144907U (en) Large-span dual-layer bailey truss structure
CN102777050A (en) Assembly type jig frame for longspan pipe truss roof girder
CN209603163U (en) A kind of tower crane bearing platform ruggedized construction
CN104818729A (en) Common foundation for transformation of large and small tower cranes
CN203531002U (en) Steel platform tower crane foundation
CN205348767U (en) Utilize steel reinforcement cage to make external formwork system of skeleton
CN209194354U (en) High-altitude long-span binder base-supporting shellfish thunder support construction
CN207244633U (en) Brick retaining wall steel bar girder hardened system on foundation pit enclosure top beam
CN207260156U (en) It is a kind of to lift steel trestle device for what large volume grinding coagulation soil put in storage
CN203755171U (en) Bridge back-pulling bearing construction support
CN214832864U (en) Raft steel column base support
CN116122296A (en) Construction and design method of newly-built foundation pit support structure adjacent to existing foundation pit
CN112523258B (en) Portable single-side formwork supporting system and construction method thereof
CN205617664U (en) Prefabricated pier stud locating rack for steel reinforcement cage
CN209703987U (en) Assembly of shear wall structure can have enough to meet the need outer protective frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180209

CF01 Termination of patent right due to non-payment of annual fee