CN206983319U - A kind of damping layer punching machine of embedded co-curing composite - Google Patents

A kind of damping layer punching machine of embedded co-curing composite Download PDF

Info

Publication number
CN206983319U
CN206983319U CN201720914659.7U CN201720914659U CN206983319U CN 206983319 U CN206983319 U CN 206983319U CN 201720914659 U CN201720914659 U CN 201720914659U CN 206983319 U CN206983319 U CN 206983319U
Authority
CN
China
Prior art keywords
perforation
poor glue
damping
prepreg
glue prepreg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720914659.7U
Other languages
Chinese (zh)
Inventor
梁森
杨先锋
古恒
郑长升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao University of Technology
Original Assignee
Qingdao University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao University of Technology filed Critical Qingdao University of Technology
Priority to CN201720914659.7U priority Critical patent/CN206983319U/en
Application granted granted Critical
Publication of CN206983319U publication Critical patent/CN206983319U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laminated Bodies (AREA)

Abstract

This application discloses a kind of damping layer punching machine of embedded co-curing composite, the punching machine includes the backing plate of the poor glue prepreg of pedestal, cylinder, connector, movable table, placement with damping diaphragm, binder discharging flat board, spring and perforated template with some through holes.Used by the proposition of novel perforations equipment, poor glue prepreg with damping diaphragm is on the premise of hardly reinforcing material is damaged, the poor glue prepreg with damping diaphragm of perforation has been produced, further enhancing the mechanical property and its processing efficiency of embedded co-curing perforation damp composite material.

Description

A kind of damping layer punching machine of embedded co-curing composite
Technical field
The application belongs to structure function technical field of composite materials, and in particular to a kind of embedded co-curing perforation damping is multiple The poor glue prepreg punching machine with damping diaphragm of condensation material.
Background technology
Composite makes it in high-tech areas such as Aeronautics and Astronautics because itself has very high specific strength and specific stiffness Obtain more and more extensive application.Embedded co-curing perforation damp composite material is exactly in existing high performance composites Basis on, damping material is embedded so that this new material both maintained original fibrous composite intensity and Rigidity, excellent damping vibration attenuation performance is made it have again, so as to assign the synthesis mechanical property that structure other materials can not be taken into account Energy.But up to the present, the manufacturing cost of embedded co-curing perforation damp composite material limits it still in higher level Further apply.Trace it to its cause be typical autoclave method process embedded co-curing perforation damp composite material technique it is more multiple Miscellaneous, equipment cost is higher.
Therefore, need to develop a kind of resistance that is easy and efficiently making embedded co-curing perforation damp composite material at present Buddhist nun's layer punching machine, to improving crudy and its mechanical property, promoting it further extensively using significant.
Utility model content
The problem of difficult, the purpose of the application are prepared for embedded co-curing perforation damp composite material in the prior art It is to provide a kind of damping layer punching machine of embedded co-curing perforation damp composite material.
To achieve these goals, the technical scheme that the application uses is as follows:
A kind of poor glue prepreg punching machine with damping diaphragm, is characterized in:The punching machine include pedestal, cylinder, The backing plate of the poor glue prepreg of connector, movable table, placement with damping diaphragm, the binder discharging with some through holes are put down Plate, spring and perforated template, wherein,
The cylinder is arranged on pedestal, and the movable table is connect by connector and cylinders, and cylinder can drive Movable table makees the movement of above-below direction;The backing plate is placed on movable table;The binder discharging flat board is arranged on Between backing plate and perforated template, and the movement of above-below direction can be made relative to backing plate and perforated template;The binder discharging flat board with Spring is provided between perforated template, binder discharging flat board makees the movement of above-below direction by the spring relative to perforated template;It is described Perforated template is provided with the perforation nail being engaged with the through hole on binder discharging flat board, and the perforation nail is cone column combination body, i.e., By the cylinder being connected with perforated template and bullet on the cylinder is set to combine.
Preferably, the material of backing plate can be cork or flexible plastic or foamed material, can be regularly replaced after failure.By band The poor glue prepreg of damping diaphragm is laid on the backing plate of movable table, and the poor glue prepreg with damping diaphragm is perforated, Require that the poor glue prepreg perforation with damping diaphragm can not destroy the fiber of individual layer prepreg in perforation, ensure band damping diaphragm Poor glue prepreg performance it is hardly destroyed, the poor glue prepreg perforation purpose with damping diaphragm is in resin importing process In, the resin of flowing is passed through well from the upper and lower of whole damping diaphragm so that resin completely homogeneously infiltrates whole insertion The poor glue prepreg of formula co-curing perforation damp composite material.
For the perforated template, the size than the poor glue prepreg perforation structure preferably with damping diaphragm is hole arrangement On four angles of square, pitch-row 10mm, aperture 2mm;Certainly poor glue prepreg perforation structure with damping diaphragm Size can also be hole arrangement on rectangular four angles, by convert the cornerwise direction of rectangle and its pitch-row realize it is whole The anisotropy of body structural damping performance;Certainly the size of other perforation layout structures can be also designed as requested, obtained specific Mechanical property outside the damping capacity of direction requirement and face, this forms resin nail work mainly due in damping diaphragm punch position Result.
Compared with prior art, the technical scheme of the application has the advantages that:
Used by the proposition of novel perforations equipment, the poor glue prepreg with damping diaphragm is hardly damaging reinforcing material On the premise of, the poor glue prepreg with damping diaphragm of perforation has been produced, further enhancing embedded co-curing perforation resistance The mechanical property and its processing efficiency of damping composite material.
Brief description of the drawings
The Figure of description for forming the part of the application is used for providing further understanding of the present application, and the application's shows Meaning property embodiment and its illustrate be used for explain the application, do not form the improper restriction to the application.
Fig. 1 is molded subtraction unit main structure figure;
Fig. 2 lays the lower mould schematic diagram after the poor glue prepreg in bottom;
Poor glue prepreg punching machines of the Fig. 3 with damping diaphragm;
Fig. 4 perforated templates;
Fig. 5 perforated template partial enlarged drawings;
Fig. 6 movable tables (contain backing plate);
The poor glue prepreg with damping diaphragm of Fig. 7 perforation;
The poor glue prepreg partial enlarged drawing with damping diaphragm of Fig. 8 perforation;
The two-sided poor glue prepreg structure chart with damping diaphragm of Fig. 9 perforation;
Lower mould schematic diagram after Figure 10 laying perforation damping diaphragms;
Lower mould schematic diagram after Figure 11 laying poor glue prepregs in top;
The preforming schematic diagrames of Figure 12;
The embedded co-curing perforation damp composite material ply angles of Figure 13;
The cure profile figure of the embedded co-curing perforation damp composite material moldings of Figure 14;
The embedded co-curing perforation damp composite material mould pressing process flows of Figure 15;
Wherein:1st, resin, 2, resin ingress pipe, 3, valve, 4, upper mould, 5, vacuum tube, 6, vavuum pump, 7, resin trap Device, 8, lay the composite structure of damping diaphragm, 9, lower mould, 10, the poor glue prepreg in bottom, 11, the band damping of perforation it is thin The poor glue prepreg of film or the two-sided poor glue prepreg with damping diaphragm of perforation, 12, the poor glue prepreg in top, 13, sealing gasket Block, 14, the poor glue prepreg of upper individual layer, 15, damping layer made from spread coating or spraying process, 16, the poor glue prepreg of lower individual layer, 17, Pedestal, 18, cylinder, 19, connector, 20, movable table, 21, perforated template, 22, backing plate, 23, spring, 24, binder discharging Flat board, 25, the poor glue prepreg with damping diaphragm of perforation, 26, vibrator, 27, amplifier, 28, signal generator.
Embodiment
The application is described further with reference to Fig. 1 to Figure 15 and embodiment:
By taking the composite structure with the poor glue prepreg of damping diaphragm of embedded perforation as an example, a kind of embedded co-curing is worn The mainly poor glue prepreg processing including perforated tape damping diaphragm, the preimpregnation of poor glue of the die pressing manufacture craft of hole damp composite material Material and perforated tape damping diaphragm poor glue prepreg lay, be preforming, vacuumizing and resin by injection, frequency sweep impulse standing eliminate Bubble and Pin Jiao areas, relevant temperature and pressure, recovery room moderate pressure, die sinking taking-up test specimen are controlled according to curing process parameter. Its primary structure including resin 1, resin ingress pipe 2, valve 3, upper mould 4, vacuum tube 5, vavuum pump 6, resin as shown in figure 1, receive Storage 7, the composite structure 8 for laying damping diaphragm, lower mould 9, vibrator 26, amplifier 27 and signal generator 28.
When producing embedded co-curing perforation damp composite material with die pressing, be first according to composite structure rigidity, Intensity, stability, damping, fatigue behaviour requirement, rationally design the laying direction of poor glue prepreg, the number of plies, ply stacking-sequence, laying Laying position, the number of plies, direction and the thickness of thickness and the poor glue prepreg with damping diaphragm of perforation.Namely according to structure Performance requirement, according to the ply stacking angle of poor glue prepreg, laying order and the laying number of plies, and by the band of the perforation of suitable thickness The poor glue prepreg of damping diaphragm or the two-sided poor glue prepreg 11 with damping diaphragm of perforation are layed in the poor glue prepreg in top 12 and the poor glue prepreg 10 in bottom among.When embedded co-curing perforation damp composite material requirement have higher damping loss because The period of the day from 11 p.m. to 1 a.m, the thickness and the number of plies of damping layer of perforating will suitably increase.
Before poor glue prepreg is laid, it is necessary to mould 4 and lower mould 9 in cleaning, it must ensure that die-face cleans free from admixture, Then releasing agent is sprayed.
The poor glue prepreg of individual layer is laid to certain thickness according to certain ply stacking angle, laying order and the laying number of plies The poor glue prepreg 10 in bottom, the poor glue prepreg 10 in bottom now is softer and has certain cohesive, can easily according under The undulations of mould are routed in lower mould 9, as shown in Figure 2.By the poor glue prepreg 10 in bottom be routed in lower mould 9 after, it is necessary to Under on poor glue prepreg 10 laying perforation the poor glue prepreg with damping diaphragm.
The making of the poor glue prepreg with damping diaphragm brush (spray) coating or continuous prepreg method, i.e., by damping material Formation damping material solution in organic solvent is dissolved in by proper ratio, is applied with brush (spray) or infiltrates technique by the solution brush (spray) Apply or infiltrate on the poor glue prepreg of individual layer, after the organic solvent volatilization in damping material solution, it is thin just to obtain band damping The poor glue prepreg of film;If the damping area for the poor glue prepreg with individual layer damping diaphragm that two brushes (spray) are coated is bonded The two-sided poor glue prepreg structure with damping diaphragm is just obtained together.Damping diaphragm brush (spray) is applied to the poor glue prepreg of individual layer On the reason for be that unvulcanized damping diaphragm is especially soft, viscosity is big, can not be laid immediately on upper and lower part prepreg it In, and be used to brushing (spray) and apply or the poor glue prepreg of individual layer of infiltration damping diaphragm can play a part of bearing medium, it can make Unvulcanized damping diaphragm is obtained, it is smoothly routed on the poor glue prepreg in bottom by and can after perforation, while ensures to damp The curing temperature of film and time and resin cure temperature and time consistency.
Because damping diaphragm does not have gas permeability in itself, for mobility of the reinforced resin in poor glue prepreg, ensure The full whole die cavity of resin filling, here using the method for the poor glue prepreg perforation with damping diaphragm.Poor glue with damping diaphragm Repaved after prepreg perforation between the poor glue prepreg in upper and lower part, allow liquid resin in the poor glue prepreg in top with Smooth flow between the poor glue prepreg in portion, so as to fill up whole die cavity, it ensure that the dimensional accuracy and crudy of obtained structure.
Fig. 3 is the poor glue prepreg punching machine with damping diaphragm, and the punching machine includes pedestal 17, cylinder 18, connection Part 19, movable table 20, perforated template 21, backing plate 22, spring 23 and the binder discharging flat board 24 with several through holes. Wherein, the cylinder 18 is arranged on pedestal 17, and the movable table 20 is connected by connector 19 with cylinder 18, cylinder 18 can drive movable table 20 to make the movement of above-below direction;The backing plate 22 is placed on movable table 20;The binder Discharging flat board 24 is arranged between backing plate 22 and perforated template 21, and backing plate 22 and perforated template 21 can make above-below direction relatively Movement;Spring 23 is provided between the binder discharging flat board 24 and perforated template 21, binder discharging flat board 24 passes through the spring 23 make the movement of above-below direction relative to perforated template 21;The perforated template 21 is provided with and the through hole phase on binder discharging flat board The perforation nail of cooperation.The material of backing plate 22 can be cork or soft plastic material or foamed material, can be regularly replaced after failure. Fig. 4, Fig. 5 are respectively perforated template and perforated template partial enlarged drawing, there is series of rules distribution on the flat board of perforated template 21 Perforation nail.Fig. 6 is movable table 20, and backing plate 22 is laid on movable table 20, and the poor glue with damping diaphragm is pre- Leaching material or the two-sided poor glue prepreg structure with damping diaphragm are laid on backing plate 22, and movable table 20 passes through connector 19 It is connected with cylinder 18, cylinder 18 drives movable table 20 to move upwards, until the poor glue prepreg with damping diaphragm touches The lower surface of binder discharging flat board 24.Movable table 20 is continued up, the forced compression of spring 23, while binder discharging is put down The poor glue prepreg of the holddown belt damping diaphragm of plate 24 simultaneously moves upwardly together, until the perforation in perforated template 21 is followed closely through binder Through hole on discharging flat board 24 simultaneously pierces through the poor glue prepreg with damping diaphragm, and now the poor glue prepreg with damping diaphragm is worn Casement plate 21 pricks out the aperture of regular distribution, and damping diaphragm by the fiber of individual layer prepreg and thereon is extruded into around hole, After dimensionally stable to be perforated, keep a period of time after, movable table 20 is fallen, take out perforation with the poor of damping diaphragm Glue prepreg or the two-sided poor glue prepreg 11 with damping diaphragm of perforation.
Perforation nail in punching machine is a kind of cone column combination body, i.e., by bottom be bullet of the band compared with Small Taper and The assembly that the cylinder on top combines, the size than the poor glue prepreg perforation structure preferably with damping diaphragm is hole It is laid out on four angles of square, pitch-row 10mm, aperture 2mm;Fig. 7 is that the band damping being placed on movable table 20 is thin The poor glue prepreg 11 of film, Fig. 8 are the partial enlarged drawing of the poor glue prepreg with damping diaphragm, as can be seen from Figure 8 fiber The fiber of resin individual layer prepreg is not pricked the perforation nail disconnected, design rule is distributed in perforated template 21 by perforated template 21 Purpose is:On the one hand it is that perforating for regular distribution is followed closely and can pass regular distribution on the poor glue prepreg 11 with damping diaphragm Aperture;On the other hand it is to ensure not destroying the poor glue prepreg of individual layer while perforating on the poor glue prepreg 11 with damping diaphragm On fiber, the fiber of the poor glue prepreg of individual layer is simply extruded into the both sides in hole, ensures the poor glue prepreg of individual layer and damping material Performance be not destroyed.The two-sided poor glue prepreg structure with damping diaphragm of perforation is as shown in figure 9, it is by two brushes (spray) The damping area of the poor glue prepreg with individual layer damping diaphragm 15 coated fits together what perforation formed, i.e. the poor glue of upper individual layer Prepreg 14, the lower poor glue prepreg 16 of individual layer perforate what is formed with damping diaphragm 15 therein is clipped in.
The purpose of two-sided poor glue prepreg perforate to the poor glue prepreg with damping diaphragm or with damping diaphragm is:Make tree Fat 1 can pass through the poor glue prepreg with damping diaphragm or two-sided poor with damping diaphragm after entering the poor glue prepreg 12 in top The hole of glue prepreg enters the poor glue prepreg 10 in bottom, or conversely so that resin 1 can complete wetting it is whole embedded common Solidification perforation damp composite material preform.
The two-sided poor glue preimpregnation with damping diaphragm perforated shown in poor the glue prepreg 25 or Fig. 9 with damping diaphragm of perforation After the structure fabrication of material is good, the upper surface for being close to the poor glue prepreg 10 in bottom is routed in lower mould 9.Lay damping The lower die structure of layer is as shown in Figure 10.The poor glue prepreg with damping diaphragm of perforation is laid on the poor glue prepreg 10 in bottom Or, it is necessary to carry out the laying of the poor glue prepreg in top after the two-sided poor glue prepreg structure with damping diaphragm of perforation.Top is poor The laying of glue prepreg 12 is identical with the laying method of the poor glue prepreg 10 in bottom.Generally, the poor glue prepreg 12 in top Laying direction and the number of plies it is identical with the laying direction of the poor glue prepreg 10 in bottom and the number of plies, can also be fitted certainly according to structural requirement When each layer direction, the number of plies and the gross thickness of the poor glue prepreg 12 in adjustment top and the poor glue prepreg 10 in bottom.It should be noted that Due to needing the band to the poor glue prepreg 10 in bottom, the poor glue prepreg with damping diaphragm of perforation or perforation to hinder in mold process The poor glue prepreg 12 of two-sided poor glue prepreg and top of Buddhist nun's film is imposed severe pressure, i.e., compaction treatment is carried out to it, therefore The poor glue prepreg in bottom, the gross thickness of the poor glue prepreg of damping diaphragm and top after laying should be greater than composite finished product Thickness, performance in fig. 11 be the poor glue prepreg 12 in top upper surface height higher than seal block 13 upper surface height Degree.
After the poor glue prepreg 12 in top is laid, preforming processing need to be carried out.Mould 4 will be gone up to depress, carried out just Die closing operation is walked, and applies certain pressure, seals mould, and makes the poor glue prepreg 10 in bottom, the band damping diaphragm of perforation Poor glue prepreg or the poor glue prepreg 12 of two-sided poor glue prepreg 11 and top with damping diaphragm of perforation fill out as much as possible Full die cavity.Schematic diagram after preforming is as shown in figure 12.
After preforming, vacuumize process need to be carried out to moulding system.The purpose vacuumized is negative to make mould inside holding Pressure, so that resin 1 can smoothly flow into and be full of die cavity.As shown in figure 1, opening vavuum pump 6, it is set to pass through the He of resin trap 7 Vacuum tube 5 carries out vacuumize process to mould, and resin trap 7 act as preventing resin from flowing into vavuum pump 6.Treat that vacuum reaches To after setting value, valve 3 is opened, resin 1 is entered the composite structure 8 for laying damping diaphragm through ingress pipe 2 and upper mould 4 In, it is specific as shown in figure 13.Usually, the vacuum tube 5 and resin ingress pipe 2 being connected with cushion block 13 should be in symmetrical cloth on mould Put, so that the resin flow resistance in mould is basically identical, make the poor glue prepreg in resin infiltration upper and lower part more uniform;For Asymmetrical molds, should also try one's best dispersed placement resin ingress pipe and vacuum tube.The quantity of resin ingress pipe and vacuum tube can root It is arranged according to being actually needed, is only illustrated in Fig. 1 by taking a resin ingress pipe and two vacuum tubes as an example.
Due to the effect of mould precompressed and the air impermeability of damping diaphragm, resin flow resistance is added, therefore in resin After the completion of introducing technology, frequency sweep vibrations to stand, the perforation damping diaphragm composite preform constructions institute to having infiltrated resin Frequency sweep is carried out in system to impulse, the vibration exciter position that impulses is applied to mould lower surface and is located at system center of gravity, and frequency is from five hertz To 10,000 hertz, amplitude continues 5-8 minutes, then stands 3-5 minutes, repeat said process two to five times, allow in 0.1-2mm Resin is full of whole product in uniform mixing in damping diaphragm composite material preformed body of perforating, and eliminates the bubble of the inside and poor glue Area, stop frequency sweep vibrations, the number of plies of general damping diaphragm insertion of perforating is more, and preform is thicker, and vibration exciter impulses and continued Take large values, otherwise get the small value with time of repose.
Resin used in resin used in poor glue prepreg and introducing technology is same resin in the application, the curing molding mistake Range request composite resin can have consistent solid (sulphur) to change parameter, including the pressure that solid (sulphur) is changed with visco-elastic damping material Power, temperature and solid (sulphur) change time etc., so just it can be made to form inierpeneirating network structure in the technical process of co-curing, together When co-curing before will be along perforation upper and lower part fibre with liquid resin in the adjacent reinforcing material of perforation damping diaphragm prepreg Tie up material resin insertion to get up, formed " resin nail ", the composite layer adjacent with perforation damping diaphragm prepreg is coupled Come, collective effect is followed closely by inierpeneirating network structure and resin, so that the structure has good Coating combination performance.Solidification process In, in the different periods, there is different requirements to pressure and temperature, to control temperature, the heater used in mould It is evenly arranged, ensures that mold temperature is consistent everywhere;Room temperature is cooled to after end, discharges pressure, taking-up test specimen can obtain embedding Enter formula co-curing perforation damp composite material structural test piece, specific implementation process uses 160 DEG C of co-curing reaction curves such as Shown in Figure 14;Whole technological process is as shown in figure 15.
Need to illustrate, when making the embedded co-curing damp composite material test specimen of complicated shape, it is necessary to right Damping diaphragm is perforated, otherwise resin can not the whole poor glue prepreg of homogeneous immersion, cause waste product.
Damping material component, the pressure of the technical process are applied with reference to specific embodiment and temperature controlled processes enter Row explanation.
Embedded co-curing perforation damp composite material mainly includes for the particular/special requirement of visco-elastic damping layer:
1st, temperature requirement, the curing temperature of damping layer must be identical with the solidification temperature of glass-epoxy.
2nd, the requirement of hardening time, the prepreg with damping layer and the poor glue prepreg of fibrous epoxy resin are compound, in fiber In Curing Process of Epoxy, damping layer must be completed to vulcanize.Epoxy resin cure temperature is 155-160 DEG C of medium temperature, during solidification Between about 2-3 hours.This requires that damping diaphragm curing temperature and time are consistent with epoxy resin cure temperature and time, and not Recovery or undercure phenomenon can occur, otherwise influence the mechanical property of total.According to requirements above, the present embodiment Die pressing manufacture craft priority selection 1 shown in damping material component.
The damping material component of table 1
The poor glue prepreg of embedded co-curing composite of the present embodiment uses commercially available 2070CN epoxy resin as base Body, the poor glue prepreg of glass fabric of epoxy resin is mutually made using glass fabric as enhancing, resin content in 15%-20%, In order to lay in a mold.
The laying poor glue prepreg in bottom --- the poor glue with damping diaphragm of perforation is cut according to designed ply stacking-sequence Prepreg --- the poor glue prepreg in top, after matched moulds precompressed, vavuum pump is opened, makes to be always maintained at 0.08~0.095MPa in mould Negative pressure, importing resin material is 2070CN epoxy resin, and liquid resin must be allowed to reach the viscosity of requirement before importing, will be set Fat is uniformly introduced into the poor glue prepreg of upper and lower part.
Due to the effect of mould precompressed and the air impermeability of damping diaphragm, increased in the respective regions of complex-shaped die cavity Add resin flow resistance, easily formed bubble and Pin Jiao areas, after the completion of resin introducing technology, frequency sweep vibrations to stand, it is right System where having infiltrated the perforation damping diaphragm composite preform constructions of resin carries out frequency sweep and impulsed, and vibration exciter impulses position It is applied to mould lower surface and is located at system center of gravity, mould where the preform to having infiltrated resin carries out frequency sweep and impulsed, first First signal generator 28 sends swept-frequency signal, and system is impulsed by amplifier 27 and vibration exciter 26, and frequency is from five hertz to one Ten thousand hertz, amplitude continues 5 minutes in 0.1~2mm, then stands 4 minutes, repeats said process three times, allows resin to be hindered in perforation Uniformly mixing is full of whole product in Buddhist nun's film composite material preform, eliminates bubble and the Pin Jiao areas of the inside, stops frequency sweep Vibrations, the number of plies of general damping diaphragm insertion of perforating is more, and preform is thicker, and vibration exciter impulses and continues to take with time of repose Big value, on the contrary get the small value;
After completing frequency sweep vibrations standing, it is consistent that forming process requires that matrices of composite material can have with visco-elastic damping material Solid (sulphur) change parameter, including solid (sulphur) pressure for changing, temperature and solid (sulphur) change time, so can just make it in co-curing Technical process in formed inierpeneirating network structure and damping diaphragm punch position formed resin nail so that the structure has well Coating combination performance.The curing process parameter of the composite of the present embodiment is as shown in figure 14, and 0.08 is always maintained in mould ~0.095MPa negative pressure, 5 atmospheric pressure of mould pressurizing maintenance intracavitary, make temperature from room temperature with 1~3 DEG C/min heating rate Degree reach 150 DEG C be incubated 15 minutes, then with 1~3 DEG C/min heating rate make temperature reach 160 DEG C be incubated 3 hours, then with Rate of temperature fall no more than 1.5 DEG C/min of rate of temperature fall is down to less than 60 DEG C, completes embedded co-curing perforation damping composite wood The co-curing of material, the pressure in mould is finally shed, removes mould and auxiliary material, embedded co-curing is perforated and damps composite wood Material is taken out, and the post processing such as trimming is carried out to it.Notice that the resin of the poor glue prepreg with damping diaphragm will be with die pressing importing Resin is completely the same, and whole technological process is as shown in figure 15.
Comparative example 1:During experimental study, the application is investigated the prepreg using different resins content to insertion The influence of formula co-curing perforation damp composite material mechanical property, controls other experimental conditions identical with the application's, passes through examination Result discovery is tested, the embedded co-curing for using the prepreg (content is 25~35wt%) of normal contents resin to be prepared is worn The up-to-standard rate of hole damp composite material is relatively low, uses poor glue prepreg to be prepared compared to the application embedded solid altogether Change perforation damp composite material, the interlayer mechanical property low 10%~17% for the composite that the comparative example is prepared, mainly That the resin nail dimension to be formed is less than normal, and it is unstable caused by, the particularly complicated respective regions of mold shape are especially apparent.
Comparative example 2:During experimental study, the application is investigated frequency sweep and impulses processing to the perforation of embedded co-curing The influence degree of damp composite material mechanical property, control other experimental conditions identical with the application's, the comparative example is to obtaining The preform of composite impulsed processing without frequency sweep, found by result of the test, frequency sweep impulses processing to embedded The quality and mechanical property of co-curing perforation damp composite material have important influence, are impulsed the compound of processing without frequency sweep Bubble in material is more, Pin Jiao areas easily occurs, or even the respective regions of mold shape complexity follow closely to be formed without resin, have a strong impact on The quality of product and the qualification rate for reducing product.Impulsed the insertion that is prepared after processing using frequency sweep compared to the application Formula co-curing is perforated damp composite material, and the interlayer mechanical property of the composite that the comparative example is prepared is low 12%~ 23%.
Above-described embodiment is the preferable embodiment of the application, but presently filed embodiment is not by above-described embodiment Limitation, it is other it is any without departing from spirit herein essence with made under principle change, modification, replacement, combine, simplification, Equivalent substitute mode is should be, is included within the protection domain of the application.

Claims (5)

1. a kind of damping layer punching machine of embedded co-curing composite, it is characterized in that:The punching machine includes pedestal, gas The backing plate of the poor glue prepreg of cylinder, connector, movable table, placement with damping diaphragm, the binder discharging with some through holes Flat board, spring and perforated template, wherein,
The cylinder is arranged on pedestal, and the movable table is connect by connector and cylinders, and cylinder can drive activity Workbench makees the movement of above-below direction;The backing plate is placed on movable table;The binder discharging flat board is arranged on backing plate Between perforated template, and the movement of above-below direction can be made relative to backing plate and perforated template;The binder discharging flat board and perforation Spring is provided between template, binder discharging flat board makees the movement of above-below direction by the spring relative to perforated template;The perforation Template be provided be engaged with the through hole on binder discharging flat board perforation nail, it is described perforation nail for cone column combination body, i.e., by with The connected cylinder of perforated template and the bullet of setting on the cylinder combine.
2. punching machine as claimed in claim 1, it is characterized in that:The material of backing plate is cork.
3. punching machine as claimed in claim 1, it is characterized in that:The material of backing plate is plastics.
4. punching machine as claimed in claim 1, it is characterized in that:The material of backing plate is foam.
5. punching machine as claimed in claim 1, it is characterized in that:For the perforated template, the poor glue with damping diaphragm is pre- The size of leaching material perforation structure is hole arrangement on four angles of square, pitch-row 10mm, aperture 2mm.
CN201720914659.7U 2017-07-26 2017-07-26 A kind of damping layer punching machine of embedded co-curing composite Expired - Fee Related CN206983319U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720914659.7U CN206983319U (en) 2017-07-26 2017-07-26 A kind of damping layer punching machine of embedded co-curing composite

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720914659.7U CN206983319U (en) 2017-07-26 2017-07-26 A kind of damping layer punching machine of embedded co-curing composite

Publications (1)

Publication Number Publication Date
CN206983319U true CN206983319U (en) 2018-02-09

Family

ID=61417327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720914659.7U Expired - Fee Related CN206983319U (en) 2017-07-26 2017-07-26 A kind of damping layer punching machine of embedded co-curing composite

Country Status (1)

Country Link
CN (1) CN206983319U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113246585A (en) * 2021-04-30 2021-08-13 武汉纺织大学 Perforating needle, system and method for manufacturing foam sandwich preformed body
CN114311400A (en) * 2021-12-07 2022-04-12 何荣 Carbon fiber reinforced thermoplastic prepreg balance adjusting device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113246585A (en) * 2021-04-30 2021-08-13 武汉纺织大学 Perforating needle, system and method for manufacturing foam sandwich preformed body
CN114311400A (en) * 2021-12-07 2022-04-12 何荣 Carbon fiber reinforced thermoplastic prepreg balance adjusting device
CN114311400B (en) * 2021-12-07 2023-11-03 安徽赢碳新材料科技有限公司 Carbon fiber reinforced thermoplastic prepreg balance adjusting device

Similar Documents

Publication Publication Date Title
CN107283878A (en) The die pressing manufacture craft of embedded co-curing perforation damp composite material
JP5509212B2 (en) Manufacturing of structural composite elements
US11179901B2 (en) Process and apparatus for molding composite articles
CN1193870C (en) Method and device for producing fibre-reinforced components using injection method
CN103042700B (en) Integrated forming method and device for segmented blade
CN101801651A (en) A method for producing a composite structure and a composite structure
CN105365226B (en) Soft mode mold closing fibre reinforced composites product processing unit (plant) and processing method
CN107215039A (en) A kind of core filled composite material and preparation method thereof
CN101143492A (en) Compression type RTM forming method
CN108248161A (en) A kind of method that foam-filled honeycomb prepares liquid condition shaping composite material sandwich
CN104097329B (en) A kind of method in composite foam sandwich construction shaping, foamed material being carried out resin infusion pretreatment
CN206983319U (en) A kind of damping layer punching machine of embedded co-curing composite
CN103802333A (en) Method for manufacturing electronic product composite material shell through resin transfer molding process
CN1665676A (en) Three-dimensional knit spacer fabric sandwich composite
CN103042701A (en) Integrated formation device and method for wind power blade
CN103737946B (en) A kind of forming method of two-ply foam sandwich structure polymer matrix composites
CN104943200A (en) Liquid molding method of resin-based composite material of interlayer thermoplasticity flow guide net
CN110861318A (en) Carbon fiber automobile front floor compression molding method
CN105415706A (en) Vacuum infusion one-time forming method for composite sandwich structure
CN105751651A (en) Production method of anti-layering foam sandwich composite plate
CN106217904A (en) The preparation facilities of a kind of extruded bright finish uniform thickness fiberglass test flat board and method
JP2012513914A (en) Process and apparatus for manufacturing composite structures
CN102114689B (en) Vacuum assisted forming method for integrally closing outer housing of composite material
CN113059866A (en) Composite material sandwich pipe and manufacturing method thereof
CN107696522A (en) A kind of carbon fibre fabric method for forming parts at band R angles

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180209

Termination date: 20190726

CF01 Termination of patent right due to non-payment of annual fee