CN206980492U - One kind flocculation dispensation apparatus - Google Patents

One kind flocculation dispensation apparatus Download PDF

Info

Publication number
CN206980492U
CN206980492U CN201720947553.7U CN201720947553U CN206980492U CN 206980492 U CN206980492 U CN 206980492U CN 201720947553 U CN201720947553 U CN 201720947553U CN 206980492 U CN206980492 U CN 206980492U
Authority
CN
China
Prior art keywords
funnel
chamber
sliding block
cylinder
water inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720947553.7U
Other languages
Chinese (zh)
Inventor
宋淼
王海云
杨林波
刘洋
瞿忠卫
洪超颖
杨华
王耀波
邓兆娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Snyder Mitsui Shipbuilding (chongqing) Environmental Equipment Co Ltd
Original Assignee
Snyder Mitsui Shipbuilding (chongqing) Environmental Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Snyder Mitsui Shipbuilding (chongqing) Environmental Equipment Co Ltd filed Critical Snyder Mitsui Shipbuilding (chongqing) Environmental Equipment Co Ltd
Priority to CN201720947553.7U priority Critical patent/CN206980492U/en
Application granted granted Critical
Publication of CN206980492U publication Critical patent/CN206980492U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses one kind flocculation dispensation apparatus, including casing, dry congenial, first doline, pipe-line system, stirring system and control system, box house is provided with first partition and second partition, and casing is divided into the first cavity, the second cavity and the 3rd cavity successively, each cavity top is provided with cover plate, the dry cover plate top for speculating to be provided with the second cavity, first doline be arranged at it is dry speculate it is other, it is dry speculate to connect through helix transporting device be connected with first doline;The cover plate on each cavity top is fixedly installed a stirring system, and pipe-line system includes inlet pipeline and drain line, and control system is located on the cover plate on casing top.First doline includes the first buffering cone, the second buffering cone, the first funnel and the second funnel.Have the beneficial effect that:1st, the water that the first buffering cone has been blocked in the first funnel is splashed to spiral conveying tube output end;2nd, anti-condensation heating muff device is eliminated, reducing energy consumption reduces industrial cost.

Description

One kind flocculation dispensation apparatus
Technical field
It the utility model is related to sewage treatment area, and in particular to one kind flocculation dispensation apparatus.
Background technology
Flocculate dispensation apparatus when for water treatment field automated dispensing throwing device, it can be according to required medicament Concentration, the mixing of dry medicinal powder or gluey flocculant and water is continuously and efficiently completed, so as to obtain homogeneous, active polymerization Solution, by connecting dosing pump good medicament of transport arrangement into dispensing point or system specified, it can realize thus extensively should Occasion for municipal wastewater processing, sewage plant etc. using medicament configuration.
The U of patent CN 201605187 disclose a kind of Automatic Dosing mixing arrangement for water treatment facilities, and it throws dry An anti-condensation heating muff is provided with machine, the sleeve pipe other end is erected at just on doline, although spiral shell can be prevented to a certain extent The condensation of the dry medicinal powder of conveying device output end PAM is revolved, but there is also following deficiency:1st, because anti-condensation heating muff continues not Discontinuously run, thus it is higher to consume energy, cost is larger;2nd, anti-condensation heating muff is enclosed on outside dosing screw rod, causes cleaning Trouble;Flocculation dispensation apparatus breaks down the problems such as being difficult to repair.In summary, it is necessary to which being subject to improvement to prior art makes it Meet current requirement.
Utility model content
For the deficiency in the presence of prior art, the utility model provides a kind of flocculation dispensation apparatus, solves existing There is the problem of technology cleaning trouble, anti-condensation sleeve pipe high energy consumption, cost is big.
To achieve the above object, the utility model employs following technical scheme:
One kind flocculation dispensation apparatus includes casing, dry congenial, first doline, pipe-line system, stirring system and control system, The box house is provided with first partition and second partition, and the dividing plate is vertically arranged and cabinets cavity is divided into the first chamber Room, second chamber and the 3rd chamber, second chamber is between first chamber and the 3rd chamber, first chamber top and second Chamber roof connects, and is connected at the top of second chamber with the 3rd chamber roof, casing top is connected with first chamber, second chamber And the 3rd cover plate for all covering of chamber, the first mixer that stirring system includes being used to stir liquid in first chamber, use In the second mixer of liquid in stirring second chamber and the 3rd mixer for stirring the 3rd chamber indoor liquid, first stirs Machine, the second mixer and the 3rd mixer is mixed to be mounted on cover plate;It is installed with to do on the cover board and speculates, does what is speculated Output section is spiral conveying tube, first doline be fixedly mounted on the cover board and positioned at it is dry speculate it is other, the pipe-line system include into Water lines and drain line, inlet pipeline include water inlet supervisor, the first water inlet pipe and the second water inlet pipe, water inlet supervisor Input is used to be communicated to water supply installation, and water inlet supervisor's output end is communicated with the first water inlet pipe and the second water inlet pipe, the One water inlet pipe connects with first chamber, drain line be arranged on below casing and with first chamber, second chamber and the 3rd Chamber connects, and box house is fixed with the liquid level gauge for detecting liquid level in the 3rd chamber, liquid level gauge connection control system;
The just doline includes cylinder, the first funnel and the second water inlet pipe, and the cylinder bottom and the first funnel are big End connection, cylinder sides have a spiral conveying tube, the second water inlet pipe water side penetrate in the first funnel and with the first funnel Connection, the small end opening of the first funnel are used for the pre- wet flocculation medicament of conveying in downward first chamber;The cylinder interior is set There is the second funnel, the second inner wall of hopper is fixed with the first buffering cone, and the second funnel upper end is against cylinder inner wall, helical feed Cylinder output end connects through cylinder with the second funnel, and the first buffering is bored gap between the second inner wall of hopper, under the second funnel End is fixedly connected with one and is used for the connecting cylinder that connect the second funnel with the first funnel, and first buffers that to bore be conical structure, and first Point-blank, the diameter of the first buffering cone bottom surface is more than in connecting cylinder directly for the center line of buffering cone and the center line of connecting cylinder Footpath;The second buffering cone and injection endless tube are additionally provided with inside first funnel, the second buffering cone small end is located at second Immediately below funnel, there is gap between the big end of the second buffering cone and the first inner wall of hopper, the second buffering cone is consolidated with the first inner wall of hopper Determine, spray endless tube and be fixed on the first inner wall of hopper and be surrounded on outside the second buffering cone, the injection endless tube is annular and it is opened Provided with some uniform apopores in interval, the injection direction of apopore points to the second buffering cone, sprays endless tube and the second water inlet pipe Connection.Structure setting inside first doline, the anti-condensation sleeve pipe for eliminating prior art are set, and both having reached expected can prevent Water is splashed to the target of helix transporting device output end, and can energy saving and cost lowering, kills two birds with one stone.Injection endless tube can also be designed to inner side The equal water outlet tubule in some intervals is connected, better controls over water outlet direction.
Further, one block of horizontal plectane is stamped on the first funnel top, and plectane is removable with the first funnel top Connection is unloaded, plectane can lift plectane straight up after being dismantled from the first funnel top;Bottom of cylinder is detachably connected with plectane, circle The plate center of circle is provided with patchhole, and the connecting cylinder passes through patchhole, and the second funnel is not fixed with cylinder inner wall, outside the second funnel bottom Diameter is more than insertion bore dia;
The spiral conveying tube passes through the rectangular opening that cylinder side wall opens up, and elastic sealing device is provided with rectangular opening, The elastic sealing device includes (the first back-moving spring, second back-moving spring, the first sliding block and the second sliding block, is set in rectangular opening The first sliding block and the second sliding block are equipped with, spiral conveying tube output end can pass through between the first sliding block and the second sliding block, spiral transferring After sending an output end to be passed through between the first sliding block and the second sliding block, the first sliding block is located above spiral conveying tube output end, the Two sliding blocks are located at below spiral conveying tube output end, and two vertical slide rails are respectively arranged with the inwall of the rectangular opening both sides, the One sliding block and the second sliding block are slidably connected with two slide rails, so that the first sliding block and the second sliding block only in the vertical direction slide; (the first back-moving spring is provided between first sliding block and rectangular opening upper inside wall, is set between the second sliding block and rectangular opening inner wall lower It is equipped with second back-moving spring, the telescopic direction of (the first back-moving spring and second back-moving spring is vertical direction, works as spiral conveying tube When output end passes through between the first sliding block and the second sliding block, (the first back-moving spring and second back-moving spring are in being compressed shape State;And the elastic force of (the first back-moving spring can be overcome, connecting cylinder and plectane can take off with the first funnel when lifting plectane straight up From.Setting the benefit of elastic sealing device is:When dismantling plectane from the first funnel, because the sliding block of relative displacement second is downward Slide, second spring is further compressed by the second sliding block, so as to which the first funnel can depart from cylinder with spiral conveying tube.
Further, be provided with below the sparge ring on the first inner wall of hopper three be used for fixation spray consolidating for endless tube Reservation, each fixed seat includes homogeneous vertical plate and a level board, vertical plate are fixedly connected with level board, fixed plate and the first leakage Bucket inwall is fixedly connected, and three fixed seats are connected together in equilateral triangle with straight line.The purpose triangular in shape so done It is farthest to improve stability on the premise of can saving material.
Compared to prior art, the utility model has the advantages that:
1st, the first buffering cone not only causes the dry medicinal powder of PAM equably to fall on the second buffering cone, has also blocked the first funnel In water be splashed to spiral conveying tube output end so that cleaning work becomes light.
2nd, the utility model eliminates spiral conveying tube and has omited anti-condensation heating muff device, reduces energy consumption and then reduces Industrial cost.
3rd, the setting of endless tube is sprayed so that the dry medicinal powder of PAM fallen on the second buffering cone can be all wetted, Ran Houchong Lower first funnel, is condensed in the first funnel without the dry medicinal powder of any PAM.
Brief description of the drawings
Fig. 1 is the utility model front view.
Fig. 2 is the utility model just doline front view.
Fig. 3 is Fig. 2 II-II sectional views.
Fig. 4 is Fig. 3 I-I cutaway view Amplified images.
Fig. 5 is injection endless tube top view.
It is labeled as in figure:Cylinder 1, the second funnel 2, first buffering cone 3, annulus 4, plectane 5, the first funnel 6, injection endless tube 7th, water outlet tubule 71, the buffering of fixed seat 8, second cone 9, connecting cylinder 10, spiral conveying tube 11, elastic sealing device 12, first are multiple Position spring 121, slide rail 122, the second sliding block 123, second back-moving spring 124, the first sliding block 125, the water inlet branch of supporting leg 13, second Pipe 14, first doline 15, dry congenial 16, second mixer 17, control system 18, drain line 19.
Embodiment
In order that technological means, creation characteristic, reached purpose that the utility model is realized more understand and are easy to acting on Understand, the utility model is further elaborated with reference to the accompanying drawings and detailed description:
A kind of flocculation dispensation apparatus as shown in Figure 1, including casing, dry speculate 16, first doline 15, pipe-line system, stirring System and control system 18, box house are provided with first partition and second partition (not marked out in figure), and each dividing plate is equal It is vertically arranged and cabinets cavity is divided into first chamber, second chamber and the 3rd chamber (not marked out in figure), second chamber Between first chamber and the 3rd chamber, with being connected at the top of second chamber at the top of first chamber, second chamber top and the 3rd Chamber roof connects, and casing top is connected with the cover plate for all covering first chamber, second chamber and the 3rd chamber (in figure Do not mark out), stirring system includes being used to stir the first mixer (not marking out in figure) of liquid in first chamber, for stirring The second mixer 7 and the 3rd mixer for stirring the 3rd chamber indoor liquid for mixing liquid in second chamber (are not marked in figure Outpour), the first mixer, the second mixer 17 and the 3rd mixer are mounted on cover plate;It is installed with the cover board Dry to speculate 16, dry congenial 16 output section is spiral conveying tube 11, and first doline 15 is fixedly mounted on the cover board and speculated positioned at dry By in the of 16, pipe-line system includes inlet pipeline and drain line 19, inlet pipeline include water inlet supervisor, the first water inlet pipe with And second water inlet pipe 14, water inlet charge input terminal are used to be communicated to water supply installation, water inlet supervisor's output end is communicated with first and entered Water branch pipe and the second water inlet pipe 14, the first water inlet pipe are connected with first chamber, and drain line 19 is arranged on below casing And connected with first chamber, second chamber and the 3rd chamber, box house is fixed with for detecting liquid level in the 3rd chamber Liquid level gauge, liquid level gauge connection control system 18.
As shown in figure 3, just doline 15 includes cylinder 1, the first funnel 6 and the second water inlet pipe 14, the bottom of cylinder 1 and the There is a spiral conveying tube 11 the one end connection greatly of funnel 6, the side of cylinder 1, and the water side of the second water inlet pipe 14 is penetrated to the first funnel 6 Interior and connected with the first funnel 6,6 small end opening of the first funnel is used for the pre- wet flocculation medicament of conveying in downward first chamber; Cylinder 1 is internally provided with the second funnel 2, and the inwall of the second funnel 2 is fixed with the first buffering cone 3, and the upper end of the second funnel 2 is against cylinder 1 inwall, the output end of spiral conveying tube 11 connect through cylinder 1 with the second funnel 2, first buffering cone 3 and the inwall of the second funnel 2 it Between have a gap, the lower end of the second funnel 2 is fixedly connected with a connecting cylinder 10 for being used to connect the second funnel 2 with the first funnel 6, first Buffering cone 3 is conical structure, and with the center line of connecting cylinder 10 point-blank, first is slow for the center line of the first buffering cone 3 The diameter of 3 bottom surfaces of punching cone is more than the interior diameter of connecting cylinder 10;The second buffering cone 9 and sparge ring are additionally provided with inside first funnel 6 Pipe 7, the second buffering 9 small ends of cone are located at immediately below the second funnel 2, and the second buffering cone 9 is seamed between end and the inwall of the first funnel 6 greatly Gap, the second buffering cone 9 are fixed with the inwall of the first funnel 6, are sprayed endless tube 7 and are fixed on the inwall of the first funnel 6 and are surrounded on second Outside buffering cone 9, injection endless tube 7 for annular and its offer the uniform apopores in some intervals, the injection direction of apopore points to the Two buffering cones 9, injection endless tube 7 connect with the second water inlet pipe 14, and one block of horizontal plectane 5, plectane are stamped in the top of the first funnel 6 5 with the top of the first funnel 6 to be detachably connected, plectane 5 can lift plectane 5 straight up after being dismantled from the top of the first funnel 6;Circle 1 bottom of cylinder is detachably connected with plectane 5, and the center of circle of plectane 5 is provided with patchhole, and connecting cylinder 10 passes through patchhole, the second funnel 2 and circle 1 inwall of cylinder is not fixed, and the bottom overall diameter of the second funnel 2 is more than insertion bore dia.
As shown in Fig. 2 and Fig. 4, the side wall of cylinder 1 that spiral conveying tube 11 passes through is provided with rectangular opening, is set in rectangular opening Flexible sealing device 12, in order to both cause to keep being stably installed on the first funnel in cylinder work, ensure tearing open again Cylinder can be raised when unloading cylinder, therefore design flexibility sealing device, elastic sealing device 12 include (the first back-moving spring 121, the Two back-moving springs 124, the first sliding block 125 and the second sliding block 123, the first sliding block 125 and the second sliding block are provided with rectangular opening 123, the output end of spiral conveying tube 11 can pass through between the first sliding block 125 and the second sliding block 123, the output end of spiral conveying tube 11 After being passed through between the first sliding block 125 and the second sliding block 123, the first sliding block 125 is located above the output end of spiral conveying tube 11, the Two sliding blocks 123 are located at below the output end of spiral conveying tube 11, and two vertical slide rails are respectively arranged with the inwall of rectangular opening both sides 122, the first sliding block 125 and the second sliding block 123 are slidably connected with two slide rails 122, so that the first sliding block 125 and the second sliding block 123 only in the vertical directions slide;(the first back-moving spring 121 is provided between first sliding block 125 and rectangular opening upper inside wall, the Second back-moving spring 124 is provided between two sliding blocks 123 and rectangular opening inner wall lower, (the first back-moving spring 121 and second resets The telescopic direction of spring 124 is vertical direction, when the output end of spiral conveying tube 11 from the first sliding block 125 and the second sliding block 123 it Between through when, (the first back-moving spring 121 and second back-moving spring 124 are in confined state;And the first reset bullet can be overcome The elastic force of spring 121, connecting cylinder 10 and plectane 5 can depart from the first funnel 6 when lifting plectane 5 straight up.
As shown in figure 3, be provided with below sparge ring on the inwall of the first funnel 6 three be used for fixation spray endless tube 7 and consolidate Reservation 8, each fixed seat 8 includes homogeneous vertical plate and a level board, vertical plate are fixedly connected with level board, fixed plate and first The inwall of funnel 6 is fixedly connected, and three fixed seats 8 are connected together in equilateral triangle with straight line.First buffering cone 3 bottom ends tool There are some supporting legs 13 to be distributed evenly in the first buffering and bore 3 bottom ends, therefore can be flexibly connected and leave with the second funnel 2 So that the space that the dry medicinal powder of PAM is fallen;Second buffering cone 9 and first funnel 6 be all the first buffering bore 3 and second funnel 2 set Meter, the height of supporting leg 13 can design according to actual use.
Injection endless tube shown in Fig. 5, inwall is provided with water outlet tubule 71.
Finally illustrate, above example is only unrestricted to illustrate the technical solution of the utility model, although ginseng The utility model is described in detail according to preferred embodiment, it will be understood by those within the art that, can be to this The technical scheme of utility model is modified or equivalent substitution, without departing from the objective and model of technical solutions of the utility model Enclose, it all should cover among right of the present utility model.

Claims (3)

1. one kind flocculation dispensation apparatus, it is characterised in that:Including casing, it is dry speculate, first doline, pipe-line system, stirring system with And control system, the box house are provided with first partition and second partition, the dividing plate is vertically arranged and by casing Chamber is divided into first chamber, second chamber and the 3rd chamber, and second chamber is between first chamber and the 3rd chamber, the first chamber Ceiling portion connects, casing top is connected with first with being connected at the top of second chamber at the top of second chamber with the 3rd chamber roof The cover plate that chamber, second chamber and the 3rd chamber all cover, stirring system include being used to stir liquid in first chamber First mixer, the second mixer for stirring liquid in second chamber and for stirring the 3rd chamber indoor liquid the 3rd Mixer, the first mixer, the second mixer and the 3rd mixer are mounted on cover plate;It is installed with the cover board dry Speculate, it is spiral conveying tube to do congenial output section, and first doline is fixedly mounted on the cover board and speculates other, the pipeline positioned at dry System includes inlet pipeline and drain line, and inlet pipeline includes water inlet supervisor, the first water inlet pipe and the second water inlet Branch pipe, water inlet charge input terminal are used to be communicated to water supply installation, and water inlet supervisor's output end is communicated with the first water inlet pipe and the Two water inlet pipes, the first water inlet pipe connect with first chamber, drain line be arranged on below casing and with first chamber, second Chamber and the 3rd chamber connect, and box house is fixed with the liquid level gauge for detecting liquid level in the 3rd chamber, and liquid level gauge connects Connected control system;
The just doline includes cylinder, the first funnel and the second water inlet pipe, and the cylinder bottom connects with the big end of the first funnel Connecing, cylinder sides have a spiral conveying tube, and the second water inlet pipe water side penetrates in the first funnel and with the first funnel and connected, The small end opening of first funnel is used for the pre- wet flocculation medicament of conveying in downward first chamber;The cylinder interior is provided with second Funnel, the second inner wall of hopper are fixed with the first buffering cone, and the second funnel upper end is against cylinder inner wall, spiral conveying tube output End connects through cylinder with the second funnel, has gap between the first buffering cone and the second inner wall of hopper, the second funnel lower end is fixed Connection one is used for the connecting cylinder for connecting the second funnel with the first funnel, and the first buffering cone is conical structure, and first buffers cone Center line and connecting cylinder center line point-blank, first buffering cone bottom surface diameter be more than connecting cylinder interior diameter;Institute State and the second buffering cone and injection endless tube are additionally provided with inside the first funnel, the second buffering cone small end is being located at the second funnel just , there is gap lower section between the big end of the second buffering cone and the first inner wall of hopper, the second buffering cone is fixed with the first inner wall of hopper, sprayed Endless tube is fixed on the first inner wall of hopper and to be surrounded on the second buffering cone outer, the injection endless tube for annular and its offer it is some Uniform apopore is spaced, the injection direction of apopore points to the second buffering cone, and injection endless tube connects with the second water inlet pipe.
A kind of 2. flocculation dispensation apparatus as claimed in claim 1, it is characterised in that:It is stamped one block of water in the first funnel top Flat plectane, plectane with the first funnel top to be detachably connected, can lift straight up after being dismantled from the first funnel top by plectane Dynamic plectane;Bottom of cylinder is detachably connected with plectane, and the plectane center of circle is provided with patchhole, and the connecting cylinder passes through patchhole, and second Funnel is not fixed with cylinder inner wall, and the second funnel bottom overall diameter is more than insertion bore dia;
The spiral conveying tube passes through the rectangular opening that cylinder side wall opens up, and elastic sealing device 12, institute are provided with rectangular opening Stating elastic sealing device includes (the first back-moving spring, and second back-moving spring, the first sliding block and the second sliding block, rectangular opening is interior to be set There are the first sliding block and the second sliding block, spiral conveying tube output end can pass through between the first sliding block and the second sliding block, helical feed After cylinder output end passes through between the first sliding block and the second sliding block, the first sliding block is located above spiral conveying tube output end, and second Sliding block is located at below spiral conveying tube output end, is respectively arranged with two vertical slide rails on the inwall of the rectangular opening both sides, and first Sliding block and the second sliding block are slidably connected with two slide rails, so that the first sliding block and the second sliding block only in the vertical direction slide;The (the first back-moving spring is provided between one sliding block and rectangular opening upper inside wall, is set between the second sliding block and rectangular opening inner wall lower There is a second back-moving spring, the telescopic direction of (the first back-moving spring and second back-moving spring is vertical direction, when spiral conveying tube is defeated Go out end between the first sliding block and the second sliding block through when, (the first back-moving spring and second back-moving spring are in being compressed shape State;And the elastic force of (the first back-moving spring can be overcome, connecting cylinder and plectane can take off with the first funnel when lifting plectane straight up From.
A kind of 3. flocculation dispensation apparatus as claimed in claim 1 or 2, it is characterised in that:In the first leakage below the sparge ring Three fixed seats for being used for fixed injection endless tube are provided with bucket inwall, each fixed seat includes homogeneous vertical plate and a level Plate, vertical plate are fixedly connected with level board, and fixed plate is fixedly connected with the first inner wall of hopper, three fixed seats straight line phase It is in equilateral triangle to link up.
CN201720947553.7U 2017-07-31 2017-07-31 One kind flocculation dispensation apparatus Active CN206980492U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720947553.7U CN206980492U (en) 2017-07-31 2017-07-31 One kind flocculation dispensation apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720947553.7U CN206980492U (en) 2017-07-31 2017-07-31 One kind flocculation dispensation apparatus

Publications (1)

Publication Number Publication Date
CN206980492U true CN206980492U (en) 2018-02-09

Family

ID=61417997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720947553.7U Active CN206980492U (en) 2017-07-31 2017-07-31 One kind flocculation dispensation apparatus

Country Status (1)

Country Link
CN (1) CN206980492U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107233804A (en) * 2017-07-31 2017-10-10 耐德三井造船(重庆)环境装备有限公司 One kind flocculation dispensation apparatus
CN108408854A (en) * 2018-04-04 2018-08-17 宁波蒙曼生物科技有限公司 A kind of environment protection sewage processing unit
CN109894009A (en) * 2019-04-09 2019-06-18 牛恩鹏 A kind of solution preparation device, solution replace system and method
CN115572016A (en) * 2022-10-27 2023-01-06 佛山恒益热电有限公司 Thermal power plant high-salt-content wastewater direct injection hearth treatment process and device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107233804A (en) * 2017-07-31 2017-10-10 耐德三井造船(重庆)环境装备有限公司 One kind flocculation dispensation apparatus
CN107233804B (en) * 2017-07-31 2023-04-25 重庆耐德生态科技有限公司 Flocculation dispensing device
CN108408854A (en) * 2018-04-04 2018-08-17 宁波蒙曼生物科技有限公司 A kind of environment protection sewage processing unit
CN109894009A (en) * 2019-04-09 2019-06-18 牛恩鹏 A kind of solution preparation device, solution replace system and method
CN115572016A (en) * 2022-10-27 2023-01-06 佛山恒益热电有限公司 Thermal power plant high-salt-content wastewater direct injection hearth treatment process and device

Similar Documents

Publication Publication Date Title
CN206980492U (en) One kind flocculation dispensation apparatus
CN107233804A (en) One kind flocculation dispensation apparatus
CN107624327B (en) Water and fertilizer delivery and distribution system in field
CN206855752U (en) Small size automatic dispensing stirring conveying integrated machine
CN206045816U (en) Integrated drug adding apparatus
CN102897911A (en) Anaerobic tank jet-flow water distributor and water distribution blending system
CN207230166U (en) The pulp conveying device on preparation equipment
CN209271366U (en) A kind of homogeneous tank
CN206932641U (en) The accurate integrated reducing application amount equipment of facilities vegetable
CN205305697U (en) Clear cage utensil equipment of being convenient for is bred to poultry
CN210150782U (en) A medicine adding equipment for concentrated machine
CN210473839U (en) Anti-blocking and anti-scaling lime solution preparation device
CN206814474U (en) A kind of reactor for hydrolysis and acidification
CN209143726U (en) A kind of chemicals dosing plant for sewage disposal device
CN216584336U (en) Disinfectant feeding device
CN207091163U (en) A kind of acid waste water processing unit
CN206730897U (en) A kind of liquid fertilizer production system suitable for sprinkler pipe network
CN216619365U (en) Pressure regulating backflow conveying pipeline system
CN205115122U (en) Aerobic biochemical treatment reactor aeration hose gas supply system
CN107986496B (en) Fenton equipment for continuous sewage treatment and sewage treatment method thereof
CN205731106U (en) Integration PAM automatic medicine adding apparatus
CN104430015B (en) Automatic feeding system made of foam materials
CN208150333U (en) A kind of roller feed device for excrement
CN203540436U (en) Loading hopper dampening device for automatic chemical feeder
CN207531615U (en) A kind of herding water fountain

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant