CN206971406U - Suspension column installs fixed structure - Google Patents
Suspension column installs fixed structure Download PDFInfo
- Publication number
- CN206971406U CN206971406U CN201720146961.2U CN201720146961U CN206971406U CN 206971406 U CN206971406 U CN 206971406U CN 201720146961 U CN201720146961 U CN 201720146961U CN 206971406 U CN206971406 U CN 206971406U
- Authority
- CN
- China
- Prior art keywords
- heel slab
- suspension column
- buried plate
- fixed structure
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000725 suspension Substances 0.000 title claims abstract description 63
- 238000004873 anchoring Methods 0.000 claims abstract description 35
- 238000009434 installation Methods 0.000 claims abstract description 23
- 239000004927 clay Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 7
- 238000004519 manufacturing process Methods 0.000 abstract description 4
- 229910000831 Steel Inorganic materials 0.000 description 9
- 239000010959 steel Substances 0.000 description 9
- 238000003466 welding Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 241001282153 Scopelogadus mizolepis Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 210000000981 epithelium Anatomy 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model provides a kind of suspension column installation fixed structure, including suspension column, heel slab, buried plate, anchoring part and connector is anchored, suspension column is installed on heel slab, and heel slab is installed on buried plate, buried plate is installed on anchoring part, is anchored connector and is worn buried plate and be fixedly connected with heel slab.It is preferred that suspension column is welded on heel slab.Heel slab is welded on buried plate.Buried plate is welded on anchoring part.Connector is anchored to wear the first perforation of buried plate and be fixedly connected with heel slab.It is anchored connector and wears heel slab, fixture, which is fixed on, is anchored on connector and is resisted against on heel slab so as to which heel slab is resisted against on buried plate.Fixed suspension column can be installed using the utility model, safety and stability is reliable, convenient and swift, reduces construction loss, improve operating efficiency, effectively solve the reliable fixing end of different medium structure post lifting operation safety and stability, efficiently solve structure post unstability problem, it is ingenious in design, it is simple for structure, it is simple to manufacture, cost is low, suitable for large-scale promotion application.
Description
Technical field
It the utility model is related to technical field of building construction, more particularly to structural steelwork is pre-buried and first segmented column lifting installation
Technique for fixing field, in particular to a kind of suspension column installation fixed structure.
Background technology
At present, construction structural steelwork is pre-buried and first segmented column lifting installation fixation procedure in, when being used in steel column
During only with the grouting beam operation of bolt, single steel plate+crab-bolt or steel column root, the interim fixing point in many places is often set, is employed many times
Artificial levelling, jack correction, conventional way causes the waste of time and material, the potential safety hazard such as steel column deflection be present, topples over.
Accordingly, it is desirable to provide a kind of suspension column installation fixed structure, it can install fixed suspension column, and safety and stability is reliable, side
Just it is quick, construction loss is reduced, improves operating efficiency, different medium structure post lifting operation safety and stability is effectively solved and reliably fixes
End, efficiently solves structure post unstability problem.
Utility model content
In order to overcome it is above-mentioned in the prior art the shortcomings that, a purpose of the present utility model is to provide a kind of suspension column installation
Fixed structure, it can install fixed suspension column, and safety and stability is reliable, convenient and swift, reduce construction loss, improve operating efficiency,
Effectively solve the reliable fixing end of different medium structure post lifting operation safety and stability, structure post unstability problem is efficiently solved, suitable for big
Scale popularization and application.
Another object of the present utility model is that providing a kind of suspension column installs fixed structure, and its is ingenious in design, simple for structure,
It is simple to manufacture, cost is low, suitable for large-scale promotion application.
To achieve the above objectives, suspension column installation fixed structure of the present utility model, including suspension column, are characterized in, the post
Pin installation fixed structure also includes heel slab, buried plate, anchoring part and is anchored connector, and the suspension column is installed in the heel slab
On, the heel slab is installed on the buried plate, and the buried plate is installed on the anchoring part, and the anchor connector wears institute
State buried plate and be fixedly connected with the heel slab.
It is preferred that the suspension column is welded on the heel slab.
It is preferred that the heel slab is welded on the buried plate.
It is preferred that the anchoring part is dowel.
It is preferred that the buried plate is welded on the anchoring part.
It is preferred that being provided with the first perforation on the buried plate, the anchor connector wears described first and perforates and fix
Connect the heel slab.
It is preferred that the suspension column installation fixed structure also includes fixture, the anchor connector wears the heel slab,
The fixture is fixed on the anchor connector and is resisted against on the heel slab so as to which the heel slab is resisted against into institute
State on buried plate.
More preferably, the anchor connector is crab-bolt, and the fixture is nut, and the nut thread is engaged on the anchor
On bolt and it is resisted against on the heel slab so as to which the heel slab is resisted against on the buried plate.
More preferably, the suspension column installation fixed structure also includes backing plate, and the backing plate is located at the fixture and the post
Between sole, the fixture is resisted against on the heel slab by the backing plate.
More preferably, the second perforation is provided with the heel slab, the anchor connector wears second perforation.
The beneficial effects of the utility model essentially consist in:
1st, suspension column installation fixed structure of the present utility model includes suspension column, heel slab, buried plate, anchoring part and is anchored connection
Part, suspension column are installed on heel slab, and heel slab is installed on buried plate, and buried plate is installed on anchoring part, and anchor connector, which is worn, to be buried
Plate is simultaneously fixedly connected with heel slab, and therefore, it can install fixed suspension column, and safety and stability is reliable, convenient and swift, reduces construction damage
Consumption, operating efficiency is improved, the reliable fixing end of different medium structure post lifting operation safety and stability is effectively solved, efficiently solves structure post
Unstability problem, suitable for large-scale promotion application.
2nd, suspension column installation fixed structure of the present utility model includes suspension column, heel slab, buried plate, anchoring part and is anchored connection
Part, suspension column are installed on heel slab, and heel slab is installed on buried plate, and buried plate is installed on anchoring part, and anchor connector, which is worn, to be buried
Plate is simultaneously fixedly connected with heel slab, and therefore, its is ingenious in design, simple for structure, is simple to manufacture, and cost is low, should suitable for large-scale promotion
With.
These and other objects, feature and advantage of the present utility model, by following detailed descriptions, accompanying drawing and right will
Try to achieve to fully demonstrate, and can be achieved by means, device and the combinations thereof specially pointed out in appended claims.
Brief description of the drawings
Fig. 1 is the schematic perspective view of a specific embodiment of suspension column installation fixed structure of the present utility model.
Fig. 2 is the schematic diagram in top down perspective of the specific embodiment shown in Fig. 1.
(symbol description)
1 suspension column;2 heel slabs;21 second perforation;3 buried plates;31 through holes;32 first perforation;4 anchoring parts;41 dowels;5 are anchored
Connector;51 crab-bolts;6 fixtures;61 nuts;7 backing plates.
Embodiment
In order to be more clearly understood that technology contents of the present utility model, described in detail especially exemplified by following examples.
Refer to shown in Fig. 1 to Fig. 2, in a specific embodiment of the present utility model, suspension column installation of the present utility model
Fixed structure includes suspension column 1, heel slab 2, buried plate 3, anchoring part 4 and is anchored connector 5, and the suspension column 1 is installed in the suspension column
On plate 2, the heel slab 2 is installed on the buried plate 3, and the buried plate 3 is installed on the anchoring part 4, described to be anchored connection
Part 5 wears the buried plate 3 and is fixedly connected with the heel slab 2.
The suspension column 1, which is installed on the heel slab 2, can use any suitable structure, such as the company of being detachably fixed
Connect, such as bolt connection, or it is non-dismountable be fixedly connected, for example weld, it is described in a specific embodiment of the present utility model
Suspension column 1 is welded on the heel slab 2.Heel slab 2 is set for fixed suspension column 1, is the accessory structure of suspension column 1, the two welding
It is integral.
The heel slab 2, which is installed on the buried plate 3, can use any suitable structure, such as the company of being detachably fixed
Connect, such as bolt connection, or it is non-dismountable be fixedly connected, for example weld, it is described in a specific embodiment of the present utility model
Heel slab 2 is welded on the buried plate 3.Such as angle welding is used by the edge of the heel slab 2 and the edge of the buried plate 3
Weld integral.
For the ease of welding heel slab 2 and buried plate 3, refer to shown in Fig. 1 to Fig. 2, it is specific real of the present utility model one
Apply in example, the edge of the buried plate 3 exposes the heel slab 2.Preferably, the buried plate 3 is slightly larger than the heel slab
2, it is overproof to be not less than leg size of fillet weld.
The anchoring part 4 can be any suitable anchoring part, refer to shown in Fig. 1 to Fig. 2, of the present utility model one
In specific embodiment, the anchoring part 4 is dowel 41.
The buried plate 3, which is installed on the anchoring part 4, can use any suitable structure, such as the company of being detachably fixed
Connect, such as bolt connection, or it is non-dismountable be fixedly connected, for example weld, it is preferred that the buried plate 3 is welded on the anchoring part 4
On.In a specific embodiment of the present utility model, in the case where the anchoring part 4 is dowel 41, the buried plate 3 is welded on
On the dowel 41.
The buried plate 3, which is welded on the anchoring part 4, can use any suitable structure, it is preferred that on the buried plate 3
Through hole 31 is provided with, the anchoring part 4 is plugged in the through hole 31 and is welded to connect with the through hole 31, that is to say, that wears
Stopple welds the anchoring part 4.It is shown in Figure 2, in a specific embodiment of the present utility model, be in the anchoring part 4
In the case of dowel 41, the dowel 41 is plugged in the through hole 31 and is welded to connect with the through hole 31, that is to say, that wears
Stopple weld dowel 41, the through hole 31 and the dowel 41 be connected to each other it is integral, formed dowel embedded part.
The through hole 31 can be any suitable through hole, shown in Figure 2, in of the present utility model one specific implementation
In example, the through hole 31 is band groove circular hole.
The number of the through hole 31 can determine as needed, it is preferred that the number of the through hole 31 is multiple, refer to
Shown in Fig. 2, in a specific embodiment of the present utility model, the number of the through hole 31 is 12.
The through hole 31 can be arranged on any suitable position of the buried plate 3, it is preferred that multiple edges of the through hole 31
The surrounding of the buried plate 3 is set.It is shown in Figure 2, in a specific embodiment of the present utility model, in the through hole 31
In the case that number is 12, surrounding of 12 through holes 31 along the buried plate 3 is set.Perfectly even set.
The anchor connector 5, which wears the buried plate 3, can use any suitable structure, shown in Figure 2, at this
In one specific embodiment of utility model, the first perforation 32 is provided with the buried plate 3, the anchor connector 5 wears described
First perforation 32 is simultaneously fixedly connected with the heel slab 2.That is, the pre-buried anchor connector 5 of perforation, the first 32 Hes of perforation
Connector 5 is anchored to be not connected to each other.
First perforation 32 can be any suitable perforation, shown in Figure 2, specific of the present utility model one
In embodiment, first perforation 32 is without groove circular hole.
The number of first perforation 32 can determine as needed, it is preferred that the number of first perforation 32 is more
Individual, shown in Figure 2, in a specific embodiment of the present utility model, the number of first perforation 32 is 8.
First perforation 32 can be arranged on any suitable position of the buried plate 3, it is preferred that multiple described first
Perforation 32 is arranged on the middle part of the buried plate 3.It is shown in Figure 2, in a specific embodiment of the present utility model, described
In the case that the number of first perforation 32 is 8,8 first perforation 32 are arranged on the middle part of the buried plate 3, specifically,
It is divided into 2 rows, often arranges 4.
The anchor connector 5, which is fixedly connected with the heel slab 2, can use any suitable structure, such as detachable solid
Fixed connection, such as bolt connection, or it is non-dismountable be fixedly connected, for example weld, refer to shown in Fig. 1 to Fig. 2, in this practicality newly
In one specific embodiment of type, the suspension column installation fixed structure also includes fixture 6, and the anchor connector 5 wears described
Heel slab 2, the fixture 6 are fixed on the anchor connector 5 and are resisted against on the heel slab 2 so as to by the suspension column
Plate 2 is resisted against on the buried plate 3.
The anchor connector 5 can be any suitable anchor connector, and the fixture 6 can be any suitable
Fixture, refer to shown in Fig. 1 to Fig. 2, in a specific embodiment of the present utility model, the anchor connector 5 is crab-bolt
51, the fixture 6 is nut 61, and the nut 61 is threadably engaged in the crab-bolt 51 and is resisted against on the heel slab 2
So as to which the heel slab 2 is resisted against on the buried plate 3.
The fixture 6, which is resisted against on the heel slab 2, can use any suitable structure, more preferably, the suspension column
Installation fixed structure also includes backing plate 7, and the backing plate 7 is between the fixture 6 and the heel slab 2, the fixture 6
It is resisted against by the backing plate 7 on the heel slab 2.Refer to shown in Fig. 1 to Fig. 2, in of the present utility model one specific implementation
In example, in the case where the anchor connector 5 is crab-bolt 51 and the fixture 6 is nut 61, the backing plate 7 is set in
In the crab-bolt 51, the nut 61 is resisted against on the heel slab 2 by the backing plate 7.
The anchor connector 5, which wears the heel slab 2, can use any suitable structure, more preferably, the suspension column
The second perforation 21 is provided with plate 2, the anchor connector 5 wears second perforation 21.It is shown in Figure 2, in this reality
With in a new specific embodiment, in the case where the anchor connector 5 is crab-bolt 51, the crab-bolt 51 wears described the
Two perforation 21.
In use, buried plate 3 is installed on anchoring part 4 (such as anchoring part 4 perforates plug welding in buried plate 3), buried plate 3 first
It can also in advance be installed with anchoring part 4, then will be anchored connector 5 and wear buried plate 3,3 accurate leveling of buried plate and be fixed on will
At the top of the sole plate epithelium reinforcing bar of anchor.Then casting concrete, buried plate 3, anchoring part 4 and anchor connector 5 is pre-buried, bury
The bottom absolute altitude of plate 3 is high identical with basic top mark, then heel slab 2 (such as by fixture 6) is fixedly connected and is anchored connector 5, and
Heel slab 2 is installed into (such as welding) on buried plate 3, suspension column 1 is installed on heel slab 2, suspension column 1 and heel slab 2 can also
Install in advance, each part order of connection can also be adjusted suitably as needed.
Wherein, buried plate 3, anchoring part 4 and anchor connector 5 form double anchor pre-buried structures, anchoring part 4 and anchor connector 5
It is pre-buried, but the two effect is different, and anchoring part 4 fixes buried plate 3, is anchored connector 5 and fixes heel slab 2;Heel slab 2, which is installed in, to be buried
Double plate iterative structures are formed on plate 3;Heel slab 2 is fixedly connected with anchor connector 5 and forms entirety.
In the case where anchor connector 5 is crab-bolt 51, fixture 6 is nut 61 and uses backing plate 7, concrete is poured into a mould
Afterwards, heel slab 2 is set in crab-bolt 51, then backing plate 7 is set in crab-bolt 51, then screwed on nut 61 and screw, so that will
Heel slab 2 is resisted against on buried plate 3, then heel slab 2 and buried plate 3 are welded, and the top of buried plate 3 is with the bottom of heel slab 2 in same absolute altitude.
Therefore, the utility model provides a kind of suspension column installation fixed structure of " pre-buried+bis- plate overlapping of double anchors ", is usually used in steel
Structure suspension column is installed, and simple in construction, safety, can effectively control steel column installation accuracy, installation rate is fast, suitable for any type steel
Suspension column is pre-buried and installs, connection operation.The utility model can be set according to all types of steel-column foundations, and its attachment structure can be difference
Medium steel pile lifting operation provides safe and stable reliable fixing end, efficiently solves steel pile unstability problem.
To sum up, suspension column installation fixed structure of the present utility model can install fixed suspension column, and safety and stability is reliable, convenient fast
Victory, construction loss is reduced, improves operating efficiency, effectively solve the reliable fixing end of different medium structure post lifting operation safety and stability,
Structure post unstability problem is efficiently solved, it is ingenious in design, it is simple for structure, it is simple to manufacture, cost is low, suitable for large-scale promotion application.
As can be seen here, the purpose of this utility model is achieved completely and effectively.Function of the present utility model and
Structural principle is shown and illustrated in embodiment, and under without departing substantially from the principle, embodiment can make any modification.Institute
So that the utility model includes all variant embodiments based on claim spirit and right.
Claims (9)
1. a kind of suspension column installs fixed structure, including suspension column, it is characterised in that the suspension column installation fixed structure also includes suspension column
Plate, buried plate, anchoring part and anchor connector, the suspension column are installed on the heel slab, and the heel slab is installed in described bury
On plate, the buried plate is welded on the anchoring part, and the buried plate is fixed by the anchoring part, and the buried plate be embedded in advance it is mixed
In Xtah Crude Clay structure, the anchor connector wears the buried plate and is fixedly connected with the heel slab, passes through the anchor connector
The fixed heel slab.
2. suspension column as claimed in claim 1 installs fixed structure, it is characterised in that the suspension column is welded on the heel slab
On.
3. suspension column as claimed in claim 1 installs fixed structure, it is characterised in that the heel slab is welded on the buried plate
On.
4. suspension column as claimed in claim 1 installs fixed structure, it is characterised in that the anchoring part is dowel.
5. suspension column as claimed in claim 1 installs fixed structure, it is characterised in that the first perforation is provided with the buried plate,
The anchor connector wears first perforation and is fixedly connected with the heel slab.
6. suspension column as claimed in claim 1 installs fixed structure, it is characterised in that the suspension column installation fixed structure also includes
Fixture, the anchor connector wear the heel slab, and the fixture is fixed on the anchor connector and is resisted against
So that the heel slab is resisted against on the buried plate on the heel slab.
7. suspension column as claimed in claim 6 installs fixed structure, it is characterised in that the anchor connector is crab-bolt, described
Fixture is nut, and the nut thread is engaged in the crab-bolt and is resisted against on the heel slab so as to by the heel slab
It is resisted against on the buried plate.
8. suspension column as claimed in claim 6 installs fixed structure, it is characterised in that the suspension column installation fixed structure also includes
Backing plate, between the fixture and the heel slab, the fixture is resisted against described the backing plate by the backing plate
On heel slab.
9. suspension column as claimed in claim 6 installs fixed structure, it is characterised in that second is provided with the heel slab and is worn
Hole, the anchor connector wear second perforation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720146961.2U CN206971406U (en) | 2017-02-20 | 2017-02-20 | Suspension column installs fixed structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720146961.2U CN206971406U (en) | 2017-02-20 | 2017-02-20 | Suspension column installs fixed structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206971406U true CN206971406U (en) | 2018-02-06 |
Family
ID=61414371
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720146961.2U Expired - Fee Related CN206971406U (en) | 2017-02-20 | 2017-02-20 | Suspension column installs fixed structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206971406U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111749261A (en) * | 2020-07-07 | 2020-10-09 | 郑琼华 | Reaction kettle installation method |
CN115182460A (en) * | 2022-06-20 | 2022-10-14 | 中交一公局集团有限公司 | Assembly type wood structure column and beam assembling structure and method |
-
2017
- 2017-02-20 CN CN201720146961.2U patent/CN206971406U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111749261A (en) * | 2020-07-07 | 2020-10-09 | 郑琼华 | Reaction kettle installation method |
CN111749261B (en) * | 2020-07-07 | 2022-04-01 | 江山海维科技有限公司 | Reaction kettle installation method |
CN115182460A (en) * | 2022-06-20 | 2022-10-14 | 中交一公局集团有限公司 | Assembly type wood structure column and beam assembling structure and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107620386A (en) | The installation constitution and construction method of shock isolating pedestal in existing building base isolation reinforcement | |
CN207436373U (en) | A kind of assembled is bolted steel core concrete column entirely | |
CN206971406U (en) | Suspension column installs fixed structure | |
CN206174487U (en) | Pre -cast screw fixing device | |
CN206233087U (en) | A kind of prefabricated assembled combination concrete trestle system | |
CN103669432A (en) | Jacking device for deviation rectification of steel pylon in mining area of coal mine | |
CN207332350U (en) | The installation constitution of shock isolating pedestal in existing building base isolation reinforcement | |
CN207525758U (en) | A kind of reinforced Structure About Soldier Pile | |
CN204238230U (en) | A kind of side slope prestressing anchor support steel work anchor pier | |
KR20150069085A (en) | Screw pile for supporting | |
CN201982898U (en) | Equipment installation base plate regulating device | |
CN207176411U (en) | One kind is applied to the reusable combined type base board of soft soil foundation | |
CN204530501U (en) | The support bearing of arc rib alignment is controlled during a kind of constructability | |
CN203846756U (en) | Overhanging profile steel anchor device | |
CN203614064U (en) | Steel band with adjustable anchor rod hole pitches | |
CN207919592U (en) | A kind of prefabricated assembled pile foundation of bearing platform plinth of transmission tower | |
CN205742125U (en) | A kind of work platform for boring | |
CN201713940U (en) | Steel column base structure | |
CN203383217U (en) | Prestressed ground anchor device for foundation pit supporting | |
CN211848779U (en) | Mix dirt road surface limit side form and support auxiliary device | |
CN210857192U (en) | Pile foundation steel reinforcement cage positioning device | |
CN209339334U (en) | A kind of Architectural Structure Design wall column foot Quick Connect Kit | |
KR20060116372A (en) | Setting apparatus for transmission iron tower base | |
CN210507568U (en) | Steel pipe pile foundation reinforcing apparatus | |
CN207582419U (en) | Channel expansive soil slope protective slope structure and channel expansive soil slope |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||