CN206969580U - A kind of bridge building materials handling device - Google Patents

A kind of bridge building materials handling device Download PDF

Info

Publication number
CN206969580U
CN206969580U CN201720787059.9U CN201720787059U CN206969580U CN 206969580 U CN206969580 U CN 206969580U CN 201720787059 U CN201720787059 U CN 201720787059U CN 206969580 U CN206969580 U CN 206969580U
Authority
CN
China
Prior art keywords
plate
sweep
welded
building materials
snap bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720787059.9U
Other languages
Chinese (zh)
Inventor
张洪艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yichun Tongda Road And Bridge Construction Co ltd
Original Assignee
Taoyuan Flower Professional Cooperative In Yongchun County Fujian Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taoyuan Flower Professional Cooperative In Yongchun County Fujian Province filed Critical Taoyuan Flower Professional Cooperative In Yongchun County Fujian Province
Priority to CN201720787059.9U priority Critical patent/CN206969580U/en
Application granted granted Critical
Publication of CN206969580U publication Critical patent/CN206969580U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Auxiliary Methods And Devices For Loading And Unloading (AREA)

Abstract

The utility model discloses a kind of bridge building materials handling device, including sweep;The vertical welding loading plate in the middle part upper surface of the sweep;The loading plate is in cuboid-type, is made up of steel;Fixed support plate is welded with the welding block;The lower end of the fixed support plate is welded and fixed bracing piece;The bracing piece is connected on sweep, is placed on the both sides of boss;The first axle connects installation activity supporting plate;The lower section of the movable supporting plate is intilted to be welded with upper strata snap bar;The lower end connection installation activity hinge-connection of the upper strata snap bar;The lower section connection lower floor snap bar of the moveable hinge link;The lower end of lower floor's snap bar is connect by second hinge to be fixed on sweep;Fixed cluster plate on the column;The sorting plate is arranged on the top of fixed support plate;The utility model is simple in construction, using with it is easy to operate, easily manufactured, handling efficiency is high, and security performance chamber, practicality is stronger, is adapted to promote.

Description

A kind of bridge building materials handling device
Technical field
A kind of bridge auxiliary equipment is the utility model is related to, specifically a kind of bridge building materials handling device.
Background technology
Bridge, refer generally to be erected in rivers,lakes and seas, the structures for making traffic etc. smoothly to pass through.It is modern to adapt to The transportation industry of high speed development, bridge be also extended to across mountain stream, unfavorable geology or meet other traffic needs and set up make Current more easily building, the life of people using great convenience of bridge.
, it is necessary to use the materials such as substantial amounts of reinforcing bar and sheet material in the process of construction of bridge, these materials need constructing When timely add to the positions of needs, traditional way is carried using worker's manpower, so not only serious waste The muscle power of worker, and the limited amount carried, and security cannot ensure, the construction to entirety generates unfavorable shadow Ring.
Utility model content
The purpose of this utility model is to provide a kind of bridge building materials handling device, to solve to propose in above-mentioned background technology The problem of.
To achieve the above object, the utility model provides following technical scheme:
A kind of bridge building materials handling device, including sweep;The vertical welding loading plate in the middle part upper surface of the sweep;Institute It is in cuboid-type to state loading plate, is made up of steel;The front end of loading plate, which is inlayed, is fixed with reflector;The left and right sides wall of loading plate On be welded with welding block;Fixed support plate is welded with the welding block;The lower end of the fixed support plate is welded and fixed Bracing piece;The bracing piece is connected on sweep, is placed on the both sides of boss;The end installation first axle of fixed support plate Connect;The first axle connects installation activity supporting plate;The lower section of the movable supporting plate is intilted to be welded with upper strata folding Disconnected bar;The lower end connection installation activity hinge-connection of the upper strata snap bar;The lower section connection lower floor of the moveable hinge link fractures Bar;The lower end of lower floor's snap bar is connect by second hinge to be fixed on sweep;Weld two columns in the upper surface of loading plate; Fixed cluster plate on the column;The sorting plate is arranged on the top of fixed support plate.
As further program of the utility model:The lower surface of the sweep is welded with four support bars;It is described The lower end installing wheel of support bar;The side installation braking vane of the wheel.
As further program of the utility model:The junction of the loading plate and sweep is provided with boss.
As further program of the utility model:The inclined both sides for being placed on loading plate of the fixed support plate.
As further program of the utility model:Lower floor's snap bar links outer with upper strata snap bar in moveable hinge Side is provided with limiting plate.
As the utility model further scheme:The front end of the sweep is welded with draw ring.
Compared with prior art, the beneficial effects of the utility model are:
Multiple hinge-connections that the utility model is set can easily realize the carrying and handling of material, and structure is more simple It is single, while the multiple reinforcement connecting rods and contiguous block that set can increase the stabilization and security of device in the handling process, ensure The safety of workmen;The structure of device is simple, using with it is easy to operate, easily manufactured, handling efficiency is high, security performance chamber, Practicality is stronger, is adapted to promote.
Brief description of the drawings
Fig. 1 is a kind of structural representation of bridge building materials handling device.
Fig. 2 is a kind of structural representation of front view in bridge building materials handling device.
Fig. 3 is a kind of bridge building materials handling device structural representation that snap bar is connected with lower floor snap bar at the middle and upper levels.
In figure:1- sorting plates, 2- columns, 3- welding blocks, 4- fixed support plates, 5- bracing pieces, 6- first axles connect, and 7- lives Dynamic supporting plate, 8- upper stratas snap bar, the link of 9- moveable hinges, 10- second hinges connect, 11- braking vanes, 12- wheels, 13- support bars, 14- sweeps, 15- draw rings, 16- bosses, 17- lower floors snap bar, 18- reflectors, 19- loading plates, 20- limited blocks.
Embodiment
The technical scheme of this patent is described in more detail with reference to embodiment.
Refer to Fig. 1-3, a kind of bridge building materials handling device, including sweep 14;The lower surface welding of the sweep 14 is solid Surely there are four support bars 13;The lower end installing wheel 12 of the support bar 13;The convenient construction personnel's mobile device of wheel 12 Use, conveniently carried;The side installation braking vane 11 of wheel 12;The braking vane 11 can fix device;Sweep 14 The vertical welding loading plate 19 in middle part upper surface;The loading plate 19 is in cuboid-type, is made up of steel, is placed for carrying The bridge construction material carried is needed on sweep 14;The junction of loading plate 19 and sweep 14 is provided with boss 16;It is described Boss 16 is used for increasing the bonding strength of loading plate 19 and sweep 14, ensures the security of device;The front end edge of loading plate 19 It is embedding to be fixed with reflector 18;The reflector 18 with sky light, can ensure the security of construction;The left and right sides of loading plate 19 Welding block 3 is welded with wall;Fixed support plate 4 is welded with the welding block 3;The fixed support plate 4 is inclined to be put Put in the both sides of loading plate 19, allow building materials to be placed on it and carry use;The lower end of fixed support plate 4 is welded and fixed bracing piece 5; The bracing piece 5 is connected on sweep 14, is placed on the both sides of boss 16, increases the support strength of fixed support plate 4, is ensured The safety carrying of building materials;The end installation first axle of fixed support plate 4 connects 6;The first axle connects installation activity on 6 and supported Plate 7;The movable supporting plate 7 is used for increasing the carrying quantity of fixed support plate 4, while conveniently unloads the building materials of carrying;It is living The lower section of dynamic supporting plate 7 is intilted to be welded with upper strata snap bar 8;The lower end connection installation activity of the upper strata snap bar 8 Hinge-connection 9;The lower section connection lower floor snap bar 17 of the moveable hinge link 9;Lower floor's snap bar 17 and the energy of upper strata snap bar 8 Inwardly lateral bending folding, drive movable supporting plate 7 are moved downward under the connection of moveable hinge link 9, and fixed support is placed on so as to unload Building materials in plate 4, while movable supporting plate 7 can be supported by inclined connection;Lower floor's snap bar 17 exists with upper strata snap bar 8 The outside of moveable hinge link 9 is provided with limiting plate 20;The two can only be bent inwards for the limiting plate 20, while allows the two can be by work Dynamic supporting plate 7 is supported;The lower end of lower floor's snap bar 17 connects 10 by second hinge and is fixed on sweep 14;Second hinge Lower floor's snap bar 17 can be rotated around it for link 10;Weld two columns 2 in the upper surface of loading plate 19;It is fixed on the column 2 Sorting plate 1;The sorting plate 1 is arranged on the top of fixed support plate 4, is easy to record to carry the information of building materials, ensures that construction has The progress of sequence;The front end of sweep 14 is welded with draw ring 15;The draw ring 15 allows the movement of user's pull unit to use.
Operation principle of the present utility model is:In use, upper strata snap bar 8 is allowed by moveable hinge link 9 and limited block 20 With lower floor snap bar 17 it is inclined it is vertical live, allow movable supporting plate 7 to form hook solid with fixed support bar 4, placing needs what is carried Bridge construction material, moved by the pull unit of draw ring 15, during unloading, promote moveable hinge link 9 to bend inwards, allow movable supporting Plate 7 moves downward, and completes unloaded operation.
The better embodiment of this patent is explained in detail above, but this patent is not limited to above-mentioned embodiment party Formula, can also be on the premise of this patent objective not be departed from one skilled in the relevant art's possessed knowledge Make a variety of changes.

Claims (6)

1. a kind of bridge building materials handling device, including sweep (14);Characterized in that, the middle part upper surface of the sweep (14) is erected Straight welding loading plate (19);The loading plate (19) is in cuboid-type, is made up of steel;Inlay solid in the front end of loading plate (19) Surely there is reflector (18);Welding block (3) is welded with the left and right sides wall of loading plate (19);Welded on the welding block (3) It is connected to fixed support plate (4);The lower end of the fixed support plate (4) is welded and fixed bracing piece (5);Bracing piece (5) connection Onto sweep (14), the both sides of boss (16) are placed on;The end installation first axle of fixed support plate (4) connects (6);It is described First axle connects installation activity supporting plate (7) on (6);The lower section of the movable supporting plate (7) is intilted to be welded with upper strata Snap bar (8);The lower end connection installation activity hinge-connection (9) of the upper strata snap bar (8);Under the moveable hinge link (9) Side's connection lower floor's snap bar (17);The lower end of lower floor's snap bar (17) connects (10) by second hinge and is fixed on sweep (14) On;Weld two columns (2) in the upper surface of loading plate (19);Fixed cluster plate (1) on the column (2);The sorting plate (1) It is arranged on the top of fixed support plate (4).
A kind of 2. bridge building materials handling device according to claim 1, it is characterised in that the lower surface of the sweep (14) It is welded with four support bars (13);The lower end installing wheel (12) of the support bar (13);The side of the wheel (12) Braking vane (11) is installed.
3. a kind of bridge building materials handling device according to claim 1, it is characterised in that the loading plate (19) and sweep (14) junction is provided with boss (16).
4. a kind of bridge building materials handling device according to claim 1, it is characterised in that the fixed support plate (4) is inclined The oblique both sides for being placed on loading plate (19).
A kind of 5. bridge building materials handling device according to claim 1, it is characterised in that lower floor's snap bar (17) with Upper strata snap bar (8) is provided with limiting plate (20) in the outside of moveable hinge link (9).
A kind of 6. bridge building materials handling device according to claim 1, it is characterised in that the front end weldering of the sweep (14) It is connected to draw ring (15).
CN201720787059.9U 2017-07-02 2017-07-02 A kind of bridge building materials handling device Expired - Fee Related CN206969580U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720787059.9U CN206969580U (en) 2017-07-02 2017-07-02 A kind of bridge building materials handling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720787059.9U CN206969580U (en) 2017-07-02 2017-07-02 A kind of bridge building materials handling device

Publications (1)

Publication Number Publication Date
CN206969580U true CN206969580U (en) 2018-02-06

Family

ID=61406856

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720787059.9U Expired - Fee Related CN206969580U (en) 2017-07-02 2017-07-02 A kind of bridge building materials handling device

Country Status (1)

Country Link
CN (1) CN206969580U (en)

Similar Documents

Publication Publication Date Title
CN203654299U (en) Steel support loose end
CN201809036U (en) Hanging hopper with detachable chassis
CN203487803U (en) Safety protection structure for elevator shaft construction
CN204418784U (en) Inner steel cylinder of chimney hydraulic pressure lift construction equipment
CN101786539A (en) Conveying chain for tubular pile production
CN205775852U (en) Acting force conversion support for top of steel structure supporting jig frame
CN201330609Y (en) Inside-tunnel steel support mechanical lifting device of shallow-tunneling cavern
CN104563590B (en) Inner steel cylinder of chimney hydraulic pressure lift constructing device and method thereof
CN204626998U (en) A kind of attached lift scaffold discharging platform
CN211338050U (en) Unloading platform
CN204253048U (en) A kind of shield launching reaction frame for the engineering construction of shield structure
CN206969580U (en) A kind of bridge building materials handling device
CN205527291U (en) A frame type frame for hoisting two superimposed sheets
CN206336557U (en) A kind of electric pole transportation pallet suitable for fork truck
CN202390077U (en) Lifting appliance for conveying tower crane
CN202688882U (en) Cofferdam lowering positioning platform for double-wall steel cofferdam construction of deep-water bridge pier
CN204626475U (en) A kind of load box being exclusively used in engineering pile foundation detection ballasting system
CN205204769U (en) Supplementary overheadhoist of prefabricated fence board
CN211169652U (en) Portable small-size concrete pipe transportation and hoist device
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN209179519U (en) Hang the truss splicing steel construction moulding bed of auxiliary installation in a kind of gymnasium top
CN207277893U (en) A kind of section steel platform formwork erecting structure for high-altitude overhanging
CN207348574U (en) A kind of high-altitude construction is with regard to bit platform
CN207227959U (en) Overall peace is torn open connects high construction platform built in formula radial pattern colyliform steel pile casting
CN206707259U (en) bowl buckle fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190723

Address after: 336000 Dapu Village, Binjiang Town, Yuanzhou District, Yichun City, Jiangxi Province

Patentee after: Yichun Tongda Road and Bridge Construction Co.,Ltd.

Address before: 362310 Jinxing Village 483, Dapu Town, Yongchun County, Quanzhou City, Fujian Province

Patentee before: Taoyuan Flower Professional Cooperative of Yongchun County, Fujian Province

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180206