CN206956730U - Multiple tracks annular concrete support pit earthwork outward transport constructing structure - Google Patents
Multiple tracks annular concrete support pit earthwork outward transport constructing structure Download PDFInfo
- Publication number
- CN206956730U CN206956730U CN201720313384.1U CN201720313384U CN206956730U CN 206956730 U CN206956730 U CN 206956730U CN 201720313384 U CN201720313384 U CN 201720313384U CN 206956730 U CN206956730 U CN 206956730U
- Authority
- CN
- China
- Prior art keywords
- annular concrete
- multiple tracks
- supported beam
- outward transport
- post
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The technical field of Deep Foundation Pit Excavation outward transport is the utility model is related to, discloses multiple tracks annular concrete support Deep Foundation Pit Excavation outward transport constructing structure.By forming concrete supporting construction and multiple tracks annular concrete supported beam in the soil body, concrete supporting construction has multiple stand column pile, stand column pile is along foundation depth Longitudinal extending, and multiple stand column pile are arranged around the periphery of foundation ditch, and multiple tracks annular concrete supported beam is along the longitudinally spaced arrangement of foundation depth;Correspondingly it is located in adjacent annular concrete supported beam in the range of ramp, multiple post plates is set, the both ends of post plate is connected on adjacent annular concrete supported beam, multiple laterally adjacent arrangements of post plate, and form closing post harden structure.The problem of hardened interim soil-baffling structure system for being configured to one of post plate barricade of this post, during avoiding the support Deep Foundation Pit Excavation outward transport of multiple tracks annular concrete, the backfilling of earthwork amount at ramp is big, causes pit earthwork construction repetition, and workload is big.
Description
Technical field
The utility model patent is related to the technical field of pit earthwork outward transport, is supported in particular to multiple tracks annular concrete
Pit earthwork transports outward constructing structure.
Background technology
When starting to build building, the provisional foundation ditch excavated for building foundation is generally required.Foundation ditch belongs to
Temporary work, its effect are to provide a space, the operation of building by laying bricks or stones on basis is carried out according to the specified position of design.
With developing rapidly for city, underground parking, the buried, civil air defense constructions and installations of skyscraper etc., cutting depth is required for
Larger foundation ditch.General cutting depth more than 5 meters (containing 5 meters) or basement more than three layers (containing three layers), though or depth not less than 5
Rice, but geological conditions and surrounding environment and the especially complex foundation ditch of underground utilities are referred to as deep basal pit, and deep basal pit needs support system
As support, wherein, annular concrete branch supporting system is more conventional.
In the deep pit digging of annular concrete support, the earthwork is transported by the way of ramp is unearthed, because per pass concrete branch
Support structure must be closed, and could keep foundation pit side-wall uniform force, so now the earthwork of the unearthed ramp scope of foundation ditch must be dug
Remove, after annular concrete support closing is completed, then backfill ramp earthwork recovery ramp and be unearthed;And with one of concrete support under deep basal pit
Construction, the backfilling of earthwork amount at ramp is just very big, causes pit earthwork construction to repeat, workload is big.
Utility model content
The purpose of this utility model is to provide multiple tracks annular concrete support pit earthwork outward transport constructing structure, it is intended to solves existing
Have in technology, backfilling of earthwork amount is big at ramp of being unearthed, and causes pit earthwork construction to repeat, the problem of workload is big.
The utility model is achieved in that multiple tracks annular concrete support pit earthwork outward transport constructing structure, including is formed
Concrete supporting construction and multiple tracks annular concrete supported beam in the soil body, the concrete supporting construction has multiple longitudinally prolongs along foundation depth
The stand column pile stretched, and multiple stand column pile are arranged around the periphery of the foundation ditch, annular concrete supported beam is described in described in multiple tracks
The longitudinally spaced arrangement of foundation depth;Correspondingly it is located in the adjacent annular concrete supported beam in the range of ramp, multiple post plates is set,
The both ends of the post plate are connected on the adjacent annular concrete supported beam, multiple laterally adjacent arrangements of post plate, and
Form enclosed construction.
Further, the annular concrete supported beam is located at the position in ramp orientation and is embedded with reinforcing bar, and the post plate passes through institute
Reinforcing bar is stated to be connected with the annular concrete supported beam.
Further, connecting framework is connected with the annular concrete supported beam, the connecting framework is vertically arranged, the post
Plate is connected with the connecting framework.
Further, the connecting framework is connection channel-section steel.
Further, the both ends of the post plate are connected with the annular concrete supported beam respectively, and the middle part of the post plate
Interval between inner side and the stand column pile be present.
Further, along the foundation depth direction, mutually abutted between the end of the adjacent post plate.
Further, after the completion of last one of concrete supports the post plate construction together between concrete support, along the base
The depth direction in hole, between the adjacent post plate, the ramp is ladder-like arranged.
Further, the multiple tracks annular concrete support pit earthwork outward transport constructing structure includes excavator and grab bucket, when
Need not construct ramp when, using excavator relay fall soil and grab bucket be unearthed.
Compared with prior art, multiple tracks annular concrete support pit earthwork outward transport constructing structure provided by the utility model, leads to
Cross in the range of the unearthed ramp of the concrete supporting construction of foundation ditch, multiple post plates are set, the both ends of post plate are connected to adjacent
On annular concrete supported beam, multiple laterally adjacent arrangements of post plate, and closing post harden structure is formed, this post is hardened to be configured to one of post plate
The interim soil-baffling structure system of barricade, during avoiding the support Deep Foundation Pit Excavation outward transport of multiple tracks annular concrete, the earthwork at ramp
The problem of backfill amount is big, causes pit earthwork construction to repeat, and workload is big.
Brief description of the drawings
Fig. 1 is that the multiple tracks annular concrete support Deep Foundation Pit Excavation outward transport constructing structure that the utility model embodiment provides was constructed
Journey diagrammatic cross-section;
Fig. 2 is the schematic diagram amplified in Fig. 1 at A;
Fig. 3 is that the multiple tracks annular concrete support Deep Foundation Pit Excavation outward transport constructing structure ramp that the utility model embodiment provides is in
Diagrammatic cross-section during stepped arrangement.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation
Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only explaining
The utility model, it is not used to limit the utility model.
Realization of the present utility model is described in detail below in conjunction with specific embodiment.
Same or analogous label corresponds to same or analogous part in the accompanying drawing of the present embodiment;Retouched of the present utility model
In stating, it is to be understood that if it is based on accompanying drawing to have the orientation of the instructions such as term " on ", " under ", "left", "right" or position relationship
Shown orientation or position relationship, it is for only for ease of description the utility model and simplifies description, rather than indicates or imply institute
The device or element of finger must have specific orientation, with specific azimuth configuration and operation, therefore position is closed described in accompanying drawing
Term the being given for example only property explanation of system, it is impossible to the limitation to this patent is interpreted as, for one of ordinary skill in the art
Speech, the concrete meaning of above-mentioned term can be understood as the case may be.
It is preferred embodiment provided by the utility model shown in reference picture 1-3.
The utility model is achieved in that multiple tracks annular concrete support pit earthwork outward transport construction provided by the utility model
Structure, including concrete supporting construction and multiple tracks annular concrete supported beam 12 in the soil body are formed, concrete supporting construction has multiple edges
The stand column pile 11 of foundation depth Longitudinal extending, and multiple stand column pile 11 are arranged around the periphery of foundation ditch, multiple tracks annular concrete supported beam
12 along the longitudinally spaced arrangement of foundation depth so that foundation pit side-wall keeps uniform force.
It is corresponding in the range of ramp 16 in adjacent annular concrete supported beam 12, multiple post plates 13 are set, the two of post plate 13
End is connected on adjacent annular concrete supported beam 12, multiple 13 laterally adjacent arrangements of post plate, and forms enclosed construction, this knot
The interim soil-baffling structure system of one of barricade of post plate 13 is configured to, can stop that the earthwork is back to support beam 12 when ramp 16 backfills
The problem of lower section, the backfilling of earthwork amount avoided at ramp 16 is big, and construction repeats.
During practice of construction, including following construction procedure:
1), smooth location to first of concrete supported beam 12 bottom absolute altitude, and construct first of annular concrete supported beam 12 so that
First of annular concrete supported beam 12 is connected with multiple stand column pile 11, forms the annular of closing, can so cause foundation pit side-wall by
Power is uniform;The embedded bar 14 on the position at the soil outlet of ramp 16 of concrete supported beam 12 simultaneously;
2), the earthwork that foundation ditch first layer is dug out, outwards transported by the way of ramp 16, continue earth excavation to second
The bottom absolute altitude of concrete supported beam 12, the earthwork in the range of ramp 16 is all excavated, second annular concrete supported beam 12 of then constructing,
So that second annular concrete supported beam 12 is connected the annular for forming closing with multiple stand column pile 11;It is located in the second concrete supported beam 12
Embedded bar 14 on position at the soil outlet of ramp 16;
3), before in the range of by backfilling of earthwork to ramp 16, in first of annular concrete supported beam 12 and second annular
Post plate 13 is set between concrete supported beam 12, and post plate 13 passes through reinforcing bar 14 and first annular concrete supported beam 12 and second respectively
Annular concrete supported beam 12 connects, and so forms an overall structure of post plate 13, and this structure forms the interim of one barricade of post plate 13
Soil-baffling structure system, the earthwork during backfill of ramp 16 can be avoided to be back to the lower section of support beam 12;After post plate 13 is constructed, on slope
The earthwork is backfilled in the range of road 16, recovers slight slope road 16;
4), foundation ditch continue down the construction and excavation earthwork when, when using ramp 16 when, according to construction procedure 3) method behaviour
Make, post plate 13 is set between adjacent annular concrete supported beam 12.
5) in construction procedure 4) after, when need not construct ramp 16 when, will last one of concrete supported beam 12 with it is upper together with concrete
The construction of post plate 13 between support beam 12 is completed, and forms a complete overall structure of post plate 13, then using the relay of excavator 17
Soil and grab bucket 18 are unearthed.
Above-mentioned multiple tracks annular concrete support pit earthwork outward transport constructing structure, annular concrete supported beam 12 are located at the orientation of ramp 16
Position be embedded with reinforcing bar 14, post plate 13 is connected by reinforcing bar 14 with annular concrete supported beam 12, for the connection bone next constructed
Frame provides firm tie point.
Connecting framework is connected with annular concrete supported beam 12, connecting framework is vertically arranged, and post plate 13 is connected with connecting framework,
So, post plate 13 and annular concrete supported beam 12 can be caused closely to link together, it is overall to form a firm post plate 13
Structure.
In the present embodiment, connecting framework is connection channel-section steel 15, and it plays support and fixed effect to post plate 13 so that shape
Into the overall structure of post plate 13 have enough intensity, the pressure in 16 cubic metres of earth of ramp can be born.
In the present embodiment, the both ends of post plate 13 are connected with annular concrete supported beam 12 respectively, can so cause the He of post plate 13
Connect between concrete supporting construction and more consolidate, and interval, post plate 13 between the inner side at the middle part of post plate 13 and stand column pile 11 be present
Ramp is isolated for 16 cubic metres of earth with the underlying space of support beam 12, reduces construction workload.
Along foundation depth direction, mutually abutted between the end of adjacent post plate 13, and in the range of ramp 16, two rings
Multiple post plates 13 between shape concrete supported beam 12 form enclosed construction.So, the structure of post plate 13 of a sealing is formed, can be very
Good keeps apart the earthwork and the space of the lower section of support beam 12.
Along the depth direction of foundation ditch, last one of concrete supported beam 12 on together with the structure of post plate 13 between concrete supported beam 12 apply
After the completion of work, between adjacent post plate 13, ramp 16 is ladder-like arranged, and is so advantageous to the relay of excavator 17 and falls native and grab
Bucket 18 is unearthed, and completes last unearthed work.
In the present embodiment, multiple tracks annular concrete support pit earthwork outward transport constructing structure also includes excavator 17 and grab bucket
18, when need not construct ramp 16 when, ramp 16 is arranged into a ladder, excavator 17 is placed on the ladder at interval, each to dig
Toward adjacent ladder, soil, the last earthwork are caught pick machine 17 using grab bucket 18.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model
All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model
Protection domain within.
Claims (8)
1. multiple tracks annular concrete support pit earthwork outward transport constructing structure, it is characterised in that including forming the concrete support in the soil body
Structure and multiple tracks annular concrete supported beam, the concrete supporting construction have multiple stand column pile along foundation depth Longitudinal extending, and
Multiple stand column pile arrange that annular concrete supported beam described in multiple tracks is along between the foundation depth longitudinal direction around the periphery of the foundation ditch
Every arrangement;Correspondingly it is located in the adjacent annular concrete supported beam in the range of ramp, multiple post plates, the both ends of the post plate is set
It is connected on the adjacent annular concrete supported beam, multiple laterally adjacent arrangements of post plate, and forms enclosed construction.
2. multiple tracks annular concrete support pit earthwork outward transport constructing structure as claimed in claim 1, it is characterised in that the annular
The position that concrete supported beam is located at ramp orientation is embedded with reinforcing bar, and the post plate is connected by the reinforcing bar and the annular concrete supported beam
Connect.
3. multiple tracks annular concrete support pit earthwork outward transport constructing structure as claimed in claim 1, it is characterised in that the annular
Connecting framework is connected with concrete supported beam, the connecting framework is vertically arranged, and the post plate is connected with the connecting framework.
4. multiple tracks annular concrete support pit earthwork outward transport constructing structure as claimed in claim 1, it is characterised in that the connection
Skeleton is connection channel-section steel.
5. multiple tracks annular concrete support pit earthwork outward transport constructing structure as claimed in claim 1, it is characterised in that the post plate
Both ends be connected respectively with the annular concrete supported beam, and between existing between the inner side at the middle part of the post plate and the stand column pile
Every.
6. multiple tracks annular concrete support pit earthwork outward transport constructing structure as claimed in claim 1, it is characterised in that along the base
Depth direction is cheated, is mutually abutted between the end of the adjacent post plate.
7. multiple tracks annular concrete support pit earthwork outward transport constructing structure as claimed in claim 1, it is characterised in that last one
After the completion of concrete supports the post plate construction together between concrete support, along the depth direction of the foundation ditch, the adjacent post
Between plate, the ramp is ladder-like arranged.
8. multiple tracks annular concrete support pit earthwork outward transport constructing structure as claimed in claim 1, it is characterised in that the multiple tracks
Annular concrete support pit earthwork outward transport constructing structure includes excavator and grab bucket, when need not construct ramp when, using excavation
Machine relay is fallen native and grabbed bucket unearthed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720313384.1U CN206956730U (en) | 2017-03-28 | 2017-03-28 | Multiple tracks annular concrete support pit earthwork outward transport constructing structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720313384.1U CN206956730U (en) | 2017-03-28 | 2017-03-28 | Multiple tracks annular concrete support pit earthwork outward transport constructing structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206956730U true CN206956730U (en) | 2018-02-02 |
Family
ID=61378023
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720313384.1U Active CN206956730U (en) | 2017-03-28 | 2017-03-28 | Multiple tracks annular concrete support pit earthwork outward transport constructing structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206956730U (en) |
-
2017
- 2017-03-28 CN CN201720313384.1U patent/CN206956730U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105464686B (en) | Multi-layer underground space curtain posture excavating construction method and supporting construction under existing facility | |
CN104652443B (en) | Construction method of the interim horizontal support of deep basal pit as permanent structure beam | |
CN104131565B (en) | A kind of against making the construction method that the earthwork is just made to excavate | |
CN104763433A (en) | Underground excavation construction method of large-span subway station in flexible-top and hard-bottom stratum | |
CN108612117A (en) | A kind of seabed water-retaining structure across municipal tunnel greatly and construction method | |
CN102505704A (en) | Large open caisson construction method in soft geological shaft | |
CN103911996B (en) | Close on existing building steel sheet pile and pull out construction method | |
CN103775110A (en) | Underground excavation construction method for multilayer underground space of soft soil area | |
CN103510520A (en) | Sectionalized construction method of deep and large foundation pit | |
CN103938634B (en) | A kind of deep foundation pit supporting structure and construction method | |
CN104695445B (en) | Basement top-down method earth excavation method | |
CN103410152B (en) | A kind of construction method for long and narrow deep foundation pit earthwork digging | |
CN105735354A (en) | Covered-excavation full-top-down construction method of municipal underground engineering | |
CN108867692A (en) | The protection of city big cross section open trench tunnel Nearby Structure and tunnel foundation pit method for digging | |
CN110159296A (en) | Structural system for controlling deformation of subway shield tunnel and construction method thereof | |
CN104895111B (en) | The construction method of integrated pipe canal in weak soil ground | |
CN111139837A (en) | Method for simultaneously excavating multiple base pits at crossed subway in soft soil area | |
CN211500658U (en) | Shallow tunnel supporting construction that nearly connects that buries suitable for sand ground | |
CN109898556A (en) | A kind of underground pipe gallery structure and sunk type construction method | |
CN107165640B (en) | Tunnels and underground engineering surely builds method certainly | |
CN109826230A (en) | A kind of town road pipeline reinforcement protection structure and its construction method | |
CN109487793A (en) | Inner support of pile foundation pit permanent support structure is perfused in a kind of solid matter under complex environment | |
CN107023012B (en) | Multiple tracks annular concrete supports Deep Foundation Pit Excavation to transport outward construction method | |
CN208266896U (en) | A kind of seabed water-retaining structure across municipal tunnel greatly | |
CN206956730U (en) | Multiple tracks annular concrete support pit earthwork outward transport constructing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |