CN206956549U - A kind of bridge safeguard structure - Google Patents

A kind of bridge safeguard structure Download PDF

Info

Publication number
CN206956549U
CN206956549U CN201720725779.2U CN201720725779U CN206956549U CN 206956549 U CN206956549 U CN 206956549U CN 201720725779 U CN201720725779 U CN 201720725779U CN 206956549 U CN206956549 U CN 206956549U
Authority
CN
China
Prior art keywords
column
bridge
pipe
ring portion
safeguard structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720725779.2U
Other languages
Chinese (zh)
Inventor
叶吉利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tibet Tianyuan Luqiao Co., Ltd.
Original Assignee
叶吉利
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 叶吉利 filed Critical 叶吉利
Priority to CN201720725779.2U priority Critical patent/CN206956549U/en
Application granted granted Critical
Publication of CN206956549U publication Critical patent/CN206956549U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of bridge safeguard structure, including more root posts, and guard assembly of the cooperation between two adjacent columns, it is combined with below the column and pours pipe, the pipe that pours is cast in bridge, it is described to pour the upper of pipe, lower end both passes through bridge, the lower end of the column pours pipe through described, described pour is combined with screw between pipe and the column, before the guard assembly is in including two, symmetrically arranged ring portion afterwards, and fender rod of the cooperation between two ring portions, welding is provided with connection sheet between the fender rod and the ring portion, the ring portion is set on the outer ring of the column, the ring portion can be along the axial movement of the column, the first screw is combined between the ring portion and the column;The present apparatus can reasonably utilize structure, realize dual anti-collision effect, effectively reduce the impulsive force of vehicle, avoid vehicle from going out bridge floor.

Description

A kind of bridge safeguard structure
Technical field
It the utility model is related to a kind of bridge safeguard structure.
Background technology
Need to set fender rod in the both sides of bridge, protected by fender rod, avoid pedestrian from falling river, but this kind of knot The blocking capability of the fender rod of structure is poor, when to lose control of one's vehicle, can not block errant vehicle, cause vehicle to go out bridge floor, occurs Vehicle falls river accident, larger potential safety hazard be present.
Based on above mentioned problem, it is desirable to provide one kind can reasonably utilize structure, realize dual anti-collision effect, effectively reduce The impulsive force of vehicle, vehicle is avoided to go out the bridge safeguard structure of bridge floor.
Utility model content
Technical problem to be solved in the utility model, which is to provide one kind, can reasonably utilize structure, realize dual anticollision Effect, the impulsive force of vehicle is effectively reduced, avoids vehicle from going out the bridge safeguard structure of bridge floor.
The utility model is achieved through the following technical solutions:
A kind of bridge safeguard structure, including more root posts, and coordinate the protection group between two adjacent columns Part, it is combined with below the column and pours pipe, the pipe that pours is cast in bridge, and the upper and lower end for pouring pipe is worn Bridge is crossed, the lower end of the column pours pipe through described, and described pour is combined with screw between pipe and the column, described anti- Protecting assembly is in forward and backward symmetrically arranged ring portion including two, and coordinates the fender rod between two ring portions, the protection Welding is provided with connection sheet between bar and the ring portion, and the ring portion is set on the outer ring of the column, and the ring portion can edge The axial movement of the column, the first screw is combined between the ring portion and the column.
Preferably, welding is provided with a postive stop baffle on the tube wall for pouring pipe, and the postive stop baffle is spacing in bridge The upper surface of beam, pour pipe in a pre-installation, embedded hole can be opened up on bridge, will then pour pipe and assign into embedded hole, By postive stop baffle gear in the top of bridge, concrete is then inserted from below, and that completes to pour pipe pours fixation, by spacing Baffle plate to pour high unity of the pipe above bridge at the top of bridge floor now.
Preferably, welding is provided with more bracing pieces between two fender rods, and the bracing piece is obliquely installed, and leads to Structural strength between two root guard bars can be strengthened by crossing bracing piece.
Preferably, the fender rod is hollow steel rod member, closed at both ends, the wall thickness of the fender rod of the fender rod For 6mm-12mm.
Preferably, protection ball is provided with the top of the column, the bottom of the protection ball is provided with inserted link, described to insert Bar is inserted in the column, is threadedly coupled between the inserted link and the column, by setting protection ball can be in the upper of column It is square into without corner angle, avoid pedestrian collided with the present apparatus after injury.
The beneficial effects of the utility model are:Pour pipe in the present apparatus to be cast in bridge floor, and column is through pouring Pipe is built, when bearing Vehicular impact, column can be avoided and pour pipe disengaging, it is ensured that the reliability of protection, while the present apparatus Two root guard bars are equipped with, by the first root guard bar stress, secondary loading is carried out by the second root guard bar, can be substantially reduced The impact of automobile, vehicle is avoided to go out bridge floor, the structure of the present apparatus is relatively simple, and cost is more cheap, is adapted to promote the use of.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only It is some embodiments of the utility model, for those of ordinary skill in the art, is not paying the premise of creative work Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the cooperation schematic diagram for pouring pipe and column;
Fig. 2 is the side view of guard assembly.
Embodiment
All features disclosed in this specification, or disclosed all methods or during the step of, except mutually exclusive Feature and/or step beyond, can combine in any way.
This specification(Including any accessory claim, summary and accompanying drawing)Disclosed in any feature, except non-specifically chatting State, can alternative features equivalent by other or with similar purpose replaced.I.e., unless specifically stated otherwise, each feature It is an example in a series of equivalent or similar characteristics.
A kind of bridge safeguard structure as depicted in figs. 1 and 2, including more root posts 1, and coordinate adjacent described at two Guard assembly between column 1, the lower section of the column 1, which is combined with, pours pipe 3, and the pipe 3 that pours is cast in bridge, described The upper and lower end for pouring pipe 3 both passes through bridge, and the lower end of the column 1 pours pipe 3 through described, and the pipe 3 that pours is stood with described Screw 301 is combined between post 1, the guard assembly is in forward and backward symmetrically arranged ring portion 201 including two, and is coordinated two Fender rod 202 between the individual ring portion 201, welded between the fender rod 202 and the ring portion 201 and be provided with connection sheet 203, the ring portion 201 is set on the outer ring of the column 1, the ring portion 201 can along the axial movement of the column 1, The first screw 211 is combined between the ring portion 201 and the column 1.
A preferred embodiment in the utility model, welded on the tube wall for pouring pipe 3 and be provided with a limiting block Plate 331, the postive stop baffle 331 is spacing in the upper surface of bridge, pours pipe in a pre-installation, can be opened up on bridge pre-buried Hole, it will then pour pipe and assign into embedded hole, and be kept off by postive stop baffle in the top of bridge, then insert coagulation from below Soil, that completes to pour pipe pours fixation, pours pipe at the top of bridge floor now by postive stop baffle above bridge High unity.
A preferred embodiment in the utility model, between two fender rods 202 welding be provided with more plus Strong bar, the bracing piece are obliquely installed, and can strengthen the structural strength between two root guard bars by bracing piece.
A preferred embodiment in the utility model, the fender rod 202 are hollow steel rod member, the fender rod 202 it is closed at both ends, the wall thickness of the fender rod 202 is 8mm.
A preferred embodiment in the utility model, protection ball 121, the guarantor are provided with the top of the column 1 The bottom for keeping 121 is provided with inserted link 131, and the inserted link 131 is inserted in the column 1, the inserted link 131 and the column 1 Between be threadedly coupled, by set protection ball can column top formed without corner angle, avoid pedestrian from being knocked with the present apparatus Injury after touching.
The beneficial effects of the utility model are:Pour pipe in the present apparatus to be cast in bridge floor, and column is through pouring Pipe is built, when bearing Vehicular impact, column can be avoided and pour pipe disengaging, it is ensured that the reliability of protection, while the present apparatus Two root guard bars are equipped with, by the first root guard bar stress, secondary loading is carried out by the second root guard bar, can be substantially reduced The impact of automobile, vehicle is avoided to go out bridge floor, the structure of the present apparatus is relatively simple, and cost is more cheap, is adapted to promote the use of.
It is described above, only specific embodiment of the present utility model, but the scope of protection of the utility model is not limited to In this, any change or replacement expected without creative work, should all cover within the scope of protection of the utility model. Therefore, the scope of protection of the utility model should be determined by the scope of protection defined in the claims.

Claims (5)

  1. A kind of 1. bridge safeguard structure, it is characterised in that:Including more root posts, and coordinate between two adjacent columns Guard assembly, be combined with below the column and pour pipe, the pipe that pours is cast in bridge, it is described pour pipe it is upper, Lower end both passes through bridge, and the lower end of the column pours pipe through described, and described pour is combined with spiral shell between pipe and the column Silk, the guard assembly is in forward and backward symmetrically arranged ring portion including two, and coordinates the protection between two ring portions Bar, welded between the fender rod and the ring portion and be provided with connection sheet, the ring portion is set on the outer ring of the column, institute The first screw can be combined with along the axial movement of the column by stating ring portion between the ring portion and the column.
  2. 2. bridge safeguard structure according to claim 1, it is characterised in that:Weld and set on the tube wall for pouring pipe A postive stop baffle is equipped with, the postive stop baffle is spacing in the upper surface of bridge.
  3. 3. bridge safeguard structure according to claim 1, it is characterised in that:Weld and set between two fender rods More bracing pieces are equipped with, the bracing piece is obliquely installed.
  4. 4. bridge safeguard structure according to claim 1, it is characterised in that:The fender rod is hollow steel rod member, The fender rod it is closed at both ends, the wall thickness of the fender rod is 6mm-12mm.
  5. 5. bridge safeguard structure according to claim 1, it is characterised in that:Protection is provided with the top of the column Ball, the bottom of the protection ball are provided with inserted link, and the inserted link is inserted in the column, spiral shell between the inserted link and the column Line connects.
CN201720725779.2U 2017-06-21 2017-06-21 A kind of bridge safeguard structure Expired - Fee Related CN206956549U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720725779.2U CN206956549U (en) 2017-06-21 2017-06-21 A kind of bridge safeguard structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720725779.2U CN206956549U (en) 2017-06-21 2017-06-21 A kind of bridge safeguard structure

Publications (1)

Publication Number Publication Date
CN206956549U true CN206956549U (en) 2018-02-02

Family

ID=61384832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720725779.2U Expired - Fee Related CN206956549U (en) 2017-06-21 2017-06-21 A kind of bridge safeguard structure

Country Status (1)

Country Link
CN (1) CN206956549U (en)

Similar Documents

Publication Publication Date Title
CN204282255U (en) Self-opening type limit for height door frame
CN104060558A (en) Improved super-plasticity safety height limiting pole
CN104453270B (en) The bracing means of a kind of deformed bar concrete component and construction method
CN206956549U (en) A kind of bridge safeguard structure
CN207552928U (en) A kind of road and bridge guardrail fixing device
CN205999784U (en) Bridge guardrail
CN109555016A (en) Self-resetting corrugated guardrail
CN208594514U (en) A kind of safety guard fence for super highway
CN108487134A (en) A kind of anti-collision guard rail for highways based on multiple defence line
CN104631308A (en) Reinforced concrete composite pier with strong impact resistance
CN205577260U (en) Concrete column
CN106948294A (en) A kind of waveform sandwich highway safeguard structure
CN207059964U (en) Anti-collision protection device and there is its vehicle
CN205893977U (en) High strength safety fence
CN203668857U (en) Walkable operating platform frame used for connection and reinforcement of SS-level guardrail templates
CN109577187A (en) A kind of Bridge guardrail
CN106758991B (en) Intercommunication subchannel anticollision barrier
CN205840506U (en) A kind of isolation rail of municipal works
CN203977300U (en) A kind of attaching protection canopy of cradle construction continuous beam
CN204551239U (en) The steel concrete compound bridge pier that a kind of impact resistance is strong
CN206706579U (en) A kind of adjustable bridge guard rail template
CN208668331U (en) A kind of anticollision highway barrier
CN207193862U (en) A kind of bus stop structure of municipal works
CN205617286U (en) Guardrail end and guardrail
CN206855743U (en) A kind of protector for prestress wire tensioning

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180608

Address after: 850000 balk Road, Lhasa, Tibet autonomous region, No. 15

Patentee after: Tibet Tianyuan Luqiao Co., Ltd.

Address before: 311899 15 buildings of Tiancheng Jinjiang yuan, Zhuji City, Shaoxing, Zhejiang.

Patentee before: Ye Jili

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180202

Termination date: 20180621