CN206956537U - Adjustable bridge support pinner - Google Patents

Adjustable bridge support pinner Download PDF

Info

Publication number
CN206956537U
CN206956537U CN201720662441.7U CN201720662441U CN206956537U CN 206956537 U CN206956537 U CN 206956537U CN 201720662441 U CN201720662441 U CN 201720662441U CN 206956537 U CN206956537 U CN 206956537U
Authority
CN
China
Prior art keywords
support
rubber
lift adjustment
rubber support
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720662441.7U
Other languages
Chinese (zh)
Inventor
崔霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720662441.7U priority Critical patent/CN206956537U/en
Application granted granted Critical
Publication of CN206956537U publication Critical patent/CN206956537U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of adjustable bridge support pinner, including hydraulic pressure adjustment component and support component two parts.Support component is connected by upper plate and bottom plate and formed, and interior rim of the mouth is provided with upper plate, and rubber support is sleeved in the interior rim of the mouth of upper plate, and support lift adjustment retaining mechanism is connected with bottom plate, is additionally provided with hydraulic jack.By hydraulic jack hydraulic lifting, and the support lift adjustment locking of support lift adjustment retaining mechanism, beam slab is set to be in close contact with rubber support and producing balanced forces, so as to avoid rubber support from coming to nothing or discontinuity equalization.It not only can effectively simplify the installation of rubber support, maintenance work, improve life-span of rubber support.And beam body can be made levelling more convenient, it is more time saving and energy saving that rubber support is changed in installation, moreover it is possible to ensures that the rubber support after changing keeps stress consistent with other rubber supports, effectively ensures bridge construction quality.

Description

Adjustable bridge support pinner
Technical field
A kind of bridge pad pinner, particularly adjustable bridge support pinner are the utility model is related to, it is applied to bridge The adjustable supports of bridge beam slab during construction.
Background technology
Generally, during bridge construction, there are four rubber support supports under every piece of beam slab of bridge, this four rubber supports are put It is placed on the concrete pinner on bridge pier platform.Rubber support is placed directly on concrete pinner, is made on bearing and bridge pier platform Concrete pinner center line alignment, then lift beam slab.Irreconcilable due to concrete pinner does not have to rubber support It is spacing, easily there is rubber support sideslip, cause rubber support to bias;Easily there is up-down structure between bridge beam body and rubber support It can not be in close contact, cause the phenomenon of rubber support discontinuity, so as to reduce the service life of rubber support;Meanwhile Easily occur coming to nothing for rubber support during use;When changing rubber support, because bridge upper and lower structure such as is expanded with heat and contract with cold at the original Cause, the distance between beam body and pinner can produce minor variations, and rubber support is more easy to unbalance stress phenomenon occur.So, meeting Directly affect the stress equalization and steadiness of bridge.
The content of the invention
The purpose of this utility model is to provide a kind of adjustable bridge support pinner, and it can overcome oneself to have technology not Foot, rubber support are placed in adjustable bridge support pinner, beam slab is in close contact with rubber support, can effectively be made beam slab Under four rubber support stress it is unanimously balanced, fundamentally solve bridge pad and come to nothing and the problems such as unbalance stress, and can letter Change the installation and maintenance of rubber support.
Its solution is:Adjustable bridge support pinner includes hydraulic pressure adjustment component and support component two parts.Hydraulic pressure Adjustment component is made up of hydraulic pump and jack, and jack is positioned over support component center.Support component is by upper plate and bottom Plate is connected and formed.Interior rim of the mouth is provided with upper plate, for placing rubber support, support lift adjustment lock is connected with bottom plate Tight mechanism.The jack hydraulic that component is adjusted by hydraulic pressure lifts regulation, make beam slab and rubber support be in close contact simultaneously it is balanced by Power, adjustment support component is simultaneously locked, so as to avoid rubber support from coming to nothing or discontinuity equalization.
By wedge metal block, it is located in the stopper slot being arranged symmetrically on bottom plate the support lift adjustment retaining mechanism, Retaining mechanism is provided with wedge metal block, and the stopper slot outer end being arranged symmetrically on bottom plate is connected with lift adjustment Part, the lift adjustment part and the wedge metal block locking being placed in stopper slot are connected and formed.
The utility model uses above-mentioned technical proposal, can make full use of the excellent of two or four jack of a hydraulic pump band Point, makes four pieces of pinners under beam slab and rubber support stress equalization consistent, fundamentally solve bridge pad come to nothing and stress not The problem of equal, also it is greatly improved the life-span of rubber support.Also, beam body is levelling more convenient, rubber branch is changed in installation Seat it is more time saving and energy saving, can effectively simplify the installation of rubber support, maintenance work, moreover it is possible to ensure change after rubber support and Other rubber supports keep stress consistent.It can not only make in bridge construction convenient installation, moreover, also help beam slab leveling and Later stage changes rubber support, effectively ensures bridge construction quality.
Brief description of the drawings
Fig. 1 is the structural representation of adjustable bridge support pinner.
Embodiment
Specific embodiment of the present utility model is described in detail below in conjunction with the accompanying drawings.
In accompanying drawing 1, adjustable bridge support pinner includes hydraulic pressure adjustment component and the part hydraulic pressure adjustment of support component two Component is made up of hydraulic pump and hydraulic jack 1.Support component is made up of upper plate 2 and connected bottom plate 5.Set on upper plate 2 Interior rim of the mouth 7 is equipped with, rubber support is positioned in interior rim of the mouth 7.Support lift adjustment retaining mechanism is connected with bottom plate 5, in bottom plate 5 On be arranged symmetrically two stopper slots 6, two wedge metal iron blocks 3 are positioned in corresponding stopper slot 6, and can be along corresponding spacing Groove 6 is slid, and retaining mechanism 4 is provided with one end of each wedge metal iron block 3, and be arranged symmetrically on bottom plate 5 Corresponding regulating part screw rod 8 is connected at the outer end of two stopper slots 6, each regulating part screw rod 8 is corresponding to being placed in spacing The locking connection of retaining mechanism 4 in wedge metal iron block 3 in groove 6, forms support lift adjustment retaining mechanism.The hydraulic pressure thousand Jin top 1 is connected in the cavity between two stopper slots 6 being arranged symmetrically on bottom plate 5.
During bridge construction, four adjustable bridge support pinners are placed with every piece of beam slab of bridge, this four adjustable Bridge pad pinner is positioned on bridge pier platform.A hydraulic pump band two or four jack advantage is made full use of, is made under beam slab Four adjustable bridge support pinners and rubber support stress equalization it is consistent, can fundamentally solve bridge pad come to nothing and by The problem of power inequality, make beam body levelling more convenient.When needing to change rubber support, jacked by hydraulic jack, And the support lift adjustment locking of support lift adjustment retaining mechanism, it is convenient to rubber support is changed, it is saves time and effort, It can also the rubber support after replacing is set to keep stress consistent with other rubber supports.

Claims (2)

1. a kind of adjustable bridge support pinner, it is characterised in that hydraulic pressure adjusts component and the part of support component two composition is adjustable Formula bridge pad pinner;Hydraulic pressure adjusts component by hydraulic pump and by hydraulic jack(1)Composition, support component is by upper plate(2)And Bottom plate(5)It is connected and forms, upper plate(2)On be provided with interior rim of the mouth(7), rubber support is sleeved on upper plate(2)Interior rim of the mouth(7) In, bottom plate(5)On be connected with support lift adjustment retaining mechanism, be additionally provided with hydraulic jack(1), pass through hydraulic jack (1)Hydraulic lifting, and the support lift adjustment locking of support lift adjustment retaining mechanism, make beam slab closely be connect with rubber support Touch and producing balanced forces, so as to avoid rubber support from coming to nothing or discontinuity equalization.
2. adjustable bridge support pinner as claimed in claim 1, it is characterised in that it is described support lift adjustment retaining mechanism by Wedge metal block(3), it is located at bottom plate(5)On the stopper slot that is arranged symmetrically(6)It is interior, in wedge metal block(3)Inside it is provided with lock Tight mechanism(4), and in bottom plate(5)On the stopper slot that is arranged symmetrically(6)Outer end is connected with lift adjustment part(8), the rising-falling tone Save part(8)Stopper slot corresponding to being placed in(6)Interior wedge metal block(3)Locking is connected and formed.
CN201720662441.7U 2017-06-08 2017-06-08 Adjustable bridge support pinner Expired - Fee Related CN206956537U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720662441.7U CN206956537U (en) 2017-06-08 2017-06-08 Adjustable bridge support pinner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720662441.7U CN206956537U (en) 2017-06-08 2017-06-08 Adjustable bridge support pinner

Publications (1)

Publication Number Publication Date
CN206956537U true CN206956537U (en) 2018-02-02

Family

ID=61379054

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720662441.7U Expired - Fee Related CN206956537U (en) 2017-06-08 2017-06-08 Adjustable bridge support pinner

Country Status (1)

Country Link
CN (1) CN206956537U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108611977A (en) * 2018-05-12 2018-10-02 曾小真 A kind of bridge construction support equipment in science of bridge building field

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108611977A (en) * 2018-05-12 2018-10-02 曾小真 A kind of bridge construction support equipment in science of bridge building field

Similar Documents

Publication Publication Date Title
CN107448689A (en) A kind of hoisting bracket of horizontal pipeline
CN208685460U (en) Tubular arch arch rib adjuster
CN206956537U (en) Adjustable bridge support pinner
CN105887590A (en) Height direction adjusting system and method after railway foundation subsidence
CN108103936B (en) The method that prefabricated bent cap is installed on column
CN103572774A (en) Leveling ruler flat underboarding mortar bedding method
CN207847086U (en) A kind of tall and big beam form support frame
CN207919383U (en) A kind of hanging basket main truss front fulcrum height tunable arrangement
CN204199170U (en) Bridge steel support installation pinner
CN203807946U (en) Track beam erecting device
CN203821231U (en) Leveling support
CN204703059U (en) A kind of bridge pad with height-adjusting function
CN210369024U (en) Assembled tower crane cushion cap basis festival standard height controlling means
CN103437292A (en) Lifting combination device for bidirectional inclined A-shaped main tower cable-stayed bridge template
CN208702158U (en) A kind of civil engineering basic mode side head part
CN103924518B (en) A kind of stringer of rail beam and method thereof
CN209121598U (en) A kind of high-stroke gas bar
CN208105858U (en) A kind of civil engineering building template connection frame
CN206774251U (en) The levelling adjusting apparatus of boiler accessory machinery platen
CN205370948U (en) Water pump base assembly
CN217098248U (en) Slope regulator of box girder steel platform seat and steel platform seat thereof
CN204799861U (en) Forge with adjusting support frame
CN108751026A (en) A kind of jack and jacking apparatus for bridge jacking
JP3242912U (en) Height adjustable rebar gauge fixing platform with stopper
CN215252392U (en) Quick and accurate leveling device for large-tonnage rotating spherical hinge base

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180202

Termination date: 20200608