CN206956070U - Inhale dust arrester in a kind of blast furnace iron notch top - Google Patents
Inhale dust arrester in a kind of blast furnace iron notch top Download PDFInfo
- Publication number
- CN206956070U CN206956070U CN201621487570.9U CN201621487570U CN206956070U CN 206956070 U CN206956070 U CN 206956070U CN 201621487570 U CN201621487570 U CN 201621487570U CN 206956070 U CN206956070 U CN 206956070U
- Authority
- CN
- China
- Prior art keywords
- platform
- blast furnace
- cast house
- low level
- dust arrester
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000428 dust Substances 0.000 title claims abstract description 105
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 title claims abstract description 84
- 229910052742 iron Inorganic materials 0.000 title claims abstract description 42
- 238000012423 maintenance Methods 0.000 claims abstract description 22
- 239000004927 clay Substances 0.000 claims description 67
- 238000010079 rubber tapping Methods 0.000 claims description 31
- 239000011248 coating agent Substances 0.000 claims description 2
- 238000000576 coating method Methods 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 15
- 230000000694 effects Effects 0.000 abstract description 13
- 238000004519 manufacturing process Methods 0.000 abstract description 8
- 238000005516 engineering process Methods 0.000 abstract description 3
- 229910000831 Steel Inorganic materials 0.000 description 30
- 239000010959 steel Substances 0.000 description 30
- UGFAIRIUMAVXCW-UHFFFAOYSA-N Carbon monoxide Chemical compound [O+]#[C-] UGFAIRIUMAVXCW-UHFFFAOYSA-N 0.000 description 10
- 239000003546 flue gas Substances 0.000 description 10
- 239000007789 gas Substances 0.000 description 10
- 239000003818 cinder Substances 0.000 description 8
- 239000003034 coal gas Substances 0.000 description 7
- 238000000034 method Methods 0.000 description 7
- 238000007689 inspection Methods 0.000 description 6
- 239000000779 smoke Substances 0.000 description 6
- 239000000725 suspension Substances 0.000 description 6
- 239000011449 brick Substances 0.000 description 5
- 238000005259 measurement Methods 0.000 description 5
- 230000006872 improvement Effects 0.000 description 4
- 238000005266 casting Methods 0.000 description 3
- 238000005453 pelletization Methods 0.000 description 3
- 239000004576 sand Substances 0.000 description 3
- 230000011218 segmentation Effects 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 230000004888 barrier function Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 235000019504 cigarettes Nutrition 0.000 description 2
- 230000009194 climbing Effects 0.000 description 2
- 238000001816 cooling Methods 0.000 description 2
- 239000003500 flue dust Substances 0.000 description 2
- 238000005498 polishing Methods 0.000 description 2
- 206010020843 Hyperthermia Diseases 0.000 description 1
- 238000010521 absorption reaction Methods 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 229910003460 diamond Inorganic materials 0.000 description 1
- 239000010432 diamond Substances 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- 230000036031 hyperthermia Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000004630 mental health Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000005855 radiation Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 238000013519 translation Methods 0.000 description 1
Abstract
The utility model discloses a kind of blast furnace iron notch top to inhale dust arrester, belongs to blast furnace dedusting system equipment field.For existing blast furnace configure dust arrester in the Horizontal open machine technology trapping ability in run at high level it is weak, because of the problems such as horizontal wind effect escape phenomenon is serious, cast house operating environment difference.This programme employs a kind of blast furnace iron notch top and inhales dust arrester, including high-order tuyere platform and low level cast house platform, high-order tuyere platform is arranged above low level cast house platform, high-order tuyere platform is supported by high-order tuyere platform column, high furnace frame post, low level cast house platform is supported by low level cast house platform column, high furnace frame post, high furnace frame post top is provided with collar tie beam, and dust gathering arrester is covered in above high-order tuyere platform and low level cast house platform and collar tie beam.It, which can be realized, implements effect simple in construction, cheap, safe and reliable, easily operated, that minimum is influenceed on normal ironmaking production and overhaul of the equipments, and maintenance is convenient and post environment is good.
Description
Technical field
Blast furnace dedusting system equipment field is the utility model is related to, is inhaled more specifically to a kind of blast furnace iron notch top
Dust arrester.
Background technology
A kind of device that dust arrester belongs to cast house dust pelletizing system is inhaled on blast furnace discharge yard top, can pass through blast furnace discharge yard
Inhale one kind that dust arrester carries out instantaneous flue gas trapping in Horizontal open machine opening, pad sand and clay gun machine gun mudding botting in top
Dust arrester is inhaled on blast furnace discharge yard top, is widely used in the industries such as metallurgical, casting at present.
Blast furnace for configuring Horizontal open machine, it is neat by cover top and blast furnace tuyere platform that dust arrester is inhaled on cast house top
Flat, i.e. the mode of tapping hole strength smoke evacuation is taken in tapping hole dedusting, i.e., using the wide long feature of tuyere platform, to tapping hole region
Effectively sealed, top draft hood is set above the iron runner of tuyere platform end, and side-draught hood is set in iron runner both sides, carry out strength row
Cigarette, flue gas caused by tapping hole is trapped on the spot in tuyere platform region to greatest extent.Cast house dust pelletizing system is improved to remove
The operating efficiency of dirt.The industries such as metallurgical, casting are widely used at present.
But the blast furnace for configuring overhead tapping machine, (typically puts down because hydraulic pipeline apical side height is higher in frame compared with air port
Platform >=1.9m), cause cast house top to inhale dust arrester top surface absolute altitude lifting, influence the effective suction that dust arrester is inhaled on top, and wind
Be highly prone to above mouthful platform two cast house factory buildings and its between depletion region transverse direction wind effect, be commonly called as wild wind, cause worker
The work position cloud of dust diffuses, and has a strong impact on the physical and mental health of operating personnel, reduces labor productivity.Caused subject matter is such as
Under:
(1) dust arrester top surface absolute altitude lifting is inhaled on the top of cast house, is had a strong impact on that the suction of dust arrester is inhaled on top, is caused cigarette
Gas can not promptly and accurately enter top and inhale in dust arrester cover mouth, influence post health;
(2) dust arrester top surface absolute altitude lifting is inhaled on cast house top, accelerates horizontal wind effect, or even the Work places cloud of dust is more
It is unrestrained, it can not ensure that overhead tapping machine is promptly and accurately directed at tapping hole and is open and padded husky operation, influence to produce normal operation;
(3) dust arrester top surface absolute altitude lifting is inhaled on the top of cast house, accelerates horizontal wind effect, or even the Work places cloud of dust
Diffuse, can not ensure that stemming operating personnel is promptly and accurately lost in quasi- clay gun machine on tuyere platform, and then influence to carry out clay gun machine
The closure operation of stemming, influence to produce normal operation.It can cause loss serious simultaneously, increase production cost;
(4) clay gun machine and its during being supported on maintenance, inhales dust arrester (with trough direction by transverse crossing cast house top
Less parallel), when serious cast house top will be caused to inhale the possibility influence that dust arrester is scrapped, add the cost of overhaul.
Chinese patent application, application number 201220071236.0, publication date on November 14th, 2012, disclose a kind of blast furnace
Tapping hole dust excluding hood.It includes top and absorbs dust hood and side absorption dust hood, is installed in wherein dust hood is absorbed on top on the outside of blast furnace iron notch
Top, side absorbs dust hood and is installed in the side of the trough being connected with blast furnace iron notch;Absorb dust hood and removed including first in top
Dirt pipe and the first dust excluding hood being connected with dust removing tube;Dust hood is absorbed in side to be included the second dust removing tube and is connected with the second dust removing tube
The second dust excluding hood, the cover mouth of dust hood is absorbed to be obliquely installed in side.The use of such a dust hood for blast furnace tap hole not only reduces energy
Consumption, improve cast house working environment and smoke catching efficiency can be improved.But this dust excluding hood still influences to carry out clay gun machine gun mud
Closure operation, influence produce normal operation.
The content of the invention
1. technical problems to be solved
The cast house top suction dust arrester configured for existing blast furnace in Horizontal open machine technology traps in run at high level
Ability is weak, because of the problems such as horizontal wind effect escape phenomenon is serious, cast house operating environment difference, and the utility model provides a kind of height
Stove tapping hole top inhale dust arrester, it can realize implement it is simple in construction, cheap, safe and reliable, easily operated, to normal
Ironmaking production and overhaul of the equipments influence minimum effect, and maintenance is convenient and post environment is good.
2. technical scheme
The purpose of this utility model is achieved through the following technical solutions.
Inhale dust arrester, including high-order tuyere platform and low level cast house platform, high-order air port in a kind of blast furnace iron notch top
Platform is arranged above low level cast house platform, and high-order tuyere platform is supported by high-order tuyere platform column, high furnace frame post,
Low level cast house platform is supported by low level cast house platform column, high furnace frame post, and high furnace frame post top is provided with collar tie beam,
Three-stage dust gathering arrester is covered in above high-order tuyere platform and low level cast house platform and collar tie beam.This three-stage dust gathering arrester, area
Big large area >=50m2, increase tapping outlet secondary flue gas caching capabilities, can effectively improve account for respectively 87% and 13% once,
The capture rate of secondary smoke.Dust suction cover degree is high, high-order tuyere platform upper area, height >=1.9m, reduces and trough is examined
The influence repaiied, avoids top draft hood from being disassembled.Respectively across the cast house platform of high-order tuyere platform and low level, height cloth straggly
Put, general frame stress, Stability Analysis of Structures is reliable.The tuyere platform of high low setting, span the tuyere platform operation and low of a high position
The cast house platform bilayer operation of position.With reference to by iron field main building upright supports, the air port that supporting construction spans a high position is put down
The cast house platform of platform and low level, makes overall structure reliable and stable.Both cover open area had been added, turn avoid and overhead tapping machine
The interference of the production operations such as opening, pad sand, if desired overhead guard is horizontal or vertically movable, and horizontal or vertically movable saving overhead guard is horizontal
Mobile power consumption.
Further, described three-stage dust gathering arrester, it is the clay gun machine and its supporting access path top movable at middle part
Cover plate and the fixation dust gathering arrester of both sides.
Further, be provided with described high-order tuyere platform stemming operation door and or disclose air port operation door.Although
Add the twice operation procedure of stemming operation door open and close;But first solve the high polishing working of stemming and dedusting is semiclosed takes into account
It is required that problem;Second solves the lance that the high polishing working of stemming discloses air port working space interference with the long six-edged steel prickers of region 6m
Shield;Three provide side view observation space for trough maintenance, so as to judge trough scarfing cinder, cast house main building driving handling iron
In place whether the upkeep operations such as ditch.Although add the twice operation procedure for disclosing air port operation door open and close;But first solve
6m long six-edged steel prickers in the region disclose air port operation and the semiclosed problem for taking into account requirement of dedusting;Second solve trough maintenance to carry
For facing observation space, so as to judge whether the upkeep operations such as trough scarfing cinder, cast house main building driving handling trough arrive
Position.
Further, described low level cast house platform side is provided with beam wind barricade.Both beam wind is blocked, again
Materially increase tapping outlet once, the caching capabilities of secondary smoke.
Further, plain bonnet top inlet scoop is provided with three-stage dust gathering arrester, plain bonnet top inlet scoop is to be respectively arranged at
The clay gun machine and its supporting access path latter end shroud and clay gun machine and its supporting access path leading portion of three-stage dust gathering arrester both sides
Shroud, and clay gun machine and its clay gun machine and its supporting access path shroud on supporting access path top movable cover plate.Three
Segmentation, and match somebody with somebody and detachable shroud is used above clay gun machine and its supporting access path, the passage outside shroud adds removable cover
Mode;The working space that cover body H profile steel collar tie beam is simple in construction, hanging structure in turn ensures that overhead tapping machine under in light weight, beam,
Simple in construction, convenient disassembly, labor intensity is reduced, and do not influence the normal production operation of overhead tapping machine.Ensure that passage is unimpeded,
Detachable shroud and removable cover are repeatable to be utilized, and reduces the influence to upkeep operation, cost is low.
Further, clay gun machine and its supporting access path latter end shroud, clay gun machine and its supporting access path leading portion
Shroud and clay gun machine and its supporting access path shroud can be section respectively using top semicircle and or rectangular cross section structure,
And it is aided with outside gusset.
Further, described three-stage dust gathering arrester bottom is coated with fireproof coating.
Further, in addition to electrically operated valve, electrically operated valve are located on the outside of cast house main building, set operating platform.
Further, including dust arrester is inhaled on above-mentioned any 2 sets of described blast furnace iron notch tops, can be with blast furnace center line
For axial line, mirror image combination arrangement.
Further, box type column is common 3-4 on described high-order tuyere platform 8, and the top of low level cast house platform 9 increases
If low level cast house platform column is 1-2.
3. beneficial effect
Compared to prior art, the utility model has the advantage of:
1) dust arrester is inhaled on a kind of top of large area of this programme blast furnace iron notch three sections of shrouds of support straggly, will entirely push up suction
Dust arrester is connected using the H profile steel collar tie beam of lightweight steel construction with cast house main building column, tuyere platform and low level with a high position
The integral framework architecture of leg-shaped set up respectively of cast house platform, the top of overhead opening pusher side is inhaled dust arrester cover body and used
Hanging structure under beam, it is ensured that overhead tapping machine and horizontal rotation operation of the clay gun machine along high furnace frame post below can be real
Now operate steadily, securely and reliably;
2) whole top is inhaled dust arrester and connected using the H profile steel collar tie beam of lightweight steel construction with cast house main building column, with height
The tuyere platform of position and the integral framework architecture of leg-shaped set up respectively of cast house platform of low level, on high-order tuyere platform
Air port operation door is disclosed above Fang Zengshe stemming operation doors and iron runner to be only opened manually in respective operation, is manually returned after operation
Position, avoids vibration, rational in infrastructure;
3) whole top is inhaled dust arrester and set using the H profile steel collar tie beam of lightweight steel construction, top plain bonnet top and low level cast house platform
Put (the cast house platform of the general job personnel headroom tuyere platform high-order compared with cast house platform >=2.2m, < and low level
The 4m discrepancy in elevation) beam wind barricade form relatively semi-enclosed structure.Set up above high-order tuyere platform stemming operation door and
Disclose above iron runner air port operation door only operation when opened respectively according to operating regulation, closed respectively according to operating regulation when operation finishes
Close, meet the basic demand of cast house dedusting, good airproof performance;
4) outfit motor regulated valve, keying are easy to adjust:The blast furnace discharge yard tapping hole system of working by turns, each top are absorbed
Dirt device configures electrically operated valve and its inspection platform, chain by control box by machine and blast furnace Central Control Room PLC, conveniently opening and closing;
5) whole top is inhaled dust arrester cover body and used across the double high of the cast house platform of high-order tuyere platform and low level
Journey height formula straggly, large area (area >=50m2) dust cover structure, super large trapping ability, operating environment is effectively improved, improved
Worker's enthusiasm for labour, work efficiency is improved, make the increase of ironmaking yield;
6) whole top suction dust arrester is simple to operate, and running cost is low, can stably improve the economic benefit of user, improves
Production efficiency;
7) due to top inhale dust arrester be effectively improved operating environment, will not be diffused because of flue dust to overhead tapping machine tapping outlet,
Pad is husky and clay gun machine stifled iron notch influences, and operates steadily;And overhead tapping machine and water of the clay gun machine along high furnace frame post below
Flat rotary operation has enough working spaces, by effective service life for extending blast-furnace body, overhead tapping machine and clay gun machine.
Brief description of the drawings
Fig. 1 is that dust arrester elevational schematic view is inhaled on the cast house top of prior art;
Fig. 2 is the floor map of this programme;
Fig. 3 is this programme diagrammatic cross-section;
Fig. 4 is non-opening pusher side windbreak A-A diagrammatic cross-sections;
Fig. 5 is opening pusher side without windbreak B-B diagrammatic cross-sections;
Fig. 6 is the cast house floor map of 2 sets of two molten iron mouths.
Label declaration in figure:
1st, three-stage dust gathering arrester;2nd, stemming operation door;3rd, air port operation door is disclosed;7th, plain bonnet top inlet scoop;8th, high-order air port
Platform;9th, low level cast house platform;11st, clay gun machine and its supporting access path latter end shroud;12nd, clay gun machine and its supporting maintenance
Passage leading portion shroud;13rd, clay gun machine and its supporting access path shroud;14th, collar tie beam;16th, beam wind barricade;17th, electrically operated valve;
18th, operating platform;30th, high furnace frame post;31st, 32, high-order tuyere platform column;33rd, low level cast house platform column;36th, mud
Big gun machine and its supporting access path top movable cover plate;51st, plain bonnet top is pushed up;52nd, overhead tapping machine;53rd, Hydraulic clay gun machine;54、
Blast-furnace body;55th, drive a vehicle;56th, driving crane girder.
Embodiment
With reference to Figure of description and specific embodiment, the utility model is described in detail.
As shown in figure 1, dust arrester is inhaled on existing cast house top, device is directly a top surface formula entirety cover body, because of machine
Hydraulic pipeline apical side height is higher (typically compared with tuyere platform >=1.9m) on frame, causes cast house top to inhale dust arrester top surface absolute altitude
Lifting, influence the effective suction that dust arrester is inhaled on top;
This programme belongs to blast furnace dedusting system equipment field, specifically in blast furnace cast house dedusting system to blast furnace casting
Absorb dirt dress in the top that field carries out a kind of large area of blast furnace iron notch three sections of shrouds of formula straggly for taking into account caching capabilities semiclosed in short-term
Put.
When blast furnace discharge yard tapping hole is worked by turns, opened as overhead tapping machine 52 during being tapped a blast furnace for blast furnace iron notch
Mouth, pad are husky, dust arrester, and not shadow are inhaled in the blast furnace discharge yard top of the instantaneous flue gas trapping of clay gun machine gun mudding botting progress
Ring the normal translation handling during clay gun machine and its supporting are overhauled below tuyere platform.
The present invention inhales dust arrester cover body to cast house top and crosses over the tuyere platform of a high position and going out for low level using large area
Double elevations height formula straggly of iron field platform, dust leg put the segmentation of cover top integrated, reserved clay gun machine and its supporting handling passage
Frame mode.Three-stage dust gathering arrester 1 including large area, area can be more than 50m2, the high-order top of tuyere platform 8 is provided with big gun
Air port operation door 3 is disclosed above mud operation door 2 and iron runner;Low level cast house platform 9 is provided with beam wind barricade 16, and basic herein
Upper raising whole device semi-hermetic;Wherein three-stage dust gathering arrester 1 assumes diamond in shape or rectangle;The H profile steel of the lightweight steel construction is overhead
Collar tie beam 14 connects with cast house main building column, the leg-shaped set respectively with high-order tuyere platform 8 and low level cast house platform 9
Integral framework architecture;Secondary beam is provided with passage in collar tie beam 14;Reserve clay gun machine and its support the detachable passage of handling
Frame mode.Channel width >=1m.Detachable shroud pushes up positioned at cover, can be with the supporting safety climbing ladder of work high above the ground.In order to ensure
Safety, detachable shroud push up positioned at cover, can be with high-altitude working safety railing.
The stemming operation door 2 that the high-order top of tuyere platform 8 is set is between high furnace frame post 30 and high-order tuyere platform column
Between 31;Stemming operation door 2 can be the door of various structures, can be preferably following structure, including doorframe, door handle, right
Two-door, door bolt and door hinge are opened, wherein:The split right symmetrical both sides for being fixedly installed on doorframe of two-door the first from left;Doorframe is set
On high-order tuyere platform 8.High-order tuyere platform 8 is steel structure platform upper berth refractory brick.Low level cast house platform 9 mixes for reinforcing bar
Xtah Crude Clay structure.
Stemming operation door 2 has following effect:
First, the high-order needs for throwing mud of clay gun machine are solved;
2nd, during solving flue gas trapping, realize and be vertically changed to semi-enclosed, barrier wind above tuyere platform by open type
The purpose of beam wind above mouth platform;
3rd, when close on stemming operation door 2 occur blast furnace block up air port the working of a furnace when, provide activity space to disclose air port;
4th, the maintenance such as the cast house platform trough scarfing cinder when low level, cast house main building 55 handling trough of driving is made
During industry, it is sometimes desirable to carry out side view observation from the stemming operation door 2 of a high position.Driving 55 is arranged on driving crane girder 56.
Air port operation door 3 is disclosed above the iron runner that the high-order top of tuyere platform 8 is set, air port operation door 3 is disclosed, is various structures
Door, can be preferably following structure, double track three fans rectangular door;Air port operation door 2 is disclosed to hang including doorframe, door handle, top
Loop wheel machine structure and lower pulley and upper raised track;2 pulleys are fixedly connected by wheel shaft integral disclose air port operation door respectively;On
Raised track is fixed on the bottom girder above high-order tuyere platform.
Disclosing air port operation door 3 has following effect:
First, solve disclose air port operation door 3 occur blast furnace block up air port the working of a furnace when, provide activity space to disclose air port;
2nd, during solving flue gas trapping, realize and be vertically changed to semi-enclosed, barrier wind above tuyere platform by open type
The purpose of beam wind above mouth platform;
3rd, during solving trough maintenance replacing, cast house main building driving 55 and the positive observation of hydraulic machinery operation
The function in hole;High-order top inhales dust arrester and is easy to maintenance replacement operation space of the hydraulic machinery to trough, and operation clear height >=
5.5m, reduce the labor intensity of maintenance employee.
4th, solves the spatial relationship disturbed during flue gas trapping with other operations above tuyere platform.
The beam wind barricade 16 that low level cast house platform 9 is set from technique.Beam wind barricade 16 uses sheet metal reinforcement
The steel construction mode of plate, saving construction cost;
Beam wind barricade 16 has following effect:
First, during solving flue gas trapping, the considerable influence factor of the cast house platform beam wind of low level;
2nd, the passage of the husky operating personnel of pad has been taken into account;
3rd, the caching capabilities to a flue dust, secondary smoke trapping are added;
This programme implement it is simple in construction, cheap, safe and reliable, easily operated, normal ironmaking production and equipment are examined
Repairing influences minimum design concept, tapping outlet, throws mud, stifled iron notch, discloses the production maintenance facilities such as air port, pad sand, trough scarfing cinder,
The process maintenance facility such as trough replacing, clay gun machine and its revolving support substep handling, the good win-win of post environment.
With reference to specific embodiment, the present invention is described in detail.
Embodiment 1
The present embodiment, as shown in Fig. 2 being provided with including the high-order top of tuyere platform 8 between high furnace frame post 30 and a high position
Stemming operation door 2 between tuyere platform column 31, high-order tuyere platform, which are provided with to set up above iron runner, discloses air port operation door
3rd, the cast house platform of low level is provided with low level cast house platform column 33 and its beam wind barricade 16, the side of overhead tapping machine 52
Top inhales dust arrester cover body and uses structure hanging under beam, and stemming operation door 2 can be that simple gate can be two-door, and two-door structure is such as
Under:
Including doorframe, door handle, split two-door, door bolt and door hinge, wherein:Split two-door the first from left is right symmetrical fixed
It is arranged on the both sides of doorframe;Doorframe is arranged on high-order tuyere platform 8.High-order tuyere platform 8 is the fire resisting of steel structure platform upper berth
Brick.Low level cast house platform 9 is reinforced concrete structure.
When close on stemming operation door 2 occur blast furnace block up air port the working of a furnace when, answer strict safety measure provide, wear first
The appliances for labor protection such as mask, earplug are worn, coal gas measurement is carried out to the air port neighboring area using gas leak detector, meets coal gas
After the condition that concentration allows, stemming operation door 2 is opened to the position that can go deep into six-edged steel pricker in air port, stemming by door handle
Operation door 2 is double door or single open-door, and 1-2 air ports/door, six-edged steel pricker herein is 6m, and piping work personnel open inspection hole cover,
Stokehold personnel stretch into 6m long six-edged steel prickers in air port, disclose brick set and block up mud;After drill rod is extracted, cooling of fetching water, prevent from scalding,
Piping work personnel compress inspection hole cover, urgent pin, prevent hot blast from revealing;After disclosing air port operation, by door handle by big gun
Mud operation door is 2-in-1 to be held together to reset;Meet the semiclosed requirement of dedusting;
The upkeep operations such as trough scarfing cinder, cast house main building 55 handling trough of driving when low level cast house platform 9
When, it is sometimes desirable to carry out side view observation from the stemming operation door 2 of a high position.Safety measure regulation is should refer to, wears protection face first
The appliances for labor protection such as tool, earplug, coal gas measurement is carried out to the air port neighboring area using gas leak detector, meets that gas concentration allows
Condition after, by door handle by stemming operation door 2 open to can will be easy to observation position, when the cast house platform molten iron of low level
Ditch scarfing cinder, cast house main building are driven a vehicle after the upkeep operations such as 55 handling trough, by door handle that stemming operation door is 2-in-1
Hold together to reset;Meet the semiclosed requirement of dedusting.
The frame mode of the integrated arrangement of the segmentation of three-stage dust gathering arrester 1, is efficiently solved between cover top and cast house crane beam bottom
The nervous contradiction of headroom.Inhale dust arrester and use the H profile steel collar tie beam 14 of lightweight steel construction, top plain bonnet top 51 and low level to tap a blast furnace in whole top
The beam wind barricade that field platform 9 is set forms relatively semi-enclosed structure.The stemming operation door that the high-order top of tuyere platform 8 is set
2 and iron runner above disclose air port operation door 3 only operation when opened respectively according to operating regulation, advised respectively according to operation when operation finishes
Journey is closed, and meets the basic demand of cast house dedusting, good airproof performance
Cast house platform clay gun machine and its supporting (upper, left and right three suspension centres synchronization job) substep handling inspection for low level
The characteristics of repairing, and the horizontal channel of clay gun machine and its supporting (upper, left and right three suspension centres synchronization job) substep handling is taken into full account,
The present invention inhales dust arrester dust shroud top to cast house top and uses three stage structure, reformulates operating regulation and step, really
Protect clay gun machine and its supporting maintenance is smoothed out.Can to cast house top suction dust arrester for the cast house factory building beam wind of low level
The turbulent flow influence that can be brought, sets up operating personnel's headroom, typically the tuyere platform high-order compared with cast house platform >=2.2m, <
With the 4m discrepancy in elevation of the cast house platform of low level) on beam wind barricade, integrally realize semi-enclosed structure.
High-order top inhales dust arrester and is easy to maintenance replacement operation space of the hydraulic machinery to trough, and operation clear height >=
5.5m, reduce the labor intensity of maintenance employee.Three-stage dust gathering arrester 1 and its overhead collar tie beam 14 of H profile steel using lightweight steel construction, beam
Height >=0.5m, the caching capabilities of tapping machine opening exhaust gas volumn at initial stage can be increased to greatest extent, at utmost reduce the escape of flue gas.
Embodiment 2
This embodiment scheme is as follows:Whole device, which also includes being provided with above high-order tuyere platform above iron runner, discloses air port
Operation door 3, disclose air port operation door 3 and fan rectangular door for double track three;Disclosing air port operation door 2 includes doorframe, door handle, top suspention machine
Structure and lower pulley and upper raised track;2 pulleys are fixedly connected by wheel shaft integral disclose air port operation door respectively;Upper protruding rail
Road is fixed on the bottom girder above high-order tuyere platform.
Close on disclose air port operation door 3 occur blast furnace block up air port the working of a furnace when, answer strict safety measure provide, wear first
The appliances for labor protection such as mask, earplug are worn, coal gas measurement is carried out to the air port neighboring area using gas leak detector, meets coal gas
After the condition that concentration allows, operation door in air port will be disclosed by door handle, be three, double track, 3-4 air ports/door, opened to 6m can be grown
The position that six-edged steel pricker gos deep into air port, piping work personnel open inspection hole cover, and the long six-edged steel prickers of 6m are stretched into wind by stokehold personnel
It is intraoral, disclose brick set and block up mud;Drill rod is fetched water cooling after extracting, and prevents from scalding, piping work personnel compression inspection hole cover, urgent pin
Son, prevent hot blast from revealing;After disclosing air port operation, air port operation door 3 will be disclosed by door handle and close up reset;Meet dedusting
Semiclosed requirement;
The upkeep operations such as the scarfing cinder of cast house platform trough, cast house main building 55 handling trough of driving when low level
When, it is sometimes desirable to it is observed from the air port operation door 3 of disclosing of a high position.Should refer to safety measure regulation, first wear mask,
The appliances for labor protection such as earplug, coal gas measurement is carried out to the air port neighboring area using gas leak detector, meets what gas concentration allowed
After condition, the position of observation can will be easy to by air port operation Men Kaizhi is disclosed by door handle, when the cast house platform molten iron of low level
Ditch scarfing cinder, cast house main building are driven a vehicle after the upkeep operations such as 55 handling trough, and air port operation door will be disclosed by door handle
Close up reset;Meet the semiclosed requirement of dedusting.Blast-furnace body 54, overhead tapping machine 52 and Hydraulic clay gun machine 53 will effectively be extended
Service life
Embodiment 3
Its basic structure thes improvement is that with embodiment 1:Plain bonnet top inlet scoop 7 is redesigned, in large area
It is clay gun machine and its reserved clay gun machine of supporting handling and its supporting access path under conditions of three sections of shroud collar tie beams 14 keep constant
Top movable cover plate 36, plain bonnet top inlet scoop 7 and its top three-stage dust gathering arrester 1 are split as three sections;That is clay gun machine and its branch
Hold access path latter end shroud 11, clay gun machine and its supporting access path leading portion shroud 12 and clay gun machine and its supporting access path
The three parts of shroud 13, clay gun machine and its supporting access path shroud 13 are detachable, and the three parts are aided with outside gusset, full
The width requirement of sufficient pipeline stiffness by itself and clay gun machine and its supporting maintenance handling passage.
When low level cast house platform clay gun machine and its supporting need substep to remove handling, should strictly observe《Hydraulic clay gun
Machine Maintenance and Repair code》Regulation, the first appliances for labor protection such as safe wearing cap, Labor protection shoes, using gas leak detector to the operation, sight
Examine region and carry out coal gas measurement, after meeting the condition that gas concentration allows, it is proposed that by clay gun machine and its former three step handling sides of supporting
Case is changed to increase and is split as handling in cover and covers the four corresponding operational procedures of step handling scheme timely replacement that the outer step of handling two is walked;
The handling of clay gun machine substantially divides four steps, the first step, and staff is pushed up by three sections of shrouds 1 of large area on safety climbing ladder
Face, will through clay gun machine and its 13 reserved hanger of supporting access path shroud by the steel wire rope of windlass for pushing up upper upper platform
Part hangs passage and places safety place, and clay gun machine and its supporting access path top movable cover plate 36 sequentially place safety place
Code is good;
Second step, after reserving clay gun machine and its supporting access path, by being pre-installed in clay gun machine and its supporting inner side
Steel wire rope of windlass horizontally tracting, the steel wire rope of windlass of the upper upper platform in the top of three-stage dust gathering arrester 1 hammered into shape to drawing and tap a blast furnace
Main building drive a vehicle 55 suspension centres be located at this 3 points of overhead guard inner side be collectively forming, the mechanism of left and right three suspension centres synchronization job;True
Under conditions of ensuring safety, clay gun machine is hung to the drop point for pressing close to cast house main building in cover;
3rd step, cast house main building is driven a vehicle behind 55 suspension centres removal overhead guard outside, then passes through upper, left and right three suspension centres synchronization
Clay gun machine is hung to the cast house main building drop point of the steel wire rope of windlass permission of overhead guard upper platform by operation;
Hydraulic clay gun machine 53 is hung to truck outward transport maintenance by the 4th step, cast house main building driving 55;
The step handling program of clay gun machine pivoting support four is similar to the step handling program of Hydraulic clay gun machine 53 4;
When clay gun machine and its pivoting support reparation are finished when re-assemblying, with above-mentioned four steps handling program contrast;Return
Turn supporting and first press inverse four step handlings, following clay gun machine presses inverse four step handlings again.
After handling, by the steel wire rope of windlass of the upper upper platform in three sections of shrouds 1 of large area top successively backward by mud
Big gun machine and its supporting access path top movable cover plate 36 and clay gun machine and its supporting access path shroud 13 are lifted into each runback
Position finishes.
Embodiment 4
The basic structure of the present embodiment thes improvement is that with embodiment 1:Ensureing clay gun machine and its supporting maintenance handling
Under conditions of reserved passageway, to latter end shroud 11, leading portion shroud 12 and the three parts section of detachable shroud 13 using top semicircle
Add the combination of rectangular cross section, and be aided with outside gusset, meet that pipeline stiffness by itself and clay gun machine and its supporting maintenance are hung
Wan access requirement.
Embodiment 5
The basic structure of the present embodiment thes improvement is that with embodiment 1:Reserved in guarantee clay gun machine and its supporting handling
Under conditions of passage, rectangular cross section is used to latter end shroud 11, leading portion shroud 12 and the three parts section of detachable shroud 13
And it is aided with the mode of outside gusset, meet pipeline stiffness by itself and clay gun machine and its supporting maintenance handling channel requirements.
Embodiment 6
When being arranged using the cast house of two molten iron mouths, the improvement is that:Singly it is arranged in guarantee embodiment 1- embodiments 5
Under conditions of applying, dust arresters are inhaled on two sets of tops can be using blast furnace center line as axial line, mirror image combination arrangement, by above-mentioned measure,
Reach control flue gas loss, it is ensured that dust gathering arrester mouth once, the valid cache of secondary smoke, make top inhale dust arrester reach good
Semi-hermetic effect, meet the requirement that cast house dust pelletizing system works well.
Embodiment 7
Embodiment 7 is substantially the same manner as Example 6, and difference is, as shown in fig. 6, box type column on high-order tuyere platform 8
Be optimized for totally 3, the top low level cast house platform column 33 of low level cast house platform 9 can be optimized for only 1, in figure, 2 low levels
Cast house platform column 33 can be merged into one.
Embodiment 8
Embodiment 8 and embodiment 1-7 are essentially identical, preferred scheme:To reduce period molten iron (molten iron temperature >=1530 of tapping a blast furnace
DEG C) hyperthermia radiation of inhaling dust arrester to top acts on, it is proposed that cover body bottom sprays >=and 8mm fire resisting (heatproof >=1350 DEG C) applies
Material.
Embodiment 9
Embodiment 9 and embodiment 1-8 are essentially identical, preferred scheme:To ensure overhead tapping machine 52 along high furnace frame post
Operation is rotated horizontally, the top of the overhead side of tapping machine 52 inhales dust arrester cover body and structure hanging under beam is used from technique.
Embodiment 10
Embodiment 10 and embodiment 1-9 are essentially identical, preferred scheme:High-order tuyere platform ground and column is steel knot
Structure;The cast house platform ground of low level is armored concrete ground;The column is steel construction, outer block refractory brick.
Embodiment 11
Embodiment 11 and embodiment 1-10 are essentially identical, preferred scheme:It is provided with electrically operated valve 17,17 equal position of electrically operated valve
On the outside of cast house main building, operating platform 18 is respectively provided with from technique, operating platform 18 controls each part to be operated.
Schematically the invention and embodiments thereof are described above, this describe it is no restricted, not
In the case of the spirit or essential characteristics of the present invention, the present invention can be realized in other specific forms.Institute in accompanying drawing
What is shown is also one of embodiment of the invention, and actual structure is not limited thereto, any attached in claim
Icon note should not limit involved claim.So if one of ordinary skill in the art is enlightened by it, do not departing from
In the case of this creation objective, the frame mode similar to the technical scheme and embodiment are designed without creativeness, all should
Belong to the protection domain of this patent.In addition, the word of " comprising " one is not excluded for other elements or step, "one" word before element
It is not excluded for including " multiple " element.The multiple element stated in claim to a product can also by an element by software or
Person hardware is realized.The first, the second grade word is used for representing title, and is not offered as any specific order.
Claims (10)
1. dust arrester is inhaled on a kind of blast furnace iron notch top, it is characterised in that:Put down including high-order tuyere platform (8) and low level cast house
Platform (9), high-order tuyere platform (8) are arranged above low level cast house platform (9), and high-order tuyere platform (8) passes through high-order air port
Platform column (31,32), high furnace frame post (30) support, low level cast house platform (9) pass through low level cast house platform column
(33), high furnace frame post (30) supports, and high furnace frame post (30) top is provided with collar tie beam (14), and three-stage dust gathering arrester (1) covers in
Above high-order tuyere platform (8) and low level cast house platform (9) and collar tie beam (14).
2. dust arrester is inhaled on a kind of blast furnace iron notch top according to claim 1, it is characterised in that:Described three-stage collection
Dust hood (1), it is the clay gun machine and its supporting access path top movable cover plate (36) and the fixation dust gathering arrester of both sides at middle part.
3. dust arrester is inhaled on a kind of blast furnace iron notch top according to claim 2, it is characterised in that:Described high-order air port
Be provided with platform (8) stemming operation door (2) and or disclose air port operation door (3).
4. dust arrester is inhaled on a kind of blast furnace iron notch top according to Claims 2 or 3, it is characterised in that:Described low level
Cast house platform (9) is provided with beam wind barricade (16).
5. dust arrester is inhaled on a kind of blast furnace iron notch top according to claim 4, it is characterised in that:Three-stage dust gathering arrester
(1) plain bonnet top inlet scoop (7) is provided with, plain bonnet top inlet scoop (7) is the mud for being respectively arranged at three-stage dust gathering arrester (1) both sides
Big gun machine and its supporting access path latter end shroud (11) and clay gun machine and its supporting access path leading portion shroud (12), and clay gun
Machine and its clay gun machine and its supporting access path shroud (13) on supporting access path top movable cover plate (36).
6. dust arrester is inhaled on a kind of blast furnace iron notch top according to claim 5, it is characterised in that:Clay gun machine and its supporting
Access path latter end shroud (11), clay gun machine and its supporting access path leading portion shroud (12) and clay gun machine and its supporting maintenance are logical
Road shroud (13) is respectively that section uses top semicircle and the structure of or rectangular cross section, and is aided with outside gusset.
7. dust arrester is inhaled on a kind of blast furnace iron notch top according to claim 1, it is characterised in that:Described three-stage collection
Dust hood (1) bottom is coated with fireproof coating.
8. dust arrester is inhaled on a kind of blast furnace iron notch top according to claim 1, it is characterised in that:Also include electrically operated valve
17, electrically operated valve 17 is located on the outside of cast house main building, sets operating platform 18.
9. dust arrester is inhaled on a kind of blast furnace iron notch top, it is characterised in that:Including any described blast furnaces of 2 sets of claim 1-8
Dust arrester is inhaled on tapping hole top, can be using blast furnace center line as axial line, mirror image combination arrangement.
10. dust arrester is inhaled on a kind of blast furnace iron notch top according to claim 9, it is characterised in that:Described high-order wind
Box type column is common 3-4 on mouth platform 8, and it is 1-2 that low level cast house platform column (33) is set up in the top of low level cast house platform 9
It is individual.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621487570.9U CN206956070U (en) | 2016-12-31 | 2016-12-31 | Inhale dust arrester in a kind of blast furnace iron notch top |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621487570.9U CN206956070U (en) | 2016-12-31 | 2016-12-31 | Inhale dust arrester in a kind of blast furnace iron notch top |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206956070U true CN206956070U (en) | 2018-02-02 |
Family
ID=61376324
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621487570.9U Expired - Fee Related CN206956070U (en) | 2016-12-31 | 2016-12-31 | Inhale dust arrester in a kind of blast furnace iron notch top |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206956070U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106480249A (en) * | 2016-12-31 | 2017-03-08 | 安徽马钢工程技术集团有限公司 | Dust arrester is inhaled on a kind of blast furnace iron notch top |
-
2016
- 2016-12-31 CN CN201621487570.9U patent/CN206956070U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106480249A (en) * | 2016-12-31 | 2017-03-08 | 安徽马钢工程技术集团有限公司 | Dust arrester is inhaled on a kind of blast furnace iron notch top |
CN106480249B (en) * | 2016-12-31 | 2018-11-30 | 马钢集团设计研究院有限责任公司 | A kind of blast furnace iron notch top suction dust-extraction unit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106480249B (en) | A kind of blast furnace iron notch top suction dust-extraction unit | |
CN104500123A (en) | Rapid ventilation and smoke exhausting device and method for construction period of long-distance tunnel | |
CN206956070U (en) | Inhale dust arrester in a kind of blast furnace iron notch top | |
CN207131443U (en) | Under extra-long railway tunnel vertical shaft pattern Rescue Station take precautions against natural calamities ventilation and smoke evacuation system | |
CN114836586A (en) | Environment-friendly hot splashing slag treatment system and use method thereof | |
CN107699650A (en) | A kind of installation method of blast furnace cooling stave | |
CN109666487A (en) | A kind of closing of coke oven and ventilating dust-arrester and method | |
CN108796159B (en) | Modular detachable blast furnace cast house combined dust removal device | |
CN108788111A (en) | A kind of continuous casting tundish is tumbled dust-extraction unit and its control method | |
CN207828338U (en) | A kind of detachable dust excluding hood of blast furnace iron notch | |
CN102277960B (en) | Construction shield and construction method | |
CN207578199U (en) | A kind of environment-friendly type strength recycles sand blasting room | |
CN202090604U (en) | Construction protective cover | |
CN207445866U (en) | A kind of inflating green suitable for contaminated site | |
CN109162466A (en) | Room level units formula curtain wall installing structure and method | |
CN203947122U (en) | A kind of converter flue is stained with slag cleaning device | |
CN204923917U (en) | Portable dust collector in line frequency furnace stokehold | |
CN208089333U (en) | A kind of aeration-cooling device for Tunnel Second Lining Construction operation | |
CN205635674U (en) | Portable petticoat pipe residue beating platform of converter | |
CN108015519B (en) | The drawing process covered in blast furnace | |
CN201628483U (en) | Expansion environmental-protection gas hood | |
CN114134273A (en) | Dust hood for blast furnace casting house | |
CN108913832A (en) | The method for dismounting of resistance to material in a kind of super-huge hot-blast stove furnace | |
CN201262095Y (en) | Natural ventilation equipment for underground mine | |
CN207658909U (en) | A kind of construction elevator cage door |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180202 |