CN206955473U - A kind of elevated trestle with balance adjustment function - Google Patents

A kind of elevated trestle with balance adjustment function Download PDF

Info

Publication number
CN206955473U
CN206955473U CN201720388085.4U CN201720388085U CN206955473U CN 206955473 U CN206955473 U CN 206955473U CN 201720388085 U CN201720388085 U CN 201720388085U CN 206955473 U CN206955473 U CN 206955473U
Authority
CN
China
Prior art keywords
trestle
lifting
control
jack
comparator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720388085.4U
Other languages
Chinese (zh)
Inventor
苏欢迎
谢广恕
李铁栓
高辉
张秀勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Municipal Engineering Branch of CTCE Group
Original Assignee
Municipal Engineering Branch of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Municipal Engineering Branch of CTCE Group filed Critical Municipal Engineering Branch of CTCE Group
Priority to CN201720388085.4U priority Critical patent/CN206955473U/en
Application granted granted Critical
Publication of CN206955473U publication Critical patent/CN206955473U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of elevated trestle with balance adjustment function, including trestle, positioned at four hoisting frames of four corner points of trestle, and for lifting the lifting device of trestle, the lifting device includes four jack machinisms being arranged on hoisting frame, and for controlling the Lifting Control System of the jack machinism, the Lifting Control System includes two A.C. contactors and eight conversion A.C. contactors, two A.C. contactors are used to control four jack machinisms to rise or simultaneously decline simultaneously, eight conversion A.C. contactors are used to control rising or falling for single jack machinism.The utility model engages single-point and Multipoint synchronous enhanced feature, realizes timely balance adjustment control, and control principle is simple, easy to operate directly perceived, the practical application being easy in live lifting process, and trestle lifting can be adjusted in time.

Description

A kind of elevated trestle with balance adjustment function
Technical field
It the utility model is related to heavy multi-point lifting technical field, and in particular to a kind of carrying with balance adjustment function Lift-type trestle.
Background technology
, it is necessary to realize the lifting of trestle with running block using hoist engine when trestle is lifted.At present, general hoisting and hanging is equal Lifted for single-point power, or multiple spot starts simultaneously.Lifted for similar trestle, volume is big, and weight is big, can not using single-point lifting Complete, be difficult to grasp according to multi-point lifting its control process, deviation is larger, balance it is difficult to ensure that.
Utility model content
In order to solve the above technical problems, a kind of strong applicability of the utility model offer, elevated trestle simple to operate, Balance adjustment ability is stronger, and concrete technical scheme is as follows:
A kind of elevated trestle with balance adjustment function, including trestle, four positioned at four corner points of trestle Hoisting frame, and for lifting the lifting device of trestle, the lifting device includes four be arranged on hoisting frame Heavy-duty machine structure, and for controlling the Lifting Control System of the jack machinism, the Lifting Control System includes two A.C. contactors With eight conversion A.C. contactors, two A.C. contactors are used to control four jack machinisms to rise or simultaneously decline, eight simultaneously Individual conversion A.C. contactor is used to control rising or falling for single jack machinism.
Warning module of weighing is provided with the jack machinism, the warning module of weighing includes being used to measure jack machinism load The weighing sensor of lotus, and the early warning circuit of processing weighing sensor output signal.
The early warning circuit include be sequentially connected in series the two poles of the earth integrated operatinoal amplifier, comparator, gate circuit, control circuit, and The audible-visual annunciator and control relay being connected with two output ends of control circuit, the comparator is four comparators, wherein three Individual comparator independent of each other respectively compared with different reference voltages, according to different ground jack load divided by control circuit Class controls.
Three comparators independent of each other are respectively first comparator, the second comparator and the 3rd comparator, reference voltage Respectively 90%, 105% and the 130% of rated value, wherein the output end of the second comparator is connected with delay circuit.
The lower end of the hoisting frame is provided with stay wire displacement sensor, and stack is measured in real time by stay wire displacement sensor The hoisting depth of each angle point of bridge.
From above technical scheme, the utility model engages single-point and Multipoint synchronous enhanced feature, realizes timely Balance adjustment controls, and control principle is simple, and easy to operate directly perceived, the practical application being easy in live lifting process can be right in time Trestle lifting adjusts.
Brief description of the drawings
Fig. 1 is front view of the present utility model;
Fig. 2 is side view of the present utility model.
Embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in detail, it is new describing this practicality in detail Before the technical scheme of each embodiment of type, involved noun and term are explained, in this manual, title is identical Or label identical part represents similar or identical structure, and it is only limitted to the purpose of signal.
As illustrated in fig. 1 and 2, the elevated trestle includes trestle 1, four lever gear doors positioned at four corner points of trestle Frame 2, and for lifting the lifting device of trestle.The lifting device includes four cranes being arranged on hoisting frame Structure, and for controlling the Lifting Control System of the jack machinism.
The jack machinism includes hoist engine 31, running block 32 and warning module of weighing, and wherein hoist engine is set respectively On the top of hoisting frame, trestle is pulled to be lifted by steel wire rope.The warning module of weighing includes being used to measure lifting The weighing sensor of mechanism load, and the early warning circuit of processing weighing sensor output signal, wherein weighing sensor are located at Between the fixed pulley axis and axle bed of crane, for monitoring the load of crane in real time.After jack machinism lifts by crane object, weigh Sensor, which is pressurized, produces the voltage signal proportional to load, completes weight and is changed to voltage signal.
The early warning circuit include be sequentially connected in series the two poles of the earth integrated operatinoal amplifier, comparator, gate circuit, control circuit, and The audible-visual annunciator and control relay being connected with two output ends of control circuit, the comparator is four comparators, wherein three Individual comparator independent of each other respectively compared with different reference voltages, according to different ground jack load divided by control circuit Class controls.
Three comparators independent of each other are respectively first comparator, the second comparator and the 3rd comparator, reference voltage Respectively 90%, 105% and the 130% of rated value, wherein the output end of the second comparator is connected with delay circuit.
When ground jack load reaches 90%, first comparator action, audible-visual annunciator sends pulsed sound, yellow indicator lamp Bright, control relay is failure to actuate;When ground jack load reaches 105%, the second comparator action, for avoid start when impact carry The false overload of moment caused by lotus, there is provided a delay circuit, and after being delayed 1 ~ 2 second, if overload still suffers from, judgement is true Positive overload, cuts off lifting motor power supply by control relay immediately, and red beacon lamp is bright.If load is more than 130%, the Three comparators act, and directly open gate circuit, cut off jack machinism lift control ring current immediately, are simultaneously emitted by acousto-optic report It is alert.
The control relay for performing control uses small-sized high-power DC relay, and when normal lifting, relay is motionless Make, present apparatus control relay contact series are in jack machinism hoisting circuit.When overload, control relay action, raising Loop is cut off, and jack machinism stops raising operation.A total of two groups of dc sources of circuit:± 6V supplies sensor and secondary meter ,+ 5V supplies weight figure display.
The lower end of the hoisting frame 2 is provided with stay wire displacement sensor 4, is measured in real time by stay wire displacement sensor The hoisting depth of each angle point of trestle, and be shown on displacement digital display, operating personnel can be according to the position of the angle point of trestle four Lifting is moved to deviate to adjust corresponding jack machinism, to reach the purpose of balance adjustment.Stay-supported type displacement sensor carries trestle Elevator turn changes quantifiable electric signal into, is wound on by stretchable stainless steel cable on a threaded wheel hub, this wheel hub Linked together with a precision rotation inductor.Stay-supported type displacement sensor is arranged in trestle base cross members, and bracing wire end is consolidated Being scheduled on to be lifted on trestle.Trestle is lifted or declined, and bracing wire stretching, extension and contraction, drives the rotation of precision rotation inductor, output one The individual electric signal proportional to bracing wire displacement, measurement output signal can draw displacement or the speed of trestle.
The Lifting Control System includes two A.C. contactors and eight conversion A.C. contactors, two A.C. contactors For controlling four jack machinisms to rise or decline simultaneously simultaneously, eight conversion A.C. contactors are used to control single jack machinism Rise or fall.
The Lifting Control System can realize single-point lifting and multi-point lifting combination control, pacify at the top of trestle hoisting frame Hoist engine is filled, is that the lifting of trestle provides power by wire rope pulley group, four hoist engines move, stop combination by lifting control System control, the peripheral operation interface combinations switch control of Lifting Control System include " with rising " of multiple hoist points, " list Rise ", " stoppings " function, rising or falling for each hoist engine correspond to when stacked switch be in single shelves has independent switch to control System, when in rising, corresponding two switches of raising and lowering.
The utility model to trestle by jack machinism super-limit prewarning, lifting real-time displacement monitoring, single-point lifting and more The control that point lifting is combined, reach the technology of trestle lifting balance adjustment, avoid occurring not in Multipoint synchronous lifting process Balanced hoisting, excessive deformation will not be caused to trestle overall structure in lifting process.
Embodiment described above is only that preferred embodiment of the present utility model is described, not to this practicality New scope is defined, and on the premise of the utility model design spirit is not departed from, those of ordinary skill in the art are to this The various modifications and improvement that the technical scheme of utility model is made, the guarantor that claims of the present utility model determine all should be fallen into In the range of shield.

Claims (5)

1. a kind of elevated trestle with balance adjustment function, including trestle, carry positioned at four of four corner points of trestle Door frame is risen, and for lifting the lifting device of trestle, it is characterised in that the lifting device includes being arranged on hoisting frame Four jack machinisms, and for controlling the Lifting Control System of the jack machinism, the Lifting Control System includes two friendships Contactor and eight conversion A.C. contactors are flowed, two A.C. contactors are for the rising simultaneously of four jack machinisms of control or simultaneously Decline, eight conversion A.C. contactors are used to control rising or falling for single jack machinism.
2. elevated trestle according to claim 1, it is characterised in that be provided with early warning of weighing in the jack machinism Module, the warning module of weighing are defeated including the weighing sensor for measuring jack machinism load, and processing weighing sensor Go out the early warning circuit of signal.
3. elevated trestle according to claim 2, it is characterised in that the early warning circuit includes two be sequentially connected in series Pole integrated operatinoal amplifier, comparator, gate circuit, control circuit, and the audible-visual annunciator being connected with two output ends of control circuit And control relay, the comparator are four voltage comparators, wherein three comparators independent of each other respectively from different bases Quasi- voltage ratio is compared with control circuit carries out classification control according to different ground jack load.
4. elevated trestle according to claim 3, it is characterised in that three comparators independent of each other are respectively One comparator, the second comparator and the 3rd comparator, reference voltage are respectively 90%, 105% and the 130% of rated value, wherein The output end of second comparator is connected with delay circuit.
5. elevated trestle according to claim 1, it is characterised in that the lower end of the hoisting frame is provided with bracing wire Displacement transducer, measure the hoisting depth of each angle point of trestle in real time by stay wire displacement sensor.
CN201720388085.4U 2017-04-13 2017-04-13 A kind of elevated trestle with balance adjustment function Expired - Fee Related CN206955473U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720388085.4U CN206955473U (en) 2017-04-13 2017-04-13 A kind of elevated trestle with balance adjustment function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720388085.4U CN206955473U (en) 2017-04-13 2017-04-13 A kind of elevated trestle with balance adjustment function

Publications (1)

Publication Number Publication Date
CN206955473U true CN206955473U (en) 2018-02-02

Family

ID=61373596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720388085.4U Expired - Fee Related CN206955473U (en) 2017-04-13 2017-04-13 A kind of elevated trestle with balance adjustment function

Country Status (1)

Country Link
CN (1) CN206955473U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111172880A (en) * 2020-01-03 2020-05-19 同济大学 Automatic balance type liftable trestle based on negative feedback
CN111676799A (en) * 2020-06-19 2020-09-18 杭州江润科技有限公司 Height-adjustable simple cable-stayed diversion trench temporary bridge and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111172880A (en) * 2020-01-03 2020-05-19 同济大学 Automatic balance type liftable trestle based on negative feedback
CN111676799A (en) * 2020-06-19 2020-09-18 杭州江润科技有限公司 Height-adjustable simple cable-stayed diversion trench temporary bridge and construction method thereof

Similar Documents

Publication Publication Date Title
CN201647849U (en) Automatic balancing tower type crane
CN201553569U (en) Tower crane safety monitoring system
CN206955473U (en) A kind of elevated trestle with balance adjustment function
CN201852711U (en) System for testing energy efficiency and performance of hoisting mechanism
CN103395727A (en) Control method and weighing device for high-altitude working basket safe load
CN201729594U (en) Bridge crane trolley safety monitoring device
CN204714255U (en) Based on the safety device of building hoist
CN201224662Y (en) Non-load sensing type elevating capacity stopper
CN214059657U (en) Tower crane load moment protection device
CN203606154U (en) A chain block detection machine
CN202321848U (en) Elevator balance coefficient measurer
CN201206086Y (en) Lifting limiter for crane
CN202092883U (en) Multi-project electric hoist test stand
CN101628689A (en) Integrated display of tower crane
CN201626777U (en) Comprehensive safety protection device of hoisting equipment
CN208308309U (en) A kind of crane load protective device
CN201180076Y (en) Weighing and overload controlling apparatus for electric block
CN201971573U (en) Safety monitoring device for tower crane
CN102785979A (en) Test method and intelligent measuring instrument of elevator balancing coefficient
CN108657981A (en) A kind of improved safety protection lifting equipment
CN205296949U (en) Quick inverter type lifting and horizontal moving parking equipment
CN201580875U (en) Security monitoring device of hoisting equipment
CN202481970U (en) Load lifting limiter for tower crane
CN201962014U (en) Overload protection device for hosting mechanism of electric hoist
CN204823820U (en) Bridge crane load -lifting height measuring device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180202

Termination date: 20190413

CF01 Termination of patent right due to non-payment of annual fee