CN202092883U - Multi-project electric hoist test stand - Google Patents

Multi-project electric hoist test stand Download PDF

Info

Publication number
CN202092883U
CN202092883U CN2011201853179U CN201120185317U CN202092883U CN 202092883 U CN202092883 U CN 202092883U CN 2011201853179 U CN2011201853179 U CN 2011201853179U CN 201120185317 U CN201120185317 U CN 201120185317U CN 202092883 U CN202092883 U CN 202092883U
Authority
CN
China
Prior art keywords
electric block
testing table
counterweight
multinomial order
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011201853179U
Other languages
Chinese (zh)
Inventor
陶成
殷学文
巫波
陆忠华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Special Equipment Safety Supervision Inspection Institute of Jiangsu Province Wuxi Branch
Original Assignee
Special Equipment Safety Supervision Inspection Institute of Jiangsu Province Wuxi Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Special Equipment Safety Supervision Inspection Institute of Jiangsu Province Wuxi Branch filed Critical Special Equipment Safety Supervision Inspection Institute of Jiangsu Province Wuxi Branch
Priority to CN2011201853179U priority Critical patent/CN202092883U/en
Application granted granted Critical
Publication of CN202092883U publication Critical patent/CN202092883U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a multi-project electric hoist test stand which comprises two parallel upper beams fixed on vertical columns, wherein two longitudinal tracks are fixedly suspended below the two upper beams, fixed pulleys are arranged at one ends of the tracks, counter weights are connected on an electric hoist by the fixed pulleys, and the two tracks include one light track and one heavy track. The multi-project electric hoist test stand can be used for climbing tests of the electric hoist by changing gravity of the counter weights into resistance in the running direction of the electric hoist through the fixed pulleys; by adopting double-suspension technology, the two tracks of different specifications are suspended below the upper beams, thus reducing equipment investment while meeting the electric hoists of different tonnages. The multi-project electric hoist test stand is simple, compact and reasonable in structure, and can cover various models of electric hoists lower than 32 tonnages and improve the use efficiency of the test stand.

Description

Multinomial order electric block testing table
Technical field
The utility model relates to the test unit of electric block, specifically a kind of multinomial order electric block testing table.
Background technology
Electric block is as a kind of easy hoisting machinery, because it has compact conformation, little from heavy and light, overall dimensions, and advantages such as simple to operate, applicability is strong and be subjected to user's favor day by day have been widely used in fields such as port and pier, metallurgical manufacturing, building industry, electric power facility, mining excavation and general manufacturing at present.The safe operation of electric block is that production operation normally moves, the assurance of equipment property safety and operating personnel's personal safety, is a important step in electric block research and development and the factory inspection process at the usability of electric block and the compbined test evaluation in life-span therefore.
Present test platform generally can only be realized the partial test project of electric block, and great majority can not be finished hill climbing test or durability test.
Summary of the invention
The utility model provides a kind of multinomial order electric block testing table at above-mentioned the deficiencies in the prior art, and this testing table can satisfy the multinomial purpose examination requirements of electric block.
The technical scheme that provides according to the utility model, a kind of multinomial order electric block testing table, comprise two parallel entablatures that are fixed on the column, two described entablatures hang down and are fixed with track longitudinally, one end of described track is provided with fixed pulley, and the counterweight counterweight is connected on the electric block by described fixed pulley.
The two ends of described track are provided with dismountable block.
Described track has two, is respectively a light rail and a heavy rail.
Hang between two described entablatures and be fixed with operating corridor, an end of described operating corridor links to each other with ground by stair.
Described operating corridor is between two described tracks.
Also be provided with at least between two described entablatures other one link to each other with described track pass through the entablature that column fixes on the ground.
Ground between the described column is provided with the counterweight shallow hole, is provided with the counterweight dell in the described counterweight shallow hole.
The column spacing in described dell district is less than the column spacing in described shallow hole district.
The direction that hoists of described electric block is provided with the stay cord displacement transducer.
The trolley travelling direction of described electric block is provided with two light sensation sensors.
Compared with the prior art the utility model has the following advantages: the utility model becomes the resistance of electric block traffic direction to the gravity of counterweight counterweight by fixed pulley, is used for the hill climbing test of electric block; The utility model disposes two kinds of counterweight melt pits of the depth, and shallow hole is used for conventional test, and dell is used for life-span and lifting altitude test, has reduced the ground input; The utility model adopts two suspension technology, hangs the track of two kinds of different sizes under entablature, when satisfying the electric block of different tonnages, has reduced the equipment input.The utility model is simple, compact and reasonable for structure, can cover each pattern electric block below 32 tons, has improved the service efficiency of testing table.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is the left view of Fig. 1.
Embodiment
Below in conjunction with the embodiment in the accompanying drawing the utility model is further described.
Among Fig. 1, Fig. 2, comprise ground 1, column 2, entablature 3, heavy rail 4, light rail 5, counterweight counterweight 6, fixed pulley 7, operating corridor 8, stair 9, shallow hole 10, dell 11 etc.
As shown in Figure 1 and Figure 2, the utility model is a kind of multinomial order electric block testing table, mainly comprises column 2 and entablature 3.Column 2 has four at least, is arranged in the both sides of length direction of rectangle pilot region and fixing with ground 1.Be fixed with an entablature 3 respectively on two root posts 2 of each side, these two entablatures 3 be arranged in parallel.3 times suspensions of two entablatures are fixed with track longitudinally, and an end of track is provided with fixed pulley 7, and counterweight counterweight 6 is connected on the electric block by fixed pulley 7.By fixed pulley 7 gravity of counterweight counterweight 6 is become the resistance of electric block traffic direction, be used to finish hill climbing test.
Entablature adopts two suspension design for 3 times, and the track of suspension has two, is the track of different model specification, is respectively a light rail 5 and a heavy rail 4.Two tracks can satisfy the electric block test of different tonnages, have reduced the equipment input, and light rail 5 satisfies the electric block test below 5 tons, and heavy rail 4 satisfies the electric block test below 32 tons.
The two ends of track are provided with dismountable block, not slippage from the track when guaranteeing the smooth installation of electric block and test.
Hang between two entablatures 3 and be fixed with operating corridor 8, an end of operating corridor 8 links to each other with ground by stair 9, makes things convenient for the staff to overhaul.Operating corridor 8 is preferably between two tracks.
Also be provided with at least between two entablatures 3 other one link to each other with track pass through the entablature 3 that column 2 fixes on the ground.Improve the rigidity of test tracks by the number that increases entablature 3 and column 2.
Ground between the column 2 is provided with the counterweight melt pit, and the counterweight melt pit divides shallow hole 10 and dell 11, and dell 11 is positioned at shallow hole 10.Shallow hole 10 is used for conventional test, and dell 11 is used for life-span and lifting altitude test, and counterweight counterweight 6 places melt pit, has reduced the ground input.Dell 11 districts will be used for durability test, so the column spacing in dell 11 districts is less than the column spacing in shallow hole 10 districts.
The direction that hoists of electric block is provided with the stay cord displacement transducer.By the stay cord displacement transducer, obtain displacement and time relation in real time, can calculate lifting velocity and brake slide amount fast.
The trolley travelling direction of electric block is provided with two light sensation sensors.Measure mistiming and the distance of the light sensation sensor travelling speed that can fast calculate dolly of dolly by two light sensation sensors.
The testing table that the utility model provides can select for use different counterweights to carry out the test of each pattern electric block below 32 tons, can realize the test such as lifting capacity, pulling speed, travelling speed, brake slide amount, zero load, dynamic load, static load, climbing, life-span of electric block.The utility model is simple, compact and reasonable for structure, can cover each pattern electric block below 32 tons, has improved the service efficiency of testing table.

Claims (10)

1. multinomial order electric block testing table, comprise the two parallel entablatures (3) that are fixed on the column (2), two described entablatures (3) hang down and are fixed with track longitudinally, it is characterized in that: an end of described track is provided with fixed pulley (7), and counterweight counterweight (6) is connected on the electric block by described fixed pulley (7).
2. according to the described multinomial order electric block testing table of claim 1, it is characterized in that: the two ends of described track are provided with dismountable block.
3. according to the described multinomial order electric block testing table of claim 1, it is characterized in that: described track has two, is respectively a light rail (5) and a heavy rail (4).
4. according to the described multinomial order electric block testing table of claim 3, it is characterized in that: hang between two described entablatures (3) and be fixed with operating corridor (8), an end of described operating corridor (8) links to each other with ground by stair (9).
5. according to the described multinomial order electric block testing table of claim 4, it is characterized in that: described operating corridor (8) is between two described tracks.
6. according to the described multinomial order electric block testing table of claim 1, it is characterized in that: also be provided with at least between two described entablatures (3) other one link to each other with described track pass through the entablature (3) that column (2) fixes on the ground.
7. according to the described multinomial order electric block testing table of claim 6, it is characterized in that: the ground between the described column (2) is provided with counterweight shallow hole (10), is provided with counterweight dell (11) in the described counterweight shallow hole (10).
8. according to the described multinomial order electric block testing table of claim 7, it is characterized in that: the column spacing in described dell (11) district is less than the column spacing in described shallow hole (10) district.
9. according to the described multinomial order electric block testing table of claim 1, it is characterized in that: the direction that hoists of described electric block is provided with the stay cord displacement transducer.
10. according to the described multinomial order electric block testing table of claim 1, it is characterized in that: the trolley travelling direction of described electric block is provided with two light sensation sensors.
CN2011201853179U 2011-06-02 2011-06-02 Multi-project electric hoist test stand Expired - Lifetime CN202092883U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201853179U CN202092883U (en) 2011-06-02 2011-06-02 Multi-project electric hoist test stand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201853179U CN202092883U (en) 2011-06-02 2011-06-02 Multi-project electric hoist test stand

Publications (1)

Publication Number Publication Date
CN202092883U true CN202092883U (en) 2011-12-28

Family

ID=45367944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201853179U Expired - Lifetime CN202092883U (en) 2011-06-02 2011-06-02 Multi-project electric hoist test stand

Country Status (1)

Country Link
CN (1) CN202092883U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102305705A (en) * 2011-06-02 2012-01-04 江苏省特种设备安全监督检验研究院无锡分院 Multiproject electric hoist test bed
CN106226105A (en) * 2016-08-24 2016-12-14 德马科起重机械有限公司 A kind of multi-functional European electric hoist test bench
CN110349466A (en) * 2019-07-11 2019-10-18 上海外高桥造船有限公司 A kind of cucurbit operating experience device of big shipyards

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102305705A (en) * 2011-06-02 2012-01-04 江苏省特种设备安全监督检验研究院无锡分院 Multiproject electric hoist test bed
CN106226105A (en) * 2016-08-24 2016-12-14 德马科起重机械有限公司 A kind of multi-functional European electric hoist test bench
CN106226105B (en) * 2016-08-24 2018-10-26 德马科起重机械有限公司 A kind of multi-functional European electric hoist test bench
CN110349466A (en) * 2019-07-11 2019-10-18 上海外高桥造船有限公司 A kind of cucurbit operating experience device of big shipyards

Similar Documents

Publication Publication Date Title
CN201753436U (en) Detachable lift type bridge inspection vehicle
CN203373014U (en) Static load loading apparatus of overhead and gantry crane
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN201053106Y (en) Bridge detection and maintenance device
CN105780646B (en) A kind of bridge maintenance equipment of automatically walk
CN105277353A (en) A high-altitude lifting basket type machine safety lock testing experiment table and testing method
CN206591432U (en) Pipe installing job platform
CN202092883U (en) Multi-project electric hoist test stand
CN201990928U (en) Pontoon pier steel approach bridge lifting device
CN102323100B (en) Integrated trolley type electric hoist test stand
CN102305705B (en) Multiproject electric hoist test bed
CN206359150U (en) A kind of hanging basket system
CN203284126U (en) Simple composite gantry high-altitude weight hoisting device
CN202864734U (en) Novel double-beam bridge crane
CN202092861U (en) Electric cucurbit testing stand of integrated dolly type
CN203534840U (en) Tower-type air winch performance test and experiment platform
CN203112355U (en) Garbage bridge grabbing crane
CN110160817A (en) Electric block tests reinforcement poise system and its application method
CN105173983A (en) People and goods dual-purpose vertical-transportation building construction elevator
CN202390106U (en) Lifting hook portal crane easy to maintain
CN2871634Y (en) Bridge maintaining equipment
Sakurikar et al. Review of overhead crane and analysis of components depending on span
CN209214936U (en) A kind of electric hoist test bench
CN203241251U (en) Lever-type dynamic load test bed with adjustable load
CN102913016B (en) Ground, subway train lowering or hoisting gear

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20111228

Effective date of abandoning: 20130501

RGAV Abandon patent right to avoid regrant