CN206953249U - The Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment - Google Patents
The Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment Download PDFInfo
- Publication number
- CN206953249U CN206953249U CN201720738190.6U CN201720738190U CN206953249U CN 206953249 U CN206953249 U CN 206953249U CN 201720738190 U CN201720738190 U CN 201720738190U CN 206953249 U CN206953249 U CN 206953249U
- Authority
- CN
- China
- Prior art keywords
- partition
- behavior
- cement paste
- hardened cement
- material preparation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Sampling And Sample Adjustment (AREA)
Abstract
The utility model discloses a kind of Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment, it is related to Oil-Gas Well Engineering field, and the Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment includes the Behavior of Hardened Cement Paste test material preparation mould of vibration cementing experiment, including:First partition;Second partition;3rd dividing plate, second partition, the 3rd dividing plate can be removably mounted in first partition;The cover plate and bottom plate of first partition, second partition and the 3rd dividing plate top and bottom are separately mounted to, first partition, second partition, cover plate and bottom plate can form the first cavity, and first partition, the 3rd dividing plate, cover plate and bottom plate can form the second cavity;The polylith demarcation strip in the first cavity and the second cavity can be plugged, so that the first cavity and the second cavity in the vertical direction are divided into some;Vibrating device, vibrating device are used to vibrate the Behavior of Hardened Cement Paste test material preparation mould that the vibration cementing filled with cement mortar is tested.
Description
Technical field
Oil-Gas Well Engineering field is the utility model is related to, more particularly to a kind of Behavior of Hardened Cement Paste test material preparation of vibration cementing experiment
Device.
Background technology
In order to improve the rheological behavior of cement mortar, oil gas water breakthrough after well cementation is prevented, improves cementing quality, it is solid to have carried out vibration
The research of well technology.In vibration cementing technology, the mechanical property of Behavior of Hardened Cement Paste is to evaluate the weight of a bite well cementing quality after vibration
Index is wanted, directly affects the long-term sealing quality of pit shaft.Therefore, the mechanical test of Behavior of Hardened Cement Paste also turns into vibration cementing technology after vibration
One of emphasis of research.
Vibration is advantageous to improve cementing quality, but inevitably, vibration wave can force cement granules generation to tremble and mix
Alter, cause the property of mortar architecture to produce difference in the vertical, it is uneven as a result to show as the development of Behavior of Hardened Cement Paste bulk strength.At present
General Behavior of Hardened Cement Paste test specimen prepares mould and can not detect that cement strength anisotropism under effect of vibration is developed both at home and abroad
Situation, thus need a kind of experiment of vibration cementing of utility model Behavior of Hardened Cement Paste test material preparation mould and corresponding method for testing pressure with
For detecting the situation that cement strength anisotropism is developed under effect of vibration.
Utility model content
In order to overcome the drawbacks described above of prior art, the utility model embodiment technical problem to be solved there is provided
A kind of Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment, it can detect influence of the vibration to cement mortar homogenieity, to comment
Cement strength development characteristics after valence vibrations.
The concrete technical scheme of the utility model embodiment is:
A kind of Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment, it includes:
The Behavior of Hardened Cement Paste test material preparation mould of vibration cementing experiment, including:
First partition, the first partition include the first noumenon vertically extended and along perpendicular to the firsts
First extension of body direction extension;
Second partition, the second partition include the second body vertically extended and along perpendicular to described second
Second extension of body direction extension;
3rd dividing plate, the 3rd dividing plate include the 3rd body vertically extended and along perpendicular to described 3rd
3rd extension of body direction extension, the second partition, the 3rd dividing plate can be removably mounted in first partition;
It is separately mounted to the first partition, the cover plate of the second partition and the 3rd dividing plate top and bottom and bottom
Plate, second extension can abut against with the side of the first noumenon, second physical efficiency and first extension
Abut against, the 3rd physical efficiency abuts against with first extension, and the 3rd extension can be with the first noumenon
Opposite side abuts against, so that the first partition, the second partition, the cover plate and the bottom plate can form the first cavity,
The first partition, the 3rd dividing plate, the cover plate and the bottom plate can form the second cavity;
The polylith demarcation strip in first cavity and second cavity can be plugged, so that first cavity and institute
State the second cavity in the vertical direction and be divided into some;
Vibrating device, the vibrating device are used for the Behavior of Hardened Cement Paste test specimen tested to the vibration cementing filled with cement mortar
Mould is prepared to be vibrated.
In a preferred embodiment, vertically offer and pass through on the first extension of the first partition
Perforate, connecting rod can be equipped with the through hole, one end of the connecting rod can be connected with the cover plate, the connecting rod
The other end can be connected with bottom plate.
In a preferred embodiment, it is provided with guiding gutter on the lower surface of the cover plate.
In a preferred embodiment, the first partition, the second partition and the 3rd dividing plate form institute
State and chute is provided with the side wall of the first cavity and second cavity, the first breach is offered in the side wall of the second partition
Groove, the second gap slot is offered in the side wall of the 3rd dividing plate, and the demarcation strip can lack from first gap slot or second
Mouth groove insertion, is fixed in first cavity or the second cavity so as to be plugged by the chute.
In a preferred embodiment, first gap slot is opened on the second body of the second partition,
Through hole is offered on second extension, fixture is provided with the through hole with to inserting described in first gap slot
Demarcation strip is fixed.
In a preferred embodiment, second gap slot is opened on the 3rd body of the 3rd dividing plate,
Through hole is offered on 3rd extension, fixture is provided with the through hole with to inserting described in second gap slot
Demarcation strip is fixed.
In a preferred embodiment, open up hole on the second partition, when the second partition with it is described
When first partition is engaged, the first partition offers screwed hole in described hole corresponding section, described hole with it is described
Screwed hole is provided with fixture so that the first partition is connected to a fixed with the second partition.
In a preferred embodiment, open up hole on the 3rd dividing plate, when the 3rd dividing plate with it is described
When first partition is engaged, the first partition offers screwed hole in described hole corresponding section, described hole with it is described
Screwed hole is provided with fixture so that the first partition is connected to a fixed with the 3rd dividing plate.
The technical solution of the utility model has following notable beneficial effect:
The Behavior of Hardened Cement Paste test specimen that the Behavior of Hardened Cement Paste test material preparation device that vibration cementing is tested in the application is tested by vibration cementing
The Behavior of Hardened Cement Paste test specimen tested for vibration cementing can be made by preparing mould, in the Behavior of Hardened Cement Paste test specimen system of whole vibration cementing experiment
Standby mould is placed on when being vibrated on vibrating device, vertical direction during its vibration, simultaneously because vibration cementing is tested
Behavior of Hardened Cement Paste test material preparation mould in cement mortar vertically set, in this way, the bubble inside cement mortar is in effect of vibration
Under can be broken up so that mortar architecture more even compact, to improve the cement strength of late maintaining generation, but shake
Dynamic action effect can be influenceed and be faded away by mould and paste structure damping, i.e., presented with the extension of operating distance
Subtract trend, so influence in the vertical direction of the vibration to mortar architecture is necessarily uneven, therefore, vibration cementing experiment
Behavior of Hardened Cement Paste test material preparation mould in the intensity of Behavior of Hardened Cement Paste made of cement mortar at diverse location be entirely different.Pass through survey
The different polylith water of vibration cementing is tested in examination the application the in the vertical direction that is made of Behavior of Hardened Cement Paste test material preparation device
Mudstone just can obtain the difference condition that cement strength is developed at diverse location, to judge the work of the vibration wave of vibrating device
With scope, so as to instruct the adjustment of vibration parameters, eventually for vibration cementing is instructed to improve consolidating for cement mortar after vibration cementing
Well quality.
Brief description of the drawings
Accompanying drawing described here is only used for task of explanation, and is not intended in any way to limit disclosed in the utility model
Scope.In addition, shape and proportional sizes of each part in figure etc. are only schematical, it is used to help to reason of the present utility model
Solution, it is not the specific shape and proportional sizes for limiting each part of the utility model.Those skilled in the art is new in this practicality
Under the teaching of type, various possible shapes and proportional sizes can be selected to implement the utility model as the case may be.
Fig. 1 is that part-structure is illustrated in the Behavior of Hardened Cement Paste test material preparation mould that vibration cementing is tested in the utility model embodiment
Figure.
Fig. 2 is that the structure of the Behavior of Hardened Cement Paste test material preparation mould bottom plate that vibration cementing is tested in the utility model embodiment is shown
It is intended to.
Fig. 3 is that the structure of the Behavior of Hardened Cement Paste test material preparation mould cover plate that vibration cementing is tested in the utility model embodiment is shown
It is intended to.
Fig. 4 is the schematic diagram that Behavior of Hardened Cement Paste test specimen is tested on pressure testing machine in the utility model embodiment.
The reference of the figures above:
1st, first partition;11st, the first noumenon;12nd, the first extension;121st, through hole;2nd, second partition;21st, second
Body;22nd, the second extension;23rd, the first gap slot;24th, through hole;25th, fixture;26th, hole;27th, screwed hole;3rd, the 3rd every
Plate;31st, the 3rd body;32nd, the 3rd extension;33rd, the second gap slot;4th, demarcation strip;5th, cover plate;51st, guiding gutter;6th, bottom plate;
7th, connecting rod;8th, chute;9th, the first cavity;10th, the second cavity;100th, Behavior of Hardened Cement Paste;200th, pressure testing machine.
Embodiment
With reference to the description of accompanying drawing and the utility model embodiment, can clearly understand of the present utility model
Details.But specific embodiment of the present utility model described here, it is only used for explaining the purpose of this utility model, without
It can be understood as being to limitation of the present utility model in any way.Under teaching of the present utility model, technical staff is contemplated that
Based on any possible deformation of the present utility model, these are regarded as belonging to the scope of the utility model.Need what is illustrated
It is that when element is referred to as " being arranged at " another element, it can be directly on another element or there may also be placed in the middle
Element.When an element is considered as " connection " another element, it can be directly to another element or can
There can be centering elements simultaneously.Term " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be mechanically connect or
Electrical connection or the connection of two element internals, can be joined directly together, can also be indirectly connected by intermediary,
For the ordinary skill in the art, the concrete meaning of above-mentioned term can be understood as the case may be.Made herein
Term " vertical ", " horizontal ", " on ", " under ", "left", "right" and similar statement simply to illustrate that mesh
, it is unique embodiment to be not offered as.
Unless otherwise defined, all of technologies and scientific terms used here by the article and the technical field of the application is belonged to
The implication that technical staff is generally understood that is identical.The term used in the description of the present application is intended merely to description tool herein
The purpose of the embodiment of body, it is not intended that in limitation the application.Term as used herein "and/or" includes one or more
The arbitrary and all combination of related Listed Items.
In order to effectively detect influence of the vibration to cement mortar homogenieity, cement strength is developed after being vibrated with evaluation
Feature, proposes a kind of Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment in this application, and Fig. 1 is implemented for the utility model
Part-structure schematic diagram in the Behavior of Hardened Cement Paste test material preparation mould that vibration cementing is tested in example, Fig. 2 are in the utility model embodiment
The structural representation of the Behavior of Hardened Cement Paste test material preparation mould bottom plate of vibration cementing experiment, Fig. 3 are to be shaken in the utility model embodiment
The structural representation of the Behavior of Hardened Cement Paste test material preparation mould cover plate of dynamic well cementation experiment, as shown in Figure 1, Figure 2 and Figure 3, the vibration is consolidated
The Behavior of Hardened Cement Paste test material preparation device of well experiment includes:The Behavior of Hardened Cement Paste test material preparation mould and vibrating device of vibration cementing experiment, shake
Dynamic device is used to vibrate the Behavior of Hardened Cement Paste test material preparation mould that the vibration cementing filled with cement mortar is tested.Above-mentioned this moves solid
The Behavior of Hardened Cement Paste test material preparation mould of well experiment includes:First partition 1, first partition 1 include the first vertically extended
The first extension 12 that body 11 and edge extend perpendicular to the direction of the first noumenon 11;Second partition 2, second partition 2 are included along vertical
The second extension 22 that second body 21 of direction extension and edge extend perpendicular to the direction of the second body 21;3rd dividing plate 3, the
Two dividing plates 2 include the 3rd extension of the 3rd body 31 vertically extended and edge perpendicular to the extension of the direction of the 3rd body 31
32, second partition 2, the 3rd dividing plate 3 can be removably mounted in first partition 1;It is separately mounted to first partition 1, second partition 2
With the cover plate 5 and bottom plate 6 of the top and bottom of the 3rd dividing plate 3, the second extension 22 can abut against with the side of the first noumenon 11, the
Two bodies 21 can abut against with the first extension 12, and the 3rd body 31 can abut against with the first extension 12, the 3rd extension 32
It can be abutted against with the opposite side of the first noumenon 11, so that first partition 1, second partition 2, cover plate 5 and bottom plate 6 can form the first sky
Chamber 9, first partition 1, the 3rd dividing plate 3, cover plate 5 and bottom plate 6 can form the second cavity 10;It can plug into the first cavity 9 and second
Polylith demarcation strip 4 in cavity 10, so that the first cavity 9 and the in the vertical direction of the second cavity 10 are divided into some.
The Behavior of Hardened Cement Paste test specimen that the Behavior of Hardened Cement Paste test material preparation device that vibration cementing is tested in the application is tested by vibration cementing
Prepare the first partition 1 in mould, second partition 2, the 3rd dividing plate 3 and bottom plate 6 be stitched together with formed can accommodate water
The first cavity 9 and the second cavity 10 of mud, cement mortar is poured into the first cavity 9 and the second cavity 10 to fill full first cavity
9 and second cavity 10, cover plate 5 is covered afterwards be located at first partition 1, second partition 2, the 3rd dividing plate 3 top and be fixed,
The Behavior of Hardened Cement Paste test material preparation mould that can be so tested with making vibration cementing, which is vertically placed on vibrating device, to be carried out
Vibration test, demarcation strip 4 is inserted in the first cavity 9 and the second cavity 10 and is fixed after vibration test terminates, so that
Obtain cement mortar in the vertical direction and be divided into some, finally enter the Behavior of Hardened Cement Paste test material preparation mould that vibration cementing is tested
Row maintenance, the Behavior of Hardened Cement Paste test material preparation mould of vibration cementing experiment is disassembled after maintenance terminates to obtain Behavior of Hardened Cement Paste.Work as insert
4 position suitable of demarcation strip when, identical water in terms of polylith shapes and sizes can be produced by said process
Mudstone, still, when the Behavior of Hardened Cement Paste test material preparation mould of whole vibration cementing experiment is placed on and vibrated on vibrating device, its
Vertical direction during vibration, simultaneously because the cement mortar in the Behavior of Hardened Cement Paste test material preparation mould of vibration cementing experiment is along vertically
Direction is set, in this way, the bubble inside cement mortar can be broken up under effect of vibration, so that mortar architecture more uniformly causes
Close, to improve the cement strength of late maintaining generation, but the action effect vibrated can be damped by mould and paste structure
Influence and fade away, i.e., taper off trend with the extension of operating distance, so influence of the vibration to mortar architecture exists
It is necessarily uneven on vertical direction, therefore, in the Behavior of Hardened Cement Paste test material preparation mould of vibration cementing experiment at diverse location
The intensity of Behavior of Hardened Cement Paste made of cement mortar is entirely different.And tried by testing the Behavior of Hardened Cement Paste that vibration cementing is tested in the application
It is strong that the different polylith Behavior of Hardened Cement Paste of in the vertical direction that part preparation facilities is made just can obtain Behavior of Hardened Cement Paste at diverse location
The difference condition of development is spent, to judge the sphere of action of the vibration wave of vibrating device, so as to instruct the adjustment of vibration parameters, finally
For instructing vibration cementing to improve the cementing quality of cement mortar after vibration cementing.
For the Behavior of Hardened Cement Paste test material preparation device that the vibration cementing being better understood by the application is tested, it will be done below
It is explained further and illustrates.The Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment in the application includes vibration cementing experiment
Behavior of Hardened Cement Paste test material preparation mould and vibrating device two large divisions, vibrating device are mainly used in the vibration cementing filled with cement mortar
The Behavior of Hardened Cement Paste test material preparation mould in the vertical direction of experiment is vibrated.
The Behavior of Hardened Cement Paste test material preparation mould of vibration cementing experiment in the application mainly includes first partition 1, second partition
2nd, the 3rd dividing plate 3, cover plate 5, bottom plate 6 and demarcation strip 4.As shown in figure 1, first partition 1 includes the first noumenon 11 and along vertical
In the first extension 12 of the direction of the first noumenon 11 extension, the first noumenon 11 extends along perpendicular, what it can be rectangle
Tabular.First extension 12 can be arranged on the centre of the first noumenon 11, and it extends along perpendicular to the direction of the first noumenon 11, the
The tabular that one extension 12 is also rectangle.Second partition 2 includes the second body 21 and along perpendicular to the direction of the second body 21
Second extension 22 of extension.Second body 21 extends along perpendicular, its tabular that can be rectangle.Second extension
22 can be arranged on the edge of the second body 21, and it extends along perpendicular to the direction of the second body 21, and the second extension 22 is also in length
Square tabular.Second partition 2 includes the 3rd extension of the 3rd body 31 and edge perpendicular to the extension of the direction of the 3rd body 31
32.3rd body 31 extends along perpendicular, its tabular that can also be rectangle.3rd extension 32 can be arranged on
The edge of three bodies 31, it extends along perpendicular to the direction of the 3rd body 31, the tabular that the 3rd extension 32 is also rectangle.
That is second partition 2 can be with identical with the shape size of second partition 2, second partition 2, the 3rd dividing plate 3 can be installed detachably
In first partition 1.
As shown in figure 1, when second partition 2, the 3rd dividing plate 3 are arranged in first partition 1, both are separately positioned on first
The both sides of dividing plate 1.The edge of second body 21 of second partition 2 offsets with the edge of the first extension 12 of first partition 1, the
The edge of the second extension 22 of two dividing plates 2 and the edge of the first noumenon 11 of first partition 1 offset.3rd body of the 3rd dividing plate 3
31 edge and the edge of the first extension 12 of first partition 1 offset, the edge of the 3rd extension 32 of the 3rd dividing plate 3 and first every
The edge of the first noumenon 11 of plate 1 offsets.In order to preferably cause first partition 1 be connected with second partition 2, the 3rd dividing plate 3,
Hole 26 is opened up on second partition 2, can be the edge of the second body 21 of second partition 2, when second partition 2 and first every
When plate 1 is engaged, first partition 1 offers screwed hole 27 in the corresponding section of hole 26, can be the extension of first partition 1 first
12 edge, screwed hole 27 is provided with fixture 25 in hole 26 so that first partition 1 is connected to a fixed with second partition 2,
Fixture 25 can be screw or bolt etc., its penetrate hole 26 be threaded into hole 27 with realize first partition 1 and second every
The fixation of plate 2.Similarly, open up hole 26 on the 3rd dividing plate 3, when the 3rd dividing plate 3 is engaged with first partition 1, first every
Plate 1 offers screwed hole 27 in the corresponding section of hole 26, hole 26 and screwed hole 27 be provided with fixture 25 so that first every
Plate 1 is connected to a fixed with the 3rd dividing plate 3.In other embodiments, hole 26 can also be opened in the second extension of second partition 2
The edge in portion 22, screwed hole 27 are located at the edge of the first noumenon 11 of first partition 1.Hole 26 can also be opened in the 3rd dividing plate
The edge of 3 the 3rd extension 32, screwed hole 27 are located at the edge of the first noumenon 11 of first partition 1.
As shown in Figure 2 and Figure 3, cover plate 5 and bottom plate 6 are separately mounted to first partition 1, on the dividing plate 3 of second partition 2 and the 3rd
End and lower end, in this way, first partition 1, second partition 2, cover plate 5 and bottom plate 6 can form the first cavity 9, first partition the 1, the 3rd
Dividing plate 3, cover plate 5 and bottom plate 6 can form the second cavity 10, in order to preferably so that cover plate 5, bottom plate 6 and first partition 1, second
Dividing plate 2, the 3rd dividing plate 3 are fixed, and through hole 121 is vertically offered on the first extension 12 of first partition 1,
Connecting rod 7 can be equipped with through hole 121, one end of connecting rod 7 can be connected with cover plate 5, and the other end of connecting rod 7 can be the bottom of with
Plate 6 is connected.The both ends of connecting rod 7 can be threaded into the screwed hole opened up on cover plate 5 and bottom plate 6, in this way, a side
Face can realize and be detachably connected that still further aspect can adjust the distance between cover plate 5 and bottom plate 6.
In a preferred embodiment, as shown in figure 3, guiding gutter 51 can be provided with the lower surface of cover plate 5.Should
Guiding gutter 51 can be two, and it is separately positioned on the both sides of cover plate 5, wherein one can connect the first cavity 9 with extraneous, separately
One can connect the second cavity 10 in the external world.It is unnecessary when the cement mortar that the first cavity 9 is filled in the second cavity 10 is excessive
Cement mortar can be overflowed from the guiding gutter 51.
As shown in figure 1, demarcation strip 4 can plug into the first cavity 9 and the second cavity 10 so that the first cavity 9 and second is empty
The in the vertical direction of chamber 10 is divided into some.The first cavity 9 and second can be easily inserted for the ease of demarcation strip 4
Cavity 10, in a kind of feasible embodiment, first partition 1, second partition 2 and the 3rd dividing plate 3 form the first cavity 9 and the
Chute 8 is provided with the side wall of two cavitys 10, the first gap slot 23, the side of the 3rd dividing plate 3 are offered in the side wall of second partition 2
The second gap slot 33 is offered on wall, demarcation strip 4 can insert from the first gap slot 23 or the second gap slot 33, so as to pass through chute
8 plug and are fixed in the first cavity 9 or the second cavity 10.For the ease of the demarcation strip 4 of insertion is fixed, the first gap slot
23 are opened on the second body 21 of second partition 2, and through hole 24 is offered on the second extension 22, fixation is provided with through hole 24
Part 25 is fixed with the demarcation strip 4 to the first gap slot 23 of insertion.Fixture 25 can be pin, screw, bolt etc..Together
Reason, the second gap slot 33 are opened on the 3rd body 31 of the 3rd dividing plate 3, and through hole 24, through hole are offered on the 3rd extension 32
Fixture 25 is provided with 24 so that the demarcation strip 4 for inserting the second gap slot 33 to be fixed.In the vertical direction, when chute 8
At at least two, the distance of adjacent chute 8 is equal, while distance of the chute 8 of the top away from cover plate 5 and adjacent cunning
Groove 8 the distance between it is equal, distance of the chute 8 of bottom away from bottom plate 6 and adjacent chute 8 the distance between it is equal,
In this way, demarcation strip 4 can cause some all sames that the first cavity 9 and the in the vertical direction of the second cavity 10 are divided into.
In one embodiment, when chute 8 is one, distance of the chute 8 away from cover plate 5 is equal with distance of the chute 8 away from bottom plate 6.
In a preferred embodiment, above-mentioned first partition 1, second partition 2, the 3rd dividing plate 3, bottom plate 6, cover plate 5
And demarcation strip 4 can be made of stainless steel metal material, it possesses certain decay resistance, while is condensed into cement mortar
After Behavior of Hardened Cement Paste, in mold process is removed it is not easy that grinding tool is caused to damage, and then the grinding tool is used for multiple times.
The Behavior of Hardened Cement Paste test material preparation mould tested by above-mentioned vibration cementing can make in same vertical direction height
Go out two pieces of identical Behavior of Hardened Cement Paste, when testing the intensity of Behavior of Hardened Cement Paste, if finding the data of Behavior of Hardened Cement Paste in same vertical direction height
Differ larger, then it is considered that error, mistake or unreasonable place during Behavior of Hardened Cement Paste is this time made be present, water should be remake
Mudstone, the Behavior of Hardened Cement Paste of this making cancel.
The Behavior of Hardened Cement Paste test material preparation device of above-mentioned vibration cementing experiment prepares the operation step of Behavior of Hardened Cement Paste test specimen in this application
Rapid process is as follows, and the process comprises the following steps:
Step 1:Seal grease will be smeared on the inwall of the Behavior of Hardened Cement Paste test material preparation mould of vibration cementing experiment.Seal grease
When splicing the Behavior of Hardened Cement Paste test material preparation mould of vibration cementing experiment, it on the one hand can improve and engage or offset between different parts
The sealing at place, still further aspect are easy to the dismounting of mould after cement mortar condenses into Behavior of Hardened Cement Paste, avoid removing the process of mould
In the surface of Behavior of Hardened Cement Paste is caused to damage.
Step 2:First partition 1, second partition 2, the 3rd dividing plate 3 and bottom plate 6 are stitched together to form the and of the first cavity 9
Second cavity 10.In a kind of feasible mode, by inserting fixture in the hole 26 of the dividing plate 3 of second partition 2 and the 3rd
25, the screwed hole 27 of first partition 1 is screwed into by fixture 25 to realize the spelling of first partition 1, second partition 2, the 3rd dividing plate 3
Connect fixation.By by bottom plate 6 be arranged on first partition 1, second partition 2, the 3rd dividing plate 3 lower section, and connecting rod 7 is penetrated
In the through hole 121 of one dividing plate 1, while the screwed hole being screwed on bottom plate 6.
Step 3:The cement mortar prepared is uniformly poured into the first cavity 9 and the second cavity 10.In this step, will make
The first predetermined position that the cement mortar got ready is uniformly poured into mould the first cavity 9 and/or the second cavity 10, the first default position
Put can the quantity of demarcation strip 4 as needed determined that the first predeterminated position can be the position that first piece of bottom demarcation strip 4 inserts
Put place.Certain puddle is carried out to the cement mortar that pours into, then proceedes to add cement mortar successively to the second predetermined position, second
The determination of the particular location of predeterminated position is identical with the determination principle of the first predeterminated position.Carry out one again after cement mortar is added into
Fixed puddle, aforesaid operations are so repeated to the top added in cement mortar to the first cavity 9 and/or the second cavity 10.
Step 4:Cover plate 5 is covered on die ontology and is fixed.In this step, the lid of seal grease will be coated with
Plate 5 is covered on first partition 1, second partition 2, the 3rd dividing plate 3, and unnecessary cement mortar can be overflowed by the guiding gutter 51 on cover plate 5,
Struck off and cleaned out with ruler, showed if spillage occurs for the Behavior of Hardened Cement Paste test material preparation mould side wall of vibration cementing experiment or bottom
As then discarding the test specimen, re-starting making.Have no problem, connecting rod 7 is connected with cover plate 5.
Step 5:The Behavior of Hardened Cement Paste test material preparation mould that vibration cementing equipped with cement mortar is tested vertically is placed on
Vibration test is carried out on vibrating device, i.e. bottom plate 6 is disposed below, and cover plate 5 is placed on top.
Step 6:After vibration test terminates, it is empty that the demarcation strip 4 for being coated with seal grease is inserted into the first cavity 9 and second
In chamber 10 and it is fixed, to cause cement mortar in the vertical direction to be divided into some.In this step, will first smear
There are the first gap slot 23 of different height for being opened up in the side wall of the luxuriant insertion second partition 2 of demarcation strip 4 of seal grease and the
Second gap slot 33 of the different height opened up in the side wall of three dividing plates 3, demarcation strip 4 pass through first partition 1, the and of second partition 2
Chute 8 in the side wall of 3rd dividing plate 3 is inserted in the first cavity 9 or the second cavity 10.Again by the dividing plate of second partition 2 and the 3rd
Fixture 25 is inserted in 3 through hole 24 so that demarcation strip 4 to be fixed.
Step 7:The Behavior of Hardened Cement Paste test material preparation mould that vibration cementing is tested is conserved, disassembles and shakes after maintenance terminates
The Behavior of Hardened Cement Paste test material preparation mould of dynamic well cementation experiment is to obtain Behavior of Hardened Cement Paste.In this step, the water that vibration cementing can be tested
Mudstone test material preparation mould is placed in water bath according to the temperature and pressure condition needed for experimental program and conserved, maintenance knot
A period of time is cooled down after beam, then extracts demarcation strip 4, disassembles the Behavior of Hardened Cement Paste test material preparation mould of vibration cementing experiment to obtain
The Behavior of Hardened Cement Paste formed on polylith difference vertical direction.Finally by vibration cementing experiment Behavior of Hardened Cement Paste test material preparation mold clean and dry in the air
It is dry, in case experiment is continuing with next time.
In order to carry out corresponding Mechanics Performance Testing to manufactured Behavior of Hardened Cement Paste, this prepares the operating procedure mistake of Behavior of Hardened Cement Paste test specimen
Journey can also comprise the following steps:
Step 8:The polylith Behavior of Hardened Cement Paste for the Behavior of Hardened Cement Paste test material preparation mould preparation tested by vibration cementing is obtained, and by water
The surface of mudstone 100 is placed on after being handled on even loading pressure testing machine 200.In this step, Fig. 4 is the utility model
The schematic diagram that the test specimen of Behavior of Hardened Cement Paste 100 is tested on pressure testing machine in embodiment, as shown in figure 4, the upper following table by Behavior of Hardened Cement Paste 100
The impurity in face is cleaned out, and then the Behavior of Hardened Cement Paste 100 cleaned out is placed on even loading pressure testing machine 200.
Step 9:Load, Behavior of Hardened Cement Paste the last 100 are applied to the surface of test piece of Behavior of Hardened Cement Paste 100 by even loading pressure testing machine 200
Degree is equal to the area of the pressure divided by the loading end of Behavior of Hardened Cement Paste 100 when test specimen reaches broken, corresponding data is recorded, so as to comparative analysis
The difference of cement strength development at the Behavior of Hardened Cement Paste test material preparation mould diverse location of vibration cementing experiment.
Multiple element, composition, part or step can be provided by single integrated component, composition, part or step.It is alternative
Ground, single integrated component, composition, part or step can be divided into multiple element, composition, part or the step of separation.It is used for
The open "a" or "an" for describing element, composition, part or step is not said to exclude other elements, composition, part
Or step.
Each embodiment in this specification is described by the way of progressive, what each embodiment stressed be with
The difference of other embodiment, between each embodiment identical similar part mutually referring to.Above-described embodiment is only
Illustrate technical concepts and features of the present utility model, it is new its object is to allow person skilled in the art to understand this practicality
The content of type is simultaneously implemented according to this, can not limit the scope of protection of the utility model with this.It is all real according to the utility model spirit
The equivalent change or modification that matter is made, it should all cover within the scope of protection of the utility model.
Claims (10)
1. a kind of Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment, it is characterised in that it includes:
The Behavior of Hardened Cement Paste test material preparation mould of vibration cementing experiment, including:
First partition, the first partition include the first noumenon vertically extended and along perpendicular to the first noumenon sides
To the first extension of extension;
Second partition, the second partition include the second body vertically extended and along perpendicular to the second body sides
To the second extension of extension;
3rd dividing plate, the 3rd dividing plate include the 3rd body vertically extended and along perpendicular to the 3rd body sides
To the 3rd extension of extension, the second partition, the 3rd dividing plate can be removably mounted in first partition;
The cover plate and bottom plate of the first partition, the second partition and the 3rd dividing plate top and bottom are separately mounted to,
Second extension can abut against with the side of the first noumenon, and second physical efficiency offsets with first extension
Connect, the 3rd physical efficiency abuts against with first extension, and the 3rd extension can be another with the first noumenon
Side abuts against, so that the first partition, the second partition, the cover plate and the bottom plate can form the first cavity, it is described
First partition, the 3rd dividing plate, the cover plate and the bottom plate can form the second cavity;
The polylith demarcation strip in first cavity and second cavity can be plugged, so that first cavity and described
Two cavity in the vertical directions are divided into some;
Vibrating device, the vibrating device are used for the Behavior of Hardened Cement Paste test material preparation tested to the vibration cementing filled with cement mortar
Mould is vibrated.
2. the Behavior of Hardened Cement Paste test material preparation device of vibration cementing according to claim 1 experiment, it is characterised in that described the
Through hole is vertically offered on first extension of one dividing plate, connecting rod, the company can be equipped with the through hole
One end of extension bar can be connected with the cover plate, and the other end of the connecting rod can be connected with bottom plate.
3. the Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment according to claim 1, it is characterised in that the cover plate
Lower surface on be provided with guiding gutter.
4. the Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment according to claim 1, it is characterised in that described first
Dividing plate, the second partition and the 3rd dividing plate, which are formed in the side wall of first cavity and second cavity, is provided with cunning
Groove, the first gap slot is offered in the side wall of the second partition, the second gap slot is offered in the side wall of the 3rd dividing plate,
The demarcation strip can be inserted from first gap slot or the second gap slot, and described the is fixed on so as to be plugged by the chute
In one cavity or the second cavity.
5. the Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment according to claim 4, it is characterised in that described first
Gap slot is opened on the second body of the second partition, and through hole is offered on second extension, is set in the through hole
Fixture is equipped with so that the demarcation strip for inserting first gap slot to be fixed.
6. the Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment according to claim 4, it is characterised in that described second
Gap slot is opened on the 3rd body of the 3rd dividing plate, and through hole is offered on the 3rd extension, is set in the through hole
Fixture is equipped with so that the demarcation strip for inserting second gap slot to be fixed.
7. the Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment according to claim 1, it is characterised in that described second
Hole is opened up on dividing plate, when the second partition is engaged with the first partition, the first partition is in described hole
Corresponding section offers screwed hole, the screwed hole is provided with fixture in described hole so that the first partition with it is described
Second partition is connected to a fixed.
8. the Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment according to claim 1, it is characterised in that the described 3rd
Hole is opened up on dividing plate, when the 3rd dividing plate is engaged with the first partition, the first partition is in described hole
Corresponding section offers screwed hole, the screwed hole is provided with fixture in described hole so that the first partition with it is described
3rd dividing plate is connected to a fixed.
9. the Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment according to claim 4, it is characterised in that in vertical side
Upwards, the chute is at least two, and the distance of the adjacent chute is equal, and the chute of the top is away from the cover plate
Distance it is equal with the distance between the adjacent chute, distance of the chute of bottom away from the bottom plate with it is adjacent
The distance between the chute is equal.
10. the Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment according to claim 4, it is characterised in that vertical
On direction, the chute is one, and distance of the chute away from the cover plate is equal with distance of the chute away from the bottom plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720738190.6U CN206953249U (en) | 2017-06-23 | 2017-06-23 | The Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720738190.6U CN206953249U (en) | 2017-06-23 | 2017-06-23 | The Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206953249U true CN206953249U (en) | 2018-02-02 |
Family
ID=61386230
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720738190.6U Active CN206953249U (en) | 2017-06-23 | 2017-06-23 | The Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206953249U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107253263A (en) * | 2017-06-23 | 2017-10-17 | 中国石油天然气集团公司 | Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment and preparation method thereof |
-
2017
- 2017-06-23 CN CN201720738190.6U patent/CN206953249U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107253263A (en) * | 2017-06-23 | 2017-10-17 | 中国石油天然气集团公司 | Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment and preparation method thereof |
CN107253263B (en) * | 2017-06-23 | 2023-09-26 | 中国石油天然气集团公司 | Cement stone test piece preparation device for vibration well cementation experiment and preparation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104374649B (en) | A kind of experimental rig and method for being used to observe shear deformation breaks down feature between pile tube and the slip casting soil body | |
CN203337435U (en) | Axial tension test piece mould of concrete | |
CN206953249U (en) | The Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment | |
CN105372412B (en) | Repair simulated test mould and shaping method of specimen in high polymer grouting road surface | |
CN114062107B (en) | Shearing box device suitable for direct shearing tests of cylindrical samples with different sizes and application of shearing box device | |
CN104374650A (en) | Testing device and method for testing static force shear property between tubular pile and grouting soil body | |
CN109459290B (en) | NSCB sample preparation device for testing I-type fracture toughness of compacted clay and using method thereof | |
CN104977201A (en) | Fixed side confining rock socketed pile testing device and method thereof | |
CN205483810U (en) | Coal mine tunnel anchor bolt support nondestructive test laboratory bench | |
CN101736761A (en) | Indoor model test device by dynamic replacement method | |
CN106706754A (en) | Experiment system and experiment method for mechanical vibration on cement slurry | |
CN204461905U (en) | A kind of test unit testing static(al) shear property between pile tube and the slip casting soil body | |
CN107253263A (en) | Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment and preparation method thereof | |
CN105758739A (en) | Method for obtaining duration curve of early age shear strength of concrete intermittent surface | |
CN113341116A (en) | Clay mixing amount estimation method for construction waste roadbed filler | |
CN105784506B (en) | Pre-add shear stress test specimen, test material preparation device and method and diametral compression test method | |
CN104990839A (en) | Permeability test device for sand-containing fog sealing layer material | |
CN209513456U (en) | A kind of sxemiquantitative unconfined compressive strength tester | |
CN206633176U (en) | A kind of assembly type die trial for the Civil Engineering Construction for being easy to be stripped | |
CN205475365U (en) | Not drainage loading test device of fixed side limit embedded rock pile | |
CN105445050A (en) | Caisson-type underwater separator high pressure cabin testing device and production method thereof | |
CN107860651A (en) | Anchor pole load transfer analysis method | |
CN212722300U (en) | Confining pressure device for soft crushed rock undisturbed sample triaxial compression test | |
CN209640179U (en) | A kind of closely knit quality testing tool of concrete vibrating | |
Dahlberg et al. | Continuum modeling of nodular cast iron using a porous plastic model with pressure-sensitive matrix–experiments, model calibration & verification |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |