CN206953249U - The Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment - Google Patents

The Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment Download PDF

Info

Publication number
CN206953249U
CN206953249U CN201720738190.6U CN201720738190U CN206953249U CN 206953249 U CN206953249 U CN 206953249U CN 201720738190 U CN201720738190 U CN 201720738190U CN 206953249 U CN206953249 U CN 206953249U
Authority
CN
China
Prior art keywords
partition
behavior
cement paste
hardened cement
material preparation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720738190.6U
Other languages
Chinese (zh)
Inventor
王友文
刘斌辉
尹宜勇
王兆会
曲从锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Engineering Technology R&D Co Ltd
Original Assignee
China National Petroleum Corp
CNPC Drilling Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, CNPC Drilling Research Institute Co Ltd filed Critical China National Petroleum Corp
Priority to CN201720738190.6U priority Critical patent/CN206953249U/en
Application granted granted Critical
Publication of CN206953249U publication Critical patent/CN206953249U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model discloses a kind of Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment, it is related to Oil-Gas Well Engineering field, and the Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment includes the Behavior of Hardened Cement Paste test material preparation mould of vibration cementing experiment, including:First partition;Second partition;3rd dividing plate, second partition, the 3rd dividing plate can be removably mounted in first partition;The cover plate and bottom plate of first partition, second partition and the 3rd dividing plate top and bottom are separately mounted to, first partition, second partition, cover plate and bottom plate can form the first cavity, and first partition, the 3rd dividing plate, cover plate and bottom plate can form the second cavity;The polylith demarcation strip in the first cavity and the second cavity can be plugged, so that the first cavity and the second cavity in the vertical direction are divided into some;Vibrating device, vibrating device are used to vibrate the Behavior of Hardened Cement Paste test material preparation mould that the vibration cementing filled with cement mortar is tested.

Description

The Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment
Technical field
Oil-Gas Well Engineering field is the utility model is related to, more particularly to a kind of Behavior of Hardened Cement Paste test material preparation of vibration cementing experiment Device.
Background technology
In order to improve the rheological behavior of cement mortar, oil gas water breakthrough after well cementation is prevented, improves cementing quality, it is solid to have carried out vibration The research of well technology.In vibration cementing technology, the mechanical property of Behavior of Hardened Cement Paste is to evaluate the weight of a bite well cementing quality after vibration Index is wanted, directly affects the long-term sealing quality of pit shaft.Therefore, the mechanical test of Behavior of Hardened Cement Paste also turns into vibration cementing technology after vibration One of emphasis of research.
Vibration is advantageous to improve cementing quality, but inevitably, vibration wave can force cement granules generation to tremble and mix Alter, cause the property of mortar architecture to produce difference in the vertical, it is uneven as a result to show as the development of Behavior of Hardened Cement Paste bulk strength.At present General Behavior of Hardened Cement Paste test specimen prepares mould and can not detect that cement strength anisotropism under effect of vibration is developed both at home and abroad Situation, thus need a kind of experiment of vibration cementing of utility model Behavior of Hardened Cement Paste test material preparation mould and corresponding method for testing pressure with For detecting the situation that cement strength anisotropism is developed under effect of vibration.
Utility model content
In order to overcome the drawbacks described above of prior art, the utility model embodiment technical problem to be solved there is provided A kind of Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment, it can detect influence of the vibration to cement mortar homogenieity, to comment Cement strength development characteristics after valence vibrations.
The concrete technical scheme of the utility model embodiment is:
A kind of Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment, it includes:
The Behavior of Hardened Cement Paste test material preparation mould of vibration cementing experiment, including:
First partition, the first partition include the first noumenon vertically extended and along perpendicular to the firsts First extension of body direction extension;
Second partition, the second partition include the second body vertically extended and along perpendicular to described second Second extension of body direction extension;
3rd dividing plate, the 3rd dividing plate include the 3rd body vertically extended and along perpendicular to described 3rd 3rd extension of body direction extension, the second partition, the 3rd dividing plate can be removably mounted in first partition;
It is separately mounted to the first partition, the cover plate of the second partition and the 3rd dividing plate top and bottom and bottom Plate, second extension can abut against with the side of the first noumenon, second physical efficiency and first extension Abut against, the 3rd physical efficiency abuts against with first extension, and the 3rd extension can be with the first noumenon Opposite side abuts against, so that the first partition, the second partition, the cover plate and the bottom plate can form the first cavity, The first partition, the 3rd dividing plate, the cover plate and the bottom plate can form the second cavity;
The polylith demarcation strip in first cavity and second cavity can be plugged, so that first cavity and institute State the second cavity in the vertical direction and be divided into some;
Vibrating device, the vibrating device are used for the Behavior of Hardened Cement Paste test specimen tested to the vibration cementing filled with cement mortar Mould is prepared to be vibrated.
In a preferred embodiment, vertically offer and pass through on the first extension of the first partition Perforate, connecting rod can be equipped with the through hole, one end of the connecting rod can be connected with the cover plate, the connecting rod The other end can be connected with bottom plate.
In a preferred embodiment, it is provided with guiding gutter on the lower surface of the cover plate.
In a preferred embodiment, the first partition, the second partition and the 3rd dividing plate form institute State and chute is provided with the side wall of the first cavity and second cavity, the first breach is offered in the side wall of the second partition Groove, the second gap slot is offered in the side wall of the 3rd dividing plate, and the demarcation strip can lack from first gap slot or second Mouth groove insertion, is fixed in first cavity or the second cavity so as to be plugged by the chute.
In a preferred embodiment, first gap slot is opened on the second body of the second partition, Through hole is offered on second extension, fixture is provided with the through hole with to inserting described in first gap slot Demarcation strip is fixed.
In a preferred embodiment, second gap slot is opened on the 3rd body of the 3rd dividing plate, Through hole is offered on 3rd extension, fixture is provided with the through hole with to inserting described in second gap slot Demarcation strip is fixed.
In a preferred embodiment, open up hole on the second partition, when the second partition with it is described When first partition is engaged, the first partition offers screwed hole in described hole corresponding section, described hole with it is described Screwed hole is provided with fixture so that the first partition is connected to a fixed with the second partition.
In a preferred embodiment, open up hole on the 3rd dividing plate, when the 3rd dividing plate with it is described When first partition is engaged, the first partition offers screwed hole in described hole corresponding section, described hole with it is described Screwed hole is provided with fixture so that the first partition is connected to a fixed with the 3rd dividing plate.
The technical solution of the utility model has following notable beneficial effect:
The Behavior of Hardened Cement Paste test specimen that the Behavior of Hardened Cement Paste test material preparation device that vibration cementing is tested in the application is tested by vibration cementing The Behavior of Hardened Cement Paste test specimen tested for vibration cementing can be made by preparing mould, in the Behavior of Hardened Cement Paste test specimen system of whole vibration cementing experiment Standby mould is placed on when being vibrated on vibrating device, vertical direction during its vibration, simultaneously because vibration cementing is tested Behavior of Hardened Cement Paste test material preparation mould in cement mortar vertically set, in this way, the bubble inside cement mortar is in effect of vibration Under can be broken up so that mortar architecture more even compact, to improve the cement strength of late maintaining generation, but shake Dynamic action effect can be influenceed and be faded away by mould and paste structure damping, i.e., presented with the extension of operating distance Subtract trend, so influence in the vertical direction of the vibration to mortar architecture is necessarily uneven, therefore, vibration cementing experiment Behavior of Hardened Cement Paste test material preparation mould in the intensity of Behavior of Hardened Cement Paste made of cement mortar at diverse location be entirely different.Pass through survey The different polylith water of vibration cementing is tested in examination the application the in the vertical direction that is made of Behavior of Hardened Cement Paste test material preparation device Mudstone just can obtain the difference condition that cement strength is developed at diverse location, to judge the work of the vibration wave of vibrating device With scope, so as to instruct the adjustment of vibration parameters, eventually for vibration cementing is instructed to improve consolidating for cement mortar after vibration cementing Well quality.
Brief description of the drawings
Accompanying drawing described here is only used for task of explanation, and is not intended in any way to limit disclosed in the utility model Scope.In addition, shape and proportional sizes of each part in figure etc. are only schematical, it is used to help to reason of the present utility model Solution, it is not the specific shape and proportional sizes for limiting each part of the utility model.Those skilled in the art is new in this practicality Under the teaching of type, various possible shapes and proportional sizes can be selected to implement the utility model as the case may be.
Fig. 1 is that part-structure is illustrated in the Behavior of Hardened Cement Paste test material preparation mould that vibration cementing is tested in the utility model embodiment Figure.
Fig. 2 is that the structure of the Behavior of Hardened Cement Paste test material preparation mould bottom plate that vibration cementing is tested in the utility model embodiment is shown It is intended to.
Fig. 3 is that the structure of the Behavior of Hardened Cement Paste test material preparation mould cover plate that vibration cementing is tested in the utility model embodiment is shown It is intended to.
Fig. 4 is the schematic diagram that Behavior of Hardened Cement Paste test specimen is tested on pressure testing machine in the utility model embodiment.
The reference of the figures above:
1st, first partition;11st, the first noumenon;12nd, the first extension;121st, through hole;2nd, second partition;21st, second Body;22nd, the second extension;23rd, the first gap slot;24th, through hole;25th, fixture;26th, hole;27th, screwed hole;3rd, the 3rd every Plate;31st, the 3rd body;32nd, the 3rd extension;33rd, the second gap slot;4th, demarcation strip;5th, cover plate;51st, guiding gutter;6th, bottom plate; 7th, connecting rod;8th, chute;9th, the first cavity;10th, the second cavity;100th, Behavior of Hardened Cement Paste;200th, pressure testing machine.
Embodiment
With reference to the description of accompanying drawing and the utility model embodiment, can clearly understand of the present utility model Details.But specific embodiment of the present utility model described here, it is only used for explaining the purpose of this utility model, without It can be understood as being to limitation of the present utility model in any way.Under teaching of the present utility model, technical staff is contemplated that Based on any possible deformation of the present utility model, these are regarded as belonging to the scope of the utility model.Need what is illustrated It is that when element is referred to as " being arranged at " another element, it can be directly on another element or there may also be placed in the middle Element.When an element is considered as " connection " another element, it can be directly to another element or can There can be centering elements simultaneously.Term " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be mechanically connect or Electrical connection or the connection of two element internals, can be joined directly together, can also be indirectly connected by intermediary, For the ordinary skill in the art, the concrete meaning of above-mentioned term can be understood as the case may be.Made herein Term " vertical ", " horizontal ", " on ", " under ", "left", "right" and similar statement simply to illustrate that mesh , it is unique embodiment to be not offered as.
Unless otherwise defined, all of technologies and scientific terms used here by the article and the technical field of the application is belonged to The implication that technical staff is generally understood that is identical.The term used in the description of the present application is intended merely to description tool herein The purpose of the embodiment of body, it is not intended that in limitation the application.Term as used herein "and/or" includes one or more The arbitrary and all combination of related Listed Items.
In order to effectively detect influence of the vibration to cement mortar homogenieity, cement strength is developed after being vibrated with evaluation Feature, proposes a kind of Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment in this application, and Fig. 1 is implemented for the utility model Part-structure schematic diagram in the Behavior of Hardened Cement Paste test material preparation mould that vibration cementing is tested in example, Fig. 2 are in the utility model embodiment The structural representation of the Behavior of Hardened Cement Paste test material preparation mould bottom plate of vibration cementing experiment, Fig. 3 are to be shaken in the utility model embodiment The structural representation of the Behavior of Hardened Cement Paste test material preparation mould cover plate of dynamic well cementation experiment, as shown in Figure 1, Figure 2 and Figure 3, the vibration is consolidated The Behavior of Hardened Cement Paste test material preparation device of well experiment includes:The Behavior of Hardened Cement Paste test material preparation mould and vibrating device of vibration cementing experiment, shake Dynamic device is used to vibrate the Behavior of Hardened Cement Paste test material preparation mould that the vibration cementing filled with cement mortar is tested.Above-mentioned this moves solid The Behavior of Hardened Cement Paste test material preparation mould of well experiment includes:First partition 1, first partition 1 include the first vertically extended The first extension 12 that body 11 and edge extend perpendicular to the direction of the first noumenon 11;Second partition 2, second partition 2 are included along vertical The second extension 22 that second body 21 of direction extension and edge extend perpendicular to the direction of the second body 21;3rd dividing plate 3, the Two dividing plates 2 include the 3rd extension of the 3rd body 31 vertically extended and edge perpendicular to the extension of the direction of the 3rd body 31 32, second partition 2, the 3rd dividing plate 3 can be removably mounted in first partition 1;It is separately mounted to first partition 1, second partition 2 With the cover plate 5 and bottom plate 6 of the top and bottom of the 3rd dividing plate 3, the second extension 22 can abut against with the side of the first noumenon 11, the Two bodies 21 can abut against with the first extension 12, and the 3rd body 31 can abut against with the first extension 12, the 3rd extension 32 It can be abutted against with the opposite side of the first noumenon 11, so that first partition 1, second partition 2, cover plate 5 and bottom plate 6 can form the first sky Chamber 9, first partition 1, the 3rd dividing plate 3, cover plate 5 and bottom plate 6 can form the second cavity 10;It can plug into the first cavity 9 and second Polylith demarcation strip 4 in cavity 10, so that the first cavity 9 and the in the vertical direction of the second cavity 10 are divided into some.
The Behavior of Hardened Cement Paste test specimen that the Behavior of Hardened Cement Paste test material preparation device that vibration cementing is tested in the application is tested by vibration cementing Prepare the first partition 1 in mould, second partition 2, the 3rd dividing plate 3 and bottom plate 6 be stitched together with formed can accommodate water The first cavity 9 and the second cavity 10 of mud, cement mortar is poured into the first cavity 9 and the second cavity 10 to fill full first cavity 9 and second cavity 10, cover plate 5 is covered afterwards be located at first partition 1, second partition 2, the 3rd dividing plate 3 top and be fixed, The Behavior of Hardened Cement Paste test material preparation mould that can be so tested with making vibration cementing, which is vertically placed on vibrating device, to be carried out Vibration test, demarcation strip 4 is inserted in the first cavity 9 and the second cavity 10 and is fixed after vibration test terminates, so that Obtain cement mortar in the vertical direction and be divided into some, finally enter the Behavior of Hardened Cement Paste test material preparation mould that vibration cementing is tested Row maintenance, the Behavior of Hardened Cement Paste test material preparation mould of vibration cementing experiment is disassembled after maintenance terminates to obtain Behavior of Hardened Cement Paste.Work as insert 4 position suitable of demarcation strip when, identical water in terms of polylith shapes and sizes can be produced by said process Mudstone, still, when the Behavior of Hardened Cement Paste test material preparation mould of whole vibration cementing experiment is placed on and vibrated on vibrating device, its Vertical direction during vibration, simultaneously because the cement mortar in the Behavior of Hardened Cement Paste test material preparation mould of vibration cementing experiment is along vertically Direction is set, in this way, the bubble inside cement mortar can be broken up under effect of vibration, so that mortar architecture more uniformly causes Close, to improve the cement strength of late maintaining generation, but the action effect vibrated can be damped by mould and paste structure Influence and fade away, i.e., taper off trend with the extension of operating distance, so influence of the vibration to mortar architecture exists It is necessarily uneven on vertical direction, therefore, in the Behavior of Hardened Cement Paste test material preparation mould of vibration cementing experiment at diverse location The intensity of Behavior of Hardened Cement Paste made of cement mortar is entirely different.And tried by testing the Behavior of Hardened Cement Paste that vibration cementing is tested in the application It is strong that the different polylith Behavior of Hardened Cement Paste of in the vertical direction that part preparation facilities is made just can obtain Behavior of Hardened Cement Paste at diverse location The difference condition of development is spent, to judge the sphere of action of the vibration wave of vibrating device, so as to instruct the adjustment of vibration parameters, finally For instructing vibration cementing to improve the cementing quality of cement mortar after vibration cementing.
For the Behavior of Hardened Cement Paste test material preparation device that the vibration cementing being better understood by the application is tested, it will be done below It is explained further and illustrates.The Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment in the application includes vibration cementing experiment Behavior of Hardened Cement Paste test material preparation mould and vibrating device two large divisions, vibrating device are mainly used in the vibration cementing filled with cement mortar The Behavior of Hardened Cement Paste test material preparation mould in the vertical direction of experiment is vibrated.
The Behavior of Hardened Cement Paste test material preparation mould of vibration cementing experiment in the application mainly includes first partition 1, second partition 2nd, the 3rd dividing plate 3, cover plate 5, bottom plate 6 and demarcation strip 4.As shown in figure 1, first partition 1 includes the first noumenon 11 and along vertical In the first extension 12 of the direction of the first noumenon 11 extension, the first noumenon 11 extends along perpendicular, what it can be rectangle Tabular.First extension 12 can be arranged on the centre of the first noumenon 11, and it extends along perpendicular to the direction of the first noumenon 11, the The tabular that one extension 12 is also rectangle.Second partition 2 includes the second body 21 and along perpendicular to the direction of the second body 21 Second extension 22 of extension.Second body 21 extends along perpendicular, its tabular that can be rectangle.Second extension 22 can be arranged on the edge of the second body 21, and it extends along perpendicular to the direction of the second body 21, and the second extension 22 is also in length Square tabular.Second partition 2 includes the 3rd extension of the 3rd body 31 and edge perpendicular to the extension of the direction of the 3rd body 31 32.3rd body 31 extends along perpendicular, its tabular that can also be rectangle.3rd extension 32 can be arranged on The edge of three bodies 31, it extends along perpendicular to the direction of the 3rd body 31, the tabular that the 3rd extension 32 is also rectangle. That is second partition 2 can be with identical with the shape size of second partition 2, second partition 2, the 3rd dividing plate 3 can be installed detachably In first partition 1.
As shown in figure 1, when second partition 2, the 3rd dividing plate 3 are arranged in first partition 1, both are separately positioned on first The both sides of dividing plate 1.The edge of second body 21 of second partition 2 offsets with the edge of the first extension 12 of first partition 1, the The edge of the second extension 22 of two dividing plates 2 and the edge of the first noumenon 11 of first partition 1 offset.3rd body of the 3rd dividing plate 3 31 edge and the edge of the first extension 12 of first partition 1 offset, the edge of the 3rd extension 32 of the 3rd dividing plate 3 and first every The edge of the first noumenon 11 of plate 1 offsets.In order to preferably cause first partition 1 be connected with second partition 2, the 3rd dividing plate 3, Hole 26 is opened up on second partition 2, can be the edge of the second body 21 of second partition 2, when second partition 2 and first every When plate 1 is engaged, first partition 1 offers screwed hole 27 in the corresponding section of hole 26, can be the extension of first partition 1 first 12 edge, screwed hole 27 is provided with fixture 25 in hole 26 so that first partition 1 is connected to a fixed with second partition 2, Fixture 25 can be screw or bolt etc., its penetrate hole 26 be threaded into hole 27 with realize first partition 1 and second every The fixation of plate 2.Similarly, open up hole 26 on the 3rd dividing plate 3, when the 3rd dividing plate 3 is engaged with first partition 1, first every Plate 1 offers screwed hole 27 in the corresponding section of hole 26, hole 26 and screwed hole 27 be provided with fixture 25 so that first every Plate 1 is connected to a fixed with the 3rd dividing plate 3.In other embodiments, hole 26 can also be opened in the second extension of second partition 2 The edge in portion 22, screwed hole 27 are located at the edge of the first noumenon 11 of first partition 1.Hole 26 can also be opened in the 3rd dividing plate The edge of 3 the 3rd extension 32, screwed hole 27 are located at the edge of the first noumenon 11 of first partition 1.
As shown in Figure 2 and Figure 3, cover plate 5 and bottom plate 6 are separately mounted to first partition 1, on the dividing plate 3 of second partition 2 and the 3rd End and lower end, in this way, first partition 1, second partition 2, cover plate 5 and bottom plate 6 can form the first cavity 9, first partition the 1, the 3rd Dividing plate 3, cover plate 5 and bottom plate 6 can form the second cavity 10, in order to preferably so that cover plate 5, bottom plate 6 and first partition 1, second Dividing plate 2, the 3rd dividing plate 3 are fixed, and through hole 121 is vertically offered on the first extension 12 of first partition 1, Connecting rod 7 can be equipped with through hole 121, one end of connecting rod 7 can be connected with cover plate 5, and the other end of connecting rod 7 can be the bottom of with Plate 6 is connected.The both ends of connecting rod 7 can be threaded into the screwed hole opened up on cover plate 5 and bottom plate 6, in this way, a side Face can realize and be detachably connected that still further aspect can adjust the distance between cover plate 5 and bottom plate 6.
In a preferred embodiment, as shown in figure 3, guiding gutter 51 can be provided with the lower surface of cover plate 5.Should Guiding gutter 51 can be two, and it is separately positioned on the both sides of cover plate 5, wherein one can connect the first cavity 9 with extraneous, separately One can connect the second cavity 10 in the external world.It is unnecessary when the cement mortar that the first cavity 9 is filled in the second cavity 10 is excessive Cement mortar can be overflowed from the guiding gutter 51.
As shown in figure 1, demarcation strip 4 can plug into the first cavity 9 and the second cavity 10 so that the first cavity 9 and second is empty The in the vertical direction of chamber 10 is divided into some.The first cavity 9 and second can be easily inserted for the ease of demarcation strip 4 Cavity 10, in a kind of feasible embodiment, first partition 1, second partition 2 and the 3rd dividing plate 3 form the first cavity 9 and the Chute 8 is provided with the side wall of two cavitys 10, the first gap slot 23, the side of the 3rd dividing plate 3 are offered in the side wall of second partition 2 The second gap slot 33 is offered on wall, demarcation strip 4 can insert from the first gap slot 23 or the second gap slot 33, so as to pass through chute 8 plug and are fixed in the first cavity 9 or the second cavity 10.For the ease of the demarcation strip 4 of insertion is fixed, the first gap slot 23 are opened on the second body 21 of second partition 2, and through hole 24 is offered on the second extension 22, fixation is provided with through hole 24 Part 25 is fixed with the demarcation strip 4 to the first gap slot 23 of insertion.Fixture 25 can be pin, screw, bolt etc..Together Reason, the second gap slot 33 are opened on the 3rd body 31 of the 3rd dividing plate 3, and through hole 24, through hole are offered on the 3rd extension 32 Fixture 25 is provided with 24 so that the demarcation strip 4 for inserting the second gap slot 33 to be fixed.In the vertical direction, when chute 8 At at least two, the distance of adjacent chute 8 is equal, while distance of the chute 8 of the top away from cover plate 5 and adjacent cunning Groove 8 the distance between it is equal, distance of the chute 8 of bottom away from bottom plate 6 and adjacent chute 8 the distance between it is equal, In this way, demarcation strip 4 can cause some all sames that the first cavity 9 and the in the vertical direction of the second cavity 10 are divided into. In one embodiment, when chute 8 is one, distance of the chute 8 away from cover plate 5 is equal with distance of the chute 8 away from bottom plate 6.
In a preferred embodiment, above-mentioned first partition 1, second partition 2, the 3rd dividing plate 3, bottom plate 6, cover plate 5 And demarcation strip 4 can be made of stainless steel metal material, it possesses certain decay resistance, while is condensed into cement mortar After Behavior of Hardened Cement Paste, in mold process is removed it is not easy that grinding tool is caused to damage, and then the grinding tool is used for multiple times.
The Behavior of Hardened Cement Paste test material preparation mould tested by above-mentioned vibration cementing can make in same vertical direction height Go out two pieces of identical Behavior of Hardened Cement Paste, when testing the intensity of Behavior of Hardened Cement Paste, if finding the data of Behavior of Hardened Cement Paste in same vertical direction height Differ larger, then it is considered that error, mistake or unreasonable place during Behavior of Hardened Cement Paste is this time made be present, water should be remake Mudstone, the Behavior of Hardened Cement Paste of this making cancel.
The Behavior of Hardened Cement Paste test material preparation device of above-mentioned vibration cementing experiment prepares the operation step of Behavior of Hardened Cement Paste test specimen in this application Rapid process is as follows, and the process comprises the following steps:
Step 1:Seal grease will be smeared on the inwall of the Behavior of Hardened Cement Paste test material preparation mould of vibration cementing experiment.Seal grease When splicing the Behavior of Hardened Cement Paste test material preparation mould of vibration cementing experiment, it on the one hand can improve and engage or offset between different parts The sealing at place, still further aspect are easy to the dismounting of mould after cement mortar condenses into Behavior of Hardened Cement Paste, avoid removing the process of mould In the surface of Behavior of Hardened Cement Paste is caused to damage.
Step 2:First partition 1, second partition 2, the 3rd dividing plate 3 and bottom plate 6 are stitched together to form the and of the first cavity 9 Second cavity 10.In a kind of feasible mode, by inserting fixture in the hole 26 of the dividing plate 3 of second partition 2 and the 3rd 25, the screwed hole 27 of first partition 1 is screwed into by fixture 25 to realize the spelling of first partition 1, second partition 2, the 3rd dividing plate 3 Connect fixation.By by bottom plate 6 be arranged on first partition 1, second partition 2, the 3rd dividing plate 3 lower section, and connecting rod 7 is penetrated In the through hole 121 of one dividing plate 1, while the screwed hole being screwed on bottom plate 6.
Step 3:The cement mortar prepared is uniformly poured into the first cavity 9 and the second cavity 10.In this step, will make The first predetermined position that the cement mortar got ready is uniformly poured into mould the first cavity 9 and/or the second cavity 10, the first default position Put can the quantity of demarcation strip 4 as needed determined that the first predeterminated position can be the position that first piece of bottom demarcation strip 4 inserts Put place.Certain puddle is carried out to the cement mortar that pours into, then proceedes to add cement mortar successively to the second predetermined position, second The determination of the particular location of predeterminated position is identical with the determination principle of the first predeterminated position.Carry out one again after cement mortar is added into Fixed puddle, aforesaid operations are so repeated to the top added in cement mortar to the first cavity 9 and/or the second cavity 10.
Step 4:Cover plate 5 is covered on die ontology and is fixed.In this step, the lid of seal grease will be coated with Plate 5 is covered on first partition 1, second partition 2, the 3rd dividing plate 3, and unnecessary cement mortar can be overflowed by the guiding gutter 51 on cover plate 5, Struck off and cleaned out with ruler, showed if spillage occurs for the Behavior of Hardened Cement Paste test material preparation mould side wall of vibration cementing experiment or bottom As then discarding the test specimen, re-starting making.Have no problem, connecting rod 7 is connected with cover plate 5.
Step 5:The Behavior of Hardened Cement Paste test material preparation mould that vibration cementing equipped with cement mortar is tested vertically is placed on Vibration test is carried out on vibrating device, i.e. bottom plate 6 is disposed below, and cover plate 5 is placed on top.
Step 6:After vibration test terminates, it is empty that the demarcation strip 4 for being coated with seal grease is inserted into the first cavity 9 and second In chamber 10 and it is fixed, to cause cement mortar in the vertical direction to be divided into some.In this step, will first smear There are the first gap slot 23 of different height for being opened up in the side wall of the luxuriant insertion second partition 2 of demarcation strip 4 of seal grease and the Second gap slot 33 of the different height opened up in the side wall of three dividing plates 3, demarcation strip 4 pass through first partition 1, the and of second partition 2 Chute 8 in the side wall of 3rd dividing plate 3 is inserted in the first cavity 9 or the second cavity 10.Again by the dividing plate of second partition 2 and the 3rd Fixture 25 is inserted in 3 through hole 24 so that demarcation strip 4 to be fixed.
Step 7:The Behavior of Hardened Cement Paste test material preparation mould that vibration cementing is tested is conserved, disassembles and shakes after maintenance terminates The Behavior of Hardened Cement Paste test material preparation mould of dynamic well cementation experiment is to obtain Behavior of Hardened Cement Paste.In this step, the water that vibration cementing can be tested Mudstone test material preparation mould is placed in water bath according to the temperature and pressure condition needed for experimental program and conserved, maintenance knot A period of time is cooled down after beam, then extracts demarcation strip 4, disassembles the Behavior of Hardened Cement Paste test material preparation mould of vibration cementing experiment to obtain The Behavior of Hardened Cement Paste formed on polylith difference vertical direction.Finally by vibration cementing experiment Behavior of Hardened Cement Paste test material preparation mold clean and dry in the air It is dry, in case experiment is continuing with next time.
In order to carry out corresponding Mechanics Performance Testing to manufactured Behavior of Hardened Cement Paste, this prepares the operating procedure mistake of Behavior of Hardened Cement Paste test specimen Journey can also comprise the following steps:
Step 8:The polylith Behavior of Hardened Cement Paste for the Behavior of Hardened Cement Paste test material preparation mould preparation tested by vibration cementing is obtained, and by water The surface of mudstone 100 is placed on after being handled on even loading pressure testing machine 200.In this step, Fig. 4 is the utility model The schematic diagram that the test specimen of Behavior of Hardened Cement Paste 100 is tested on pressure testing machine in embodiment, as shown in figure 4, the upper following table by Behavior of Hardened Cement Paste 100 The impurity in face is cleaned out, and then the Behavior of Hardened Cement Paste 100 cleaned out is placed on even loading pressure testing machine 200.
Step 9:Load, Behavior of Hardened Cement Paste the last 100 are applied to the surface of test piece of Behavior of Hardened Cement Paste 100 by even loading pressure testing machine 200 Degree is equal to the area of the pressure divided by the loading end of Behavior of Hardened Cement Paste 100 when test specimen reaches broken, corresponding data is recorded, so as to comparative analysis The difference of cement strength development at the Behavior of Hardened Cement Paste test material preparation mould diverse location of vibration cementing experiment.
Multiple element, composition, part or step can be provided by single integrated component, composition, part or step.It is alternative Ground, single integrated component, composition, part or step can be divided into multiple element, composition, part or the step of separation.It is used for The open "a" or "an" for describing element, composition, part or step is not said to exclude other elements, composition, part Or step.
Each embodiment in this specification is described by the way of progressive, what each embodiment stressed be with The difference of other embodiment, between each embodiment identical similar part mutually referring to.Above-described embodiment is only Illustrate technical concepts and features of the present utility model, it is new its object is to allow person skilled in the art to understand this practicality The content of type is simultaneously implemented according to this, can not limit the scope of protection of the utility model with this.It is all real according to the utility model spirit The equivalent change or modification that matter is made, it should all cover within the scope of protection of the utility model.

Claims (10)

1. a kind of Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment, it is characterised in that it includes:
The Behavior of Hardened Cement Paste test material preparation mould of vibration cementing experiment, including:
First partition, the first partition include the first noumenon vertically extended and along perpendicular to the first noumenon sides To the first extension of extension;
Second partition, the second partition include the second body vertically extended and along perpendicular to the second body sides To the second extension of extension;
3rd dividing plate, the 3rd dividing plate include the 3rd body vertically extended and along perpendicular to the 3rd body sides To the 3rd extension of extension, the second partition, the 3rd dividing plate can be removably mounted in first partition;
The cover plate and bottom plate of the first partition, the second partition and the 3rd dividing plate top and bottom are separately mounted to, Second extension can abut against with the side of the first noumenon, and second physical efficiency offsets with first extension Connect, the 3rd physical efficiency abuts against with first extension, and the 3rd extension can be another with the first noumenon Side abuts against, so that the first partition, the second partition, the cover plate and the bottom plate can form the first cavity, it is described First partition, the 3rd dividing plate, the cover plate and the bottom plate can form the second cavity;
The polylith demarcation strip in first cavity and second cavity can be plugged, so that first cavity and described Two cavity in the vertical directions are divided into some;
Vibrating device, the vibrating device are used for the Behavior of Hardened Cement Paste test material preparation tested to the vibration cementing filled with cement mortar Mould is vibrated.
2. the Behavior of Hardened Cement Paste test material preparation device of vibration cementing according to claim 1 experiment, it is characterised in that described the Through hole is vertically offered on first extension of one dividing plate, connecting rod, the company can be equipped with the through hole One end of extension bar can be connected with the cover plate, and the other end of the connecting rod can be connected with bottom plate.
3. the Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment according to claim 1, it is characterised in that the cover plate Lower surface on be provided with guiding gutter.
4. the Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment according to claim 1, it is characterised in that described first Dividing plate, the second partition and the 3rd dividing plate, which are formed in the side wall of first cavity and second cavity, is provided with cunning Groove, the first gap slot is offered in the side wall of the second partition, the second gap slot is offered in the side wall of the 3rd dividing plate, The demarcation strip can be inserted from first gap slot or the second gap slot, and described the is fixed on so as to be plugged by the chute In one cavity or the second cavity.
5. the Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment according to claim 4, it is characterised in that described first Gap slot is opened on the second body of the second partition, and through hole is offered on second extension, is set in the through hole Fixture is equipped with so that the demarcation strip for inserting first gap slot to be fixed.
6. the Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment according to claim 4, it is characterised in that described second Gap slot is opened on the 3rd body of the 3rd dividing plate, and through hole is offered on the 3rd extension, is set in the through hole Fixture is equipped with so that the demarcation strip for inserting second gap slot to be fixed.
7. the Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment according to claim 1, it is characterised in that described second Hole is opened up on dividing plate, when the second partition is engaged with the first partition, the first partition is in described hole Corresponding section offers screwed hole, the screwed hole is provided with fixture in described hole so that the first partition with it is described Second partition is connected to a fixed.
8. the Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment according to claim 1, it is characterised in that the described 3rd Hole is opened up on dividing plate, when the 3rd dividing plate is engaged with the first partition, the first partition is in described hole Corresponding section offers screwed hole, the screwed hole is provided with fixture in described hole so that the first partition with it is described 3rd dividing plate is connected to a fixed.
9. the Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment according to claim 4, it is characterised in that in vertical side Upwards, the chute is at least two, and the distance of the adjacent chute is equal, and the chute of the top is away from the cover plate Distance it is equal with the distance between the adjacent chute, distance of the chute of bottom away from the bottom plate with it is adjacent The distance between the chute is equal.
10. the Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment according to claim 4, it is characterised in that vertical On direction, the chute is one, and distance of the chute away from the cover plate is equal with distance of the chute away from the bottom plate.
CN201720738190.6U 2017-06-23 2017-06-23 The Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment Active CN206953249U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720738190.6U CN206953249U (en) 2017-06-23 2017-06-23 The Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720738190.6U CN206953249U (en) 2017-06-23 2017-06-23 The Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment

Publications (1)

Publication Number Publication Date
CN206953249U true CN206953249U (en) 2018-02-02

Family

ID=61386230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720738190.6U Active CN206953249U (en) 2017-06-23 2017-06-23 The Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment

Country Status (1)

Country Link
CN (1) CN206953249U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107253263A (en) * 2017-06-23 2017-10-17 中国石油天然气集团公司 Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment and preparation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107253263A (en) * 2017-06-23 2017-10-17 中国石油天然气集团公司 Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment and preparation method thereof
CN107253263B (en) * 2017-06-23 2023-09-26 中国石油天然气集团公司 Cement stone test piece preparation device for vibration well cementation experiment and preparation method thereof

Similar Documents

Publication Publication Date Title
CN104374649B (en) A kind of experimental rig and method for being used to observe shear deformation breaks down feature between pile tube and the slip casting soil body
CN203337435U (en) Axial tension test piece mould of concrete
CN206953249U (en) The Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment
CN105372412B (en) Repair simulated test mould and shaping method of specimen in high polymer grouting road surface
CN114062107B (en) Shearing box device suitable for direct shearing tests of cylindrical samples with different sizes and application of shearing box device
CN104374650A (en) Testing device and method for testing static force shear property between tubular pile and grouting soil body
CN109459290B (en) NSCB sample preparation device for testing I-type fracture toughness of compacted clay and using method thereof
CN104977201A (en) Fixed side confining rock socketed pile testing device and method thereof
CN205483810U (en) Coal mine tunnel anchor bolt support nondestructive test laboratory bench
CN101736761A (en) Indoor model test device by dynamic replacement method
CN106706754A (en) Experiment system and experiment method for mechanical vibration on cement slurry
CN204461905U (en) A kind of test unit testing static(al) shear property between pile tube and the slip casting soil body
CN107253263A (en) Behavior of Hardened Cement Paste test material preparation device of vibration cementing experiment and preparation method thereof
CN105758739A (en) Method for obtaining duration curve of early age shear strength of concrete intermittent surface
CN113341116A (en) Clay mixing amount estimation method for construction waste roadbed filler
CN105784506B (en) Pre-add shear stress test specimen, test material preparation device and method and diametral compression test method
CN104990839A (en) Permeability test device for sand-containing fog sealing layer material
CN209513456U (en) A kind of sxemiquantitative unconfined compressive strength tester
CN206633176U (en) A kind of assembly type die trial for the Civil Engineering Construction for being easy to be stripped
CN205475365U (en) Not drainage loading test device of fixed side limit embedded rock pile
CN105445050A (en) Caisson-type underwater separator high pressure cabin testing device and production method thereof
CN107860651A (en) Anchor pole load transfer analysis method
CN212722300U (en) Confining pressure device for soft crushed rock undisturbed sample triaxial compression test
CN209640179U (en) A kind of closely knit quality testing tool of concrete vibrating
Dahlberg et al. Continuum modeling of nodular cast iron using a porous plastic model with pressure-sensitive matrix–experiments, model calibration & verification