CN206942661U - A kind of flywheel energy storage low-carbon energy-saving pulling type workover rig - Google Patents
A kind of flywheel energy storage low-carbon energy-saving pulling type workover rig Download PDFInfo
- Publication number
- CN206942661U CN206942661U CN201720648536.3U CN201720648536U CN206942661U CN 206942661 U CN206942661 U CN 206942661U CN 201720648536 U CN201720648536 U CN 201720648536U CN 206942661 U CN206942661 U CN 206942661U
- Authority
- CN
- China
- Prior art keywords
- gear
- workover rig
- energy
- connection
- natural gas
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Earth Drilling (AREA)
Abstract
It is related to a kind of flywheel energy storage low-carbon energy-saving pulling type workover rig of Oil/gas Well development equipment, natural gas power unit, LNG tank, energy accumulation device for fly wheel, electric power management device, more gear gear shift winches, driller control house, derrick assembly are installed on workover rig trailer chassis, in the ride Middle face of trailer chassis, LNG tank is connected with natural gas power unit for described natural gas power unit and electric power management device.The utility model reduces fuel cost 20% using natural gas power unit as power, while realizes PM2.5 zero-emissions, and the state that consumed energy to workover rig monitors in fact, according to working condition, to electrical power storage or release, equipment integration transport, dismounting, installation and movement efficiency high.
Description
Technical field
It the utility model is related to a kind of oil-gas field development equipment.
Background technology
At present, domestic workover rig is more using diesel engine as power, drives gearbox or torque converter to drive winch by diesel engine,
Lower tubular column and workover treatment are realized.Sulfide, the nitrogen oxides of diesel engine discharge are PM2.5 important pollutants, instantly ring
Border pollution problem receives much concern, and energy-saving and emission-reduction are the task of top priority.Country vigorously advocate the background of energy-conserving and environment-protective under, workover rig with
The inexpensive clean energy resource such as natural gas is that power turns into following development trend.
During conventional workover rig raising tubing string, oil pipe hoisting time accounts for whole cycle 1/4, and shackle, put it is single etc.
Subsidiary operation time accounts for 3/4, and diesel engine is under low load or empty loaded-up condition and run in this time, and diesel engine operating is economical
Property it is poor, its oil consumption rate be higher than full load under oil consumption rate, cause energy significant wastage, and accelerate the abrasion of equipment.
For existing workover rig in lower tubular column, there is serious energy dissipation phenomenon.Oil pipe is thus lifted to ground from underground
Store sizable potential energy.The potential energy stored during lower drain line will discharge, and existing workover rig can not reclaim these energy,
It can only be consumed by brake block, not only waste energy but also caused the pad wear that brakes.
Domestic workover rig is mostly self-propelled, in addition to workover treatment power is configured, is provided with the engine on driving chassis.Should
Engine is in workover treatment and without using causing power waste, well workover team also needs optional equipment special vehicle human pilot.
The content of the invention
The purpose of this utility model is to provide a kind of flywheel energy storage low-carbon energy-saving pulling type workover rig, and it is a kind of solution
The problems such as existing pollution of existing workover rig is big, energy dissipation, and the workover rig of energy energy storage.
Technical scheme is used by the utility model solves its technical problem:
Natural gas power unit, LNG tank, energy accumulation device for fly wheel, electric energy management dress are installed on the trailer chassis of workover rig
Put, multi gear gear shift winch, driller control house and derrick assembly, it is characterised in that:Natural gas power unit and electric energy management
Device is installed on trailer chassis ride Middle face, is parallel transversely disposed;LNG tank is mounted left in trailer chassis main longitudinal grider by support
Side, it is connected by pipeline with natural gas power unit, fuel is provided for it;After driller's control room is installed in trailer chassis left side
Portion, derrick assembly are arranged on trailer chassis afterbody, electric power management device input by cable respectively with generator, flywheel energy storage
Device connects, and the motor on output end connection multi-gear gear-case, driller's control is installed on by the control unit of control cable connection
In room.
Multi gear gear shift winch, which is bolted, is installed on trailer chassis postmedian, is become by motor, shaft coupling, more gears
Fast case, master rotor and auxiliary brake composition, motor output shaft input axis connection, multi-gear transmission by shaft coupling and multi-gear gear-case
Case output shaft is integrated altogether with master rotor central shaft, and the master rotor central shaft other end is connected with auxiliary brake.
One end of steel wire rope is connected with master rotor, and the other end is connected after overhead traveling crane on derrick assembly with hook block, trip
Car hook is connected with tubing string.
The beneficial effects of the utility model:
1. workover rig uses integrated trailer transportation, dismounting, installation and movement efficiency high, when reducing operation preparation
Between, realize that more workover rigs share a tractor, reduce drilling team's special vehicle human pilot.
2. the application of natural gas power unit can reduce fuel cost about 20%, while the row of pollution synthesis is greatly decreased
Put, realize PM2.5 zero-emissions.
3. workover rig configures energy accumulation device for fly wheel, the electric energy that gap generator is sent between storage operation, in high-power riser
Discharged during post, make up power swing, engine can be made to operate at greater efficiency all the time.
4. tubing string can be transferred to the part potential energy discharged to be converted into electric energy and be used, greatly reduce and repair
Well operations cost.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is Fig. 1 top view;
Fig. 3 is more gear gear shift winch structure schematic diagrames;
Fig. 4 is utility model works state diagram.
Embodiment
The utility model is described in further detail by 1-3 below in conjunction with the accompanying drawings.
In Fig. 1-2:Natural gas power unit 5, LNG tank, energy accumulation device for fly wheel 4, electricity are installed on the trailer chassis 3 of workover rig
Can managing device 6, more gear gear shift winches 7, driller control house 8, derrick assembly 16, natural gas power unit 5 and electric energy pipe
Reason device 6 is installed on the ride Middle face of trailer chassis 3, is parallel transversely disposed, LNG tank is mounted in trailer chassis 3 by support
On the left of main longitudinal grider, it is connected by pipeline with natural gas power unit 5, provides fuel for it, driller control house 8 is arranged on trailer bottom
The left side postmedian of disk 3, derrick assembly 16 are installed on the afterbody of trailer chassis 3, pass through cable point by the input of electric power management device 6
It is not connected with generator, energy accumulation device for fly wheel 4, the motor 11 on output end connection multi-gear gear-case 9, its control unit is installed on
In driller control house 8, by control cable connection.
In Fig. 3:More gear gear shift winches 7 are bolted the postmedian in trailer chassis 3, by motor 11, shaft coupling
Device 10, multi-gear gear-case 9, master rotor 13, auxiliary brake 12 form, and the output shaft of motor 11 passes through shaft coupling 10 and multi-gear gear-case
9 input axis connections, the output shaft of multi-gear gear-case 9 is integrated with the central shaft of master rotor 13, the central shaft other end of master rotor 13 with it is auxiliary
Help the connection of brake 12.
In Fig. 4:One end of steel wire rope 14 is connected with master rotor 13, the other end after the overhead traveling crane of derrick assembly 16 with tourist bus
Hook 15 is connected, and hook block 15 is connected with tubing string 17.
Between workover rig well site during movement, tractor 1 is connected by towing pin 2 with trailer chassis 3;Transport to well site well head pair
In after, tractor 1 disengages with exclusive trail car chassis 3;Every well workover team 3-5 platforms workover rig can be equipped with a tractor 1.
Workover treatment provides power by natural gas power unit 5 for complete machine, and during raising 17 operation of tubing string, operating personnel are taking charge of
Bore control electric power management device 6 in control room 8 and send promotion signal, natural gas power unit 5, energy accumulation device for fly wheel 4 are jointly
Motor 11 provides electric energy, drives it to rotate forward.After proposing a tubing string 17, stop powering to motor 11, auxiliary brake 12 is stopped
Firmly master rotor 13.Now, energy accumulation device for fly wheel 4 starts the electric energy that natural gas-storing generating set 5 is sent, for next of lifting
Used during tubing string, make up power swing.Shaft mouth operation work connects hook block 15 and next tubing string in well head, and entrance is next
The circulation of raising tubing string 17.
When transferring tubing string operation, operating personnel control electric power management device 6 to send lower discharge signal, and tubing string pulls steel wire rope 14
Move downward, drive master rotor 13 to reversely rotate, invert and generate electricity through the drive motor 11 of multi gear speed-changing gear box 9, the electric energy sent
It is stored in energy accumulation device for fly wheel 4;After the completion of single tubing string decentralization, motor 11 stops operating, and shaft mouth operation work connects another
Tubing string, energy accumulation device for fly wheel 4 discharge electric energy, and motor 11 is rotated forward, and hook block 15 is promoted into high position, operation work
The new tubing string other end is connected with former wellhead column, into the circulation of next decentralization tubing string.The operation process realizes decentralization
Tubing string potential energy reclaims.
Claims (3)
- A kind of 1. flywheel energy storage low-carbon energy-saving pulling type workover rig, in the trailer chassis of workover rig(3)Upper installation natural gas power Unit(5), LNG tank, energy accumulation device for fly wheel(4), electric power management device(6), multi gear gear shift winch(7), driller control house (8), it is characterised in that:Natural gas power unit(5)With electric power management device(6)It is installed on trailer chassis(3)Ride Middle face, It is parallel transversely disposed;LNG tank is mounted in trailer chassis by support(3)On the left of main longitudinal grider, pass through pipeline and natural gas generator Group(5)Connection, driller control house(8)It is installed on postmedian on the left of trailer chassis, derrick assembly(16)Installed in trailer chassis(3) Afterbody, electric power management device(6)Input by cable respectively with generator, energy accumulation device for fly wheel(4)Connection, output end connection Multi-gear gear-case(9)On motor(11), driller control house is installed on by the control unit of control cable connection(8)It is interior.
- A kind of 2. flywheel energy storage low-carbon energy-saving pulling type workover rig according to claim 1, it is characterised in that:More gear gears Speed-changeable winch(7)It is bolted and is arranged on trailer chassis(3)Postmedian, by motor(11), shaft coupling(10), multi-gear transmission Case(9), master rotor(13), auxiliary brake(12)Composition, motor(11)Output shaft passes through shaft coupling(10)With multi-gear gear-case(9) Input axis connection, multi-gear gear-case(9)Output shaft and master rotor(13)Central shaft is integrated, master rotor(13)The central shaft other end With auxiliary brake(12)Connection.
- A kind of 3. flywheel energy storage low-carbon energy-saving pulling type workover rig according to claim 1, it is characterised in that:Steel wire rope (14)One end and master rotor(13)Connection, the other end pass through derrick assembly(16)After upper overhead traveling crane with hook block(15)Connection, Hook block(15)With tubing string(17)Connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720648536.3U CN206942661U (en) | 2017-06-06 | 2017-06-06 | A kind of flywheel energy storage low-carbon energy-saving pulling type workover rig |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720648536.3U CN206942661U (en) | 2017-06-06 | 2017-06-06 | A kind of flywheel energy storage low-carbon energy-saving pulling type workover rig |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206942661U true CN206942661U (en) | 2018-01-30 |
Family
ID=61362692
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720648536.3U Active CN206942661U (en) | 2017-06-06 | 2017-06-06 | A kind of flywheel energy storage low-carbon energy-saving pulling type workover rig |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206942661U (en) |
-
2017
- 2017-06-06 CN CN201720648536.3U patent/CN206942661U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204571836U (en) | Double power vehicle-mounted workover rig | |
CN104775754B (en) | A kind of pole disc type drifter with booms | |
CN206942684U (en) | A kind of super capacitor energy-storage net electricity pulling type workover rig | |
CN206942678U (en) | A kind of super capacitor energy-storage low-carbon environment-friendly pulling type workover rig | |
CN206942661U (en) | A kind of flywheel energy storage low-carbon energy-saving pulling type workover rig | |
CN206942682U (en) | A kind of flywheel energy storage low-carbon environment-friendly Self propelled type well repairing machine | |
CN103130121A (en) | Hydraulic rope guiding system applicable to drill well winch and hydraulic rope guiding method applicable to drill well winch | |
CN206942659U (en) | A kind of flywheel energy storage self power generation Self propelled type well repairing machine | |
CN102701093B (en) | Mechanically-driven double-gear winch for casing drilling machine | |
CN206942679U (en) | A kind of electricity-saving energy storage drives pulling type workover rig | |
CN206942686U (en) | A kind of super capacitor energy-storage low-carbon energy-saving pulling type workover rig | |
CN206942677U (en) | A kind of flywheel energy storage net electricity Self propelled type well repairing machine | |
CN207110996U (en) | A kind of flywheel energy storage low-carbon environment-friendly pulling type workover rig | |
CN206942681U (en) | A kind of flywheel energy storage low-carbon energy-saving Self propelled type well repairing machine | |
CN202441281U (en) | Energy-saving hydraulic mechanism for workover rigs | |
CN206942683U (en) | A kind of super capacitor energy-storage net electricity Self propelled type well repairing machine | |
CN205772993U (en) | It is applicable to the twin-roll well drilling hoist of double-wellhead operation | |
CN206942680U (en) | A kind of flywheel energy storage self power generation pulling type workover rig | |
CN206942675U (en) | A kind of super capacitor energy-storage self power generation pulling type workover rig | |
CN203285333U (en) | Full hydraulic rotation lifting type vehicle-mounted drilling and workover rig | |
CN206942662U (en) | A kind of super capacitor energy-storage self power generation Self propelled type well repairing machine | |
CN1210488C (en) | Wheel type hydraulic drifting machine | |
CN205025379U (en) | Electronic workover rig of on -vehicle compound power | |
CN206942685U (en) | A kind of super capacitor energy-storage low-carbon environment-friendly Self propelled type well repairing machine | |
CN206942660U (en) | A kind of flywheel energy storage net electricity pulling type workover rig |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |